Questions and Answers.xls

XLS spreadsheet 49 KB Posted

Attached to
R&D Optical Techniques, Devices and Measurements Federal contract opportunity
Solicitation number
N00173-21-R-NA01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

This document contains questions and answers related to a solicitation for research and development services in optical techniques, devices and measurements. The solicitation seeks proposals for unclassified basic and applied research to be performed over five years at the Naval Research Laboratory in Washington D.C. The work includes research in fiber optic sensors, chemical and biological sensors, laser sensors, photonics, infrared imaging, and specialty optics. Tasks involve materials research, device fabrication, signal processing, and system integration and testing. Proposers are directed to use labor rates and plug figures provided in the solicitation documents. The questions and answers clarify requirements and provide updates to tables and sections to ensure consistency across the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to R&D Optical Techniques, Devices and Measurements, newest first.
File Type Posted
N00173-21-R-NA01.pdf PDF
Questions and Answers.pdf PDF
Questions and Answers.pdf PDF
Questions and Answers.xls XLS spreadsheet
N00173-21-R-NA01.pdf PDF
Questions and Answers.xls XLS spreadsheet
N00173-21-R-NA01.pdf PDF
N00173-21-R-NA01.pdf PDF
Attachment 3 Cost Proposal Format Updated.XLSX XLSX spreadsheet
N00173-21-R-NA01.pdf PDF
Questions and Answers.pdf PDF
Questions and Answers2.pdf PDF
Questions and Answers.pdf PDF
Attachment 2 On Site Requirements.pdf PDF
Attachment 4 Past Perfomrance Questionnaire.pdf PDF
Attachment 5 Offeror Questions Submittal Form.xls XLS spreadsheet
N00173-21-R-NA01.pdf PDF
Attachment 1 Personnel Qualifications.pdf PDF
Attachment 3 Cost Proposal Format Updated.XLSX XLSX spreadsheet
Exhibit A CDRLs A001-A005.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions QUESTIONS & ANSWERS, August 16, 2021

N00173-21-R-NA01

Question #Name of Document AffectedAffected Section, Page, and ParagraphQuestionAnswer
1Vol IV - Cost ProposalL-6(1), Pg 92, Para 7 & Table 4LOE for Physicist/Electrical Eng. is listed at 7,820 per year, total of 36,400. However, 7,820 hours per year x 5 years totals 39,100 hours. Can the government please confirm the Physicist/Electrical Eng. LOE per year and for the duration of the effort?The LOE for the Physicist/Electrical Engineer in Table 4 should be 7,280 per year for a total of 36,400. This matches the yearly total in paragraph 7 of 22,488 hours per year and a total LOE for the duration of the effort 112,440 hours.
2Level of Effort. Vol IV - Cost ProposalH-6(a), Pg 36, Para 1. L-6(1), Pg 92, Para 7 & Table 4Adding up the total hours in each year (base and each option year) in Table 4 on page 92, the current totals are 23,028 hours per year and 115,140 for the duration of the effort. This differs from the document stated totals of 22,488 per year, 112,400 for the effort. Can the government please confirm the total LOE per year and for the duration of the effort?See answer to question 1.
3Vol V - Contract InformationL-7, Pg 95 HeadingThe Volume heading reflects IV, but should be V. Can the government please confirm that the Contract Information should be Volume V?L-7 Volume heading should be volume V.
4SOW / Vol I - Technical ProposalSection 3.7 - Pg 13 and Pg 85.Is this offering 100% Onsite at NRL in Washington DC or are there opportunities to conduct research in contractor owned and operated labortories?There are no opportunities for research to be conducted in contractor owned and operated labortories.
5Overal ProposalL-2 (1) PAGE AND SIZE FORMAT, Pg 83, Paras 2 & 3Section L-2 INSTRUCTIONS FOR SUBMISSION OF PROPOSALS/OFFERS, (1) PAGE SIZE AND FORMAT states: "A page is defined as each face of a sheet of paper containing information." and "Legible tables, charts graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 X 17 inches in size. Foldout pages shall fold entirely within the volume, and shall count as two pages for each side; double sided shall count as four pages." Question: Would the Government confirm for 11x17 foldout pages if printed on one side only the page count for this foldout is 2 pages?11 x 17 foldout pages, if printed on only one side, will count as two (2) pages as per section L-2 (1) of the solicitation.
6SOWSOW 1.0 Pg 11SOW 1.0 (pg 11) refers to “certain key research projects”. Will the government
be more specific about the application and mission objective of these projects as related to or driven by this research effort?Sufficient details regarding the unclassified technology required to execute the research projects can be found in section 4.0, Technical Task, of the SOW.
7SOWSOW 2.1 Pg 11-12SOW 2.1 (pg 11-12) “dictates that a major portion of the tasks be performed
[at NRL]”, which suggests a portion may be performed elsewhere. Is the balance typically performed at sub-contractors’ site? Or is there some work that has or is typically performed at the prime contractor’s site?It is anticipated (based on historical data) that the work to be performed will require the unique NRL laboratory equipment facilities (as well as interfacing with other project personnel at NRL). As such the work will need to be performed at NRL, with the exception of work performed while on travel.
8SOWSOW 3.8 Pg 13-14, SOW 7.0 Pg 17All work is expected to be unclassified (SOW 7.0/pg 17), but Travel/TDY
(SOW 3.8/pg 13-14) identify trips to military test ranges. Are those mutually exclusive requirements? Does this indicate that personnel could or should have security clearances?The various facilities given in Section 3.8 are examples of various duty stations where work may occur. As stated the work performed on this contract is unclassified, and clearances are not required by personnel on this contract.
9SOWF-1 Pg 21Period of Performance (F-1/pg 21), states “Performance under this contract
shall not exceed 60 months total” and the text and chart in this section clearly identify a total of 60 months of performance. However, the government also includes FAR 52.217-8 (pg 46) option to extend services, for an extension not to exceed 6 months. The government also includes in FAR 52.217-9 (c) (pg 46) that the total duration including exercise of extension shall not exceed 60 months. The detail under 52.217-9 (a) on pg 65 is blank regarding the timing to exercise options. 52.217-8 appears in conflict with the other two sections and statements. Please confirm that there is or is not the potential for the government to extend work beyond the 60 month period.The Government anticipates a total Period of Performance of 60 months.
10SOWH-6 (a) Pg 36H-6(a) (pg 36) specifies that sub-contractor direct labor counts against the
maximum total per year. If a sub-contractor works under a Firm Fixed Price agreement, please confirm that does not constitute direct labor and therefore doesn’t count against the maximum hours.H-6(a) The level of effort for performance of this contract shall not exceed 22,488 total hours for year 1 and 22,488 total hours for each option, if exercised, for years 2-5 of direct labor, including subcontractor direct labor for those subcontractors specifically identified in the Contractor's proposal as having hours included in the proposed level of effort IS counted against the maximum hours.
11SOWSection L-2 Pg 82Section L-2 (pg 82) Proposal Content/Proposal organization chart. Please
clarify the page limits for the Volume I Technical Proposal. Is the total 30 pages, inclusive of 10 pages each for Management, Transition, and Staffing Plan? Or is the total 60 pages, inclusive of 30 pages for Technical discussion and the aforementioned 3 x 10 page sections?Total is 60 pages inclusive of 30 pages for Technical discussion and the Management, Transition and Staffing Plans.
12SOWSection L-5 (B) Pg 90Section L-5(B) (pg 90) is titled Small Business Subcontracting Plan.
However, through the text in this section, a Subcontracting plan is not required though a Participation plan is required (as matches the chart in L-2). Please confirm the section heading and required content is a Participation plan with content as outlined in this section.The heading for section L-5 (B) on page 90 should be Small Business Participation Plan with content as outlined in this section.
13RFPWhat branch is this effort supporting, or does is this effort spread across
the NRL (56XX) branches?This effort supports all of NRL code 5600.
14RFPPlease confirm the incumbent contract information, or if not directly
incumbent work, if and under what contracts are parts of this work currently being executed?Contract N00173-14-D-2024, Key W now Jacobs Technology Inc.
15N00173-21-R-NA01L-5 (B), Pg 90, Para 3L-5 (B) is titled a SMALL BUSINESS SUBCONTRACTING PLAN; however the requirements detail a Small Business Participation Plan and note that a Small Business Subcontracting Plan is not required. Can the Government please confirm that a Small Business Participation Plan is required, not a Small Business Subcontracting Plan?See the response to question 12 above.
16N00173-21-R-NA01L-2, Pg 83, Para 2 - 5In the section titled (1) PAGE SIZE AND FORMAT, the Government establishes size requirements, but not font preferences. Are Contractors permitted to presume that any standard system font is permissible so long as it is legible at the sizes stated?Any uncomplicated, legible, 12 point font is acceptable.
17N00173-21-R-NA01L-2, Pg 82In the table on page 82, the RFP references Volume # and Title, III Cost Proposal, yet on page 91, L-6 the heading of this paragraph is VOLUME IV - COST PROPOSAL. Can the Government please clarify the volume numbers?The table on page 82 should list IV - Cost Proposal, followed by IV - Cost Spreadsheet (Excel). The heading on page 91, L-6 should read Volume IV - Cost Proposal.
18N00173-21-R-NA01L-2, Pg 82In the table on page 82, the RFP lists Small Business Participation, Cost Proposal, and Cost Spreadsheet (Excel) all as Volume III. If in fact Cost Volume is Volume IV (see question # 3 above) then is Contract Information Volume V?The table on page 82 should list V - Contract Information. Section L-7 should read Volume V - Contract Information.
19N00173-21-R-NA01L-2, Pg 82In the table on page 82, the RFP lists specific file naming conventions for the Management Plan, Transition Plan, and Staffing Plan. Can the Government confirm that these are to be submitted as part of the Offeror's Volume I - Technical Proposal submission and not as separate files?The Management Plan, Transition Plan, and Staffing Plan are to be submitted as part of the Offeror's Volume I - Technical Proposal submission. See section L-3 Volume I - Technical Proposal of the solicitation.
20N00173-21-R-NA01Table 4Referencing the Table 4 of the Solicitation, ‘LCATs, Skill Mix and Labor Hours’, can the Government please review or further explain the hours contained in the table as well as the summary hours?
Specifically, the number of hours for the ‘Physicist/Electrical Eng.’ is listed as 7,820 which is not an efficient derivative or multiple of the basic full-time equivalent (FTE) hours of 1,920. Can the Government explain whether that is a combination of whole FTEs and partial FTEs?See the response to question 1 above.
21N00173-21-R-NA01Table 4The total numbers in the table do not accumulate correctly to the total listed at the bottom of the table. The 22,488 listed is short of the accumulated hours of 23,028 for each year. Coincidentally, a correction to the total hours for the Physicist/Electrical Eng.’ to be 7,280 corrects the accumulation of the line items of hours to equal the Total – both within each year as well as the line item total of 36,400 hours for the 'Physicist/Electrical Eng.’ However, a total of 7,280 is not an efficient derivative or multiple of the basic full-time equivalent (FTE) hours of 1,920.
Can the Government explain whether that is a combination of whole FTEs and partial FTEs, and can the Government review and correct as appropriate Table 4 in its entirety as applicable?See the response to question 1 above.
22N00173-21-R-NA01Table 4References to the 22,488 hours per year are present in several places within the solicitation. If necessary changes are made to this number, would the Government also correct those numbers throughout the solicitation document?See the response to question 1 above.
23N00173-21-R-NA01Section M, Factor 4 CostReferencing the Section M-6 Factor 4 Cost criteria, specifically the instructions to provide actual incurred direct and indirect labor rates for the past three contractor fiscal years, can the Government elaborate on the request? Specifically, and in consideration of the offeror’s ability to provide supporting documentation from DCMA/DCAA that supports our proposed indirect rates, would the Government accept a DCMA letter accepting the utilized indirect rates as sufficient support for our proposed indirect rates?
Our experience of this type of requirement to provide a number of years of historical data is most often applicable to offerors who cannot produce a viable document from DCMA/DCAA. Would the Government consider modifying this requirement to also include notification from DCAA/DCMA (e.g., PBR letter) as a viable source of our proposed indirect rates?Please provide your actual incurred direct and indirect labor rates to support the rates being proposed for this solicitation. A letter from DCMA / DCAA accepting the utilized direct and indirect rates is sufficient support for proposed rates. Notification from DCAA/DCMA would be considered a viable source of proposed indirect rates on agency letter head.
24N00173-21-R-NA01Government Provided Cost / Price ModelWithin the Government provided Cost/Price Model certain cells were populated with Material and ODC amounts. Can the Government confirm that these amounts were placeholders and should be replaced by the specific figures provided in the solicitation?Offerors are instructed to propose the plug amounts provided in the Cost/Price Model - Attachment 3.
25N00173-21-R-NA01Government Provided Cost / Price Model L-6(1) CLIN Pricing Instructions, Pg 92Section L-6 (1) has been updated to state that "Offerors are instructed to propose only the above stated plug amounts for Material and ODC.

However, the Government's answer to Question 24 states that "Offerors are instructed to propose the plug amounts provided in the Cost/Price Model - Attachment 3."

The table provided in Section L-6 (1) provides different plug figures than the amounts included Attachment 3. Can the Government please confirm that Offerors should use the plug figures included in Section L-6 (1) and provide an updated Attachment 3 reflecting these dollar amounts?The plug figures in both section L-6(1) and attachment 3 have been updated.
Explanation of Fields:

1. Submitting Organization: Provide the name of the organization submitting the question.

2. Point of Contact: Provide the full contact information for the individual(s) that are submitting the questions. 3. Organization Question #: Submit questions separately and consecutively. All questions shall have a unique number assigned.

4. Name of Document Affected: Provide the name of the document affected (ex. RFP, or Att. J-8).

5. Affected Section Page, and Paragraph: Provide the affected section/page/paragraph title in relation to the question.

6. Question: Provide detailed question.

File details come from the government source that posted it. Updated .