QandA_for_N0018919R00020001.docx

DOCX document 15 KB Posted

Attached to
Engineering Services for Habitability Federal contract opportunity
Solicitation number
N0018919R0002
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document outlines a federal contract opportunity for engineering services for habitability. The Naval Supply Systems Command Fleet Logistics Center Norfolk Contracting Department intends to award an indefinite-delivery, indefinite-quantity contract for ship engineering and planning support services using FAR Part 15 and Subpart 16.5 procedures. The requirement is 100% set aside for small businesses with a NAICS code of 541330 and size standard of $38.5 million. The Mid-Atlantic Regional Maintenance Center mission is to maintain ships, and the contractor shall provide engineering, logistical, and IT services to support U.S. Navy habitability projects including ship modifications and material procurement. The effective period is from February 1, 2019 through January 31, 2024 with an optional six-month extension. The total anticipated contract period is five years.

QandA_for_N0018919R00020001.docx

View the file

Other files for this federal contract opportunity

Other files attached to Engineering Services for Habitability, newest first.
File Type Posted
QandA_for_N0018919R00020002.docx DOCX document
N0018919R00020003.docx DOCX document
N0018919R00020002.docx DOCX document
Attachment_9_-_Organizational_Conflicts_of_Interest_Representation.docx DOCX document
Attachment_5_-_Past_Performance_Report_Form.doc DOC document
Attachment_4_-_Past_Performance_Information_Form.doc DOC document
Attachment_7_-_Pricing_Spreadsheet.xlsx XLSX spreadsheet
N0018919R00020001.docx DOCX document
Detailed_Description.docx DOCX document
Attachment_7_-_Pricing_Spreadsheet.xlsx XLSX spreadsheet
N0018919R0002.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for N0018919R00020001 Set 1:

1. 1.The RFP (page 18 and 26) references Attachment 8 (Wage Determination), but no wage determination is available on the NECO site. Will the Gov’t provide Attachment 8 or the correct Wage Determination number to be used in proposal development?

Attachment 8 (Wage Determination) is available in NECO. The additional attachments can be retrieved through “Click here for Additional Documents” under the solicitation.

2. Page 22 of the RFP requires submission of one resume for the key position of “Senior Engineer.” Should that resume be submitted for the Supervisory Engineer key position, vice the non-key position of Senior Engineer?

Section has been updated to reflect the correct key personnel for the resumes. One (1) each for Program Manager, Program Planning Manager, Supervisory Engineer, Systems Analyst and five (5) for Project Manager.

Set 2:

3. Does the Government expect a comprehensive Attachment 7 that states the Team’s overall price? In order for the Prime contractor to provide a comprehensive Attachment 7, one must include its subcontractor’s rates in the calculation. In some instances, the Prime and the Subcontractor could be assigned the same labor category. Without the ability to modify the Attachment to accommodate the split of hours, the Prime would be required to calculate a blended rate for the team. Is this the Government’s expectation? Or will the Government allow the bidder to add a line item to show the breakout of hours between the Prime and subcontractor across one labor category? For example, Prime has 3 FTEs and Subcontractor has 1, we propose to illustrate this on two rows within the cost workbook. Please advise the appropriate practice.

Additional lines may be added to show the breakout between the Prime and the Subcontractor.