0312-05_-_Rugged_Panel_Modification_-_CDRL_A002_(Engr_Drawings).pdf

PDF 123 KB Posted

Attached to
AUTOMATIC DATA PROCESSING EQUIPMENT AND SUPPORT EQUIPMENT
Solicitation number
N0017814Q4302
Issued by

About this file

CDRL A002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP ___ TM _____ OTHER X - DRPR

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

RUGGEDIZED TOUCH PANELS N00178- MILCOTS, LLC

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 ENGINEERING DRAWINGS TOUCHPANEL INTERFACE DRAWING PACKAGE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-DRPR-80651 (SEE BLK 16) SOW Para 4.2 NSWC DAHLGREN, G34

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED ONE/R SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D (SEE BLK 16)

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft Final

A N/A N/A Reg Repro

16. REMARKS TPOC 1 1 0

BLK 4: CONTRACTOR SHALL PROVIDE PRELIMINARY DRAWING AND SOLID MODEL CREATION:

THE CONTRACTOR SHALL PROVIDE A PRELIMINARY REVISED INSTALLATION DRAWING

PACKAGE. THE CONTRACTOR SHALL PROVIDE A 3D CAD MODEL THAT INCLUDES THE

MODIFICATION. THE PRIMARY PURPOSE OF THIS DRAWING PACKAGE IS TO DEMONSTRATE

HOW THE TOUCHPANEL IS ATTACHED.

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 30 DAYS FROM

RECEIPT OF DRAFT TO REVIEW AND COMMENT. THE CONTRACTOR HAS 15 DAYS TO SUBMIT

REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS WITHIN 30 DAYS

UPON RECEIPT OF THE DRAFT, SUBMITTAL IS APPROVED.

BLOCK 9: DISTRIBUTION STATMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF

DEFENSE AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY USE APRIL 2012. OTHER

REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO COMMANDER, NAVAL SURFACE

WARFARE CENTER DAHLGREN DIVISION, ATTENTION G34,17320 DAHLGREN ROAD, DAHLGREN,

VA 22448-5100.

BLKS 10, 12: DRAFT DUE 5 DAYS UPON COMPLETION OF THE MODIFICATION. FINAL

SUBMISSION DUE 15 DAYS AFTER GOVERNMENT APPROVAL OF DRAFT.

BLK 14: ELECTRONIC MEDIA: ENGINEERING DRAWINGS SHALL BE SUBMITED IN ONE OF THE

FOLLOWING FORMATS: AUTOCAD, SOLID WORKS 2010 (OR NEWER) OR ALTIUM DESIGNER 6.9

(OR NEWER). UTILIZATION OF ANY OTHER SOFTWARE PROGRAM MUST BE APPROVED BY THE

GOVERNMENT PRIOR TO UTILIZATION. DRAWINGS ARE TO BE ATTACHED TO EMAIL AND

SUBMITTED TO THE TPOC AS LISTED IN SECTION G, GOVERNMENT CONTRACT

ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES.

SEE BLK 16

15. TOTAL ▬▬▬▬► 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

MATTHEW SPRUILL

18 Mar 2014

PATRICIA A. HONOSKY, DM

18 Mar 2014

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 4 Pages

2014-03-19T09:08:25-0400
SPRUILL.MATTHEW.R.1057837086
2014-03-19T09:17:00-0400
HONOSKY.PATRICIA.ALISA.1172371660

File details come from the government source that posted it. Updated .