This file is a Questions and Answers document addressing clarifications and concerns raised by potential offerors regarding a Request for Proposals (RFP) for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an initial Task Order 1 (TO1).
The solicitation, issued by the Naval Research Laboratory (NRL), concerns an IDIQ contract with a maximum total value of $110 million and a period of performance beginning February 28, 2027. Amendment 0001 addressed numerous clarifications, including corrections to SF 33 dates (correcting the issuance date to September 25, 2026, and proposal due date to November 6, 2026 at 1:30 PM ET), removal of a previously referenced Amendment 0002, and revision of attachments addressing personnel qualifications and labor categories. The proposal submission requires separate volumes with specific page limits, including a cover letter, technical volume with four scenarios and staffing matrix (22 pages maximum), past performance (with an extended 8-year history period), organizational conflict of interest documentation, and detailed cost proposals. Key Personnel must possess final security clearance eligibility by proposal submission for the initial award, with non-Key Personnel required to obtain clearances prior to Task Order 1 performance start; paperwork must be submitted within ten business days of award. The government will accept independent CPA reviews of accounting system adequacy in lieu of cognizant agency reviews, provided the reviewer addresses SF 1408 criteria and DFARS requirements. Offerors may adjust formulas within the cost proposal workbook and link information between sheets to accurately reflect proposed pricing, and the past performance evaluation period was extended from the original five years to eight years to promote small business competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Task Order 1 Level of Effort REVISED.pdf | ||
| Attachment 6 - IDIQ Level of Effort REVISED.pdf | ||
| Attachment 8 - Cost Proposal Format REVISED.xlsx | XLSX spreadsheet | |
| Solicitation Amendment N0017326RGF020001 SF 30.pdf | ||
| Attachment 2 - Personnel Qualifications and Locations REVISED.pdf | ||
| Attachment 5 - Past Performance Questionnaire.pdf | ||
| Attachment 7 - Task Order 1 Level of Effort.docx | DOCX document | |
| Exhibit A - CDRL.pdf | ||
| 26-R-GF02 Attachment 9 - Requirements for Onsite Contractors.docx | DOCX document | |
| Attachment 2 - Personnel Qualifications and Locations.docx | DOCX document | |
| Attachment 3 - Task Order 1 SOW.docx | DOCX document | |
| Attachment 4 - Draft DD254.pdf | ||
| Attachment 6 - IDIQ Level of Effort.docx | DOCX document | |
| Attachment 8 - Cost Proposal Format.xlsx | XLSX spreadsheet | |
| Attachment 1 - IDIQ SOW.docx | DOCX document | |
| Solicitation - N0017326RGF02.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Original N Order No. Document Doc Section Question Government response 1 0 1 SF 33 (RFP) Block 05 Will the date issued on the SF 33 be updated to 9/25/26 to align with SAM? Currently, it shows
10/3/25.
See Amendment 0001 and revised SAM post.
24 0 2 SF 33 (RFP) Block 05 Please clarify if the date in Box 5 should indicate 25 Sept 2026. See Amendment 0001 and revised SAM post.
26 0 3 SF 33 (RFP) Block 05 SAM.gov reflects that the solicitation was issued on 25 Sep 2026 with a proposal due date of 06
Nov 2026. However, Blocks 5 and 9 of the SF33 shows 03 Oct 2025 as the issuance date and 26 Oct 2026 as the proposal due date. Considering these dates impact when questions are due and past performance validity period, please confirm that the solicitation issuance date in Block 5 should reflect 25 Sep 2026 and Block 9 should show 06 Nov 2026.
See Amendment 0001 and revised SAM post.
2 0 4 SF 33 (RFP) Block 09 Will the proposal due date on the SF 33 be updated to 11/6/26 by 1:30PM ET to align with
SAM?
Currently, it shows 10/26/26 by 2:00 PM.
See Amendment 0001 and revised SAM post.
25 0 5 SF 33 (RFP) Block 09 Please clarify if the date in Box 9 should indicate 06 Nov 2026. See Amendment 0001 and revised SAM post.
3 0 6 SF 33 (RFP) Block 14 Will Amendment 0002 dated 10/29/25 on the SF 33 be removed? See Amendment 0001 and revised SAM post.
27 0 7 SF 33 (RFP) Block 14 Please confirm that Amendment 0002 has not been issued as reflected in Block 14. See Amendment 0001 and revised SAM post.
28 1 8 RFP B-3 Please clarify if $85M is the maximum IDIQ contract ceiling or allowable task order ceiling. See Amendment 0001:
The IDIQ maximum total value is revised from $85M to $110M.
Task order values when combined shall not exceed $110M.
29 1 9 RFP F-4 Since the IDIQ contract has a period of performance that starts on 28 Feb 2027, please confirm that there will be a 30-day phase-in period after contract award with an effective commencement date of 28 Feb 2027.
TO1 will start at contract award with phase in period to be determined.
30 1 10 RFP F-4 Since the IDIQ contract has a period of performance that starts on 28 Feb 2027, please confirm that 28 Feb 2027 is also the presumed start date of TO1.
TO1 will start at contract award with phase in period to be determined.
12 1 11 RFP I - Clauses Page 30 of the Solicitation, Indefinite Quantity (52.216-22), paragraph c, states "The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations". Does this conflict with the Presonnel Qualifications attachment that states specific locations?
No.
31 1 12 RFP L-3-1 “All Key Personnel and all personnel proposed for TO1 shall possess the final security-clearance eligibility required by the applicable DD Form 254 and TO1 SOW as of proposal submission.”
Considering the requirement to have all Key Personnel have an active security clearance specified by the DD254 at the time of proposal submission creates a significant barrier to competition and disproportionately favors the incumbent contractor.
To promote meaningful small business competition, would the Government consider revising the requirement to state:
“All Key Personnel and all personnel proposed for TO1 shall possess the final security-clearance eligibility required by the applicable DD Form 254 and TO1 SOW prior to the start of TO1 performance.”
See Amendment 0001:
Paperwork for DD254 must be submitted to NRL security no later than 5 days following the award date.
NRL revised Section L accordingly.
“All Key Personnel shall posses the final security-clearance eligibility required by the applicable DD254 and TO1 SOW by proposal submission.
Non-Key personnel proposed for TO1 shall possess the final security-clearance eligibility required by the applicable DD Form 254 and TO1 SOW prior to the start of TO1 performance.”
All personnel security paperwork required to be submited to NRL shall be submitted within 10 business days of award.
32 1 13 RFP L-4 “The Offeror shall include in Volume II either:
(1) an affirmative statement that it is not aware of any actual…or
(2) a disclosure and proposed mitigation plan for each actual or potential OCI or unfair competitive advantage of which it is aware.”
Please confirm that Offerors who have no real or perceived OCI, are not required to submit an OCI Mitigation Plan with their proposals.
An OCI Mitigation Plan is only required when an actual or potential OCI or unfair competitive advantage is known.
An affirmative statement is required when an offeror has no real or perceived OCI.
35 1 14 RFP L-7-2 Considering Section L-9 calls for a Cover or Transmittal Letter, please confirm that the following file naming convention for the Cover or Transmittal Letter, which is to be submitted separately from Volumes I – V, is acceptable:
[Solicitation Number]_[Offeror Name]_[Cover or Transmittal Letter].
Similarly, please confirm that it is acceptable to name the two separate pricing worksheets called for by L-9-5-1.b.1. as
[Solicitation Number]_[Offeror Name]_[Attachment 8 – IDIQ and Attachment 8 – TO1].
Confirmed.
36 1 15 RFP L-7-2 “Each email shall not exceed [INSERT MAXIMUM TOTAL MESSAGE SIZE, IN MB].”
Please specify the maximum file size.
See Amendment 0001:
25MB
37 1 16 RFP L-9 “The proposal volumes discussed below shall be accompanied by a cover letter (letter of transmittal) identifying the Offeror's name….”
Please confirm that the Cover or Transmittal Letter is to be submitted as a separate file from the Volumes I – V proposal files.
Confirmed.
38 1 17 RFP L-9-1 “Volume I shall contain only a master table of contents and….”
Please confirm that the Volume I Table of Contents may be included in the “Master Table of Contents,” which is excluded from page count as the 2-page limit only applies to the Cross- Reference Table.
See Amendment 0001:
No Limit on page numbers releated to cross-reference tables
39 1 18 RFP L-9-2 Please confirm that an independent, third-party review and determination that an Offeror’s accounting system has been reviewed and determined to be adequate and meets all requirements of the Pre-Award Survey or SF1408 is acceptable in lieu of a cognization federal government agency review.
See Amendment 0001:
NRL will accept will accept an independent review by a qualified CPA or CPA firm experienced in Federal contract cost accounting as evidence of accounting system adequacy.
The Offeror must provide a signed report addressing the applicable SF 1408 criteria and DFARS 252.242- 7006 requirements, including the reviewer’s findings and conclusion.
40 1 19 RFP L-9-2-2 Please confirm that if Offerors do not have a real or perceived OCI, they are not required to submit an OCI Mitigation Plan.
See Question 13
41 1 20 RFP L-9-2-6 L-8-7 calls for, “The Offeror shall include in Volume II a consolidated list of all material assumptions and all exceptions to the solicitation.” To ensure consistency in proposal preparation and evaluation, would the government consider revising the requirement for L-9-2-6 to include requirements for both “assumptions” and “exceptions?” Additionally, please confirm that the requirement to include “assumptions” in Volume II pertains to contract-level assumptions as the scenarios have their own assumptions.
"Assumptions" pertains to contract level assumptions.
Offerors may note "exceptions" as well as "assumptions" where the RFP only states "assumptions".
42 1 21 RFP L-9-3-1 & L-9-3-3 Please confirm that the maximum number of pages for Volume III is 22, including up to 20 for the four (4) scenarios and up to 2 pages for the staffing matrix.
Confirmed. Although subject to the instructions there may be annexes that are not part of the official page count.
43 1 22 RFP L-9-3-3 Please confirm that the IDIQ Labor Categories contained in Attachment 6 represent all available labor categories for the resulting contract and Task Orders issued under the prime contract.
Additionally, please confirm that new labor categories may not be introduced or proposed at the task order level.
The IDIQ LOE intends to capture all possible labor categories, however the unpredictable nature of requirements may necessitate extra labor categories at the Task Order level subject to proposal and negotiation.
44 1 23 RFP L-9-3-3 “Each Key Personnel position identified in the Personnel Qualifications attachment for the Base IDIQ or TO1….” The solicitation calls for the Staffing Matrix to identify Key Personnel in the Personnel Qualifications attachment for the Base IDIQ or TO1. Although the IT Specialist III is identified as a Key Personnel in Attachment 7, it is not in Attachment 6. Similarly, the IT Specialist IV is identified as a Key Personnel in Attachment 6, but not in Attachment 7. Please confirm that the IT Specialist III and IV are to be identified as Key Personnel in the Staffing Matrix.
See Amendment 0001: Attachments 2, 6, and 7 are revised.
45 1 24 RFP L-9-3-3 “Each Key Personnel position identified in the Personnel Qualifications attachment for the Base IDIQ or TO1….” The solicitation calls for the Staffing Matrix to identify Key Personnel in the Personnel Qualifications attachment for the Base IDIQ or TO1. Since only TO1 is awardable at contract inception and there is no identified task order for the remaining Base IDIQ Key Personnel, would the government consider removing the requirement to name Base IDIQ Key Personnel as there is no define role for the four additional Base IDIQ Key Personnel positions that are not identified in TO1?
See Amendment 0001.
For Key positions not required under TO1, offerors may provide signed commitments contingent upon IDIQ award and issuance of a task order requiring those services.
These individuals are not required to be hired or dedicated to this contract before their services are needed, but must be available by the applicable task order’s required performance start date.
NRL anticipates awarding subsequent task orders which would require the remaining Key Personnel by Feb. 2027.
46 1 25 RFP L-9-3-3 The Staffing Matrix calls for the identification of “Clearance Level/Number Cleared” for Non- Key Base IDIQ and TO1 labor categories, implying that the government will evaluate the number of available cleared Non-Key Personnel. Considering the “Acceptable/Unacceptable” evaluation criteria, the current solicitation unfairly favors the incumbent contractor or their team as they currently employ all required personnel. Since only TO1 is awardable at contract award, would the government consider revising the Staffing Matrix to only include TO1 Key Personnel?
See Amendment 0001:
The staffing matrix is only applicable to TO1 Key and non-key personnel..
47 1 26 RFP L-9-3-3 “Coverage basis--Base IDIQ Key Personnel, TO1 Key Personnel, or TO1 non-Key--and the Government labor-category title and level from the Personnel Qualifications and LOE attachments.”
Please confirm that the Staffing Matrix Base IDIQ and TO1 Key Personnel may be the same individual
Additionally, please confirm that only TO1 non-Key Personnel are to be included in the Staffing Matrix. The Base IDIQNon-key are required for only the
See Amendment 0001:
No Base IDIQ Staffing Matrix is required.
48 1 27 RFP L-9-3-3 The solicitation calls for pricing of a full-time (i.e., 1920 hours) for a Program Manager IV along with other labor categories that are repetitive between the Base IDIQ and TO1. Please confirm that the Key Personnel positions identified in the table can be the same individual for both the Base IDIQ and TO1.
The Table only applies to TO1 Staffing.
Pricing is required with factor 4. Key Personnel identified in the Base IDIQ Cost Proposal Workbook shall be the same personnel identified in the TO1 Staffing Matrix, as applicable.
49 1 28 RFP L-9-3-3 The solicitation Key Personnel table calls for five (5) Science & Engineering Professional IV, but Attachment 6 only identifies four (4). Please clarify if the labor category titled, “Science & Engineering Professional/PM III (Key Personnel)” should be titled as “Science & Engineering Professional IV.”
See Amendment 0001: Attachments 2, 6, and 7 are revised.
19 1 29 RFP L-9-3-3 b. The Key Personnel number of FTEs on Attachment 6, 7, 2 and page 63 of the solicitation do not match.
See Amendment 0001: Attachments 2, 6, and 7 are revised.
20 1 30 RFP L-9-3-3 b. Is the IT Specialist (KEY) a IV or III? TO1 LOE states III, IDIQ LOE and RFP state IV. See Amendment 0001: Attachments 2, 6, and 7 are revised.
22 1 31 RFP L-9-3-3 b. IDIQ LOE has an IT Specialist III, and TO1 LOE has IT Specialist II is this an error? See Amendment 0001: Attachments 2, 6, and 7 are revised.
23 1 32 RFP L-9-3-3 b. Will the government allow TBD or unnamed personnel in Key Personnel positions? See Q24.
9 1 33 RFP L-9-3-3.b Will the Key Personnel "final chart" be updated to include the IT Specialist IV (Key) and the Science & Engineering Professional/PM III (Key), to match Attach 6 LOE?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
10 1 34 RFP L-9-3-3.b Will the Key Personnel "final chart" be updated to remove 1 of the 5 Science & Engineering Professional IV personnel, to match the Attach 6 LOE?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
50 1 35 RFP L-9-4-1 Considering the required technical expertise (e.g., corrosion engineering) is highly specialized, would the government consider removing or extending the period preceding the solicitation, for past performance purposes, to eight years to promote small business competition?
Alternatively, would the government consider Key Personnel experience for Past Performance?
See Amendment 0001:
The past Performance Period has been extended to 8 years.
Key Personnel experience is evaluated in Factor 2, NRL will not use key personnel experience in lieu of corporate Past Performance.
13 1 36 RFP L-9-4-1 For the Past Performance Reference Sheet with a 2 page max per reference, is the SOW Relevance Matrix table required in or can we reformat our response for the table into paragraph form?
Paragraph form is acceptable if desired by the offeror.
33 1 37 RFP L-9-5-1 Section L requires Offerors to provide estimated direct labor rates for TO1 but also states that the TO1 worksheet shall use the corresponding proposed IDIQ maximum reimbursable direct-labor-rate ceiling “without revision.” Section H states that the ceiling is only a maximum reimbursable rate and that actual allowable direct labor below the ceiling will be reimbursed at actual cost. Please clarify whether TO1 should be priced using
(a) the offeror's estimated actual direct labor rate, subject to the IDIQ ceiling, or
(b) the proposed IDIQ ceiling itself. If estimated actual rates are intended, please revise the Volume V instruction stating, “The TO1 worksheet shall use the IDIQ ceiling without revision.”
To “The TO1 worksheet shall use the IDIQ ceiling, as applicable.”
See Amendment 0001. L-9-5-1 c.
Offerors shall propose the entire Base IDIQ Level of effort in accordance with the Cost Proposal Workbook - Attachment 8.
TO1 labor rates shall be proposed using the information proposed in Base IDIQ Cost Proposal Workbook.
The final negotiated Base IDIQ Cost Proposal Workbook will be incorporated in section H of the resulting award. These labor rate will be used for future task orders.
34 1 38 RFP L-9-5-1 Since TO1 has a five (5) year period of performance, please clarify if the TO1 Combined Option Period ODC plug number of $2,090,000 is to be used for each of the four (4) option period or only for Option Period 1.
See Amendment 0001:
NRL revised plug numbers for TO1.
51 1 39 RFP L-9-5-1 Please clarify if the referenced “i.” should be “j.” as the previous section is titled as “i.” See Amendment 0001:
NRL revised ordered list.
14 2 40 Personnel Qualifications Attach #2 Regarding the Personnel Qualifications requirements in Attachment 2, will the Government allow an exchange of years of relevant experience to substitute for the required education?
No.
18 2 41 Personnel Qualifications Attach #2 Are there personnel qualification equivalents for MS/PHD vs years of experience? I.e., can we substutute years of experience for MS/PHD?
No.
52 2 42 Personnel Qualifications Attach #2 Attachment 6 identifies “Science & Engineering Professional/PM III (Key Personnel),” but there is no corresponding Personnel Qualification description in Attachment 2. Please clarify if the labor category titled, “Science & Engineering Professional/PM III (Key Personnel)” in Attachment 6 should be titled as “Science & Engineering Professional IV.”
See Amendment 0001: Attachments 2, 6, and 7 are revised.
53 2 43 Personnel Qualifications Attach #2 Although Attachment 7 specifies the IT Specialist II labor category, it is not identified in Attachment 6 and there is no corresponding personnel qualification description in Attachment 2.
Please clarify if the IT Specialist II labor category is part of the resulting contract and should be included in Attachments 2, 6, and 7.
See Amendment 0001: Attachments 2, 6, and 7 are revised.
54 2 44 Personnel Qualifications Attach #2 Although Attachment 7 specifies the Facilities & Engineering Professional NOS labor category, it is not identified in Attachment 6 and there is no corresponding personnel qualification description in Attachment 2. Please clarify if the Facilities & Engineering Professional NOS labor category is part of the resulting contract and should be included in Attachments 2, 6, and 7.
See Amendment 0001: Attachments 2, 6, and 7 are revised.
21 2 45 Personnel Qualifications Attach #2 Qualifications for the following categories are not included in RFP Attachment 2.
a. IT Specialist II
b. Facilities & Engineering Professional NOS
c. Science & Engineering Professional/PM III (KEY)
d. Science & Engineering Technician IV
See Amendment 0001: Attachments 2, 6, and 7 are revised.
17 2 46 Personnel Qualifications / SOW Attach #2 Would the government consider adding additional work locations, or allowing flexibility for positions between gov' and contractor locations, with written approval from the COR?
See Paragraph 5 of the Statement of Work
11 2 47 Personnel Qualifications / Task Order 1 Level of Effort
Attach #2 and #7 For Task Order 1, would the government consider adding additional work locations, or allowing flexibility for positions between gov' and contractor locations, with written approval from the
COR?
See Paragraph 5 of the Statement of Work
4 6 48 IDIQ Level of Effort Attach #6 Will Personnel Quals be provided for the IDIQ LOE Science & Eng Tech IV labor category? See Amendment 0001: Attachments 2, 6, and 7 are revised.
5 6 49 IDIQ Level of Effort Attach #6 Will Personnel Quals be provided for the IDIQ LOE Science & Eng Professional/PM III (Key) labor category?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
15 6 50 IDIQ Level of Effort Attach #6 Are the Annual Hours for the Science & Engineering Professional I/II/III labor categories part-time @1500 on Attach #6?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
6 7 51 Task Order 1 Level of Effort Attach #7 Are the TO 1 IT Specialist III (Key) and IT Specialist II labor categories in addition to the IT Specialist III (non-key) and IT Specialist IV (Key) listed in the IDIQ LOE?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
7 7 52 Task Order 1 Level of Effort Attach #7 Will Personnel Quals be provided for the IT Specialist III (Key) and the IT Specialist II Labor Categories requested in TO 1?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
8 7 53 Task Order 1 Level of Effort Attach #7 Will Personnel Quals be provided for the Facilities & Eng Professional NOS Labor Category requested in TO 1?
See Amendment 0001: Attachments 2, 6, and 7 are revised.
55 7 54 Task Order 1 Level of Effort Attach #7 Please confirm that all labor categories specified in Attachment 7 are a subset of the IDIQ labor categories contained in Attachment 6.
Confirmed.
16 8 55 Cost Proposal Format Attach #8 Will formulas in Column F "Total Hours" be corrected to sum up the hours, by employee/by subcontractor for all contract years?
Offerors may adjust formulae within cells to accurately reflect proposed price while still providing the information required by the spreadsheet.
56 8 56 Cost Proposal Format Attach #8 The Indirect Rates Template requests either a Forward Pricing Rate Agreement (FPRA) or Forward Pricing Rate Proposal (FPRP). Because cognizant audit agencies may establish or approve indirect rates for a limited period that does not cover all proposed out-years, please confirm that it is acceptable for Offerors to proposal forward pricing rates based on Offerors forecasted indirect rates in the out-years.
Confirmed.
57 8 57 Cost Proposal Format Attach #8 The Indirect Rates Template calls for historical indirect rates by the contemplated contract Base Year and each of the four Option Periods. Would the government consider changing the requirements to have Offerors provide historical indirect rates for the past three years to be consistent with the requirements of L-9-5-1.d.?
See Amendment 0001: Attachment 8, Indirect Rates Template charts have been revised for clarity.
58 8 58 Cost Proposal Format Attach #8 If Offerors have only one overhead rate, please clarify how Offerors are to complete the OH rate information in each of the tabs in Attachment 8.
See Amendment 0001: Attachment 8, Indirect Rates Template charts have been revised for clarity.
59 8 59 Cost Proposal Format Attach #8 There are various cells in Attachment 8 that do not contain the needed formula (i.e., Cell J27 in the Summary Template tab). Would the government allow Offerors to incorporate any needed formula to properly calculate values or amounts in the Attachment 8 workbook?
Offerors may adjust formulas to accurately reflect proposed calculations.
60 8 60 Cost Proposal Format Attach #8 Considering the Summary Template tab calls for fully burdened rates contained in in the Labor Build-Up Template tab, would the government considering allowing Offerors to “link” the rate in the Summary Template tab to the rate information contained in the Labor Build-Up Template tab to avoid data entry errors?
Offerors may link information from within the workbook.
61 8 61 Cost Proposal Format Attach #8 Please clarify if Offerors are to include each employee’s name in column B of the Labor Build- Up Template tab.
Offerors shall include names of proposed key-personnel. Non-Key Personnel positions are not required to be named.
62 8 62 Cost Proposal Format Attach #8 Although columns L – O in the Labor Build-Up Template tab have a field for the annual escalation rate, the formula for columns M – O is pulling from cell L10. Would the government consider allowing Offerors to revise the formula in columns M – O, respectively to pull from the corresponding cell in row 11 for each contract year?
Offerors may adjust formulas within cells to accurately reflect proposed price while still providing the information required by the spreadsheet.
63 8 63 Cost Proposal Format Attach #8 Considering the material impact of the answers to questions to Offerors proposals, would the government consider a two-week extension to the proposal due date from 06 Nov 2026 to 20 Nov 2026?
See Amendment 0001 and updated SAM posting.
KR and GF Responses Final-ish
File details come from the government source that posted it. Updated .