Attachment 1, SOW (Rev D) 19 Oct 2016
Statement of Work for Dual Microwave and Millimeter Wave Antenna
1. Scope
| This | statement | of | work | covers | the | tasks, | deliverables, | and | general | goals | for | the | Naval | Research | | | |
| Laboratory | (NRL) | for | Dual | Microwave | and | Millimeter | Wave | Antennas | that | are | capable | of | | | | | |
| transmitting | a | radio | frequency | signal | over | the | 4‐40 | GHz | frequency | range. | | Non‐recurring | design | | | | |
| and | analysis | will | be | conducted | for | the | antennas | to | meet | the | specifications | that | are | described | in | | |
| “Specifications | for | Dual | Microwave | and | Millimeter | Wave | Antenna.” | This | effort | includes | the | delivery | | | | | |
| of | 10 | preliminary | antennas | within | 3 | months | of | contract | award, | the | delivery | of | one | pair | (forward | | |
| and | aft) | of | prototype | antennas | at | a | Critical | Design | Review | 6 | months | after | contract | award, | and | final | |
| delivery | of | 3 | pairs | (forward | and | aft) | of | antennas | at | contract | completion. | | An | 12 | month | period | of |
| performance | is | anticipated. | | | | | | | | | | | | | | | |
2. Applicable Documents.
2.1. Specifications for a Dual Microwave and Millimeter Wave Antenna
3. Overview
| The | antennas | for | the | NRL | application | must | individually | fit | inside | of | the | end | of | a | straight | 2.4 | inch | | |
| outside | diameter | cylinder | (0.05 | inch | wall | thickness), | and | three | of | the | antennas | must | individually | fit | | | | | |
| inside | of | a | circular | cylinder | (0.05 | inch | wall | thickness) | that | tapers | from | 2.1 | inches | outside | diameter | | | | |
| down | to | 1.8 | inches | outside | diameter | over | a | length | of | 2 | inches, | as | shown | in | Figure | 1. | | The | antennas |
| shall | radiate | axially | out | the | end | of | a | 2.4 | inch | straight | cylinder | (forward | end) | or | out | the | 1.8 | inch | |
| diameter | end | of | a | tapered | cylinder | (aft | end), | and | a | radome | will | be | required | to | seal | both | forward | and | |
| aft | ends | of | the | cylinder. | | The | radome | shall | be | designed | to | maximize | RF | transmission | through | the | | | |
| radome | with | minimum | reflected | RF | energy | back | into | the | antenna. | The | antenna | pattern | including | the | | | | | |
| radome | will | span | a | cone | of | roughly | 60˚ | half | angle | (120˚ | included | angle) | in | both | azimuth | and | elevation | | |
| planes. | The | radome | shall | be | designed | to | withstand | a | dynamic | pressure | equivalent | to | an | axial | air | | | | |
| velocity | of | 400 | knots | at | sea | level | for | up | to | 4 | hours. | | | Tasks | are | listed | in | Section | 4. |
19 Oct 2016
| Figure | 1. | | Available | antenna | volume | (cross‐hatched | region) | excluding | connector | for | (a) | straight |
| circular | cylinder | and | (b) | tapered | circular | cylinder | (dimensions | in | inches). | | | |
4. Tasks
| 4.1 Preliminary | Forward | Antennas | – | The | contractor | shall, | within | 3 | months | of | contract | | | | | | | | | |
| award, | fabricate | and | deliver | ten | (10) | preliminary | antennas. | | The | preliminary | antennas | shall | | | | | | | | |
| nominally | meet | all | of | the | requirements | of | the | Specification | except | at | a | reduced | power | level | of | 15 | | | | |
| watts | from | 4 | to | 18 | GHz | and | 10 | watts | from | 18 | to | 40 | GHz. | | | The | preliminary | antennas | shall | be |
| mechanically | configured | identically | to | the | forward | antennas | with | radome | and | mounting | brackets | | | | | | | | | |
| (CLIN | 0001). | | | | | | | | | | | | | | | | | | | |
| 4.2 Critical | Design | and | Analysis | ‐ | Within | 6 | months | after | contract | award, | the | contractor | shall | | | | |
| deliver | one | pair | of | prototype | antennas | with | radomes | for | the | straight | and | tapered | cylinders | at | a | | |
| Critical | Design | Review | (CDR) | to | be | held | at | NRL | in | Washington, | DC | or | at | the | contractor’s | facility. | One |
| pair | (forward | and | aft) | of | antennas | with | radomes | and | mounting | brackets | will | be | delivered | at | CDR | | |
| (CLIN | 0002). | Design | drawings | and | measurements | of | the | antenna | performance | must | be | provided | at | | | | |
| CDR | that | meet | the | requirements | of | the | specification. | | If | any | design | specifications | are | not | being | met, | |
| then | a | plan | to | correct | any | design | deficiencies | shall | be | provided | at | CDR | (CDRL | A003). | | | |
Deliverables:
4.2.1.1 One pair (forward and aft) of antennas with radomes and mounting brackets will be delivered
| at | CDR | (CLIN | 0002). | | | | | | | | | |
| 4.2.1.2 RF | measurements | of | the | prototype | antennas | delivered | at | CDR | that | includes | RF | antenna |
| patterns, | insertion | loss, | and | reflection | performance | over | the | frequencies | and | the | angles | of |
| interest | in | contractor | format | (CDRL | A003). | | | | | | | |
| 4.2.1.3 Copies | of | the | meeting | minutes | of | the | Critical | Design | Review. | | |
| 4.2.1.4 Design | drawings | showing: | details | of | the | antenna | construction | presented | at | CDR, | associated |
mounting brackets or flanges, radome construction, and a full bill of materials (CDRL A003).
19 Oct 2016
| 4.2.1.5 If | any | deficiencies | in | the | detailed | design | are | identified | at | CDR, | then | within | 7 | days | after |
| the | CDR, | the | contractor | shall | submit | a | written | plan | to | remedy | such | deficiencies | (CDRL | | |
A003).
| 4.3 Final | Prototype | Fabrication | – | Within | 12 | months | after | contract | award, | fabricate | and | deliver | | | |
| three | final | pairs | (forward | and | aft) | of | antennas | with | radomes | and | mounting | brackets | to | be | installed |
| by | NRL | in | the | straight | and | tapered | cylinders | (CLIN | 0003). | Measurements | of | the | antenna | | |
| performance | and | antenna | design | drawings | shall | be | delivered | in | a | Final | Report | (CDRL | A004) | | |
4.3.1 Deliverables:
| 4.3.1.1 Three | pairs | of | antennas | with | radomes | and | mounting | brackets | (CLIN | 0003). | | |
| 4.3.1.2 A | Final | Report | containing | RF | measurements | of | the | antennas | delivered | at | contract | completion |
| that | includes | RF | antenna | patterns, | insertion | loss, | and | reflection | performance | over | the |
| frequencies | and | the | angles | of | interest | in | contractor | format | (CDRL | A004). | |
| 4.3.1.3 Design | drawings | of | the | final | antennas | showing | details | of | the | antenna | construction, | associated | | |
| mounting | brackets | or | flanges, | | radome | construction, | and | a | full | bill | of | materials | (CDRL | A004). |
| 4.4 Monthly | Progress | Reports | – | The | contractor | shall | submit | a | monthly | progress | report |
| regarding | technical | progress | and | expenditures | incurred | for | each | month’s | work | (CDRL | A001). |
5. Travel
| Prior | to | CDR, | a | maximum | of | two | (2) | contractor | personnel | will | travel | from | the | contractor’s | location |
| to | NRL, | Washington, | DC | to | attend | a | Pre‐Critical | Design | Review | at | NRL | (CLIN | 0004). | | |
| 6. Deliverables | List | | | | | | | |
| 1. Monthly | Progress | Reports | The | contractor | shall | submit | a | monthly |
| progress | report | regarding | technical | |
| progress | and | expenditures | incurred | for |
| each | month’s | work | (CDRL | A001). |
| 2. Preliminary | forward | antennas |
| (CLIN | 0001) | |
| The | contractor | shall, | within | 3 | months | | | |
| of | contract | award, | deliver | ten | (10) | | | |
| preliminary | 4 | to | 40 | GHz | antennas | at | | |
| PDR. | | The | optional | antennas | shall | | | |
| nominally | meet | all | of | the | requirements | | | |
| of | the | Specification | except | at | a | reduced | | |
| power | level | of | 15 | watts | from | 4 | to | 18 |
| GHz | and | 10 | watts | from | 18 | to | 40 | GHz. |
| The | preliminary | antennas | shall | be | | | | |
| mechanically | configured | identically | to | | | | | |
| the | forward | antennas | with | radome | | | | |
| and | mounting | brackets. | | | | | | |
| 3. Critical | Design | and | Analysis | of | a | 4‐ |
| 40 | GHz | antenna | (CLIN | 0002) | | |
| Design | and | analyze | a | suitable | antenna | | |
| for | the | 4 | to | 40 | GHz | frequency | range |
| that | meets | the | requirements | of | | | |
| “Specifications | for | Dual | Microwave | | | | |
19 Oct 2016
| and | Millimeter | Wave | Antenna.” | | One |
| pair | (forward | and | aft) | of | prototype |
| antennas | with | radomes | shall | be | |
| delivered | at | a | Critical | Design | Review |
(CDR).
| 4. CDR | Design | document | and |
| measured | data | | |
| Contractor | shall | deliver | at | CDR: | RF | | | |
| measured | performance | data | of | the | | | | |
| prototype | antennas | delivered | at | CDR, | | | | |
| a | plan | to | remedy | any | performance | | | |
| deficiencies, | detailed | design | drawings, | | | | | |
| a | full | bill | of | materials | and | copies | of | the |
| meeting | minutes | of | the | CDR | | | | |
| (CDRL | A003). | | | | | | | |
| 5. Final | antenna | sets | (CLIN | 0003) | Contractor | shall | deliver | three | final |
| pairs | (forward | and | aft) | of | antennas | | | | |
| with | radomes | and | mounting | bracket. | | | | | |
| 6. Final | Report | Contactor | shall | deliver | a | Final | Report |
| at | contract | completion | containing: | RF | | | |
| measurements | of | the | antennas | | | | |
| delivered | at | contract | completion, | | | | |
| design | drawings | of | the | final | antennas | | |
| and | associated | mounting | brackets | or | | | |
| flanges, | and | a | full | bill | of | materials. | |
| (CDRL | A004) | | | | | | |
| 7. Travel | (CLIN | 0004) | Prior | to | CDR, | a | maximum | of | two | (2) |
| contractor | personnel | will | travel | from | | | | | | |
| the | contractor’s | location | to | NRL, | | | | | | |
| Washington, | DC | to | attend | a | Pre‐ | | | | | |
| Critical | Design | Review | at | NRL. | | | | | | |