N0017324RBZ01_QA Document_6Mar.docx
DOCX document 13 KB Posted
- Solicitation number
- N0017324RBZ01
About this file
This document is a Question and Answer (Q&A) document related to a Request for Proposal (RFP) for the Surface Electronic Warfare Engineering and Technical Services contract opportunity, solicitation number N0017324RBZ01.
The key details include:
- Clarification on the level of effort for the Software Engineer IV position, with the RFP indicating 2 FTEs but the personnel qualifications showing only 1 key personnel for this role. The response indicates updates will be made to the RFP documents.
- Clarification on the requirement for all subcontractors to submit unsanitized proposals, with the response indicating updates will be made to the use of "Major" and "Minor" subcontractors throughout Sections L and M.
- Clarification on the period of performance for the task order, with the response indicating an update to Attachment 7 Task Order Statement of Work.
- Confirmation that the offeror should address each task area of the IDIQ Statement of Work separately under the Technical Understanding, Capability, and Approach factor.
- A request to update the paragraph numbering in Section 4 of the IDIQ Statement of Work, which the response indicates has been updated.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No.
| Section |
| Question |
| Response |
| 1 |
| RFP Section L-11-1 |
| The task order level of effort table estimates 3,840 hours per year for the Software Engineer IV. Using the FTE of 1,920 hours, this is equivalent to 2 FTEs for this position. Attachment 2 Personnel Qualifications states there is only 1 Software Engineer IV, which is labeled as Key Personnel. Please clarify the discrepancy between these tables. |
| Please see the updated Attachment 2 Personnel Qualifications, as well as the update to the LOE table located in Section L-11-1. |
| 2 |
| RFP Section L-11-1 |
| Paragraph 5 requires all subcontractors to complete and submit attachment 8 in an unsanitized proposal to the Government. Elsewhere in the RFP, this requirement is limited to major subcontractors. Please clarify the requirement for subcontractor submission of unsanitized proposals to the Government. |
| Please see updates throughout Sections L&M of the RFP for changes of the use of “Major” and “Minor” Subcontractors. |
Attachment 7 Section 2 & 8
| Section 2 defines the TO period of performance as "one (1) year base period and one (1) year option". Section 8 defines the TO period of performance as "12 months" with "two (2) twelve (12) month options". Please clarify the period of performance for the TO. |
| Please see update to Attachment 7 Task Order Statement of Work. |
| 4 |
| RFP Section L-8-1 |
| Would the Government please clarify what areas of the IDIQ SoW need to be covered in Factor 1 - Technical Understanding, Capability, and Approach? |
| In accordance with Section L-8-1, “The Offeror shall address each of the task areas of the IDIQ SoW separately, demonstrating its understanding and ability to perform the required areas.” |
| 5 |
| SOW Section 4 |
| Should the paragraph numbering on 4.1.1 Mission, Requirements and Performance Analysis of Concepts and Systems be 4.1 to correspond to the level used for 4.2 System Design Engineering and Prototyping, 4.3 Test and Evaluation....? |
| Please see updated Attachment 1 IDIQ Statement of Work. |