C7_Att08_Bid_Form.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- N0025326Q0011
About this file
This is a Bid Form template for solicitation N0025326Q0011 for construction and renovation services at Naval Undersea Warfare Center (NUWC) Keyport, Washington. The form requires contractors to provide detailed pricing for two separate CLINs: Building 206 Lab Upgrade and Building 233 Restroom & Breakroom Renovation. Contractors must submit line-item pricing broken down by quantity, unit rate, and costs for materials, labor, and equipment for each task, with formulas calculating subtotals. The form includes example rows demonstrating the expected level of detail for an air handler installation and site mobilization/demobilization, which are provided for guidance only and must be deleted prior to submission. Additionally, the form requires contractors to account for subcontractor performance value, prime contractor and project management costs, and overhead and profit calculations including general home office overhead, field overhead, general and administrative expenses, profit margin, and bonding costs.
Contractors must complete all sections in accordance with the Statement of Work and adhere to the government's requirement that all formulas in total cells be preserved as formulas rather than hard-entered values. The solicitation is a 100% small business set-aside under NAICS code 238390 with a size standard of $19,000,000. Offerors must provide FOB Destination pricing to NUWC Keyport, WA 98345, and all quotes must be submitted via email to dane.a.jacobson3.civ@us.navy.mil and carly.beadle.civ@us.navy.mil. Company quote forms will not be accepted; all vendor offer details must be documented within this RFQ bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C7_PPI_Answers_Amendment0001.docx | DOCX document | |
| C7_Att12_206_233_SOW_Rev1.pdf | ||
| C7_PPI_Answers_Amendment0001.docx | DOCX document | |
| N0025326Q0011_Amendment0001.pdf | ||
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att01_Equipment_In_Place.xlsx | XLSX spreadsheet | |
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| Solicitation - N0025326Q0011.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att10_Safety_Data_Sheet.docx | DOCX document | |
| C7_Att12_Bldg206_and_Bldg233_SOW.pdf | ||
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att09_PPI_Form.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025326Q0011 | Contractor: | |
| PID Description: | Building 206 Lab Upgrade and Building 233 Restroom & Breakroom Rennovation | Date: | |
| Project Location: | Naval Undersea Warfare Center, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | CLIN 0002 | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | ||
| Building 206 Lab Upgrade | Building 233 Restroom & Breakroom Rennovation | ||||||||||||||||
| ITEM | DESCRIPTION OF TASKS | ITEM | DESCRIPTION OF TASKS | ||||||||||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||||
| B (example) | Site mobilization/demobilization | $0.00 | B (example) | Site mobilization/demobilization | $0.00 | ||||||||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||||
| 1 | 1 | ||||||||||||||||
| 2 | 2 | ||||||||||||||||
| 3 | 3 | ||||||||||||||||
| 4 | 4 | ||||||||||||||||
| 5 | 5 | ||||||||||||||||
| 6 | 6 | ||||||||||||||||
| 7 | 7 | ||||||||||||||||
| 8 | 8 | ||||||||||||||||
| 9 | 9 | ||||||||||||||||
| 10 | 10 | ||||||||||||||||
| 11 | 11 | ||||||||||||||||
| 12 | 12 | ||||||||||||||||
| 13 | 13 | ||||||||||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | ||||||||||||||
| Subcontractor Performance Value | Subcontractor Performance Value | ||||||||||||||||
| Prime Contractor & Project Management Costs | Prime Contractor & Project Management Costs | ||||||||||||||||
| Subtotal | Subtotal | ||||||||||||||||
| General Home Office Overhead (%) | General Home Office Overhead (%) | ||||||||||||||||
| General Field Overhead (%) | General Field Overhead (%) | ||||||||||||||||
| General and Administrative (%) | General and Administrative (%) | ||||||||||||||||
| Profit (%) | Profit (%) | ||||||||||||||||
| Bond | Bond | ||||||||||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount | CLIN 0001 Firm Fixed Price Proposal Amount |
File details come from the government source that posted it. Updated .