Questions and Answers2.pdf
PDF 58 KB Posted
- Attached to
- R&D Optical Techniques, Devices and Measurements Federal contract opportunity
- Solicitation number
- N00173-21-R-NA01
About this file
This solicitation seeks research and development services in optical techniques, devices, and measurements for the Naval Research Laboratory over a five-year period. Desired technical services include research in materials, devices, processing, fiber optic acoustic and chemical sensors, explosives sensors, biological agent sensors, laser sensors, microwave photonics, focal plane arrays, and quantum optics. Work will involve the design, fabrication, and testing of optical components and systems as well as field testing and laboratory analysis. Efforts range from basic measurement and analysis to prototype development and deployment support. The solicitation represents a re-compete for current contract N00173-14-D-2024 held by Sotera Defense Solutions/KeyW, Corp. Services are to be performed at field sites, at sea, and at the Naval Research Laboratory in Washington, D.C.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00173-21-R-NA01.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.xls | XLS spreadsheet | |
| N00173-21-R-NA01.pdf | ||
| Questions and Answers.xls | XLS spreadsheet | |
| N00173-21-R-NA01.pdf | ||
| N00173-21-R-NA01.pdf | ||
| Attachment 3 Cost Proposal Format Updated.XLSX | XLSX spreadsheet | |
| Questions and Answers.xls | XLS spreadsheet | |
| N00173-21-R-NA01.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.pdf | ||
| Attachment 2 On Site Requirements.pdf | ||
| N00173-21-R-NA01.pdf | ||
| Attachment 1 Personnel Qualifications.pdf | ||
| Attachment 3 Cost Proposal Format Updated.XLSX | XLSX spreadsheet | |
| Exhibit A CDRLs A001-A005.pdf | ||
| Attachment 4 Past Perfomrance Questionnaire.pdf | ||
| Attachment 5 Offeror Questions Submittal Form.xls | XLS spreadsheet |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Name of
Document Affected
Affected Section, Page, and Paragraph
Question
Vol IV - Cost Proposal
L-6(1), Pg 92, Para 7 & Table 4
LOE for Physicist/Electrical Eng. is listed at 7,820 per year, total of 36,400. However, 7,820 hours per year x 5 years totals 39,100 hours. Can the government please confirm the Physicist/Electrical Eng. LOE per year and for the duration of the effort?
Level of Effort.
Vol IV - Cost Proposal
H-6(a), Pg 36, Para
1. L-6(1), Pg 92, Para 7 & Table 4
Adding up the total hours in each year (base and each option year) in Table 4 on page 92, the current totals are 23,028 hours per year and 115,140 for the duration of the effort. This differs from the document stated totals of 22,488 per year, 112,400 for the effort. Can the government please confirm the total LOE per year and for the duration of the effort?
Vol V - Contract Information
L-7, Pg 95 Heading The Volume heading reflects IV, but should be V. Can the government please confirm that the Contract Information should be Volume V?
SOW / Vol I -
Technical Proposal
Section 3.7 - Pg 13 and Pg 85.
Is this offering 100% Onsite at NRL in Washington DC or are there opportunities to conduct research in contractor owned and operated labortories?
Explanation of Fields:
1. Submitting Organization: Provide the name of the organization submitting the question.
2. Point of Contact: Provide the full contact information for the individual(s) that are submitting the questions.
3. Organization Question #: Submit questions separately and consecutively. All questions shall have a unique number assigned.
4. Name of Document Affected: Provide the name of the document affected (ex. RFP, or Att. J-8).
5. Affected Section Page, and Paragraph: Provide the affected section/page/paragraph title in relation to the question.
6. Question: Provide detailed question.
QUESTIONS & ANSWERS, August 10, 2021
N00173-21-R-NA01
Answer
The LOE for the Physicist/Electrical Engineer in Table 4 should be 7,280 per year for a total of 36,400. This matches the yearly total in paragraph 7 of 22,488 hours per year and a total LOE for the duration of the effort 112,440 hours.
See answer to question 1.
L-7 Volume heading should be volume V.
There are no opportunities for research to be conducted in contractor owned and operated labortories.