Attachment_1_MaterialEquipment_In-Place_List.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Bldg. 894 - Create Bldg. Security Boundary Federal contract opportunity
Solicitation number
N0025324R5002
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document appears to be an equipment and material inventory list for a federal construction contract for Project Title: Bldg. 894 - Create Secure Building Boundary. The contract requires the contractor to provide security upgrades to Building 894, including adding security bars, removing and infilling doors, capping skylights, and installing emergency eyewash stations and compressed gas bottle racks. The inventory list details the existing installed equipment, including the asset numbers, descriptions, quantities, unit costs, manufacturers, model numbers, and serial numbers. It also includes columns for noting any removed equipment and the new installed equipment. The federal contract opportunity associated with this document is Solicitation Number N0025324R5002, a 100% small business set-aside for construction services to upgrade Building 894 and enhance its security. The government anticipates awarding a single firm fixed-price contract under FAR Parts 15 and 36.

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 894 - Create Bldg. Security Boundary, newest first.
File Type Posted
N0025324R50020005.pdf PDF
Attachment_12_Wage_Determination_07122024.pdf PDF
N0025324R50020004.pdf PDF
N0025324R50020003.pdf PDF
N0025324R50020002.pdf PDF
N0025324R50020001.pdf PDF
Attachment_5_Bid_Form.docx DOCX document
Attachment_7_Past_Performance_References.docx DOCX document
Attachment_9_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
Attachment_11_NAVSEA_Guide_to_Environmental_Compliance_Requirements.pdf PDF
Attachment_12_Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
Attachment_10_OPSEC_Guide_for_Defense_Contractors_2016.pdf PDF
N0025324R5002.pdf PDF
Attachment_4_Schedule_of_Values.xlsx XLSX spreadsheet
Attachment_8_Safety_Data_Sheet.docx DOCX document
Attachment_13_Wage_Determination.txt TXT text file
Attachment_6_PPI_Form.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:
Project Title:Bldg. 894 Create Secure Building Boundary
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Bldg. 894 Create Secure Building Boundary
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .