This is an Excel spreadsheet documenting equipment currently in place at the facilities subject to the renovation projects.

The file serves as an inventory attachment for the Building 206 Lab Upgrade and Building 233 Breakroom Renovation solicitation. It functions as a reference document for offerors to understand existing equipment and infrastructure at Naval Undersea Warfare Center (NUWC) Keyport facilities in Keyport, Washington. The spreadsheet provides detailed information about equipment locations, specifications, and current conditions that contractors should account for during project planning and execution. This inventory is essential for offerors to accurately scope work, identify potential conflicts with existing installations, plan around operational equipment, and develop comprehensive pricing for the renovation and upgrade work. The equipment listing helps ensure that quotations address site-specific conditions and that contractors understand the existing infrastructure they will be working within or around during the construction and renovation activities.

View the file

Other files

File Type Posted
C7_PPI_Answers_Amendment0001.docx DOCX document
C7_Att12_206_233_SOW_Rev1.pdf PDF
N0025326Q0011_Amendment0001.pdf PDF
C7_PPI_Answers_Amendment0001.docx DOCX document
C7_Att02_Wage_Determination.pdf PDF
Solicitation - N0025326Q0011.pdf PDF
C7_Att05_OPSEC_Guide.pdf PDF
C7_Att10_Safety_Data_Sheet.docx DOCX document
C7_Att03_Safety_Requirements_for_Contractors.pdf PDF
C7_Att04_Contractors_Guide_to_Env_Compliance.pdf PDF
C7_Att06_Schedule_of_Values.xlsx XLSX spreadsheet
C7_Att12_Bldg206_and_Bldg233_SOW.pdf PDF
C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C7_Att07_Past_Performance_References.docx DOCX document
C7_Att09_PPI_Form.docx DOCX document
C7_Att08_Bid_Form.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:N0025326Q0011 (Solicitation Number)
Project Title:Bldg. 206 Lab Upgrade and 233 Restroom Renovation
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Bldg. 206 Lab Upgrade
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .