This file is Amendment 0001 to solicitation N0018925R0003 for Technical and Program Support services issued by NAVSUP FLC Norfolk for Naval Information Forces (NAVIF). The amendment provides responses to questions, extends the proposal due date to January 28, 2025, and makes various revisions including adding CLINs for Defense Base Act Insurance, updating certification requirements from CompTIA+ to CompTIA Network+, and clarifying security clearance requirements.
The solicitation is for a single-award Firm Fixed Price IDIQ contract with a 5-year ordering period from August 2025 to August 2030, plus a 6-month option period. The incumbent is Booz Allen Hamilton under contract N0018920D0012 with a $92.9M ceiling. This requirement is set aside for small businesses under NAICS 541611 with a $24.5M size standard. Key services include Navy network modernization, information warfare enterprise support, IT service management, cybersecurity, portfolio management, and data science support. Proposals must include a facility clearance at Top Secret level. The government will evaluate proposals based on facility clearance (acceptable/unacceptable), technical approach (performance/management and staffing), past performance, small business participation, and price, with non-price factors being significantly more important than price. The projected award date is May 12, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0018925R0003 0002.pdf | ||
| Attachment 1 - Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 3- DD254 -draft Amendment 0001.pdf | ||
| Attachment 2 - Wage Determination .pdf | ||
| Attachment 2 - Wage Determination - 15-4341.pdf | ||
| Attachment 5 - Past Performance Report Form.docx | DOCX document | |
| Attachment 6 - Contract Discrepancy Report.pdf | ||
| Attachment 3 - DD254 - draft.pdf | ||
| Attachment 4 - Past Performance Information Form.docx | DOCX document | |
| N0018925R0003.pdf | ||
| Attachment 1- Pricing Spreadsheet.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0018925R0003 06-Dec-2024
b. TELEPHONE NUMBER
757-443-2092
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 28 Jan 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N001899. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
WILLIAM P. SPENCER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N36001NNEDUMMY
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: WILLIAM SPENCER
1968 GILBERT STREET STE 600
NORFOLK VA 23511-3392
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N36001 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
COMMAND: NAVAL INFORMATION FORCES (NAVIF
KARA BROENE
115 LAKE VIEW PARKWAY
SUFFOLK VA 23435
TEL: 757-203-3213 FAX:
FAX:
TEL: 757-206-2974 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$24,500,000
NAICS:
541611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0018925R0003
Section SF 30 - BLOCK 14 CONTINUATION PAGE
AMENDMENT 0001
Amendment 0001 is issued to:
Provide responses to questions received.
Revise Request for Proposal o Added new CLINs for DBA Insurance and revised FAR 52.212-1 accordingly (Q18) o Amended DD 254 to uncheck 11D (Q24) o Amended DD 254 Block 13 to refer to PWS for personnel clearance requirements (Q25) o Revised Attachment 0001 Pricing Spreadsheet to remove circular references (Q31) o Added Travel and Travel Insurance tab to Attachment 1 Pricing Spreadsheet. (Q35) o Revised travel table in FAR 52.212-1 to show annual breakdown of travel and travel insurance costs. Added to Pricing spreadsheet as well (Q50).
o Changed CLINs in Section B from Lot to Job (Q53). Added CLINs in Section B to include travel insurance.
o Revised DD254 to unselect Block 11d and 11h (Q63)
Revise the Performance Work Statement o Updated PWS required certification from CompTIA+ to COMPTIA Network+. (Q59) o Revised PWS paragraph 6 to show that a Secret clearance is the minimum for personnel working onsite at a Government facility or offsite.
Extend Due Date for Proposals
Q&A
1. Question: Would you kindly confirm if this is an entirely new effort or is there an incumbent currently providing these services? If so, would you please provide the incumbent contract details?
Answer: Incumbent contractor is Booz Allen Hamilton. Contract Number: N0018920D0012, PoP 8/3/2020 – 8/2/2025.
2. Question: Can we request the Government for the Incumbent vendor’s Name & their contract number (which is currently underperformance)?
Answer: See response to question 1.
3. Question: What is the total award value (size) of the current contract, which is presently ongoing by the Incumbent vendor?
Answer: Contract awarded with $92,899,999.80 maximum ceiling.
4. Question: Can the government provide information on the current incumbent, including current contract number, period of performance, and the contract value?
5. Question: Can the government please confirm if there is any change in the scope of requirements—either an increase or decrease—compared to the current contract?
Answer: There is an increase in scope for PWS Sections 3.2 (Navy Network Modernization and Transformation Support) and 3.7 (Command Data Office Data Science Support) compared to the current contract.
6. Question: Solicitation Page 14, Sub-Factor I – Performance and Management Approach. On page 14, under Sub-Factor I – Performance and Management Approach, the instructions state: “Provide a performance and management approach that demonstrates its understanding of, familiarity with, and ability to perform the specific technical requirements within Sections 3, 5, 6, 8, and 10-14 of the PWS.”
Given that Section 3 covers Task Area requirements, could the government confirm whether offerors are also expected to address their performance and management approach, as well as their understanding of the requirements, for Sections 5, 6, 8, and 10-14? If so, could the government please clarify the level of detail expected for these sections?
Answer: Yes, offerors are expected to demonstrate its understanding of, familiarity with, and ability to perform the specific requirements within Sections 3, 5, 6, 8 and 10-14. The Government will not define the level of detail expected. Offerors are responsible for providing enough detail that the government can make a meaningful evaluation of their ability to perform and fulfill the requirements of Sub- Factor I.
7. Question: Solicitation Section 3.1, Page 85. Could the government provide a list of tools currently being utilized to support Strategic Planning and Project Management activities as described in
PWS 3.1?
Answer: Basic MS Office tools, MS Teams, and Sharepoint
8. Question: Solicitation Section 3.2, Page 86. Could the government provide a list of tools currently being used for Navy Network Modernization and Transformation efforts as described in PWS 3.2?
Answer: Basic MS Office tools, MS Teams, Sharepoint, and Azure DevOps (ADO)
9. Question: Solicitation Section 3.3, Page 87. Could the government provide a list of tools currently being employed for Information Warfare Enterprise (IWE) and IW TYCOM support as outlined in PWS 3.3?
Answer: Basic MS Office tools, MS Teams, and Sharepoint
10. Question: Solicitation Section 3.4, Page 88. Could the government provide a list of tools currently used for Information Technology Service Delivery and Service Management as described in PWS 3.4?
Answer: Basic MS Office tools, MS Teams, Sharepoint, and MilSuite/Milwiki
11. Question: Solicitation Section 3.5, Page 88. Could the government provide a list of tools currently utilized for Cybersecurity and Assessment and Authorization (A&A) activities as outlined in PWS 3.5?
Answer: Adobe Acrobat, Assured Compliance Assessment Solution (ACAS), DoD Cyber Exchange, DoD IT Portfolio Repository (DITPR) / DON Application and Database Management System (DADMS) , DOTS (DoDIIS One-Way Transfer Service), eMASSter, Enterprise Mission Assurance Support Service (eMASS), Evaluate Security Technical Implementation Guides (STIG), Flank Speed, Global Information Grid (GIG) Interconnection Approval Process (GIAP), Microsoft Office Applications, Microsoft Teams, Microsoft Visio, Navy Information Technology Approval System (NAV- ITAS), Risk Management Framework (RMF) Automation & Process Streamlining (RAPS), RMF Automation Factory Tool (RAFT), Scans2Report, Security Assessment Plan – Test Battery (SAP-TB), Security Content Automation Protocol (SCAP) tools, Service Now, Systems/Network Approval Process (SNAP), Tenable, Vulnerability Remediation Asset Manager (VRAM), WinZIP, DOD/DISA STIG Viewer, Department of Defense Cybersecurity Scorecard, Continuous Monitoring & Risk Scoring
12. Question: Solicitation Section 3.6, Page 89. Could the government provide a list of tools currently in use for IT Portfolio Management tasks as described in PWS 3.6?
Answer: The Portfolio Management Team currently uses the Navy Information Technology Approval System (NAVITAS) for IT procurement tracking; DoN Applications and Database Management System (DADMS) for managing applications; and DoD Information Technology Portfolio Repository (DITPR) Department of the Navy (DoN) for managing systems.
13. Question: Solicitation Section 3.7, Page 90. Could the government provide a list of tools currently employed for Command Data Office (CDO) Data Science support as outlined in PWS 3.7?
Answer: Various tools are in used in the context of current task orders supporting organizational functions. O365 power platform is used in some cases due to constrained resources, and vendor provided JIRA in some cases for larger tasks developed via enterprise platforms (Jupiter/Advana, RAVEN, etc.)
14. Question: Solicitation Section 3.0. Could the government please clarify what ITSM tool is currently being used?
Answer: No specific ITSM tools is being utilized for the general performance of the PWS 3.0 Section Requirements.
15. Question: Could the government please provide the Transition-In period?
Answer: There is no transition period.
16. Question: Solicitation Page 13, Proposal Page Limitations. Can the Government please allow font size of Times New Roman 10-point Times New Roman for regular text to allow more detailed content within the page limitations?
Answer: The Government declines to make this change.
17. Question: Could the government please clarify if the agency is using ITIL 3 or has transitioned to
ITIL 4?
Answer: ITIL 4
18. Question: To support other types of ODC expenses beyond travel, would the Government consider amending the solicitation to add an appropriate ODC CLIN with a Not-to-Exceed (NTE) plug number, similar to CLINs 0002 and 0004? This will support historical ODCs such as conference expenses, supporting materials, reference materials/books, software licenses, and Defense Base Act (DBA) Insurance required for overseas travel per FAR 52.228-3 Workers’ Compensation Insurance and consistent with the requirements for OCONUS trips to Japan, Bahrain, and Italy as outlined in PWS Section 8.0 Travel.
Answer: Contract type will be Firm Fixed Price (FFP). All items listed in question shall be incorporated into the total proposed FFP with the exception of DBA Insurance. See Amendment 0001 for new CLINs established for DBA Insurance.
19. Question: In reviewing the submission requirements outlined in the Volume I – Factor I: Facility Clearance and Volume I – Factor IV Small Business Participation Plan, many of the substantiating documents required (e.g., Facilities Clearance, Master Subcontracting Plan) are often in the form of pre-formatted documents such as signed letters and formal submissions. We are unable to alter the font (type and/or size) of these pre-formatted substantiating documents.
Will the Government confirm that the inclusion of these types of documents are not subject to the formatting requirements outlined in the Requirements for Style on PDF Page 13, Paragraph (2) due to the predetermined standard and verified formatting?
Answer: Pre-formatted documents submitted in response to Factor I and Factor IV are not subject to the formatting standards required for proposal submission.
20. Question: In the Past Performance instructions, the solicitation limits offerors to submitting no more than three (3) task orders, delivery orders, or technical direction letters under an IDIQ or BPA reference. While this appropriately limits the use of excessively large contracts, Single Award IDIQ contracts are distinct in nature. They often involve numerous task orders (20+) of varying sizes and durations, managed by a focused corporate team with aligned buying customers.
Given that this solicitation is for a Single Award IDIQ contract, would the Government consider allowing offerors to submit a Single Award IDIQ contract as a single contract reference with up to five (5) task orders? This flexibility would enable offerors to more effectively demonstrate the scope, complexity, and magnitude of their past performance, providing a more accurate representation of their capabilities and ensuring the Government receives the most relevant and comprehensive past performance information.
21. Question: Will the Government clarify the requirement for the Past Performance Information Form does not count as one of the 12 pages?
Answer: The Past Performance Information Form is the template for Past Performance Information submission and is part of the 12 page limit.
22. Question: In the Instruction to Offerors, Volume I: Factor III – Past Performance, the solicitation provides a 12-page limit. Given the PWS focuses on seven different areas with an expansive scope across PWS tasks, will the Government increase the page limit allocation for Past Performance to 15 pages?
23. Question: Page 94, PWS section 9.0, Personnel Qualifications, position six Network Engineer certification is listed as Comptia +. Will the government confirm that this certification requirement is for Comptia Network+?
Answer: Yes, Comptia Network+
24. Question: In Attachment 3 - DD254, block 11d Fabricate, Modify, or Store Classified hardware is checked. Will the government confirm if contractor staff are expected to fabricate or use hardware containing classified material at the contractor's own cleared facility?
If so, will the government modify the draft DD 254 to include block 1B and block 11C?
Answer: The contractor staff are NOT expected to fabricate or use hardware containing classified material at the contractor's own cleared facility. See Amendment 0001 with amended DD254.
25. Question: In Attachment 3 – DD254, block 13 Security Guidance, stipulates the minimum clearance for all contractors is TS/SCI. Will the government confirm the minimum clearance is Secret?
Answer: The minimum clearance is Secret. Please refer to the PWS for personnel clearance requirements. See Amendment 0001 with amended DD254.
26. Question: Will the Government permit follow-on questions from industry after providing initial answers to questions to ensure all aspects of the solicitation are fully understood and addressed?
Answer: The Government will make its best effort to answer any questions beyond the initial question deadline. However, responses are not guaranteed.
27. Question: Page 92 of 112, PWS Section 8.0 Travel – Can the Government please clarify when the Status of Forces (SOFA) information will be provided as it was not attached at the end of the original document?
Answer: See SOFA agreements at https://www.state.gov/subjects/status-of-forces-agreement/
28. Question: Can the government please furnish a tools list for NAVIFOR?
Answer: Please see previous and below responses WRT tools as they cover the tool portfolio for this contract.
29. Question: We understand the government is using both Advana Jupiter and MS tools like Azure.
Is there an interest in moving toward a unified toolset?
Answer: There is no requirement to move towards a unified toolset.
30. Question: Is there a portfolio management tool currently used?
Answer: The Portfolio Management Team currently uses the Navy Information Technology Approval System (NAVITAS) for IT procurement tracking; DoN Applications and Database Management System (DADMS) for managing applications; and DoD Information Technology Portfolio Repository (DITPR) Department of the Navy (DoN) for managing systems.
31. Question: Attachment 1- Pricing Spreadsheet opens with circular references. Can the Government please confirm that the offeror should fix the totals on line 42 as opposed to Government releasing an updated spreadsheet?
Answer: See Amendment 0001 with circular references removed in Pricing Spreadsheet.
32. Question: Given that offerors will be requesting Government representatives to complete Past Performance Report Forms (PPRF) during a time when many personnel are on leave, would the Government consider accepting CPARS in lieu of PPRF?
Answer: Per the solicitation, CPARS may also be utilized in evaluation of Past Performance. As the due date for proposals is being extended via Amendment 0001, the Government believes there is sufficient time for Past Performance Report Forms to be submitted.
33. Question: Addendum to FAR 52.212-1 – Instructions to Offerors. “The Price Proposal in Volume II shall include the completed solicitation documents. The price proposal shall include all elements of price and such other price information considered appropriate to support the offeror’s proposal.”
Can the Government please confirm that the Offeror may include a Price Narrative in a word or pdf format submission in addition to Attachment 1 in order to address the elements of price requested under the Factor V: Price Proposal?
Answer: Per the solicitation, Factor V – Price has no page limit and offerors are responsible for providing a proposal that includes all elements of price and such other price information considered appropriate to support the offeror’s proposal. How this is accomplished, aside from the required pricing spreadsheet is at the discretion of the offeror.
34. Question: Addendum to FAR 52.212-1 – Instructions to Offerors. “Volume II: Price Proposal;
Factor V: Price Proposal. The price proposal shall include all supporting data to clearly show how the fully burdened labor prices were developed. This information shall include a breakdown of the labor categories, labor hours, and labor rates anticipated and should be submitted within Attachment I, Pricing Spreadsheet. The firm-fixed price labor rates proposed in the pricing spreadsheet will be incorporated into the resultant contract as maximum rates to be used for task order proposals.”
Does "This information" refer to the "fully burdened labor prices?"
Answer: "This information" refers to “all supporting data.”
35. Question: Addendum to FAR 52.212-1 – Instructions to Offerors. “a. A completed and signed Standard Form 1449, Solicitation/Contract/Order for Commercial Items, and executed copies of any amendments completed “Supplies or Services and Price” section. d. Travel costs are anticipated; therefore, the Government has included travel amounts for the period of performance.
All offerors are to include the "Not to Exceed" travel amounts provided in the chart below for the identified travel CLIN.”
Can the Government confirm that the Offeror shall enter the Government provided "Not to Exceed" travel amounts any applicable General and Administrative (G&A) and/or Overhead (OH) costs by completing the travel CLINS under Section SF 1449?
Answer: Confirmed. Additionally, See Amendment 0001 for revised Attachment 1 – Pricing Spreadsheet that adds tab for Travel.
36. Question: PWS 3.10.12. Support Knowledge Management (KM) initiatives to efficiently capture, communicate, and promote NAVIFOR N6 projects, products, business processes, and/or services for internal and external stakeholders.
Is there a Knowledge Management tool that NAVIFOR uses? Is there one they would prefer?
Answer: SharePoint
37. Question: PWS 3.4.3. Support Navy enterprise ITSM transformation and governance efforts to enable a mission-focused, enterprise-wide approach to IT service management.
Is there currently an ITSM tool that NAVIFOR uses? Is there one they would prefer?
Answer: No specific ITSM tool is utilized at NAVIFOR currently.
38. Question: PWS 3.4.8. Support domain request fulfillment, asset, change, configuration, and demand management processes in the delivery of IT services, hardware, and software.
What Configuration Management tool(s) is the government currently using?
Answer: The Navy Enterprise Suite of Tools (NEST)
39. Question: PWS 3.7-3.7.1. The contractor shall support the development and implementation of the NAVIFOR data strategy... Provide expert services supporting strategic planning, knowledge management, and information management associated with the NAVIFOR CDO Data and Analytics Capability Maturity Implementation Plan (I-Plan).
Can the Government provide the NAVIFOR CDO Data and Analytics Capability Maturity Implementation Plan (I-Plan)?
Answer: Decline to provide, see response to question 43
40. Question: PWS 3.7.2. Perform data exploration and preparation, and descriptive/diagnostic/predictive/prescriptive data analytics to derive meaningful insights and support decision-making processes.
From a report development standpoint: What report visualization tool(s) is NAVIFOR N6 using? How many visualizations per month is NAVIFOR N6 currently delivering? What is the demand signal for new reports?
Answer: NAVIFOR N6 is using visualization tools provided by DON Enterprise platforms. Answering the “how many visualizations per month is cannot be quantified… N6 has developed various dashboards within the following analytic environments which are in sustainment to provided dashboards for various organizational functions both internal to NAVIFOR staff and supporting operational commanders on NIPR or SIPR depending on the classification level and business function.
- The “Flankspeed” program (platform) https://flankspeed.sharepoint-mil.us is the Navy enterprise MS 0365 environment providing MS Power BI to support visualization tool. The NAVIFOR O365 App Development and BI team has multiple Power BI dashboards in production and development currently supported by a 3 FTE development team.
- The NAVWAR Readiness Analytics & Visualization Environment (RAVEN) platform https://raven.navy.smil.mil uses Tableau as the visualization tool. NAVIFOR Digital Capabilities Project team has developed Cybersecurity Readiness Overview (CRO) and IW Commander Dashboards in that environment consisting of four IWC Tableau workbooks and one CRO workbook which are in sustainment-improvement status.
https://flankspeed.sharepoint-mil.us/ https://raven.navy.smil.mil/
- The OPNAV N1 Authoritative Data Environment (ADE) https://portalprod.ade.dc3n.navy.mil/ is the authoritative back end of the MyNavy HR data and uses Tableau as the visualization tool in use by the MOC TYCOM and N1 (Manpower) analytics team. They primarily use the tool for report (.xlxs) generation but are working to develop tailored dashboard that support manpower requirement assessment and reporting.
- The SECNAV Jupiter https://jupiter.data.mil Enterprise Data & Analytics Environment which provides both QLIK SENSE and Tableau as the visualization tool. There are three FY25 dashboard/visualization lines of effort to develop Qlik dashboards in the environment supporting N4 Shore Modernization, IW Readiness Operations Cell (I-ROC), and the N7 Education and Training directorates.
41. Question: PWS 3.7.6. Advise, support and facilitate collaboration and communications across the NAVIFOR IW Enterprise governance construct supporting all NAVIFOR data strategy data competency lines of effort…
Where is the government currently storing data, e.g., systems, apps, etc?
Answer: Primarily using DoN Flankspeed O365 capability, as well as using enterprise cloud analytic platforms including ADE, Jupiter, RAVEN, JCC2 Unified Platform, and the Navy Readiness Reporting Enterprise (NRRE) suite.
42. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and visualization tools to meet the information and visualization needs of internal and external stakeholders.
What data mining and data engineering tools is the Government currently using? Do the data sources provide APIs for integration?
Answer: Data science lifecycle phases use Navy Enterprise analytic platforms which use manual, Robotic Process Automation (RPA) and in some cases API from authoritative data lakes/silos associated with the various platforms (mentioned above). The most sophisticated is provided in the DoN Jupiter/DoD Advana platform https://jupiter.data.mil/ which employ multiple data aggregation tools. The NAVWAR RAVEN platform (SIPR) which uses SQL, OData, jupiterhub, tableau for data https://portalprod.ade.dc3n.navy.mil/ https://jupiter.data.mil/ https://jupiter.data.mil/ integration, fusion and analysis. The Flankspeed capability provides the O365 low code power platform. We are also using the evolving model based product support data silos consolidating logistics and maintenance data lakes which is the logistics community program to move to the cloud.
43. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and
In lieu of the Government providing the I-Plan to offerors, can the Government identify what is the current state of data quality and governance?
Answer: The I-Plan identifies lines of effort needed to mature the current state referencing the 16 Nov 2022 NAVIFOR IW Data Strategy Study (CUI) conducted by Johns Hopkins APL which referenced the Department of the Navy Data Maturity Model and Assessment guidance of DON CIO. The study sampled NAVIFOR HQ and Echelon 3 and 4 ADCON commands and identified Maturity levels from 1 (performed) to 5 (optimized) across five competency areas. With the exception of the Navy Oceanographic community, commands were most level 1 (performed) or 2 (Managed) but not at the 3 (Defined) level. The intent of the I-plan is to increase the maturity level across the five competency areas.
44. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and
What is the scope of data cleansing, validation, and enrichment processes?
Answer: Varies widely depending on the context. In some cases a significant degree of business intelligence improvement is necessary 1st to ensure the data identified in the requirements engineering (business understanding phase) can be obtained. Once that is accomplished, data mining and data cleansing are accomplished in one of the enterprise analytic platforms (Flankspeed, RAVEN, Jupiter, ADE, JCWA Architecture Unified Platform (UP), etc.) Due to the evolving DoD and DoN information superiority vision, these activities are being accomplished at various enterprise analytic platform and governance and business rules for data quality dimensions and the VAULTIS Framework defined in the Appendix A of the DoD Data, Analytics, and Artificial Intelligence Adoption Strategy vary platform to platform.
45. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and
Are there predefined KPIs or success metrics to evaluate the effectiveness of the data science support?
Answer: Very immature at this point, but is the primary focus of the data strategy I-plan LOE to stand-up a command data office and develop governance policy. The current intent is to leverage PEO Digital’s use of the Scaled Agile Framework (SAFe) to treat our lines of effort as a “team of agile teams”, set desired cycle times and measure our ability to meeting KPIs associated with the Data Strategy I-Plan. This is an area where NAVIFOR is asking for expert advice and recommendation.
46. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and
What is the anticipated scope of IL5/IL6 data?
Answer: NAVIFOR needs to be able to access all IL5/IL6 IW data environments currently available across the enterprise. This first requires an understanding of the IW community (METOC, INT, DoDIN, CRY & EW, Cyber Mission Force) and the enterprise platforms they use.
47. Question: PWS 3.7.9. Utilize data mining, data engineering, visualization engineering, and
If existent, can the Government provide data dictionaries and business procedures (SOP) documents for the decision-making domains?
Answer: We have locally developed data dictionaries associated with development efforts in the RAVEN platform (on SIPR), and have examples from P2P working groups that use the P2P data dictionary template. For our work in Jupiter (Advana) we use the Collibra tool the serves as the data catalog and can output a data dictionary for the data sources in use for specific projects. The Government can provide these documents as needed to the successful offeror upon award.
48. Question: "Will the applicable documents be provided to bidders via bidder's library or other appropriate file sharing method?
- COMFLTCYBERCOM/COMTENTHFLT INSTRUCTION 5270.2
- COMNAVIFORHQINST 12600.1A, 24 OCT 2023
- COMUSFLTFORCOM/COMPACFLT INSTRUCTION 5230.1A FLEET FUNCTIONAL
AREA MANAGER, 13 MAR 2018.
- COMNAVIFORINST 2620.2 NAVY PROCESS REFERENCE MANUAL
- COMNAVIFORINST 2620.1C ITSM REQUIREMENTS
- DEPARTMENT OF DEFENSE DATA STRATEGY, 30 SEP 2020
- DEPARTMENT OF THE NAVY INFORMATION SUPERIORITY VISION, 14 FEB 2020
- DEPARTMENT OF THE NAVY CHIEF DATA OFFICER, DATA MATURITY MODEL
AND ASSESSMENT, VERSION 0.3, 2021
- DEPARTMENT OF THE NAVY CYBER STRATEGY, NOV 2023
- DOD ARCHITECTURE FRAMEWORK (DoDAF) VERSION 2.02"
Answer: The applicable documents will be provided to the successful offeror upon award.
49. Question: “Magnitude: The similarity of the dollar value of actually performed work that exists between the PWS and the offeror’s referenced contracts during the stated five-year period established by the solicitation.”
Will the Government confirm when evaluating the Magnitude of an Offeror's past performance reference, the similarity of dollar value refers to the dollar value for work completed over the course of twelve (12) completed, consecutive months of performance.
Answer: Please refer to FAR 52.212-2 of the solicitation. The Solicitation is clear on its face.
50. Question: Will the Government please provide an annual breakdown of Travel costs so that burdens may be applied appropriately IAW Offerors disclosed practices?
Answer: See amendment 0001 for an updated table in Addendum to FAR 52.212-1.
51. Question: Will the Government explain how task orders will be issued under the IDIQ? Will LOE be prescribed by the Government or left up to the Offeror’s discretion?
Answer: Task orders will be issued as needed, in most cases base +option periods. LOE will be at the offeror’s discretion.
52. Question: Will the Government please confirm if on Page 3 of the SF 1449 CLIN 0001 the Government is seeking the total FFP price for the 5-year ordering period as represented on Page 5
(03-AUG-2025 TO 02-AUG-2030)?
Answer: Confirmed.
53. Question: Will the Government please confirm the use of “LOT” for quantity and that the Government will be looking for the billing schedule to be broken down monthly for CLINS at the TO level.
Answer: Yes, CLINs at the TO level will be broken down by month. CLINs 0001 - 0004 are also changed from “Lot” to “Job.” See Amendment 0001.
54. Question: Would the Government extend the proposal due date to January 31, 2025?
55. Question: What is the Government’s anticipated award date?
Answer: The Government’s projected award date is 05/12/2025. This date is only a projection and may change without notice.
56. Question: Are contractors expected to submit the Volumes/Factors/Sub-Factors as seven (7) different electronic files as laid out in the “(2) Proposal Page Limitations table” on page 13?
Answer: Yes.
57. Question: For the Program Manager and Project Manager categories, a Project Management Professional (PMP) certification is required. Is there an acceptable equivalent experience; or other certification (such as Certified ScrumMaster (CSM), Certified Associate in Project Management (CAPM), Project Management Professional from the International Project Management Association (IPMA), PRINCE2 Foundation (PRINCE2 Practitioner), or Certified Project Manager (CPM))?
Answer: No
58. Question: For several labor categories, ITIL v3 or later certifications are required. Are there acceptable equivalent experiences; or other certifications (such as COBIT5, ISO/IEC 20000, Microsoft Operations Framework (MOF), or Knowledge Center Support (KCS))?
59. Question: For the Network Engineer I labor category, a “CompTIA+” certification is required.
Should that read “CompTIA A+”?
Answer: CompTIA Network +. See amendment 0001 for update in Performance Work Statement.
60. Question: Please provide the projected magnitude of the portfolio being managed by this N6 support team (dollar value, number of contracts, number of vendors).
61. Question: With respect to the draft DD254, why is the protection of proprietary information and OCI addressed in Block 9 versus in contractual clauses per FAR Subpart 9.5 - Organizational and Consultant Conflicts of Interest? Please clarify.
Answer: A future amendment will be issued to answer this question.
62. Question: Based on the OCI language in the draft DD254 Block 9, would the Government please clarify what specific acquisition programs could create significant conflict (or exclusion) for a contractor?
Answer: A future amendment will be issued to answer this question.
63. Question: The checked Blocks 11a and 11d in the draft DD254 appear to be in conflict according to the DD254 instructions, “(3) REQUIRED: If item 11a is checked, then do not check items
11b, 11c, 11d, 11h, 11i, or 11k.” Please clarify.
Answer: See amendment 0001 for a revised DD254.
64. Question: The PWS outlines the requirement for Volume I, Factor II as the Technical Approach with two sub-factors. These two sub-factors have page limits assigned. There is no mention of a page limitation for an introduction/executive summary for the Technical Approach before addressing the two sub-factors. Please clarify the page count for Factor II and the two sub-factors.
Answer: The RFP does not require an Introduction / executive summary. The total page limit is 20 pages for Sub-Factor I – Performance & Management Approach and 10 pages for Sub-Factor II – Staffing Approach excluding no more than one page for each of the following: a cover sheet, list of tables, list of figures, compliance matrix, and table of contents. An introduction/executive summary for the Technical Approach will count towards the page count.
65. Question: Please confirm up to 3 TDLs/TOs/DOs can represent 1 past performance. If not, would the Government increase the number of past performance citations from 3 to 5 and increase the past performance page count from 12 to 15
Answer: Confirmed. Offerors may submit a combination of no more than three (3) delivery orders (DOs), task orders (TOs), technical direction letters (TDLs), and/or technical area tasks (TATs) placed under an ID/IQ or BPA as one of the three examples of past performance. The Government declines to make the requested changes.
66. Question: What format would the government prefer the Small Business Participation Plan be submitted?
Answer: Small Business Participation Plan shall be submitted in Word or PDF format as stated in the solicitation.
67. Question: (Will the Small Business Participation Plan be in Volume III in place of the Small Business Subcontracting plan for small businesses?
68. Question: For Volume I – Non-Price Proposal, Factor IV: Small Business Participation Plan and Volume III – Small Business Subcontract Plan, would the Government please provide its small business goals by small business socio-economic category?
Answer: The Government declines to make this change. We expect vendors to develop their own commitment. Please refer to FAR 15.304 and DFARS 215.304.
69. Question: Regarding Security:
a. Will the government provide workspace and computing resources for all required cleared work?
b. What systems/tools will be provided for development and delivery for classified deliverables?
Answer: (a) Yes, (b) None. All classified work/deliverables will be executed within Government spaces.
70. Question: Regarding Certifications: For positions requiring certifications, will the government accept candidates who are scheduled to obtain certifications within a certain timeframe after the award?
Answer: Yes
71. Question: Regarding Performance Metrics:
a. How will the Quality Assurance Surveillance Plan (QASP) metrics be measured and tracked?
Answer: Each government TPOC will surveil and track performance according to the QASP provided at the Task Order level.
b. What tools/systems will be used for performance monitoring?
Answer: Monitoring will be conducted via reports/deliverables.
72. Question: The Government states Volume I, Factor IV – Small Business Participation Plan will be evaluated based on Table 4, which specifies, “…approach and understanding of the small business objectives.” However, the solicitation does not quantify overall small business goals, nor any participation objectives of socio-economic small business concerns. Will the Government update the solicitation to include small business participation goals as well as any specific socio-economic objectives?
Answer: See response to question 67.
Section SF 1449 - CONTINUATION SHEET
ITEM
NO
SUPPLIES/SERVIC
ES
QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Base Ordering Period - Labor
FFP
Technical and Program Support Labor in Accordance With the Performance Work Statement.
FOB: Destination
PURCHASE REQUEST NUMBER: N36001NNEDUMMY
PSC CD: DF01
NET AMT
SUPPLIES/SERVICE
S
QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
Base Ordering Period - Travel
COST
Contractor Personnel Travel In Accordance With The Performance Work Statement and Reimbursement of Travel Costs. Not To Exceed $1,004,210.71.
FOB: Destination
PURCHASE REQUEST NUMBER: N36001NNEDUMMY
ESTIMATED COST
SUPPLIES/SERVICE
S
QUANTITY UNIT UNIT PRICE AMOUNT
0003 Job
Base Ordering Period - Insurance
COST
Travel specific insurance, reimbursed for actual costs
FOB: Destination
SUPPLIES/SERVIC
ES
QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
OPTION FAR 52.217-8 - Labor
FFP
Technical and Program Support Labor in Accordance With the Performance Work Statement.
NET AMT
SUPPLIES/SERVICE
S
QUANTITY UNIT UNIT PRICE AMOUNT
0005 Job
OPTION FAR 52.217-8 - Travel
COST
Contractor Personnel Travel In Accordance With The Performance Work Statement and Reimbursement of Travel Costs Not To Exceed $106,247.19.
SUPPLIES/SERVICE
S
QUANTITY UNIT UNIT PRICE AMOUNT
0006 Job
OPTION FAR 52.217-8 - Insurance
COST
Travel specific insurance, reimbursed for actual costs
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
/ CAGE
0001 POP 03-AUG-2025 TO
02-AUG-2030
N/A COMMAND: NAVAL INFORMATION
FORCES (NAVIF
KARA BROENE
115 LAKE VIEW PARKWAY
SUFFOLK VA 23435
757-203-3213
N36001
0002 POP 03-AUG-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 03-AUG-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 03-AUG-2030 TO
02-FEB-2031
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 03-AUG-2030 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 03-AUG-2030 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.204-2 Security Requirements MAR 2021
52.204-7 System for Award Management NOV 2024
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting AUG 2020
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-29 Federal Acquisition Supply Chain Security Act Orders-- Representation and Disclosures.
DEC 2023
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
SEP 2023
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.217-5 Evaluation Of Options JUL 1990
52.222-41 Service Contract Labor Standards AUG 2018
52.222-56 Certification Regarding Trafficking in Persons Compliance Plan.
OCT 2020
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.237-1 Site Visit APR 1984
52.237-2 Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.242-13 Bankruptcy JUL 1995
52.245-1 Government Property SEP 2021
52.245-9 Use And Charges APR 2012
52.247-34 F.O.B. Destination JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights
DEC 2022
252.203-7003 Agency Office of the Inspector General AUG 2019
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023
252.204-7012 (Dev)
Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013
REVISION 1)
MAY 2024
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7022 Expediting Contract Closeout MAY 2021
252.204-7023 Alt I Reporting Requirements for Contracted Services (JUL 2021) Alternate I
JUL 2021
252.204-7024 Notice on the Use of the Supplier Performance Risk System
MAR 2023
252.205-7000 Provision Of Information To Cooperative Agreement Holders
OCT 2024
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.215-7016 Notification to Offerors--Postaward Debriefings DEC 2022
252.219-7003 Small Business Subcontracting Plan (DOD Contracts) DEC 2019
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7043 Antiterrorism/Force Protection Policy for Defense Contractors Outside the United States
JUN 2015
252.225-7048 Export-Controlled Items JUN 2013
252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.
MAY 2024
252.225-7055 Representation Regarding Business Operations with the Maduro Regime
MAY 2022
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime
JAN 2023
252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region - Representation
JUN 2023
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region
JUN 2023
252.225-7972 (Dev)
Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2024- O0014)
AUG 2024
252.225-7973 (Dev)
Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems - Representation
(DEVIATION 2024-O0014)
AUG 2024
252.225-7976 (Dev)
Contractor Personnel Performing in Japan.
(DEVIATION 2018-O0019)
AUG 2018
252.225-7995 (Dev)
Contractor Personnel Performing in the United States Central Command Area of Responsibility (Deviation 2017-O0004)
SEP 2017
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
JAN 2023
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel
JAN 2023
252.239-7001 Information Assurance Contractor Training and Certification
JAN 2008
252.239-7010 Cloud Computing Services JAN 2023
252.239-7017 Notice of Supply Chain Risk DEC 2022
252.243-7002 Requests for Equitable Adjustment DEC 2022
252.244-7000 Subcontracts for Commercial Products or Commercial Services
NOV 2023
252.245-7003 Contractor Property Management System Administration
APR 2012
252.247-7023 Transportation of Supplies by Sea OCT 2024
CLAUSES INCORPORATED BY FULL TEXT
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (NOV 2021)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices
(including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .