Amendment 01 N00174-21-R-0009.pdf
PDF 149 KB Posted
- Attached to
- Rapid Response Munitions Testing & Engineering Services Federal contract opportunity
- Solicitation number
- N0017421R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 -N00174-21-R-0009.pdf | ||
| Attachment_G_Prime_Cost_Summary_Format-REV 1_12 Jan_21.xlsx | XLSX spreadsheet | |
| Attachment H - Subcontractor_Cost_Summary_Format-REV 1_12 Jan 2021.xlsx | XLSX spreadsheet | |
| Attachment B -CDRL 006.pdf | ||
| Attachment_B_CDR_004.pdf | ||
| Attachment_G_Prime_Cost_Summary_Format.xlsx | XLSX spreadsheet | |
| Attachment_D_DD_254.pdf | ||
| Attachment_C_QASP.pdf | ||
| Attachment B-CDRL 003.pdf | ||
| Attachment B -CDRL 002.pdf | ||
| N00174_21_R_0009.pdf | ||
| Attachment H - Subcontractor_Cost_Summary_Format.xlsx | XLSX spreadsheet | |
| Attachment_B_CDRL_001.pdf | ||
| Attachment_I_Personnel_Qualifications.docx | DOCX document | |
| Attachment_F_Past_Performance_Questionnaire.pdf | ||
| Attachment_E_Past_Performance_Matrix.pdf | ||
| Attachment B -CDRL 005.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 01 to the subject solicitation is to perform the follow ing:
1. Provide answ ers to questions received under solicitation N0017421R0009.
See ensuing page for more information.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017421R0009
X 9B. DATED (SEE ITEM 11)
17-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jan-2021
CODE
NSWC IHD C02
4081 N. JACKSON RD
BLDG 841
INDIAN HEAD MD 20640-5116
N00174 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0017421R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
The following are applicable to this amendment:
1. The following Q&A is provided:
Question # 1:
The following question is in regard to the first paragraph on page 13 of the solicitation, where it is stated : “The Contractor shall perform component and system level tests, at a single location, in accordance with NAVSEAINST 8020.8”.
“I cannot find an explanation in the TB-700-2 NAVSEAINST manual on what it means.
(Contractor’s name) does not have environmental testing capabilities, so if we team with a company that does have these capabilities (at another local) we would not be able to test them here?
Answer to Question # 1:
“single location” means a test can be performed at either the main or the sublet single location.
A contractor can sublet the work, but will be responsible if the test was not performed in accordance with the standards (NAVSEAINST 8020.8, MIL-STD-2105 etc.).
Question # 2:
In reviewing the Solicitation, I have noticed that the Solicitation document consistently refers to a FFP basis contract, however the supplied files Attachment_G_Prime_Cost_Summary_Format and Attachment+H+-+Subcontractor_Cost_Summary_Format show “CPFF” as the 1st Tab title and in the row 51 Total line.
To ensure no confusion, will you please verify that those labels are incorrect and may be modified by (contractor’s name) in our submitted file(s) to show the FFP label?
Answer to Question # 2:
The CPFF labels in Attachments G and H are typographical errors and should have been labeled as “FFP”. The revised Attachment G (Prime Cost Summary Format) and Attachment H (Subcontractor Cost Summary Format) have been posted in Beta.SAM along with Amendment 01.
Questions regarding this amendment should be directed to Willy Quiambao at willy.quiambao@navy.mil