Solicitation Amendment N0018926QL3420001 SF 30 (1).pdf
PDF 593 KB Posted
- Attached to
- Ceiling Tile Replacement
- Solicitation number
- N0018926QL342
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract, specifically Amendment 0001 to solicitation N0018926QL342, effective August 25, 2026. The amendment adds a revised Performance Work Statement (PWS) for facility ceiling tile replacement and grid repair/replacement services at Naval Station Norfolk, Building W143, located at 9550 Decatur Avenue, Norfolk, VA 23511.
The PWS requires the contractor to provide comprehensive ceiling system maintenance services including pre-work inspections, identification and repair of damaged or misaligned ceiling grid members, securing and leveling suspension systems with hanger wires, and replacement of all hallway ceiling tiles on the 1st, 3rd, and 6th floors. Hallway tiles must be replaced with Armstrong School Zone Fine Fissured 24"x48"x3/4" tiles (model 1714), while 3rd floor damaged tiles require matching tiles unique to that floor. The contractor must coordinate work around existing utilities (HVAC diffusers, lighting, fire sprinklers, life safety sensors), legally dispose of all old materials offsite with daily trash removal, maintain strict adherence to OSHA standards and USACE Safety Manual EM 385-1-1, and store new materials offsite for same-day installation. The Period of Performance runs from October 26, 2026 through January 31, 2027, with normal work hours of 0700-1600, Monday through Friday, excluding federal holidays. Work is performed at a federal military installation, and the contractor must submit an Accident Prevention Plan, Activity Hazard Analysis, and Quality Control Plan within 15 calendar days of award. Deliverables include safety documentation, weekly toolbox meeting minutes, material technical data sheets, and waste disposal receipts, with performance standards requiring 95% grid compliance, 98% defect-free tile installation, and 100% safety compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.07c.pdf | ||
| MASTER W-143-3-Model.pdf | ||
| 4.07b Amendment 0002.pdf | ||
| MASTER W-143-1 Model.pdf | ||
| MASTER W-143-6-Model.pdf | ||
| 1.03b Revised PWS.pdf | ||
| Solicitation - N0018926QL342.pdf | ||
| Wage Determination 2015-4341.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Continuation of Supplies or Services and Prices/Costs
Miscellaneous text in this section has been modified to:
PERFORMANCE WORK STATEMENT
(PWS)
FACILITY CEILING TILE REPLACEMENT AND GRID REPAIR/REPLACEMENT SERVICES
1.0 GENERAL INFORMATION
1.1 Background
The Federal Government requires professional facility support services to maintain safe, functional, and aesthetically appropriate interior environments across its real property inventory. Over time, suspended acoustic ceiling systems degrade due to building movement, humidity, utility maintenance access, and general wear. To preserve facility integrity, professional intervention is required to repair or in some cases replace structural grid suspension systems and replace all ceiling tiles due to them not matching, being damaged, stained, or missing.
1.2 Scope of Work
The Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and non-personal services necessary to perform ceiling grid repair, alignment, and acoustic ceiling tile replacement services as defined in this Performance Work Statement (PWS). The work includes, but is not limited to:
- Conducting pre-work inspections of ceiling systems.
- Identifying and repairing damaged, bent, or misaligned ceiling grid members (tees and mains).
- Securing and leveling the suspension grid system, including replacing or adding hanger wires.
- Replace grid that has sustained damage by being bent, missing, or is discolored and/or rusted on 1st, 3rd, and 6th floor hallways.
N0018926QL3420001
- Replace all hallway ceiling tiles on the 1st , and 6th floor hallways with Armstrong school zone fine fissured 24"x48"x3/4" (1714).3rd, On the 3rd floor hallways, replace all damaged ceiling tiles with matching tiles that are unique to that floor. Contractor will need to identify the 3rd floor ceiling tile and match the same brand, style, and color.
- Legally dispose of all old ceiling tiles and ceiling tile grid offsite. Trash needs to be removed from the worksite daily.
- Coordinating work around existing utility fixtures (HVAC diffusers, lighting fixtures, fire sprinklers, and life safety sensors).
- New ceiling tile and grid must be stored offsite and only brought to the worksite to be installed the same day.
- Enforcing strict adherence to federal, state, and local safety regulations, specifically including OSHA standards and the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1).
1.3 Period of Performance
The Period of Performance shall be 26 October, 2026 - 31 January, 2027
1.4 Place of Performance
The services shall be performed at Naval Station Norfolk, Building Number W143, and 9550 Decatur Avenue, Norfolk, VA23511.
1.5 Work Hours and Federal Holidays
- Normal Work Hours: All work shall be performed between the hours of 0700 and 1600, Monday through Friday, excluding Federal Holidays, unless otherwise approved by the COR.
- Federal Holidays: The Contractor is not required to perform routine services on the following federal holidays:
- New Year's Day
- Martin Luther King Jr.'s Birthday
- Washington's Birthday (Presidents' Day)
- Memorial Day
- Juneteenth National Independence Day
- Independence Day
- Labor Day
- Columbus Day
- Veterans Day
- Thanksgiving Day
- Christmas Day
2.0 DEFINITIONS AND ACRONYMS
- Acoustical Ceiling Tile (ACT): A ceiling tile made from sound-absorbing materials, typically mineral fiber, fiberglass, or composite materials, designed to lay within a suspended metal grid.
- Activity Hazard Analysis (AHA): A systematic project management and safety process used to identify hazards and establish controls for specific construction/maintenance tasks.
- Accident Prevention Plan (APP): A comprehensive, site-specific safety and health plan developed by the Contractor and approved by the Government prior to work initiation.
- Contracting Officer (CO): The federal official with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
- Contracting Officer's Representative (COR): An individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
- Deficiency: Any part of the work that fails to meet the performance standards, codes, or technical requirements established in this contract.
- EM 385-1-1: The United States Army Corps of Engineers (USACE) Safety and Health Requirements Manual, which prescribes safety and occupational health requirements for federal and military projects.
- Main Runner (Main Tee): The primary load-bearing metal channel in a suspended ceiling grid system.
- OSHA: The Occupational Safety and Health Administration.
- Performance Work Statement (PWS): A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms.
- Quality Control Plan (QCP): The Contractor's internal plan to self-inspect, monitor, and guarantee that all services meet PWS standards.
- Cross Tee: The secondary metal channels that snap into the main runners to form the grid pattern supporting the ceiling tiles.
3.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES (GFP/E/S)
3.1 Government Furnished Space (GFS)
The Government will provide the Contractor with reasonable access to the facility interior to execute the required services. No dedicated on-site storage space for materials or equipment is guaranteed unless coordinate and approved in writing by the COR.
3.2 Utilities
The Government will furnish electrical power (120V) and water from existing facility outlets for use by the Contractor solely for the execution of this contract. The Contractor shall conserve utilities and utilize safe, compliant connections.
3.3 Emergency Medical Services
The Government will provide first-response emergency medical services (e.g., local fire/rescue transport) at the Contractor's expense, if needed, during the performance of duties.
4.0 CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1 General
Except for those items specifically stated to be Government-furnished in Section 3.0, the Contractor shall furnish everything required to perform this contract. This includes all labor, supervision, materials (matching existing acoustic ceiling tiles and suspension grids), specialized tools, scaffolding, ladders, personal protective equipment (PPE), containment materials, and transport vehicles.
4.2 Material Specifications
- Ceiling Tiles:
-Material: Wet-formed mineral fiber
-Dimensions: 24" x 48" x 3/4" (nominal)
-Edge Profile: Square Lay-In (15/16")
-Surface Finish: Factory-applied latex paint with non-directional fine fissured visual
-Color: White
-Sound Absorption (NRC): 0.70
-Sound Blocking (CAC): 40
-Light Reflectance (LR): 82%
-Fire Performance: Class A (UL) -- Flame Spread 25 or under, Smoke Developed 50 or under
-Sag/Humidity Resistance: High humidity and sag resistance
-Sustainability: Bio-based content, meets ANSI S12.60 Classroom Guidelines
- Grid Components: Replacement grid components must match the existing grid profile, structural classification, and color.
- Hanger Wire: Galvanized carbon steel wire, minimum 12-gauge, compliant with ASTM C635/C635M.
5.0 SPECIFIC TASKS / PERFORMANCE REQUIREMENTS
The Contractor shall execute the tasks detailed below in a professional manner, minimizing disruption to federal personnel and facility operations.
5.1 Site Assessment and Preparation
- The Contractor shall inspect the designated work areas to identify any structural, electrical, mechanical, or plumbing obstructions above or within the ceiling system.
- The Contractor shall protect all existing facility assets (including walls, floors, carpeting, desks, IT infrastructure, and sensitive equipment) from dust, debris, and damage.
- The Contractor shall deploy drop cloths, heavy plastic sheeting, and dust curtains prior to removing any tiles or manipulating the ceiling grid.
5.2 Ceiling Grid Repair and Alignment
- Structural Integrity: The Contractor shall repair, reinforce, or replace bent, damaged, rusted, or structurally compromised grid sections.
- Leveling and Squaring: The Contractor shall level and square the grid network to a tolerance of no more than 1/8 inch over 10 feet.
- Suspension Support: The Contractor shall verify that hanger wires are secured to the building structure (not to conduits, pipes, or ductwork) at intervals not exceeding 4 feet on center, and within 8 inches of any grid splices or wall moldings, in accordance with ASTM C636.
5.3 Ceiling Tile Replacement
- Demolition and Removal: The Contractor shall carefully remove undamaged, damaged, stained, broken, warped, or mold-contaminated tiles.
- Precision Installation: The Contractor shall measure, cut, and fit new acoustical ceiling tiles seamlessly into the repaired grid.
- Fit and Appearance: Installed tiles must sit flat on the grid flanges with no visible gaps, warps, or uneven surfaces. Cut edges on perimeter tiles must be clean, straight, and properly supported by wall moldings.
5.4 Utility and Fixture Coordination
- The Contractor shall ensure that ceiling-mounted fixtures (HVAC registers/diffusers, lighting fixtures, exit signs, fire sprinklers, smoke detectors, and occupancy sensors) are not disturbed or compromised during grid alignment or tile replacement.
- Any ceiling tile cuts made around utilities or fixtures must be clean, tight, and professional, leaving no gaps exceeding 1/16 inch, unless otherwise governed by manufacturer installation requirements (e.g., sprinkler escutcheon plates).
- Heavy light fixtures or HVAC diffusers must be supported independently by hanger wires attached to the building structure; the Contractor shall notify the COR immediately if any utility fixture is found to be resting entirely on the ceiling grid without independent support.
5.5 Housekeeping and Waste Management
- The Contractor shall maintain a clean work area on a daily basis. All dust, tile fragments, grid scraps, and general waste must be cleaned up continuously.
- The Contractor shall perform a thorough vacuuming of the work area daily utilizing HEPA-filtered vacuum cleaners to capture fine mineral fiber dust.
- The Contractor shall clean up all sections of hallway being worked each day, to include cleaning off any dust that falls on hanging items on the walls, dust on the wall board itself, and all flooring to include baseboards.
- All generated waste shall be legally disposed of off-site at an authorized disposal facility. The Contractor shall provide disposal receipts or manifests to the COR upon request.
6.0 SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS
Compliance with safety standards is a critical performance metric for this contract. The Government will strictly enforce safety regulations, and any failure to comply may result in an immediate Stop Work Order at the Contractor's expense.
6.1 Regulatory Compliance Standards
The Contractor shall comply with all applicable Federal, State, and local safety and occupational health laws and regulations, including but not limited to:
- OSHA General Industry Standards: 29 CFR Part 1910
- OSHA Construction Industry Standards: 29 CFR Part 1926
- USACE Safety and Health Requirements Manual: EM 385-1-1 (current version in effect at time of award)
6.2 Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA)
- Accident Prevention Plan (APP): In accordance with EM 385-1-1, Section 01.A.12, the Contractor shall submit a written, site-specific APP to the Contracting Officer for approval within fifteen (15) calendar days after contract award. No on-site work shall begin until the APP is approved.
- Activity Hazard Analysis (AHA): In accordance with EM 385-1-1, Section 01.A.13, the Contractor shall prepare and submit an AHA for each phase of work (e.g., grid demolition, wire installation, tile fitting).
- The AHA shall define the activity being performed, identify the hazards associated with each step, and detail the specific safety controls, training, and PPE required to mitigate those hazards.
- The AHA shall be reviewed and signed by the Contractor's designated Competent Person and submitted to the COR for acceptance prior to commencing that specific phase of work.
6.3 Fall Protection and Ladder Safety
Since ceiling work requires elevated access, the Contractor must manage fall risks in strict compliance with OSHA 29 CFR 1926 Subpart M (Fall , , and and Protection) OSHA 29 CFR 1926 Subpart X (Stairways and Ladders) EM 385-1-1, Section 21 (Fall Protection) Section 24 (Safe
.Access, Ladders, and Scaffolding)
- Ladders: Only commercial-grade, non-conductive (Type IA or IAA fiberglass) ladders shall be used. Metal ladders are strictly prohibited.
Ladders must be inspected daily by a Competent Person.
- Scaffolding & Work Platforms: If rolling baker scaffolds or scissor lifts are utilized, they must be equipped with standard guardrails (top rails, mid-rails, and toe boards) and locking casters. Scissor lift operators must be fully trained and certified, utilizing appropriate fall restraint systems as required by EM 385-1-1 Section 21.H.
- Three-Point Contact: Employees must maintain three points of contact while climbing or descending ladders.
6.4 Personal Protective Equipment (PPE)
The Contractor shall ensure all employees are outfitted with, and properly utilize, the mandatory PPE required for the work environment in accordance with and :OSHA 29 CFR 1926 Subpart E EM 385-1-1, Section 05
- Head Protection: ANSI Z89.1-compliant hard hats or bump caps (depending on overhead clearance hazard levels as assessed in the AHA).
- Eye and Face Protection: ANSI Z87.1-compliant safety glasses with side shields are mandatory at all times during overhead demolition and installation to protect against falling debris and fibers.
- Hand Protection: Cut-resistant gloves matching the task (e.g., ANSI Cut Level A3 or higher when using utility knives or handling metal grid edges).
- Respiratory Protection: NIOSH-approved N95 particulate respirators shall be made available and worn when handling dusty ceiling tiles or when required by the silica control plan.
- Footwear: Protective, slip-resistant, closed-toe work boots.
6.5 Safety Meetings and Reporting
- Toolbox Safety Meetings: The Contractor shall conduct weekly "toolbox" safety meetings with all on-site personnel. Meeting minutes, including topics discussed and attendee signatures, shall be submitted to the COR weekly.
- Accident Reporting: The Contractor shall immediately notify the CO and COR within one (1) hour of any occupational injury, illness, near-miss, or property damage. A written accident report (using USACE ENG Form 3396 or equivalent federal incident reporting template) shall be submitted within twenty-four (24) hours.
7.0 QUALITY CONTROL AND QUALITY ASSURANCE
7.1 Quality Control Plan (QCP)
The Contractor shall establish and maintain a comprehensive Quality Control Plan (QCP) to ensure the requirements of this contract are met.
- The QCP shall be submitted to the COR for approval within fifteen (15) calendar days after contract award.
- The plan shall identify the Quality Control Manager (QCM) responsible for inspecting the work, tracking deficiencies, and coordinating corrective actions.
- The QCP shall include an inspection checklist covering grid leveling, hanger wire tension, tile fit, and site clean-up.
7.2 Quality Assurance and Performance Requirements Summary (PRS)
The Government will evaluate the Contractor's performance under this contract using Quality Assurance surveillance methods. The Performance Requirements Summary (PRS) below outlines the critical performance indicators, standards, acceptable quality levels (AQL), and methods of surveillance.
Performanc e Objective
PWS
Parag raph
Performance Standard Acceptable Quality Level
(AQL)
Method of Surveillance
Grid Repair & Alignment
5.2 Grid is structurally sound, level to within 1/8" over 10', and aligned properly. Hanger wires secure.
95% compliance on all inspected grids. Zero structural failures.
Direct observation / Random sampling.
Tile Installation Quality
5.3 Tiles fit flush, match existing finishes, are clean, with no gaps or damaged edges.
98% defect-free tiles in completed areas.
100% inspection of completed areas.
Safety Compliance
6.0 Adherence to OSHA, EM 385-1-1, and the approved APP/AHA. Proper PPE worn.
100% compliance. Zero safety violations tolerated.
Periodic surveillance and safety audits.
Clean-up & Housekeepi ng
5.5 Work area vacuumed, protected surfaces clean, trash removed daily.
Clean-up must be completed before leaving the site each day.
Daily walk-through by COR.
Deliverable Submittals
8.0 Mandatory submittals (APP, QCP, AHA) delivered on time.
100% on-time delivery of major safety plans.
Tracking log review.
8.0 DELIVERABLES
The Contractor shall provide the following deliverables to the COR within the designated timeframes:
Deliverable PWS Paragraph
Format / Destination
Due Date
Accident Prevention Plan
(APP)
6.2 PDF / COR and CO Within 15 calendar days after contract award.
Activity Hazard Analysis
(AHA)
6.2 PDF / COR Minimum 5 business days prior to starting a work phase.
Quality Control Plan (QCP) 7.1 PDF / COR and CO Within 15 calendar days after contract award.
Material Technical Data Sheets
4.2 PDF / COR
Prior to purchasing or delivering ceiling tiles/grid to the site.
Toolbox Safety Meeting Minutes
6.5 PDF or Hardcopy /
COR
Weekly.
Accident / Incident Report 6.5 PDF / COR and CO Verbal within 1 hour; written report within 24 hours of occurrence.
Waste Disposal Receipts /Manifests
5.5 PDF or Hardcopy /
COR
Upon completion of demolition/disposal phase.
| IDCode: J |
| Page: 1 |
| Pages: 13 |
| AmendNo: 0001 |
| EffDate: 25 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00189 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR NORFOLK |
ATTENTION CODE 301, 1968 GILBERT STREET SUITE 600
NORFOLK, VA 23511-3392
UNITED STATES
Brittany Simmons, Email: brittany.s.simmons3.civ@us.navy.mil Telephone: 757-443-2104 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0018926QL342 |
| SolDate: 17 Aug 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Continuation |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to add the revised PWS. |
| ContNameTitle: |
| CoNameTitle: Brittany Simmons |
| ContDate: |
| CODate: 25 Aug 2026 |