Attachment_1_MaterialEquipment_In-Place_List.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Bldg. 894 - Create Bldg. Security Boundary Federal contract opportunity
- Solicitation number
- N0025324R5002
About this file
This document appears to be an equipment and material inventory list for a federal construction contract for Project Title: Bldg. 894 - Create Secure Building Boundary. The contract requires the contractor to provide security upgrades to Building 894, including adding security bars, removing and infilling doors, capping skylights, and installing emergency eyewash stations and compressed gas bottle racks. The inventory list details the existing installed equipment, including the asset numbers, descriptions, quantities, unit costs, manufacturers, model numbers, and serial numbers. It also includes columns for noting any removed equipment and the new installed equipment. The federal contract opportunity associated with this document is Solicitation Number N0025324R5002, a 100% small business set-aside for construction services to upgrade Building 894 and enhance its security. The government anticipates awarding a single firm fixed-price contract under FAR Parts 15 and 36.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0025324R50020005.pdf | ||
| Attachment_12_Wage_Determination_07122024.pdf | ||
| N0025324R50020004.pdf | ||
| N0025324R50020003.pdf | ||
| N0025324R50020002.pdf | ||
| N0025324R50020001.pdf | ||
| Attachment_5_Bid_Form.docx | DOCX document | |
| Attachment_7_Past_Performance_References.docx | DOCX document | |
| Attachment_9_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| Attachment_11_NAVSEA_Guide_to_Environmental_Compliance_Requirements.pdf | ||
| Attachment_12_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| Attachment_10_OPSEC_Guide_for_Defense_Contractors_2016.pdf | ||
| N0025324R5002.pdf | ||
| Attachment_4_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| Attachment_8_Safety_Data_Sheet.docx | DOCX document | |
| Attachment_13_Wage_Determination.txt | TXT text file | |
| Attachment_6_PPI_Form.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Bldg. 894 Create Secure Building Boundary | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Bldg. 894 Create Secure Building Boundary | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .