Attachment_J.6-_Delivery_Order_0001.pdf

PDF 110 KB Posted

Attached to
U-VISTA Computer Based Equipment Simulations
Solicitation number
N0017817R0005
Issued by

About this file

Attach J.6 Delivery Order 0001

View the file

Other files

File Type Posted
Solicitation_N00178-17-R-0005.pdf PDF
vista_dd254_SIGNED_07OCT2016.pdf PDF
AttachmentJ.4-CostSummaryFormat_CPFF.xls XLS spreadsheet
AttachmentJ.5-RateCheckForms.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.6- Delivery Order 0001

Request for Quote I Task Order Action Sheet

1. Contractor/Contract & Order Number: VISTA NOOl 78-17-D-0005, Order 0001

2. Action Type: Follow-on to __ New Order x_ Order Type: Cost-Plus-Fixed Fee Completion

3. Project Period of Performance: one year from Date of Award

4. Government Space for !! individuals is provided.

5. The following Governments Furnished Property is provided: None.

6. The Government's estimate of the labor mix and LOE required to perform this effort is shown below. The proposal should fully justify any deviations.

Assistant Program Mana er

3,626

Sr. Graphic Artist 2,030 3,532 1,939

Jr. Applications Tester 732 Total 13,358

7. The Government's estimate (unburdened) for ODCs is shown below. Your proposal should fully justify any excess amounts.

Travel: Identified in SOW Para C.2.6.1 - NTE $22,380.00 Materials: Identified in SOW Para- NTE $0.00

8. The Statement of Work and deliverable requirements are attached. The DD form 1423 was provided as an attachment to the solicitation (will be incorporated in the basic Contract upon award). The following Performance Criteria will be included in the order:

PERFORMANCE OBJECTIVE: The Contractor shall provide the necessary technical expertise to accomplish the tasking outlined in the SOW.

PERFOMANCE STANDARD: Timeliness - Deliver products within deadlines identified in the order. Accuracy-Factually accurate, complete and in accordance

Page 1of5

Attachment J.6-Delivery Order 0001 with NA VSEA, NSWCDD and Navy Standards and policy. Other standards and deliverables as agreed to in the order.

ACCEPTABLE QUALITY LEVEL: Quality-Free of spelling errors, grammatically correct, correct format and fully coordinated with any stakeholders. All deliverables must be fully compatible with Navy Marine Corps Intranet (NMCI) format for Microsoft Word, Excel, PowerPoint, Access, Program Manager and other application programs as described herein.

MONITORING METHOD: Government review and assessment of deliverables and products. Periodic reports from Contractor of work accomplished, including monthly status reports of active tasks.

10. Endorsement from the Canadian Commercial Corporation (CCC) form: "Price Endorsement by the Canadian Commercial Corporation" MUST be submitted at time of proposal submission. The Contractor MUST provide proof of submission with each proposal submission with each order.

11. Contract Specialist: Danielle M. Allen Email: Danielle.allen2@navv.mil

Page 2of5

Phone:540-653-7419

Attachment J.6 - Delivery Order 0001

Request for Quote/Task Order

SQQ-89AM15J VISTA TM

Statement of Work

C. DESCRIPTIONS AND SPECIFICATIONS

C.1 INTRODUCTION

This is an acquisition focusing on the results to be achieved as opposed to the manner by which the work is to be performed. The effort performed hereunder will be evaluated in accordance with the performance standards/acceptable quality and evaluation methods described in the Performance Criteria of the order.

This tasking involves the development of the SQQ-89A(V)15J VISTA™ Synthetic Maintenance Trainer (SMT) for the Center Surface Combat Systems (CSCS), Naval Surface Warfare Center Dahlgren Division (NSWCDD), Dahlgren, VA.

C.1.1 Scope of Work

This SOW provides for a SQQ-89A(V)15J VISTA™ Synthetic Maintenance Trainer (SMT) and delivery to CSCS Dahlgren. The scope of work will include the Non Recurring Engineering (NRE) activities necessary to upgrade the existing simulation.

This SOW also provides for the creation of the necessary documentation to support the SQQ-89A(V)15J VISTA™ and the conduct of one (1) site training and installation trip in the United States.

C.2 STATEMENT OF WORK

The requirements specific to the SQQ-89A(V)15J VISTA TM application shall include the following:

a. The SQQ-89A(V)15J VISTA ™shall be developed using Framework 6 and new graphics shall be produced to current VISTA TM standards. Graphics may be reused from the SQQ-89(V)15J VISTA™ at the discretion of the technical team.

b. The SQQ-89 (V)15J VISTA™ is a previous version that will be used as a technical reference for the development of the SQQ-89A(V)15J VISTA™ as follows:

1) The SQQ-89(V)15J has been updated to the SQQ-89A(V)15J configuration as described in the SQQ-89(V)15J Visual Interactive Simulation Training Application (VISTA) Report dated 13 October 2015. This document contains a description of both common and new units~ The SQQ-89A(V)15J VISTA™ will include a total of fifty-five

(55) units.

Page 3of5

Attachment J.6-Delivery Order 0001

2) The SQQ-89(V)15J VISTA TM User Manual and Instructor Manual will be updated to reflect the SQQ-89A(V)15J configuration, including incorporating comments in the SQQ-89(V)15J Visual Interactive Simulation Training Application (VISTA) Report dated 13 October 2015.

c. A total of eighty-eight (88) scenarios will be implemented as follows:

1) One (1) Operational Maintenance Task (OMT) scenario will be implemented.

2) Twenty-five (25) faults from the SQQ-89 (V)lSJ VISTA™ will be implemented for the SQQ-89A(V)l5J VISTA™ with modifications for the new Common Enterprise System (CES).

3) Forty-eight (48) faults from the SQQ-89 (V)15J VISTA TM are no longer valid and will be replaced for the SQQ-89A(V)15J VISTA™.

4) Fourteen (14) new faults for the new units will be implemented for the

SQQ-89A(V)15J VISTA™.

d. The "Sharable Content Object Reference Model (SCORM) Compliant" version shall conform to SCORM 2004 3rd edition minimum required guidelines.

e. The SQQ-89A(V)15J VISTA™ shall be delivered in Stand-Alone, Networked and Shareable Content Object Reference Model (SCORM) compliant versions.

C.2.1 Data Deliverables

The Contractor shall provide Data Deliverables under this tasking as stated in Section C - Statement of Work- of the VISTA™ III Contract to include the following:

a. SQQ-89A(V)15J VISTA™ Technical Data Package (TDP) (CDRL AOOl)

b. SQQ-89A(V)15J VISTA TM Requirements Specification (CDRL A002)

c. SQQ-89A(V)15J VISTA TM Kick-off Package (CDRL A003)

d. SQQ-89A(V)15J VISTA™ User Manual (CDRL A004)

e. SQQ-89A(V)15J VISTA™ Test Plan and Test Procedure Sheets (CDRL AOOS)

f. SQQ-89A(V)15J VISTA TM Test Plan Report (CDRL A006)

g. SQQ-89A(V)15J VISTA™ Application (CDRL A007)

h. SQQ-89A(V)15J VISTA™ Instructor's Manual (CDRL A009)

i. Inputs to the Program Management Progress Reports (CDRL AO 10).

J. SQQ-89A(V)15J VISTA™ Travel Report (CDRL A012).

C.2.2 Period of Performance/Delivery Date

The Period of Performance/Delivery date for this Delivery Order shall be twelve (12) months from date of award.

Page 4of5

Attachment J.6 - Delivery Order 0001

C.2.3 Final Acceptance

Final acceptance of the SQQ-89A(V)15J VISTA™ application shall occur at the Contractor's production facility in Montreal, QC, Canada at completion of the Factory Acceptance Test (FAT). It is anticipated that the FAT will be twelve (12) working days in duration and will consist of a review of the applications to validate that the requirements defined above have been met.

C.2.4 Simulation Baseline Software

The Contractor shall baseline and put under configuration control the SQQ-89A(V)15J VISTA™ software with version number and date upon successful completion of the

FAT.

C.2.5 Delivery

TM ' The FAT shall be followed by delivery of the SQQ-89A(V)15J VISTA contractual deliverables to CSCS at Dahlgren, VA.

C.2.6 On Site Installation

The Contractor shall support data collection, site training and installation session in the United States as determined by the Government.

C.2.6.1 Travel

The following travel is anticipated to support the data collection and installation:

Destination Dahlgren, VA Dahlgren, VA

Number of Trips

C.2.7 Notification oflmpact

Duration (days)

Number of Travelers

The Contractor shall supply the Government with an immediate notification of impact as soon as possible after the Contractor knows, or has reason to know of any major event that may:

a. Impact program planning or schedules, and/or

b. Require assistance to resolve problems or potential problems due to communications that may potentially contribute to program delays and/or adversely affect progress of the SQQ-89A(V)15J VISTA™ development or production.

Page 5of5

File details come from the government source that posted it. Updated .