N0018918R0044_N0018918R0044_QandA_Amend8.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
HAZMAT 3PL in Okinawa, Japan
Solicitation number
N0018918R0044
Issued by

About this file

This document package includes a federal solicitation and related questions and answers for hazardous materials third party logistics support services in Okinawa, Japan. The solicitation is for a fixed price economic price adjustment/firm fixed price hybrid contract requiring hazardous materials management and distribution services. Key details include a requirement to manage over 1,500 stock keeping units and provide delivery to multiple customer locations within 72 hours, pricing of a test market basket and material price list, a 30-day transition period, and a response date of 25 April 2018. The questions and answers provide additional data on workload volumes, facilities, equipment, and processes to support offerors in developing competitive proposals.

N0018918R0044_N0018918R0044_QandA_Amend8.xlsx

View the file

Other files

File Type Posted
N0018918R0044_Attachment_XXVII_GFP.XLSX XLSX spreadsheet
N0018918R0044_N0018918R0044_Amend9_Final.docx DOCX document
N0018918R0044_Attachment_XXV_GovernmentIncidentalEquipment.docx DOCX document
N0018918R0044_N0018918R0044_Amend8.docx DOCX document
N0018918R0044_N0018918R0044_QandA_Amend7.xlsx XLSX spreadsheet
N0018918R0044_AttIII_Material_Price_Submission_Worksheet_Amend6.xlsx XLSX spreadsheet
N0018918R0044_N0018918R0044_QandA_Amend6.xlsx XLSX spreadsheet
N0018918R0044_N0018918R0044_Amend6.docx DOCX document
N0018918R0044_N0018918R0044_Questions_and_Responses_V2_Final.xlsx XLSX spreadsheet
N0018918R0044_N0018918R0044_Amend5.docx DOCX document
N0018918R0044_Attachment_I_-_PPIF.docx DOCX document
N0018918R0044_N0018918R0044_Amend4.docx DOCX document
N0018918R0044_N0018918R0044_Questions_and_Responses_V1_Final.xlsx XLSX spreadsheet
N0018918R0044_AttIII_Material_Price_Submission_Worksheet_Amendment_03.xlsx XLSX spreadsheet
N0018918R0044_N0018918R0044_Amend3.docx DOCX document
N0018918R0044_N0018918R0044_Amend2.docx DOCX document
N0018918R0044_Questions_and_Answers_Round1.docx DOCX document
N0018918R0044_N0018918R0044(2).docx DOCX document
AttI_PPIF.docx DOCX document
AttII_PAST_PERFORMANCE_REPORT_FORM_Copy.docx DOCX document
N0018918R0044(2).docx DOCX document
AttIII_Material_Price_Submission_Worksheet.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Q&A

No.QuestionGovernment Responses
1Page 35 of the solicitation document titles Volume I as Non-Price Proposal and includes Technical as Factor I and Past Performance as Factor II. Page 37 of the same document titles Volume I as Technical and lists Volume II as Past Performance. It is not clear whether Past Performance should be part of Volume I or a separate volume. Can the Government please clarify the volumes, factors, and sub-factors required to be submitted?The Government does not see the error. In the chart on Page 37, Past Performance is listed as Volume I. Past performance is included in Volume I as Factor II.
2Page 37 of the solicitation document instructs offerors to pay particular attention to how it will meet service and delivery requirements in sections C-2, C-3, and C-4; however no C-2, C-3, or C-4 is listed in the PWS, as the outline goes from C-1.1.1 to C-2.2, from C-2.15 to C-3.1, and ends with Section C-3.7. It is not clear to which PWS areas offerors are required to pay particular attention. Can the Government please clarify to which PWS sections offerors are required to pay particular attention?C-2 refers to anything with C-2 in the Section heading. The same goes for C-3. The reference to C-4 was removed in Amendment 4.
3Page 41 of the solicitation document states that the offeror will be evaluated on the feasibility and comprehensiveness of their proposed approach to meeting the specific service and delivery requirements of sections C-2, C-3, and C-4. Because the PWS does not include a section C-2, C-3, or C-4, it is not clear on which PWS sections offerors will be evaluated. 1) Can the Government please clarify which PWS sections will be used in evaluating Performance Approaches? 2) Given the limited number of pages, can the Government please clarify whether the expectation is to only address these requested PWS sections or if offerors are to address all PWS sections?Please see answer to Question 2.
4Page 37 states, "Offerors are permitted to submit no more than one page for each of the following which will not be included in the page count: "a cover sheet, list of tables, list of figures, tabs, and dividers." There are multiple factors and sub-factors in Volume I. Can the Government please revise to allow offerors to submit more than one tab / divider to identify multiple sections?There is a limit of one page each for a cover sheet, a list of tables, and a list of figures. Tabs and dividers are limited to one page each but there is no overall limit to the number of tabs or dividers in the entire proposal.
5Both Sub-factor II - Management Approach and Sub-factor III - Transition/Phase-In Plan require offerors to "identify any risks or issues anticipated to arise during the transition and methods to mitigate those risks and overcome transition issues." It is assumed that the transition risks or issues identified in Sub-factor II should be in regard to implementing the offeror's Management Approach, while the transitions risks or issues identified in Sub-factor III are with regard to obtaining resources (i.e., manpower, equipment, finances, inventory, etc. within the 90 days transition/phase-in period). Can the Government please confirm whether this is the Government's intent?Yes, that is the intent of the Government.
6Page 37 states that an alternate font with 8 point size type or larger may be used for graphics (including tables). The Past Performance Information Form is in a table. May a reduced font size be used for the Past Performance Information Forms in accordance with page 37?The PPIF is considered a part of the past performance volume. The offeror shall propose in accordance with the Instructions to Offerors.
7The solicitation document defines Scope and Magnitude as part of the Relevancy aspect of Past Performance evaluation; however the Past Performance Relevancy Rating description also includes complexity as a factor and the Past Performance Information Form has a section to discuss complexity. There is no clear definition provided for complexity. Can the Government please define complexity?The reference in the relevency table cannot be deleted as that table is designated by the Department of Defense, however, complexity will not be evaluated in past performance. The PPIF has been updated.
8The provided Past Performance Information Form is wider than one-inch margin allowed on page 37 of the solicitation document. Are offerors expected to reformat the PPIF to fit within the one-inch margins or are the Past Performance Information Forms an exception to the one-inch margin requirement?The PPIF currently has a 1 inch margin
9Page 38 states that offerors are required to submit a "complete and signed cover sheet acknowledging combined synopsis solicitation;" however, no cover sheet was included with the solicitation documents package. Can the Government please provide the cover sheet?The offeror is to provide a cover page with their proposal as stated on page 38 acknowledging the solicitation and all amendments.
10Page 39 states that offerors are to use the not-to-exceed amounts in Section B for material and ODCs; however the solicitation does not include a "Section B." It is not clear whether the CLIN structure defined on pages 25 and 26 of the same document constitute Section B. Can the Government please clarify?"Section B" is on pages 25 and 26.
11Under Personnel Qualifications on page 3, the RFP states, "The Contractor shall provide staffing commensurate with the size of the operation, type and quantity of material being managed, and required service hours to support the customer. The Contractor shall provide qualified supervisory, technical, and administrative personnel to accomplish all work and services required by the SOW not later than (NLT) the first day of full Contract Performance." However, no workload data is provided with which to determine staffing and only the incumbent has access to this information. Will the Government please provide the number of receipts, issues and buys per year with which offerors can determine appropriate staffing levels?Please see Amendment 4 which adds the usage data as an attachment.
12If alternate staffing plans are proposed, would the Government consider allocating additional page count and requiring offerors to provide a detailed justification for proposed staffing levels?The Government has amended the page count in Amendment 4
13Some costs that comprise the Material Handling Charge (MHC) are aggregate costs spread across the sales volume vice assigned to individual items. Insurance, for example, is priced to offerors based upon projected sales and inventory volume. Likewise, bulk shipping savings are predicated upon anticipated sales. Therefore, an offeror's MHC depends upon volume to an extent. Allowing customers to bypass the 3PL contractor results in unplanned reduced sales and inventory volume. Will Okinawa customers be required to order all commercially sourced and Federal Supply System hazardous materials through the 3PL contractor?The customer base will be trained and instructed not to bypass the local HAZMAT provider/HMMC for their HAZMAT product needs but use will not be mandatory.
15Attachments III and VIII do not include enough information to identify the material and obtain accurate pricing. NSN/LSN items could have multiple SDSs, Manufacturers, and Part Numbers. Lack of this technical data forces offerors (other than the incumbent) to guess at the correct item to price, and in many cases Nomenclature and NSN as the only data in the attachments is insufficient to identify an item at all. This favors the incumbent and causes other offerors to assume significant risk if the incorrect item is priced. Can the Government please provide technical data for LSNs such as manufacturer's name, part number, and SDS information for all items.Please see Amendment 4 which adds the usage data as an attachment.
16Attachment VIII includes numerous items listed that have Local Stock Numbers, but the comments refer them back to another NSN. Can the Government please explain the intent of the cross reference and how offeror's are to address pricing for these items? Are these items to be separately priced separately from the NSN referenced in the comment's section or will the Government provide the technical data that caused these items to be assigned a LSN?The offerors are to price column X
17In Attachment III, column D includes quantities. Do these quantities represent actual annual usage data or are they provided as a means to quantify sales volume for price evaluation?The quantities are for price evaluation. The extended price is the quantity times the unit price proposed inclusive of the discount for that line item
20Page 39 under Test Market Basket Pricing reads "for each item in the Test Market Basket, the offeror shall determine if an item will be procured from a commercial source or a Government source of supply. If the item will be procured from a commercial source, the offeror shall complete columns E, F, and S." It would seem the Government would provide the data in Columns E and F to ensure offerors are pricing what the end use customers requires. It also appears other columns would need to be completed for commercially sourced products. Can the Government please provide unit of issue and the amount in the unit of issue, and clarify instructions for commercial products?Updated in Amendment 4.
21The Government refers to this attachment as a the pricing spreadsheet, however, it is currently just a Government LOE estimation. Offerors require more information on what pricing details are required. Are offerors permitted to alter Attachment IV to provide pricing detail? Can the Government provide additional guidance on completing this spreadsheet? For example, are offerors allowed to bid less hours than currently specified; can offerors deviate from the listed Labor Categories; is justification required for deviations; etc.?The soliciation provides guidance for justification. Attachment IV can be altered to accommodate the proposed mix as long as all the information required in the attachment is provided.
22Page 43 of the solicitation document states that the "combined total of the proposed priced in Attachment III - Material Price Submission Worksheet and Attachment IV - Estimated Service Pricing Spreadsheet will determine the offeror's total proposed price for evaluation purposes only. These prices will be added to the material and ODC NTE value to determine the total proposed price for evaluation purposes only (i.e., Material NTE + ODCs + Options + Attachment III and IV)." It seems that adding Attachment III to NTE Material amounts would be double counting material prices. Can the Government please explain why the Test Market Basket price is added to the materials NTE for evaluation purposes?Amendment 4 provides clarification
23The solicitation is not clear as to whether the Transition Out needs to be priced? Can the Government please clarify?The transition out is not priced.
24Page 43 of the solicitation document states that the "combined total of the proposed priced in Attachment III - Material Price Submission Worksheet and Attachment IV - Estimated Service Pricing Spreadsheet will determine the offeror's total proposed price for evaluation purposes only. These prices will be added to the material and ODC NTE value to determine the total proposed price for evaluation purposes only (i.e., Material NTE + ODCs + Options + Attachment III and IV)." However, the Total Material Price tab of Attachment III already adds the Total Test Market Basket to Transition, Labor, Material NTE and Total ODCs NTE. The Government's intent is not clear. Is it the Government's intent to add the Total Material Price spreadsheet Total to the Material NTE, ODCs, Options, and Attachment IV?The Government has clarified in Amendment 4. NTE and proposals will only be counted once.
25For offerors other than the incumbent, the transition period will include labor, but may also include travel costs since the place of performance is OCONUS. The solicitation is not clear as to whether the transition period is labor only. Can the Government please clarify?The transition shall include any and all ODCs and labor required.
26The Material and ODC NTE values in the solicitation are provided by the Government, but any burdening by offeror's to material and ODCs is unknown when developing these values. Is it the Government's intent to add any offeror's burdens to the NTE values?The Government has provided the NTE value for any allowable costs within the NTE. Offerors shall propose the not to exceed value.
27Under Personnel Qualifications, on page 3, there is reference to staff needing to "meet the experience, educational, and other background requirements set forth below" but no requirements are identified. Can the Government please provide the experience and educational requirements for each Labor Category?The only qualifications the Government requires are for the Site Manager and 3PL PM, as stated in the PWS. Educational stricken.
28The solicitation is unclear as to whether Attachment VIII needs to be completed and submitted with an offeror's proposal. If so, significant technical data is required to price these items. Does the Government expect a fully priced Attachment VIII with the proposal submission or only those items that are also included in Attachment III - Test Market Basket?Please see Volume II instructions. Attachment VIII is required.
29There are a number of items that are listed in Attachment III that are not listed in Attachment VIII, including 7930MC0007647, 7930MC0016123, A4, A5, 8010MC0017441, 8010MC0017465, 8010MC0017438, 8010MC0017472, 8010MC0010527, 8010MC0016932, 8030MC0016556, 8030MC0017056. Items not on the AUL cannot be issued. Can the Government please indicate if all items in Attachment III should also be included in Attachment VIII, and if not, why?The AUL is a living document and is subject to change at any time. Both attachment are required in Volume II
30There are a number of items that are identified as Never Out that are not listed in Attachment VIII, including 7930MC0016123, 7930MC0007647, 7930MC0016513. Items not on the AUL cannot be issued. Can the Government please explain why these are not listed in Attachment VIII AUL/Catalog?The AUL is a living document and is subject to change at any time. Both attachment are required in Volume II
31Page 8 of the solicitation document states that "the never-out list is an extension of the Master Stock List for the primary HMMC (Attachment VIII-AUL), and is not a separate item." This is the only place where a Master Stock List is mentioned. Can the Government please define the Master Stock List in relation to Attachment VIII?Page 8 changed from Master Stock List to AUL.
32The test market basket evaluation methodology heavily favors the current incumbent, who has past and current access to pricing from local Okinawa vendors that is not available to other offerors. Many of the items that have been requested to be priced (especially bulk chemicals) are ideally sourced from local vendors in order to provide customers lower price products, because local sources do not include shipping costs. Would the Government consider revising the Test Market Basket to exclude locally procured items in order to eliminate the incumbent’s advantage?The Government is not requiring a brand or source. Attachment is unchanged
33Use of a fixed price catalog forces offerors to incur risk that product prices do not escalate in the option years greater than the offeror’s projected escalation. It also forces offerors to make assumptions about shipping costs that are entirely out of their control, and again incurs risk. Actual shipping cost history is known only to the incumbent. This risk is magnified if offerors must price almost 1,600 items in Attachment VIII. Likewise, the incumbent knows the prices of the items in Attachment VIII and has an advantage over other offerors. Would the Government consider requiring pricing of the Test Market Basket for submission purposes of price evaluation, but delay pricing of Attachment VIII until the end of the Phase-In period using the same methodology with which the Test Market Basket is priced? This additional time mitigates risk for offerors and results in more accurate pricing for customers.The Government will not delay pricing of Attachment VIII. Offerors may wish to consider PWS section C-2.15 in determining the level of risk.
34Offerors cannot price the Test Market Basket or Attachment VIII until technical data for each Local Stock Number is provided. Likewise, alternate staffing plans cannot be developed without annual workload data. This data is already known by the incumbent and other offerors cannot develop their bids without this data. Will the Government please provide this data and extend the due date an additional 30 days from the date all LSN technical data and operational workload data is provided in order to provide non-incumbent offerors sufficient time to develop their bids?See Response to Question #15
35The incumbent is currently at an advantage by knowing workload, available GFE, site layout, HMMC design/capabilities, delivery routes, location of customer Camps and lockers, and overall familiarity with the local geography associated with this specific operation. In order to ensure all offerors are afforded access to the same operational information available to the incumbent with which to develop a competitive bid, would the Government consider providing offerors a site visit, similar to what’s been done with similar 3PL Hazmat procurements and specifically this procurement in the past?”The Government will consider a site visit but has also provided layout attachments. Site visit will be allowed at the expense of offerors. Offerors are to formally request a site visit to heather.coleman@navy.mil by COB 19 April 2018. Site visits will likely be scheduled the during the week of 23 Apr or 7 May.
36Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a mileage chart listing distances between the HM Minimization Centers (HMMC) and customer locations? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See attachments: Mileage Chart and Map of Okinawa
37Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a list of Government Furnished gas cylinders including NSN, NIIN, Nomenclature, Unit of Issue, and On Hand Quantity? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See attachement: JEMMS (Apr 2014 - Mar 2017 (Gases) This reflects three years of demand.
38Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a list of all Government Furnished Facilities? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See attachments: GFF - HMMC - Camp Hensen / GFF - HMMC Bldg 500 / GFF - HMMC Office Bldg 502 .
41Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a detailed map of the HM Minimization Centers (HMMC) and customer locations? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See response to Question # 38 and attachment (IssuePoints (4-16-18)
42Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide all HM drop points? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See attachment: IssuePoints (4-16-18)
43Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide the Hazardous Waste (HW) pick points and schedules? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See Amendment 4
44Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide inventory demand history by calendar year? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See Amendment 4
45Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide inthe LForm breakdown? This data is required for contractors to determine resource requirements in order to develop competitive pricing.See attachment: LFORM Breakdown (Kits for deployment support)
46Please confirm that the Labor cost for each period and the Transition cost should be filled out in the Total Material Price tab as well? Should the contractor assume that the labor and transition cost will be the same as in Section B, CLIN 0002 and CLIN 0004?That's correct.
47Could the Government identify the commodity groups used in the Test Market Basket spreadsheet?The Government will not be breaking out the pricing by commodity groups
48In the Total Material Price spreadsheet the Proposed Discount percentage (column C) seems to be a constant rate applied over an annual Estimated amount of the Test Market Basket whereas the Proposed Commercial Benchmark Discount %(Test Market Basket-column H) may vary between the commodity groups for a single period of performance. Could the Government clarify how a single Proposed Discounted Rate should be estimated per year when there might be multiple commodity groups with different percentages?Please see answer to question 47.
49Given that discounts by line item are required in the Test Market Basket worksheet, is the Total Material Price worksheet requesting an additional discount at the total price level?It is not. This is a composite of the discounts offered. See revised attachment.
50Could the Government confirm that the Unit Price/ List Price should be inclusive of the price customers will pay for the item plus the material and handling rate only?That is correct.

51 Could the Government confirm that the contractor should complete columns G, H and U in the Test Market Basket spreadsheet for items procured from a commercial source and the contractor should fill out columns G and V in the Test Market Basket spreadsheet for items procured from a Government source? Amendment 4 updates the columns

52 It would appear that by evaluating the Material NTE plus the totals from Attachment III is overstating the materials portion of the total evaluated price. Additionally, if the labor referenced in Attachment III represents the totals from Attachment IV, labor pricing would also be overstated. See Amendment 4

53 Could the Government provide instruction for completing Attachment VIII? See Amendment 4

54 Should the contractor assume that no price information is required for CLIN 0003 ODCS FFP and 1003- FAR 52.217-8 ODCS FFP as well? See Amendment 4

55Could the Government confirm that the Estimated Amounts in column B of the Total Material Price spreadsheet (before the Proposed Discount (in column C) and which Estimated Amounts equate to the Proposed Extended Prices in the Test Market Basket spreadsheet) will be used when calculating the total evaluation price?See Amendment 4
56Should Section B include a CLIN for the Total Material Price based on the Total amounts per period of the Test Market Basket?No change needed. Material will be the NTE value provided.
57Could the Government confirm that the contractor should include ODC and Travel for the Transition period and this cost is not part of the Government provided plug amounts?Confirmed

58 Could the Government confirm that there shouldn’t be any Fee or Profit on travel in the Transition period (CLIN 0004-FFP) as well? Confirmed

60 If the contractor maintains a minimum 30-day inventory level per the contract, and the material is not issued to customers before expiration of shelf life, it is assumed that procurement and disposition costs can be charged to the Government. If this assumption is incorrect, how does the contractor charge the Government for the material costs and disposition costs of the 30-day inventory? The assumption is incorrect. The Government will not be responsible for material or disposition costs of any inventory

66 Based on these two bullets, that the contractor has authority to place orders on behalf of the customer without approval so long as the maximum levels are not exceeded and charge the customers GCPC. Is this assumption correct? The contractor does not have authority to place orders on behalf of the customer. Contractor would own said inventory until purchased by an end user.

68 Can the contractor add transportation costs (C-2.9) and material handling charges (C-2.11) to the sales receipt? Only the material handling allowed in the PWS can be added to the price of the material charge.

74 Are the transportation charges in the material handling charges for transport of hazardous material from the HMMC to customers? Only the material handling allowed in the PWS can be added to the price of the material charge.

75 When required inventory levels are maintained by the contractor, but customers have a surge in requirements (i.e. deployment, work orders, multiple customer orders for the same material) that deplete inventory to NIS levels, will the Government allow more time for the contractor to replenish inventory when coordinated with the customer? The PWS shall be met/followed. Additionally, please see clause titled "AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER"

79What type of vehicle (i.e. van, car, truck) and quantity, if any, will the Government provide to be used in support of the contract? (Customer visits, meetings, QC/QA of hazardous material lockers and HWAPs, etc).No vehicle will be provided
80A list of HWAPS would be required to estimate pickup schedules, manpower, and vehicle requirements. When will a list of Hazardous Waste Accumulation Points (HWAPS) be made available?See Amendment 4

82 The solicitation does not identify the location, or buildings to be used, to operate the HMMC. What buildings, locations, and Government Furnished Property will be provided to support the HMMC operations? See Amendment 4

83 Can the contractor charge the customer for the transportation of material from the supplier to the HMMC site on the sales receipt (C-2.10.1)? Only the material handling allowed in the PWS can be added to the price of the material charge.

86 RFQ identifies service and delivery requirements specified in sections C-2, C-3, and C-4 of the PWS. Section C-4 is missing from the RFQ. Please provide Section C-4. See Amendment 4. See answer to Question 2.

89 Subfactor II – Management Approach requires “offerors to identify any risks or issues anticipated arising during the transition and methods to mitigate those risks and overcome transition issues”. This same statement is in Subfactor II Transition/Phase-in Plan. Please clarify if it is the Government’s intent that the offeror address transition risks in both sections? That is correct. Please refer to question 5.

93In reviewing the Q&A, we noticed not all questions were answered – when does the Navy anticipate releasing the remaining Q&A? Additionally, there are attachments referenced in the solicitation that have not been uploaded to FBO - when does the Navy anticipate uploading the missing attachments?The Government is still reviewing the remaining questions. Amendment 5 extends the solicitation close date. All attachments referenced in amendment 4 are uploaded with minor changes to the naming
94I’m trying to understand this solicitation. I see that there is multiple nsn on one of the sheets. We’re the rep for 1 of the NSN. My question is can we bid one NSN or is a combine solicitation?This solicitation is for the entire requirement.
951.Attachment III Material Price Submission Worksheet _Amend 4 contains NTE amounts from a previous version of the solicitation; are bidders authorized to update this section with the NTE amounts contained in Section B of Amendment 4?See Amendment 6
962. Seeking clarification for Q&A number 16. Attachment VIII does not contain a column X to be filled in. Did the Government mean to indicate column D "Unit Price"?

Q&A reference "Question Number: 16. Question: Attachment VIII includes numerous items listed that have Local Stock Numbers, but the comments refer them back to another NSN. Can the Government please explain the intent of the cross reference and how offeror's are to address pricing for these items? Are these items to be separately priced separately from the NSN referenced in the comment's section or will the Government provide the technical data that caused these items to be assigned a LSN? Answer: The offerors are to price column X"

See Amendment 6. Yes, the Government did intend to say column D.
973. Regarding Attachment VIII, can the Government can confirm that the Unit cost should only include M&H fee?Confirmed
984. In Section III Proposal content/ Volume II-Price proposal, the solicitation refers to a clause titled "Allowability of Material and General Business Expenses" in the solicitation. The Government refers to it in Section III. Can the Government provide the location of this clause?

Proposal reference "ODCs estimated above is for incidental material and special materials as defined in the clause entitled, "Allowability of Material and General Business Expenses" and elsewhere in the solicitation."

See Amendment 6.
99Site Visit for the week of 7 May - UPDATEThe Government will not be able to accommodate the 7 May site visit as previously expected. The Government has instead provided diagrams as attachments and will entertain any questions regarding the facility. These attachements are XIV-XVII.
100When will answers to the remaining questions be released.The Government expects to finalize all responses by 1 May.
101The RFP Amendment 0005 states, “The combined total of the proposed priced in Attachment III - Material Price Submission Worksheet and Attachment IV - Estimated Service Pricing Spreadsheet will determine the offeror's total proposed price for evaluation purposes only.”

Attachment IV represents the labor pricing, which appears to also roll into Attachment III. Combing the total of the two attachments would appear to overstate the labor pricing.

Additionally, the totals in Attachment III include the Material NTE and the total of the Test Market Basket. Assuming CLIN 0001 is where materials would be invoiced and is capped at the NTE number, adding the total of the Test Market Basket would overstate the materials estimate for this program.

Amendment 0005 also states the evaluated price is:

Material NTE + ODCs + Labor + Options + Attachment III and IV If Attachment III totals include the labor, material NTE and Test Market Basket pricing, then adding the additional elements of price to the Attachment III totals as stated above would overstate the value of this program.

Please clarify how the Government will calculate the total evaluated price.

See Amendment 6.
14PWS 2.2.3.2 states that, "Government managed inventories such as DLA, GSA and NAVSUP shall be used to maximum extent practical to fulfill customer demand within UMMIPS standards and Required Delivery Dates." The amount of government managed inventories (non-3PL HAZMAT) drives workload and an offeror's staffing solution. only the incumbent knows these inventory levels with which to determine adequate staffing. Can the Government quantify the amount of non-3PL material that will be required to be managed by the offeror and the workload associated with that inventory?See Amendment 6.
18Numerous items have a Unit Issue of BX. Can the Government define which of these items are sold as a complete BX or if the total quantity within the box is broken down and issued with a Unit Issue of EA? This packaging/conversion information is critical in determining workload volume. Also, can the Quantity Unit Pack be provided for the Unit of Issue that historically are procured and sold separately (e.g., items that are purchased in a BX of 12 but sold individually as EA).The 3PL provider is tasked with filling customer reqirements in the amount requested. This might require the offerer to acquire products at the packaging/quantity levels at which they are sold. Price of individual items in a BX is derived by cost of BX divided by number of items in the BX.
40Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a list of all Contractor Furnished Material and Supplies? This data is required for contractors to determine labor and equipment resource requirements in order to develop competitive pricing.See amendment 4.
64Laboratory or manufacturer testing may be required to extend the shelf life of Type II 30-day inventory material (C-2.2.3.2) approaching expiration/testing dates. As it is a contractual requirement to stock 30-day inventory levels, it is assumed that the costs of shipping material for laboratory testing, and any associated testing fees, will the burdened by the Government. How should be costs be charged back to the Government.Assumption is incorrect. 30-day inventory material belongs to the vendor until purchased by the Government and all costs are responsibility of the vendor.

67 Will the contractor be provided access to N-ERP? No. Contractor will use HMMS for material management.

69Shipping of dangerous goods (regulated hazardous materials) procured outside of Okinawa can take in excess of 72 hours due to international and domestic dangerous goods regulations that the contractor cannot control.Contractor is expected to adhere to the requirements in the RFP.
How does the Government expect the contractor to meet a 72 hour required delivery date in instances where dangerous goods regulations dictate a longer shipping time?
70Will the contractor be required to physically process antifreeze for recycling or hand over to MCB Environmental for processing?Government will provide facility and equipment to support this requirement per PWS C-3.3.6.

71 If the contractor is responsible for physically recycling antifreeze, will the Government provide the facilities and equipment necessary to perform the task? Government will provide facility and equipment to support this requirement per PWS C-3.3.6.

81 A list of customer HAZMAT lockers would be required to estimate delivery and locker management schedules, manpower, and vehicle requirements. When will a list of HAZMAT lockers be made available? See amendment 4.

84 It is unclear what the term “on station’ is in reference to. Will the Government define where “on station” means? "On station" is interchangeable with "delivery point."

90There is no section C-2.1 in the PWS. Will the Government make this section available?See amendment 4.
19For Attachments III and VIII, a large portion of the items do not have specific container sizes assigned to the Unit of Issue or in the Item Description itself. For example, Hydrochloric Acid has a LSN, but no container size. The lack of container size information does not allow offerors to obtain accurate pricing, since they may obtain pricing for the wrong sized container. Can the Government please provide the Unit of Issue sizes to allow for accurate pricing of these attachments?Please see Attachment XXVI.
39Contractors other than the incumbent are at a disadvantage without data that would typically be provided with a solicitation of this type. Can the Government please provide a list of all Government Furnished Equipment including the location of all equipment? This data is required for contractors to determine labor and equipment resource requirements in order to develop competitive pricing.Please see Attachment XXV.
72Past inspections by MCB Fire Department and Base Safety verbally stated that Camp Kinser building 500 walls are not rated, and ventilation inadequate, to support the recharging of Hawker batteries.Government will provide facility for recharging of Hawker batteries.
What Government building/facility will be used for recharging Hawker batteries?
73Past inspections by MCB Fire Department and Base Safety verbally stated that Camp Kinser building 500 walls are not rated, and ventilation inadequate, to support the recharging of Hawker batteries.Government will provide facility for recharging of Hawker batteries.
For contractor safety, does the building/facility require approval from MCB Fire Department and Base Safety for this task?
77For Government owned compressed gas cylinders, how will hydrostatic testing, Japan Government permissions, valve replacement, etc service fees be charged back to the Government?Please see Amendment 8.
78When will the list of GFP be made available to the contractor?Please see Attachment XXV.

61 If HAZMAT is labeled with the GDS barcode tracking label upon issue, is it correct to assume that the GDS barcode tracking label is not required to be applied to HAZMAT prior to stowing/storing in the HMMC warehouse shelf bin? See Amendment 8.

62 According to C-2.4 GDS barcodes would be labeled ‘upon issue’. Could the Government clarify what label is being referred to in this part since GDS barcodes would not require labeling until the point of issue? See Amendment 8.

63 Will the Government provide environmentally-controlled storage equipment or facilities with these capabilities? Temperature controlled storage is available, if needed.

65 If HAZMAT is not used or issued free, the HAZMAT would be located at USNH, not the HMMC. Will the Government verify the pickup location is at the HMMC? See Amendment 8.

76Is the contractor required to ship hazardous material in support of this contract through DLA Distribution San Joaquin’s Consolidation and Containerization Point (CCP)?No. Use of DLA Distribution San Joaquin’s Consolidation and Containerization Point (CCP) is not a requirement for shipping of HM in support of this contract.
85Will the government confirm if the Comprehensive Inventory Management Plan is an attachment or a deliverable once the contract is awarded? A comprehensive plan within the 30 page limit would be difficult to accomplish.See Page Limits in Section L.
87RFQ contains the statement “The PRS contains the critical performance requirements for this PWS.” Will the PRS be provided?See Amendment 8.
88DoD 4715.5 Overseas Baseline Environmental Governing Standards (OBEGS) is referenced and location is shown as “Technical Library.” Will access instructions and access to Technical Library be provided?See Amendment 8.
91The current process requires customers submit an AUL adjustment form for approval to stock up to a maximum number of hazardous materials in their lockers. Approvals of the hazardous material and maximum quantities are provided the AUL Working Group, which consists of Base Supply, Installation Safety, Environmental, and Industrial Hygiene (depending on the type of material). Section C-2.8.2 indicates that shop supervisors can determine levels to be stocked in their lockers. What will the process be for the reviewing and approving of hazardous material stock levels in customer lockers?See Amendment 8.

92 The RFP doesn’t provide a Government Fill Rate or the method to calculate the fill rate. Can the Government provide this rate and the criteria used to calculate this rate? See Amendment 8.