This document is an amendment to Solicitation N00244-24-R-0042 for Cryogenic Support Services. The amendment revises the Performance Work Statement and updates Attachment 12. The solicitation is a total small business set-aside for a commercial Firm-Fixed-Price contract to provide contractor support services for the receipt, storage, handling, and issue of liquid oxygen and liquid nitrogen to tenant and transient aviation activities at various naval installations. The period of performance includes a one-year base period and four one-year option periods. The applicable NAICS code is 561210 - Facilities Support Services. The amendment provides details on service hours, annual cryogenic throughput, and authorized customer information for each location. It also outlines contractor requirements for cryogenic storage and distribution, quality surveillance, maintenance, reporting, and other administrative tasks.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0024424R0042
N5702524RC00DCG
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) revise the PWS and 2) update attachment 12.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0024424R0042
X 9B. DATED (SEE ITEM 11)
08-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2024
CODE
NAVSUP FLC SAN DIEGO
REGIONAL CONTRACTS (CODE 200)
3985 CUMMINGS ROAD
BUILDING 116 - 3RD FLOOR
SAN DIEGO CA 92136-4200
N00244 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PERFORMANCE WORK STATEMENT
Performance Work Statement for
Commander, Naval Air Forces Installation Cryogenics Services Support
1.0 Introduction.
This Performance Work Statement (PWS) provides for support of cryogenic services to support flight operations at airfield installations required by Commander, Naval Air Force, U.S. Pacific Fleet, San Diego, CA and Commander, Naval Air Force, U.S. Atlantic Fleet, Norfolk.
The contract resulting from this Performance Work Statement is a "non-personal services contract" as defined in FAR 37.101. It is, therefore, understood and agreed that the contractor and/or the contractor's employees and subcontractors (1) shall perform the services specified herein as independent contractors, not as employees of the Government; (2) shall be responsible for their own management and administration of the work required and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract; (3) shall be free from supervision or control by any Government employee with respect to the manner or method of performance of the services specified; but (4) shall, pursuant to the Government's right and obligation to inspect, accept, or reject the work, comply with such general direction of the Contracting Officer, or the duly authorized representative of the Contracting Officer, as is necessary to ensure accomplishment of the contract objectives.
1.1 Performance locations:
A. Fleet Readiness Center Southwest Detachment Point Mugu (FRCSW DET PT MUGU). Cryogenics facility, Bldg. 348, NAS Pt Mugu, Naval Base Ventura County, CA, 93042- 5033.
B. Fleet Readiness Center Southwest Detachment North Island (FRCSW DET NASNI). Cryogenics Facility, Bldg. 399, NAS North Island, Naval Base Coronado, San Diego CA 92135-7051.
C. Fleet Readiness Center Southwest Detachment El Centro (FRCSW DET El Centro). Cryogenics Facility, Bldg. 204, NAF El Centro, El Centro CA, 92243-5001.
D. Fleet Readiness Center Mid-Atlantic Patuxent River (FRCMA Patuxent River). Cryogenics Facility, Bldg.
502, NAS Patuxent River, St Mary’s County MD, 20670- 5409.
E. Fleet Readiness Center West Detachment China Lake (FRCW DET China Lake). Cryogenics Facility, Bldg. 20174, NAWS China Lake, China Lake CA, 93555-6100.
F. Fleet Readiness Center Southeast Jacksonville (FRCSE Jacksonville). Cryogenics Facility, Bldg. 231, NAS Jacksonville, Jacksonville FL, 32212-0103 G. Fleet Readiness Center West Detachment Fallon (FRCW DET Fallon). Cryogenics Facility, Bldg. 330, NAS Fallon, Fallon NV, 89446-0001 H. Fleet Logistics Center San Diego (FLC SD) DET Lemoore. Cryogenics Facility, Bldg 191, NAS Lemoore, Lemoore, CA, 93246-0001
2.0 MANAGEMENT AND ADMINISTRATION
2.1 Knowledge and Skills:
The contractor must ensure that personnel assigned to all tasks have the requisite knowledge and skills to meet the performance standards for those tasks and comply with all Federal, State, DoD, Navy, and station/base regulations, instructions, guidelines, policy, and codes. All employees must be able to read and understand English (be literate) to the extent they can understand and follow oral instructions/directions, read and understand instructions, directives, regulations, operating procedures, detailed written orders, and training materials, and be capable of writing in English to compose required detailed reports. All employees must be capable of performing basic numeric operations (addition, subtraction, multiplication, and division) and the use of numbers as they relate to ledgers, logs, forms, meters, gauges, and measuring devices and other instruments as may be used during the receipt, handling, inventory and issue of cryogenic products.
2.2 Employment Standards:
All employees or persons who may be hired to represent, perform on behalf of, or work under the management of the contractor must comply with all Federal, State, DOD, Navy, and station/base regulations, instructions, guidelines, and policy regarding employment at and entry to base facilities. The contractor must ensure that they meet the requirements of employment and conform to the rules regarding, but not necessarily limited to, security, clearance, identification policy, vehicle registration and operation of a POV on station, medical assistance, the use of the exchange and military facilities, and other local rules, guidance, or prohibitions that may apply to their entrance to and activity or employment on station.
2.3 Security Clearance and Installation Access Requirements:
Contractor personnel performing work under this contract are not required to have or maintain a security clearance.
All hardware/software, system data, information and spaces are unclassified.
2.3.1 Contractor personnel will be required to have access to restricted facilities and computerized test equipment in support of this PWS, requiring issuance of a Common Access Card (CAC) by the government. A current favorably determined Tier III background investigation is required of all contractor personnel performing the technical requirements of this PWS. Contractor shall not disclose and must safeguard procurement sensitive information, computer systems and data, privacy act data, and government personnel work products that are obtained or generated in the performance of this task order.
2.3.2 The contractor Facility Security Officer (FSO) or representative shall submit a Visit Authorization Request (VAR) within the Defense Information System for Security (DISS) to validate the contractors’ employment and for CAC issuance. The VAR will be submitted prior to the contractor reporting to the command for the contracted assignment. The VAR shall include the following information:
a. Contractor's company name, address, telephone number, assigned CAGE Code, contract / delivery order number and expiration.
b. Government Sponsor
c. Name, date, place of birth, and citizenship of the employee(s).
d. Contractor employee/s email address (for CAC issuance).
e. Certification of the employees' background investigation type, and date investigation completed.
f. Purpose of visit.
2.3.3. Once the contractor employee has been properly vetted, an application for a Common Access Card (CAC) will be initiated by a Mission Partner Identity, Credential and Access Management Trusted Agent (MP ICAM TA).
The CAC will be used to gain physical access to DoD installations and logical access to DoD information assurance resources. This access will include Sensitive but Unclassified (SBU) and Personally Identifiable Information (PII).
When the CAC is no longer required, the Contractor or Program manager will recover the CAC from the Contractor employee and return the CAC to the MP ICAM TA or sponsor.
2.3.4. The contractor shall comply with all applicable DoD security regulations, policies and procedures during the performance of this task order. Contractor personnel on site will complete or participate in Government activity security awareness and active shooter training. The Contractor FSO shall refer to and follow the National Industrial Security Program Operating Manual (NISPOM) DoD 5220.22-M, DoD 5200.1R, DoD 5200.2-R Government security policies for security guidance.
2.3.5. The MP ICAM TA for this contract is Mr. Frank Nelson, CNAP N422A2, Email address:
frank.r.nelson3.civ@us.navy.mil, telephone: (619) 545-5370.
2.4 Records and Reports
Records and reports are listed in paragraph 4.0 of this work statement. The contractor shall submit accurate and complete documents within the required timeframes. Documents held or generated by the contractor must be open and readily available for inspection, review, and audit for the duration of the contract and any subsequent and contiguous contract periods. The contractor must submit reports to the appropriate agency for compliance with Federal, state, and local requirements. In addition, special reports may be requested for audits, inspections, reviews, and research.
2.5 Government Property Incidental to Performance
The Government will provide necessary office space, office furniture, common hand tools, telephone, and access to an ABO Analyzer and fax machine/scanner, when required to perform requirements of this services contract. The contractor must provide all administrative supplies and office equipment necessary to undertake the administrative and records keeping functions required by the contract except forms, software, or equipment specified as being provided by another source. Lost, damaged, destruction or theft (LDD&T) of Government property shall be reported to the COR not later than one (1) workday after discovery utilizing DD Form 200.
2.6 Joint Property Inventory (CDRL 04)
At contract turnover, the Outgoing and Incoming contractor and the COR/TPOC will conduct a joint inventory of all on-site furnished facilities, systems, equipment, supplies, and other property. They will jointly validate the list of facilities and equipment to be utilized by the contractor for the contract performance period. An inventory listing signed by the contractor must be provided to the COR within 10 days of the contract start date.
2.7 Annual Inventory (CDRL 01)
The contractor must account for all properties, maintain records, and submit a report of on-site property in the custody of the contractor annually on the anniversary date of the contract start date. The report must be forwarded to the COR not later than 30 days after contract award. The contractor's report must provide a complete inventory of on-site furnished property under its custody. The contractor must identify all property deleted and received since the preparation of the last inventory and provide copies of source documents.
2.8 Disposition of Property
The contractor must request disposition instructions from the COR for property. See FAR 52.245-1.
3.0 REQUIREMENTS
3.1 Cryogenic Storage and Distribution
Cryogenics Storage and Distribution Operations: Cryogenic storage and distribution operations are defined as the receipt, storage and handling, and issue of cryogenic products, liquid oxygen (LOX), liquid nitrogen (LN2), and gases, to authorized customers. The contractor must be fully responsible for performing all cryogenic bulk handling, quality, accounting, and administrative functions, and safeguarding the facilities, equipment, and products under its care.
3.1.1 Accounting Report: (CDRL 02)
The contractor must log the receipt of bulk LOX / LN2 and issue of LOX / LN2 products to authorized customers for the duration of the contract. Receipt of bulk LOX / LN2 shall include date, time, quantity and type product. Issue of LOX / LN2 shall include date, container drop off time, pick up notification time, customer name, customer activity/command, quantity and type product. The receipt and issue log shall outline receipt and issue data for the month and cumulative data for the fiscal year. The report shall be forwarded to the COR NLT the 10th of each calendar month.
3.1.2 Authorized Cryogenics Customers:
Appendix A identifies the customer organizations authorized for the issue of LOX / LN2 products under this contract.
3.2 Cryogenics Quality Surveillance and Control
The contractor must obtain LOX samples and perform quality surveillance testing using the government provided ABO Analyzer. The contractor shall contact the COR if samples fail to meet standards or the on-station ABO analyzer is not in service. The government is responsible for transportation of samples to/from the Cryogenics Compound to/from off compound testing facilities. The contractor must maintain a log of samples drawn and tested or submitted to an outside laboratory for testing, and the test results. Copies of the test result forms must be maintained on file and available to the COR on request for the duration of the contract.
Performance standard:
a. LOX samples are tested as required, documentation logs are accurate and up to date.
b. Zero major discrepancies discovered affecting product quality during random spot checks by the COR or formal inspections conducted by the Fleet Readiness Center (FRC) Quality Assurance Incentive: A monthly rating score will be assessed on the Monthly Assessment Form. A score of Excellent will be assessed if each month the samples and documentation are accurate and up to date, zero major discrepancies discovered and less than three (3) minor discrepancies discovered during COR spot checks or Quality Assurance Inspections. A score of Unsatisfactory will be assessed if LOX samples are not tested or documented as required, and/or a major discrepancy affecting product quality is discovered.
3.3 Cryogenic Services Operating Hours:
Appendix A identifies the Cryogenic Service hours required at each site.
3.3.1 Down days / Rescheduling:
From time to time, the Government may decide or be forced to close all or part of the Government installation or Facility in response to an unforeseen emergency or other occurrence such as a furlough. Sample emergencies include, but are not limited to, adverse weather such as snow or flood, an act of God such as a tornado or earthquake, or a base disaster such as a natural gas leak or fire. The contractor shall be officially dismissed upon notification of installation or facility closure. The contractor shall promptly secure all government furnished property appropriately and evacuate in an expedient but safe manner.
If a closure of the installation or facility results in lost service hours, the COR may reschedule tasks to a later date.
This will be coordinated through the contractor prior to being worked.
3.4 Product Issue Response Time:
The contractor shall issue LOX / LN2 products to authorized customers within two (2) hours from the time a customer’s LOX / LN2 container is received at the cryogenics facility for servicing by the contractor. Customers will transport LOX and/or LN2 containers to the cryogenics facility forservicing and return when notified by the contractor that the customers container is ready for pick up. Issue response times in excess of two (2) hours must be fully and accurately recorded and explained in the cryogenics accounting log.
Performance Standard: LOX / LN2 products are issued to customers within two (2) hours of the customer’s container being transported to the cryogenics facility.
Incentive: A monthly rating score will be assessed on the Monthly Assessment Form. A score of Excellent will be assessed if over 50% of the customers were issued cryogenic products within 90 minutes and zero customers waited longer than two (2) hours. A score of Unsatisfactory will be assessed if product issue to 10% or more of the customers exceeded two (2) hours.
3.5 Cryogenics Safety Plan:
The contractor must provide a detailed plan outlining the cryogenic systems applicable to the contracted locations, product handling characteristic, and the policy, procedures, and actions necessary to maintain a safe working environment. The plan, a compendium of references, local laws, and regulations applicable to the products stored and handled, Safety Data Sheets, and guidelines regarding the safe handling of such products must be maintained and updated over the course of the contract.
3.6 Workload:
Appendix A identifies historic LN2 / LOX usage information for each site.
3.7 Buildings and Structures:
The contractor must ensure that all buildings, structures, and facilities used by or under contractor control are kept clean and sanitary. The contractor must sweep and mop floors, wash windows, and walls of occupied buildings or office spaces so as to present a clean, sanitary, and orderly appearance. Food storage and preparation areas must be maintained in an orderly and sanitary condition. Clothing locker and change areas must be kept orderly and clothing hung or kept in lockers. Maintenance and storage buildings must be kept in clean and orderly manner. Areas immediately around buildings for which the contractor is responsible must be kept free of debris. The contractor must not allow fire hazards, such as oily rags, loose paper, and trash to accumulate in or around buildings, structures, facilities, and areas used, occupied, or controlled by the contractor. The requirement for building/structure maintenance, i.e., electric, carpentry, and other skilled trade work must be documented and forwarded to the COR. The contractor must not alter any structure or allow it to be altered without explicit written approval by the COR. Pest and rodent control are the responsibility of the base. Requests for services must be forwarded to the COR. The use of insecticides and rodenticides by the contractor is prohibited unless authorized in writing by the COR.
3.8 Trash Removal:
The contractor must be responsible for the pick-up of all trash and debris within and around the cryogenic facility under its control and must dispose of all such trash and debris in local area containers/dumpsters. The Navy will dispose of the trash and debris placed within the containers/dumpsters provided.
3.9 Training Plan:
The Contractor must provide a comprehensive plan outlining training and objectives. The plan must list course and subject titles of materials to be used, a brief description of the subject, identify training sources, establish the frequency of training, and detail the method of monitoring plan compliance and record keeping. Training required by Federal, DoD, Navy, state, local references and laws, must be included.
3.10 Accident/Incident Reporting:
All duty related accidents and incidents which contract personnel are responsible or involved in must be reported to the COR immediately or, depending on the severity and circumstances, as soon as practical. All accidents and incidents must be fully documented and a copy of all initial draft and final accident/incident reports forwarded to the COR by the next workday.
3.11 Facility Security Plan: (CDRL 05)
The contractor must provide a facility security plan for maintaining the security of cryogenics compound, including contingency procedures for power outages, key control, and any contractor furnished equipment, tools, and materials.
3.12 Heightened Security:
The contractor must comply with Commander Navy Region policies to ensure mission accomplishment during heightened security postures at naval installations. To provide continuity of operations, the contractor must designate cryogenic services employees as essential personnel.
3.13 Tank/Equipment Maintenance (FRCSW DET El Centro, FRCSW DET NASNI, FRCW DET Pt Mugu, FRCW DET China Lake, FRCSE DET Jacksonville, FRCMA DET Patuxent River):
The Navy will be responsible for maintenance and repair of storage tanks, MNGG, Oxygen and Nitrogen Bottle Headers, and LAU-7/LAU-138 charging racks. The contractor must visually inspect the exterior of storage tanks on a reoccurring basis and notify the COR in writing when excessive mold, dirt and rust are discovered.
3.14 Tank/Equipment Maintenance (FRCW DET Fallon): The contractor shall perform the below scheduled inspections when initiated by FRCW DET Fallon Production Control and document completion on the pre-printed Maintenance Action Forms provided. Technical publications, tools and replacement parts necessary to perform inspections will be provided.
3.14.1-ANALYZER, AVIATORS BREATHING OXYGEN (ABO)
MODEL A/E26T-3A, P/N 3964AS100-2, S/N CPM052, IMRL 4300024981
IAC WITH NAVAIR 17-600-767-6-2:
o 14-Day Inspection:
Instrument Verification (Card 1.0); 1.0 hour o 56-Day Inspection:
FTIR Desiccant Inspection/Replacement (Card 2.0); 1.5 hours Vacuum Pump Oil Level (Card 3.0); 1.0 hour o 182-Day Inspection:
Bulk Purity Analyzer Filter Replacement (Card 4.0); 0.5 hours
3.14.2-1000/2000 GALLON OXYGEN/NITROGEN CRYOGENIC SERVICE SYSTEMS
MODEL A/F26A-9 1598AS100-2 (1000 GALLON NITROGEN), S/N QQS1003, IMRL 4300028822
MODEL A/F26A-8 1678AS100-1 (2000 GALLON OXYGEN), S/N QQR2005, IMRL 4300028820; S/N
QQR2017, IMRL 4300028821
IAC WITH NAVAIR 19-600-262-6-2:
o 28-Day Inspection:
Base & Enclosure (Cards 1-1.1); 0.8 hours Electrical System (Card 2); 0.8 hours o 91-Day Inspection:
Converter System Assembly (Card 3); 0.4 hours o 720-Day Inspection:
Calibration (Card 4); 0.5 hours o 1825-Day Inspection:
Relief Valves (Card 5); 0.5 hours
3.14.3-CRYOGENIC SERVICE SYSTEM
A/F26A-1, P/N 160021-3, S/N 30081-1, IMRL 4300028823
IAC WITH NAVAIR 19-600-206-6-2:
o 28-Day Inspections:
Base & Enclosure (Card 1); 0.3 hours Plumbing (Card 2); 1.5 hours Electrical System (Card 3); 0.4 hours Vacuum Indicator (Card 4); 0.5 hours o 91-Day Inspections:
Electrical (Card 5); 0.3 hours Converter System Assembly (Card 6); 0.5 hours Functional Check (Card 7); 1.0 hour o 182-Day Inspections:
Plumbing Components (Card 8); no time given Indicators/Controls (Card 9); 2.8 hours o 365-Day Inspections:
Lubrication (Card 10); 0.4 hours
3.14.4-AIR-NITROGEN PURIFIER
P/N 67A274D77, S/N 104039, IMRL 4300017552
IAC WITH NAVAIR 19-25D-20:
o Table 4-1, page 4-2
Daily, during operation:
Leakage test, operational check, visual inspection of system
12-month Interval:
Calibration of gauges o *NOTE: the time it takes to perform each test, check, and inspection is not listed in the technical manual and varies
3.14.5-MOBILE NITROGEN GAS GENERATORS
A/E26U-6A, P/N 3757AS100-2 (S/N TZX-032, IMRL 4300029477; S/N TZX-FA3, IMRL 4300029483)
IAC WITH NAVAIR 19-600-183-6-2:
o 100-Hour Interval:
Feed Air Compressor Inspection/Replacement (Card 1); 0.3 hours Oxygen Monitor Verification (Card 2); 0.5 hours o 500-Hour Interval:
Replace oil and oil filter (Cards 3-3.1); 0.5 hours Inspect/Replace Feed Air Compressor Drive Belts (Card 4); 0.5 hours Inspect/Replace Moisture Separator Filters (Card 5); 0.5 hours o 720-Hour Interval:
Corrosion and Lubrication Inspection (Cards 6-6.1); 1.0 hour o 1000-Hour Interval:
5th-Stage Piston Assembly Replacement (Card 7); 1.0 hour Heat Exchanger, Piping, and Hose Inspections (Cards 8-8.1); 0.5 hours Post Carbon Filter Differential Pressure Inspection (Card 9); 0.3 hours o 2000-Hour Interval:
4th-Stage Compression Assembly Replacement (Card 10); 1.0 hour 2nd-Stage Compression Assembly Replacement (Card 11); 1.0 hour o 3000-Hour Interval:
3rd-Stage Compression Assembly Replacement (Card 12); 1.0 hour 1st-Stage Compression Assembly Replacement (Card 13); 1.0 hour Post Desiccant Filter and Carbon Tower Filter Replacement (Card 14); 1.0 hour o 5000-Hour Interval:
Relief Valve Replacement (Card 15); 1.0 hour
3.14.6-GUIDED MISSLE COOLANT RECHARGING UNIT
GCU-30/E, P/N 8431336, S/N 137, IMRL 0020192585
IAC WITH AIR FORCE TO 35D18-5-1:
o SECTION V, pages 5-2 and 5-3, Table 5-2
7-Day Inspection:
Clean air line filter
60-Day Inspections:
Cleanliness, corrosion Loose connections, line or hose damage Operational check Replace desiccant cartridge
180-Day Inspection:
Calibrate gauges
360-Day Inspection:
Air Cycling Valve
4.0 DELIVERIES OF PERFORMANCE
The contractor shall provide the following reports as scheduled.
Specificatio n Item
Report Title
Frequency
Submit
Due Date
2.8 Annual Property
Inventory
Annually COR Annually on anniversary of contract start date
3.1.1 Accounting report Monthly COR NLT 10th of
following month
3.10 Accident/Incident
Report
As required COR As required
Appendix A
1. Cryogenic Service Hours:
Location Service Hours Service Days Notes:
FRCSW DET Pt Mugu 0730-1600 Mon - Fri Weekends and Federal Holidays excluded
FRCSW DET NASNI 0700-1530 Mon - Fri Weekends and Federal Holidays excluded
FRCSW DET El Centro 0700-1530 Mon - Fri Weekends and Federal Holidays excluded
FRCMA Patuxent River 0700-1530 Mon - Fri Weekends and Federal Holidays excluded
FRCW DET China Lake 0600-1600
0600-1600
0600-1500
Mon – Thur (Flex Week)
Mon-Thur (Non Flex Week)
Fri (Non Flex Week)
Weekends and Federal Holidays excluded
FRCSE Jacksonville 0700-1600 Mon - Fri Weekends and Federal Holidays
FRCW DET Fallon 0700-1530 Mon - Fri Weekends and Federal Holidays excluded
FLC SD DET Lemoore 0700-1530 Mon-Fri Weekends and Federal Holidays
2. Annual Cryogenic Throughput:
Location LOX (Gallons Monthly) LN2 (Gallons Monthly)
FRCSW DET Pt Mugu 650 200
FRCSW DET NASNI 670 1100
FRCSW DET El Centro 500 450
FRCMA Patuxent River 650 200
FRCW DET China Lake 350 260
FRCSE Jacksonville 1400 1900
FRCW DET Fallon 750 700
FLC SD DET Lemoore 700 1200
3. FRCSW DET PT Mugu Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center Southwest Detachment Point Mugu (FRCSW DET PT Mugu)
Location / Bldg
Description Quantity
348 CRYOGENIC FACILITY
348 Tank, Liquid Oxygen (LOX), 2000 Gallon
(1 EACH)
348 Tank, Liquid Nitrogen (LN2), 2000 Gallon
(2 EACH)
348 Oxygen Bottle Header (Non ABO) 1
348 Oxygen Bottle Header 1
348 Nitrogen Bottle Header 1
348 Bottle Storage Area, Covered and attached to building 348.
348 LAU-7/LAU-138 charging rack 1
348 Mobile Nitrogen Gas Generator
(MNGG) 1
NAWS PT MUGU TENANT SQUADRONS
Organization Type Aircraft Number
VR-55, Minutemen C-130T, 5
VAW112, Golden E-2C, 4
VAW113, Black E-2C, 4
VAW116, Sun Kings E-2C, 4
VAW117, E-2C, 4
VX-30, Bloodhounds RP-3A, Orion 4
C-130T, 5
S-3, Viking 3
Phoenix Air EMB-120, Gulfstream
Atac (Contract) F-21, KFIR 4
MK-58,
Hawker Hunter
L-39, 2
Carona Leasing Bell-206 1
Cessna-208 2
Bell-407 2
Firescout MQ-8C, UAV 7
VTUAV MQ-8B, UAV 4
Coast Guard MH-65, 2
Air Terminal / Visiting Aircraft
Various Transient
4. FRCSW DET NASNI Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center Southwest Detachment North Island
Location / Bldg
Description Quantity
399 CRYOGENIC FACILITY
399 Tank, Liquid Oxygen (LOX), 2000 Gallon
(1 EACH)
399 Tank, Liquid Nitrogen (LN2), 2000 Gallon
(2 EACH)
399 Oxygen Bottle Header (Non ABO) 1
399 Oxygen Bottle Header 1
399 Nitrogen Bottle Header 1
399 Mobile Nitrogen Gas Generator
(MNGG)
NAS NORTH ISLAND TENANT SQUADRONS
HSC-3 MH-60S 29
HSC-4 MH-60S 8
HSC-6 MH-60S 8
HSC-8 MH-60S 8
HSC-14 MH-60S 8
HSC-15 MH-60S 8
HSC-21 MH-60S 10
HSC-23 MH-60S 11
HSC-85 MH-60S 6
HSM-35 MH-60R 11
HSM-41 MH-60R 26
HSM-71 MH-60R 11
HSM-73 MH-60R 11
HSM-75 MH-60R 11
HSM-78 MH-60R 11
HSM-79 MH-60R 11
VR-57 C-40 4
VRC-30 C-2 14
FLIGHT Varies 8
ICE Kingair / H-60 8
BERRY AVIATION C-26 4
Air Terminal / Visiting
Various Transien t
5. FRCSW DET El Centro Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center Southwest Detachment El Centro (FRCSW DET El Centro)
Location / Bldg
Description Quantity
204 CRYOGENIC FACILITY
204 Tank, Liquid Oxygen (LOX), 2000 Gallon
204 Tank, Liquid Nitrogen (LN2), 2000 Gallon
204 Oxygen Cylinder Fill Manifold 1
204 Nitrogen Cylinder Fill Manifold 1
204 Mobile Nitrogen Gas Generator
NAF EL CENTRO TENANT SQUADRONS
CSFWP DET El Centro
T-34B 2
Blue Angels F/A-18 / C-130 Varies
Air Terminal / Visiting
Various Varies
6. FRCMA Patuxent River Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center Mid-Atlantic Patuxent River
(FRCMA Patuxent River)
Location Description Qty
502 CRYOGENIC FACILITY
502 LOX Tank, 2000 Gallon Vertical (Serial
Number – 5427, 5428)
502 LOX Tank, 1500 Gallon Vertical (Serial Number – C2031, C2206)
502 LOX Tank, 500 Gallon Horizontal (Serial Number – 2193)
502 LN2 Tank, 2000 Gallon Vertical (Serial Number – 5420, 5421, 5431)
502 Converter, LN2 (Serial Number – 23638-6)
502 Mobile Nitrogen Gas Generator (MNGG) (Serial Number – PZX003, PZX005)
502 Sampler, LOX (Serial Number – 0027, 0616) 2
NAS PATUXENT RIVER TENANT SQUADRONS
Force P-3, E-2, C-2, C-130, E-6, T-6, and T-34
Test Pilot School Various Varies
Strike F-18 35
R/W Helicopters 33
Naval Research P-3 7
VX-1 Various 17
E/F Program F-18 9
VQ-4 (TACAMO) E-6B 8
Joint Strike Fighter F-35 8
Transient Various Varies
7. FRCW DET China Lake Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center West Detachment China Lake (FRCW DET China Lake)
Location Description Qty
20174 CRYOGENIC FACILITY
20174 Tank, Liquid Oxygen (LOX) 2000 Gallon
20174 Tank, Liquid Nitrogen (LN2) 1000 Gallon
20174 LOX Tank, 500 Gallon Horizontal
(Serial Number – 2193)
20174 LN2 Tank, 2000 Gallon Vertical (Serial Number – 5420, 5421, 5431)
20174 Converter, LN2 (Serial Number – 23638-6)
20174 / Range
Mobile Nitrogen Gas Generator
(MNGG)
20174 Adapters 2
20174 Purifier 2
NAWS CHINA LAKE TENANT SQUADRONS
VX-9 F-18, ENGAD 19
VX-31 AV-8, F-18, MH-60,
ENGAD
8. FRCSE Jacksonville Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center Southeast Jacksonville (FRCSE Jacksonville)
Location Description Qty
231 CRYOGENIC FACILITY
231 Tank, Liquid Oxygen (LOX) 2000 Gallon 2
231 Tank, Liquid Nitrogen (LN2), 1000 gallon
231 Mobile Nitrogen Gas Generator
NAS JACKSONVILLE TENANT SQUADRONS
CUSTOMS C-12, PA42, H500 9
FRCSE F-18, T-34, P3 89
HSM-60 MH-60 7
HSM-70 MH-60 11
HSM-72 MH-60 11
HSM-74 MH-60 11
VP-30 P-3, P-8 18
VP-5 P-8 7
VP-8 P-8 7
VP-10 P-8 7
VP-16 P-8 7
VP-26 P-8 7
VP-45 P-8 7
VP-62 P-3 6
VR-58 C-40 3
VR-62 C-130T 5
9. FRCW DET Fallon Cryogenic Facility and Authorized Customer information:
Fleet Readiness Center West Detachment Fallon (FRCW DET Fallon)
Location Description Qty
330 CRYOGENIC FACILITY
330 Tank, Liquid Oxygen (LOX) 2000 Gallon
330 Tank, Liquid Nitrogen (LN2) 2000 Gallon (Permanently Out of Service)
330 Tank, Liquid Nitrogen, 1000 gallon 1
330 Mobile Nitrogen Gas Generator
(MNGG)
330 Nicolet 210 ABO Analyzer 1
330 GCU 30 Nitrogen Air Charging Unit 1
330 Air Nitrogen Purifier 1
NAS FALLON TENANT SQUADRONS
NAWDC F-18, F-16, MH-60, E-2, 55
VFC-13 F-5 22
CAGs (5 per year) F-18, MH-60, 50
OMD Fallon SAR MH-60 3
SFARP F-18, MH-60, T-34 50
10.FLC SD DET Lemoore Cryogenic Facility and Authorized Customer Information:
Fleet Logistics Center San Diego DET Lemoore (FLC SD DET Lemoore)
Location Description Qty
191 CRYOGENIC FACILITY
191 Tank, Liquid Oxygen (LOX) 2000 Gallon
191 Tank, Liquid Nitrogen (LN2) 2000 Gallon 1
191 Tank, Liquid Nitrogen, 1000 gallon 1
191 Mobile Nitrogen Gas Generator
(MNGG)
191 ABO Analyzer 1
191 Maintenance Rack (LAU’s) 2
191 Oxygen Samplers 2
191 Oxygen Bottle Header 1
191 Nitrogen Bottle Header 1
NAS LEMOORE TENANT SQUADRONS
FRCW F-18 / F-35 / T-34 MULTI
VFA-2 F-18 10
VFA-27 F-18 10
VFA-102 F-18 10
VFA-113 F-18 10
VFA-115 F-18 10
VFA-86 F-35 14
VFA-136 F-18 10
VFA-195 F-18 10
VFA-192 F-18 10
VFA-122 F-18 10
NAMCE F-18 10
NAWDC F-18 / F-35 25 / 8
VFA-97 F-35 14
VFA-125 F-35 19
(End of Summary of Changes)