N0025324R50020004.pdf
PDF 147 KB Posted
- Attached to
- Bldg. 894 - Create Bldg. Security Boundary Federal contract opportunity
- Solicitation number
- N0025324R5002
About this file
This document is an Amendment to Solicitation N0025324R5002, which is for construction services to upgrade Building 894 to create a secure building boundary. The amendment addresses questions received and provides clarifications, including confirming that the Superintendent may serve as the Site Safety and Health Officer, that no temporary heating/cooling is required, and that card readers are no longer part of the scope. The amendment also extends the proposal due date to 23-Jul-2024 at 10:00 AM. The solicitation is a 100% small business set-aside, and the Government anticipates awarding a single firm-fixed-price contract under FAR Parts 15 and 36. The key scope of work includes adding security bars to ductwork, door removal and wall infill, capping tube skylights, welding door hinges, adding security locks, and installing emergency eyewash stations and compressed gas bottle racks.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_Wage_Determination_07122024.pdf | ||
| N0025324R50020005.pdf | ||
| N0025324R50020003.pdf | ||
| N0025324R50020002.pdf | ||
| N0025324R50020001.pdf | ||
| Attachment_5_Bid_Form.docx | DOCX document | |
| Attachment_7_Past_Performance_References.docx | DOCX document | |
| Attachment_12_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| Attachment_10_OPSEC_Guide_for_Defense_Contractors_2016.pdf | ||
| N0025324R5002.pdf | ||
| Attachment_4_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| Attachment_8_Safety_Data_Sheet.docx | DOCX document | |
| Attachment_13_Wage_Determination.txt | TXT text file | |
| Attachment_6_PPI_Form.docx | DOCX document | |
| Attachment_1_MaterialEquipment_In-Place_List.xlsx | XLSX spreadsheet | |
| Attachment_9_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| Attachment_11_NAVSEA_Guide_to_Environmental_Compliance_Requirements.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to address PPI and provide responses resulting from amendment P0003 to extend the proposal due date. This amendment also corrects the proposal due time to remove ambiguity. The point of contact for this amendment is James Wasson at james.k.w asson.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025324R5002
X 9B. DATED (SEE ITEM 11)
28-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2024
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: JAMES WASSON
JAMES.K.WASSON.CIV@US.NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025324R5002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been modified:
PPI AND RESPONSES
Amendment 0002
Inquiry 1. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
See section 2.5 Management and Administration A full-time site Superintendent and a full-time Quality Control (QC) representative are required to be on site for the duration of the project. The Superintendent may serve as the Site Safety and Health Officer (SSHO) as long as all requirements in Section 5.4 (Governmental Safety Requirements) are met.
Inquiry 2. (If building is occupied) Are there any phasing requirements? How many people will be in the building? Are there any temporary heating/cooling requirements?
No phasing is required. No temporary heating/cooling provided by the contractor is required but outages to the AHUs feeding occupied spaces outside the construction zone will need to go through the outage process and duration will need to take into account those spaces being occupied.
Inquiry 3. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Amendment 0001 clarified period of performance to 270 calendar days. Based on the scope of work and government market research, no long lead times are anticipated for material/equipment on this project. If something comes up after award, it would need to be negotiated through the changes clause with the KO.
Inquiry 4. Concerning the duct security bars, threaded steel bars are shown being installed in one direction. Is this the intent or are bars to be installed both horizontally and vertically?
Bars are only required in one direction.
If the bars are to be installed both horizontally and vertically, are they to be affixed to each other at the point that they intersect? NA
If these intersections are to be affixed. In which manner are they to be affixed? NA
Inquiry 5. Paragraph 4. Physical Security Upgrades, viii. Is not redlined, which discusses the card reader.
However, the card readers are redlined in Table VIII-1 Door Security Requirements. Can you confirm the card readers are removed from the scope?
Card readers are no longer part of the scope. Paragraph 4. Physical Security Upgrades, table note viii is no longer needed and is redlined.
Amendment 0004
Inquiry 1. Please confirm adding the deadbolts/sliding latch to secure the four existing roll up doors.
If locked and the button to open is pushed will this burn up the motor?
Confirmed.
Please confirm this is not against fire code for egress.
Confirmed. Roll up doors are not part of egress.
Inquiry 2 Please confirm no painting will be required for this project.
No painting is anticipated unless something is disturbed or damaged by the contractor during demolition/construction.
Inquiry 3 Please confirm surface mounted plumbing is acceptable.
Surface mount plumbing is acceptable.
Inquiry 4 Please confirm a demo of ceramic tile will be required please advise if new tile wall to wall will be required as the tile has been discontinued.
New tile wall will not be required. Any tiles damaged or removed shall be replaced with closest match possible.
If not, please advise to repair CMU to a finish condition.
Match existing CMU color and finish.
Inquiry 5 Please confirm no 3rd party testing will be required.
No 3rd Party testing is required.
Inquiry 6 Please confirm new completion time frame. 270 calendar days.
Amendment 001 deleted SOW V. 13. See block 11 of the solicitation
Inquiry 7 Please confirm that the CMU and GWB has been tested for asbestos containing materials If not, please advise if the contractor will be required to test.
See SOW VIII. 2. Building was constructed in 1984. No lead or asbestos is anticipated.
Inquiry 8 Please confirm that the government will provide THE LOCKING DEVICE for the roll up doors
Government is not providing any locks. Scope specifies provide and install.
Inquiry 9 Please confirm that anti tampering door hinges in replace of spot-welding hinges.
Contractor can choose to provide anit-tampering door hinges complying with Military Handbook 1013/1A in lieu of spot-welding existing hinges.
Inquiry 10 Please confirm all access control and badge readers have been deleted from this project.
Confirmed. Amendment 001 removed the two card readers (viii) from the table
Inquiry 11 Please confirm that a marble size epoxy puddle is required on the last nut for all duct security to eliminate all tampering
See SOW VIII. 4. A. Welded washers and nuts are required.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Jul-2024 12:00 AM to 23-Jul-2024 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .