Amendment 0002_QandA.pdf

PDF 146 KB Posted

Attached to
A49/108B Chilled Water Distribution Unit Upgrade with Piping
Solicitation number
N00173-24-Q-JD01
Issued by

About this file

This document is an amendment providing responses to questions regarding solicitation number N00173-24-Q-JD01 from the Department of the Navy Secretary of the Navy Office of Naval Research. The solicitation seeks proposals to upgrade the chilled water distribution system and install two new chilled water distribution units to service the A49/108B computer room at the Naval Research Laboratory. The amendment provides responses to vendor questions that clarify the glycol percentage in the system, communication protocols required to interface with the existing Struxure Ware infrastructure management tool, facility requirements documentation, and confirms that as-built drawings were provided at the site visit. It also requests proposed cooling capacities and piping designs that meet flow requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0002 to N00173-24-Q-JD01

QUESTIONS & ANSWERS

# QUESTIONS RESPONSES

1.

Glycol Percentage: The scope references glycol in the system for these units. We need to know the designed percentage of glycol. Typically, it’s around 30 – 40 percent mixture. Glycol derates unit capacity so we need to know the proper designed percentage to factor that in and design the correct capacity unit.

Please refer to the Requirements outlined in solicitation and the revised Statement of Work (Att 01 – SOW_Rev1) under Section 3, paragraph 6. Additionally, the Contractor shall propose a solution that meets the minimum requirements outlined in the Statement of Work.

2.

Struxure Ware Infrastructure Management Tool: The scope requires communication between the new units and the Navy’s Struxure Ware system. We need to know the communication language or communication protocol that the existing Stuxure Ware system utilizes in order to make sure they can communicate properly.

Please refer to the Requirements outlined in the solicitation and the revised Statement of Work (Att 01 – SOW_Rev1) under Section 3, paragraph 2. (Both units should be equipped with network interface cards that are compatible with SNMP and both units should be configured in an N+1 setup and lead/lag config to ensure redundancy).

3.

RFQ Page 4, viii, Facility Requirement Sheet

– Would NRL please provide the Facility Work Requirement sheet that is to be included in the technical proposal?

The Facility Requirement Sheet is a vendor-created document where the vendor details what they require of NRL facilities to keep a building safe by periodical planning, checkups, and maintenance activities…i.e., there may be certain electrical requirements, rooms may need a heads up of specifics and NRL will need to know what before award.

4. Please clarify whether existing drawings/as-builts will be provided. Drawings provided at Site Visit.

5.

Please confirm that the existing primary chilled water header serving the existing CRAC units and two new CDUs is sufficiently sized.

There is an 8-inch main that comes into the building and the 4-inch primary header that feeds the existing units are fed from the 8-inch main.

6.

Please provide the expected cooling capacity for the future extension into A49/108C and Future Extension Into A49/110A, respectively.

At some point we expect to install additional APC in-row coolers in each location. Between the two locations, we anticipate the cooling capacity to be about the same as a 4th Pod.

7.

The statement of work indicates that a flow rate of 324 gpm is desired in a 4” header. Note that the maximum flow allowed in a 4” pipe under ASHRAE 90.1 is 320 gpm for variable flow systems and 210 gpm for constant flow systems. Please confirm desired header size and flow rate.

The Contractor shall propose a solution that meets the minimum requirements outlined in the solicitation and Statement of Work. Please refer to the minimum requirements outlined in the solicitation and revised Statement of Work under Section 3, paragraph 3

8.

Is there an existing temperature control system for this building? If so, who is the manufacturer?

Clarification requested

AMENDMENT 0002 to N00173-24-Q-JD01

QUESTIONS & ANSWERS

9.

Will all existing equipment located in the server room be removed for us to perform the work?

No (some racks may already be powered off and are able to be removed, but most equipment is operational). If this is an issue and equipment needs to be removed, we can discuss/plan post award.

10. What are the preferred working hours? Normal business hours (7am-4pm is preferred)

11. For the bypass strainers is a dual basket strainer setup preferred?

The Contractor shall propose a solution that meets the minimum requirements outlined in the solicitation and Statement of Work.

12.

Valved and capped connections for future expansion were mentioned at the site visit.

Can you please clarify what is intended here? These are not the future connections mentioned in the SOW for the IRC’s.

At minimum, we would like the piping to be valved/capped to allow for a potential future expansion of the loop into additional rooms. This requirement is outlined in the solicitation and revised Statement of Work (Att 01 – SOW_Rev1) under Section 3, paragraph 3. (The Contractor shall propose a solution that meets these minimum requirements outlined in this section