0312-05_-_Rugged_Panel_Modification_-_CDRL_A001_(Engr_Drawings).pdf
PDF 123 KB Posted
- Solicitation number
- N0017814Q4302
About this file
CDRL A001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___ TM _____ OTHER X - DRPR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
RUGGEDIZED TOUCH PANELS N00178- MILCOTS, LLC
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 ENGINEERING DRAWINGS UPDATED BLOCK DIAGRAM/WIRE RUN LIST
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-DRPR-80651 (SEE BLK 16) SOW Para 4.1 NSWC DAHLGREN, G34
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD REQUIRED ONE/R SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D (SEE BLK 16)
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft Final
A N/A N/A Reg Repro
16. REMARKS TPOC 1 1 0
BLK 4: THE CONTRACTOR SHALL PROVIDE AN UPDATED BLOCK DIAGRAM AND WIRE RUN LIST.
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 30 DAYS FROM
RECEIPT OF DRAFT TO REVIEW AND COMMENT. THE CONTRACTOR HAS 15 DAYS TO SUBMIT
REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS WITHIN 30 DAYS
UPON RECEIPT OF THE DRAFT, SUBMITTAL IS APPROVED.
BLOCK 9: DISTRIBUTION STATMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY USE APRIL 2012. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO COMMANDER, NAVAL SURFACE
WARFARE CENTER DAHLGREN DIVISION, ATTENTION G34,17320 DAHLGREN ROAD, DAHLGREN,
VA 22448-5100.
BLKS 10, 12: DRAFT IS DUE 5 DAYS UPON COMPLETION OF THE FIRST PHASE OF ENGINEERING.
FINAL SUBMISSION IS DUE 15 DAYS AFTER GOVERNMENT APPROVAL OF DRAFT.
BLK 14: ELECTRONIC MEDIA: ENGINEERING DRAWINGS SHALL BE SUBMITED IN ONE OF THE
FOLLOWING FORMATS: AUTOCAD, SOLID WORKS 2010 (OR NEWER) OR ALTIUM DESIGNER 6.9
(OR NEWER). UTILIZATION OF ANY OTHER SOFTWARE PROGRAM MUST BE APPROVED BY THE
GOVERNMENT PRIOR TO UTILIZATION. DRAWINGS ARE TO BE ATTACHED TO EMAIL AND
SUBMITTED TO THE TECHNICAL POINT OF CONTACT (TPOC) AS LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES.
SEE BLK 16
15. TOTAL ▬▬▬▬► 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
MATTHEW SPRUILL
18 Mar 2014
PATRICIA A. HONOSKY, DM
18 Mar 2014
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 4 Pages
| 2014-03-19T09:07:10-0400 | |
| SPRUILL.MATTHEW.R.1057837086 |
| 2014-03-19T09:16:21-0400 | |
| HONOSKY.PATRICIA.ALISA.1172371660 |
File details come from the government source that posted it. Updated .