att 1_Base Bldgs
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | | | | | | | | | |
| CUSTODIAL INVENTORY Base Buildings | | | | | | | | | | |
| Building | Floor No. | Room No. | Function | Floor Type | Area (SF) | Service Class | SC A | SC B | SC C | SC D |
| 1 | Basement | B132 | Fitness Center | Vinyl covered foam pad | 2635 | A | 2,635 | 0 | 0 | 0 |
| 1 | Basement | | General Admin Area | Tile | 2,931 | C | 0 | 0 | 2,931 | 0 |
| 1 | Basement | | General Admin Area | Carpet | 1,682 | C | 0 | 0 | 1,682 | 0 |
| 1 | Basement | | Floor | Concrete | 2,515 | C | 0 | 0 | 2,515 | 0 |
| 1 | Basement | | Stairways | Concrete | 575 | C | 0 | 0 | 575 | 0 |
| 1 | Basement | B127 | Restroom - Women | Tile | 236 | A | 236 | 0 | 0 | 0 |
| 1 | Basement | B131 | Locker Room - Women | Tile | 605 | A | 605 | 0 | 0 | 0 |
| 1 | Basement | | Restroom - Men | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 1 | Basement | | Locker Room - Men | Tile | 750 | A | 750 | 0 | 0 | 0 |
| 1 | 1st Floor | | General Admin Area | Tile | 123 | C | 0 | 0 | 123 | 0 |
| 1 | 1st Floor | | General Admin Area | Carpet | 144 | C | 0 | 0 | 144 | 0 |
| 1 | 1st Floor | | Restroom - Men | Tile | 242 | C | 0 | 0 | 242 | 0 |
| 1 | 1st Floor | | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 1 | 1st Floor | | Walkway | Concrete | 500 | C | 0 | 0 | 500 | 0 |
| 1 | Mezz West End | | General Admin Area | Tile | 628 | C | 0 | 0 | 628 | 0 |
| 1 | Mezz West End | | General Admin Area | Carpet | 2,631 | C | 0 | 0 | 2,631 | 0 |
| 1 | Mezz West End | | Lobby | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 1 | Mezz West End | | Restrooms | Tile | 132 | C | 0 | 0 | 132 | 0 |
| 1 | Mezz West End | | Stairways | Concrete | 890 | C | 0 | 0 | 890 | 0 |
| 1 | Mezz East End | | General Admin Area | Tile | 367 | C | 0 | 0 | 367 | 0 |
| 1 | Mezz East End | | General Admin Area | Carpet | 1,045 | C | 0 | 0 | 1,045 | 0 |
| 1 | Mezz East End | | Stairways | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 1 | 2nd Floor | | General Admin Area | Tile | 1,000 | B | 0 | 1,000 | 0 | 0 |
| 1 | 2rd Floor | 212 | General Admin Area | Carpet | 700 | C | 0 | 0 | 700 | 0 |
| 1 | 2rd Floor | 208 | General Admin Area | Carpet | 868 | C | 0 | 0 | 868 | 0 |
| 1 | 2rd Floor | 209 | General Admin Area | Carpet | 250 | C | 0 | 0 | 250 | 0 |
| 1 | 2nd Floor | | Formal Training Areas | Carpet | 5,682 | B | 0 | 5,682 | 0 | 0 |
| 1 | 2nd Floor | | Lobby | Carpet | 900 | B | 0 | 900 | 0 | 0 |
| 1 | 2nd Floor | | Vending Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 1 | 2nd Floor | | Vending Machine Area | Tile | 30 | B | 0 | 30 | 0 | 0 |
| 1 | 2nd Floor | | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 1 | 2nd Floor | | Restroom - Men | Tile | 410 | C | 0 | 0 | 410 | 0 |
| 1 | 2nd Floor | | Locker Room - Men | Tile | 210 | C | 0 | 0 | 210 | 0 |
| 1 | 2nd Floor | | Stairways | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 1 | 2nd Floor | | Restroom | Tile | 450 | C | 0 | 0 | 450 | 0 |
| 1 | 2nd Floor Mezz | | General Admin. Area | Tile | 1,000 | C | 0 | 0 | 1,000 | 0 |
| 1 | 2nd Floor Mezz | | General Admin. Area | Carpet | 7,500 | C | 0 | 0 | 7,500 | 0 |
| 1 | 2nd Floor Mezz | | Lobby | Carpet | 900 | C | 0 | 0 | 900 | 0 |
| 1 | 2nd Floor Mezz | | Stairway | Metal | 250 | C | 0 | 0 | 250 | 0 |
| 1 | 3rd Floor | | General Admin Area | Carpet | 2,000 | C | 0 | 0 | 2,000 | 0 |
| 1 | 3rd Floor | | General Admin Area | Tile | 1,000 | C | 0 | 0 | 1,000 | 0 |
| 1 | 3rd Floor | | Restroom | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 2 | Basement | | Operations & Production | Tile | 7,873 | C | 0 | 0 | 7,873 | 0 |
| 2 | Basement | | General Admin Area | Carpet | 1,671 | C | 0 | 0 | 1,671 | 0 |
| 2 | Basement | | Lobby | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 2 | Basement | | Restroom - Women | Tile | 210 | C | 0 | 0 | 210 | 0 |
| 2 | Basement | B207 | Nursing Room | Carpet | 100 | C | 0 | 0 | 100 | 0 |
| 2 | Basement | | Stairways | Concrete | 235 | C | 0 | 0 | 235 | 0 |
| 2 | Basement | | Entrance/Exit | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 2 | 1st Floor | | Command Head Quarters | Carpet | 1,028 | A | 1,028 | 0 | 0 | 0 |
| 2 | 1st Floor | | Restroom | Tile | 193 | A | 193 | 0 | 0 | 0 |
| 2 | 1st Floor | | General Admin Area | Tile | 388 | A | 388 | 0 | 0 | 0 |
| 2 | 1st Floor | | General Admin Area | Carpet | 4,356 | A | 4,356 | 0 | 0 | 0 |
| 2 | 1st Floor | 113 | Kichen - Coffee Mess | Tile | 15 | A | 15 | 0 | 0 | 0 |
| 2 | 1st Floor | | Hallway | Terrazzo | 5,031 | A | 5,031 | 0 | 0 | 0 |
| 2 | 1st Floor | | Lobby | Carpet | 600 | A | 600 | 0 | 0 | 0 |
| 2 | 1st Floor | | Restroom | Ceramic | 324 | C | 0 | 0 | 324 | 0 |
| 2 | 1st Floor | | Stairways | Terrazzo | 450 | C | 0 | 0 | 450 | 0 |
| 2 | 1st Floor | | Entrance/Exit | Concrete | 575 | C | 0 | 0 | 575 | 0 |
| 2 | 2nd Floor | | General Admin Area | Tile | 3,127 | C | 0 | 0 | 3,127 | 0 |
| 2 | 2nd Floor | 202 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 2 | 2nd Floor | 206 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 2 | 2nd Floor | 313 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 2 | 2nd Floor | | Stairways | Terrazzo | 784 | C | 0 | 0 | 784 | 0 |
| 2 | 2nd Floor | | Hallway | Tile | 975 | C | 0 | 0 | 975 | 0 |
| 2 | 2nd Floor | | Restroom - Women | Tile | 348 | C | 0 | 0 | 348 | 0 |
| 2 | 2nd Floor | | Stairways | Terrazzo | 450 | C | 0 | 0 | 450 | 0 |
| 2 | 3rd Floor | | General Admin Area | Tile | 4,739 | C | 0 | 0 | 4,739 | 0 |
| 2 | 3rd Floor | | General Admin Area | Carpet | 3,826 | C | 0 | 0 | 3,826 | 0 |
| 2 | 3rd Floor | | Stairways | Terrazzo | 467 | C | 0 | 0 | 467 | 0 |
| 2 | 3rd Floor | | Hallway | Tile | 565 | C | 0 | 0 | 565 | 0 |
| 2 | 3rd Floor | | Restrooms | Tile | 241 | C | 0 | 0 | 241 | 0 |
| 2 | 3rd Floor | | Stairways | Terrazzo | 450 | C | 0 | 0 | 450 | 0 |
| 3 | Basement | | Operations & Production | Tile | 4,028 | C | 0 | 0 | 4,028 | 0 |
| 3 | Basement | | Walkways | Concrete | 1,547 | C | 0 | 0 | 1,547 | 0 |
| 3 | Basement | 10 | Coffee Mess Area | Tile | 30 | B | 0 | 30 | 0 | 0 |
| 3 | Basement | | Stairways | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 3 | Basement | | Stairways | Concrete | 235 | C | 0 | 0 | 235 | 0 |
| 3 | 1st Floor | | General Admin. Area | Tile | 4,770 | C | 0 | 0 | 4,770 | 0 |
| 3 | 1st Floor | | General Admin. Area | Carpet | 5,716 | C | 0 | 0 | 5,716 | 0 |
| 3 | 1st Floor | | Hallway | Concrete | 2,685 | C | 0 | 0 | 2,685 | 0 |
| 3 | 1st Floor | | Lobby | Tile | 600 | C | 0 | 0 | 600 | 0 |
| 3 | 1st Floor | 108-B | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 1st Floor | 110 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 1st Floor | 151 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 1st Floor | | Restrooms | Tile | 266 | C | 0 | 0 | 266 | 0 |
| 3 | 1st Floor | | Stairways | Concrete | 450 | C | 0 | 0 | 450 | 0 |
| 3 | 1st Floor | | Entrance/Exit | Concrete | 475 | C | 0 | 0 | 475 | 0 |
| 3 | Mezz | | Walkways | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 3 | Mezz | | General Admin. Area | Carpet | 3,432 | C | 0 | 0 | 3,432 | 0 |
| 3 | Mezz | 100-M | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | Mezz | | Landing | Tile | 85 | C | 0 | 0 | 85 | 0 |
| 3 | Mezz | | Stairways | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 3 | 2nd Floor | | General Admin. Area | Tile | 5,011 | C | 0 | 0 | 5,011 | 0 |
| 3 | 2nd Floor | | General Admin. Area | Carpet | 10,292 | C | 0 | 0 | 10,292 | 0 |
| 3 | 2nd Floor | | Lobby | Tile | 915 | C | 0 | 0 | 915 | 0 |
| 3 | 2nd Floor | 208 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 2nd Floor | 220 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 2nd Floor | 248 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 2nd Floor | 249 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 2nd Floor | | Restrooms | Tile | 477 | C | 0 | 0 | 477 | 0 |
| 3 | 2nd Floor | | Stairways | Concrete | 375 | C | 0 | 0 | 375 | 0 |
| 3 | 3rd Floor | | General Admin. Area | Tile | 3,424 | C | 0 | 0 | 3,424 | 0 |
| 3 | 3rd Floor | | General Admin. Area | Carpet | 11,739 | C | 0 | 0 | 11,739 | 0 |
| 3 | 3rd Floor | 306 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 3rd Floor | 324 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 3rd Floor | 351 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 3rd Floor | 355 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 3rd Floor | 358 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 3 | 3rd Floor | | Lobby | Tile | 565 | C | 0 | 0 | 565 | 0 |
| 3 | 3rd Floor | | Restrooms | Tile | 477 | C | 0 | 0 | 477 | 0 |
| 3 | 3rd Floor | | Stairways | Concrete | 375 | C | 0 | 0 | 375 | 0 |
| 4 | West Fitting Room | General Admin. Area | Tile | 641 | C | 0 | 0 | 641 | 0 |
| 4 | West Fitting Room | Operations & Production | Concrete | 2,655 | C | 0 | 0 | 2,655 | 0 |
| 4 | J Basin | Walkway | Concrete | 11,328 | C | 0 | 0 | 11,328 | 0 |
| 4 | J Basin | Restroom - Unisex | Tile | 80 | C | 0 | 0 | 80 | 0 |
| 4E | Basement | B01 | Office | Tile | 288 | C | 0 | 0 | 288 | 0 |
| 4E | Basement | B02A | Office | Tile | 515 | C | 0 | 0 | 515 | 0 |
| 4E | Basement | B02A | Kitchen - Coffee Mess | Tile | 278 | B | 0 | 278 | 0 | 0 |
| 4E | Basement | B03, B04 | General Admin Area | Tile | 780 | C | 0 | 0 | 780 | 0 |
| 4E | Basement | B39A | Operations & Production | Concrete | 1134 | C | 0 | 0 | 1,134 | 0 |
| 4E | Basement | B32 | General Admin Area | Concrete | 319 | C | 0 | 0 | 319 | 0 |
| 4E | Basement | | Walkway | Concrete | 6,336 | C | 0 | 0 | 6,336 | 0 |
| 4E | Basement | | Stairways | Concrete | 575 | C | 0 | 0 | 575 | 0 |
| 4E | 1st Floor | | Operations & Production | Tile | 3,935 | C | 0 | 0 | 3,935 | 0 |
| 4E | 1st Floor | | General Admin Area | Carpet | 4,358 | C | 0 | 0 | 4,358 | 0 |
| 4E | 1st Floor | | Walkway | Concrete | 11,413 | C | 0 | 0 | 11,413 | 0 |
| 4E | 1st Floor | | Stairways | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 4E | 1st Floor | 109 | Kichen - Coffee Mess | Tile | 115 | B | 0 | 115 | 0 | 0 |
| 4E | 1st Floor | | Restrooms | Tile | 672 | C | 0 | 0 | 672 | 0 |
| 4E | 1st Floor | | Stairways | Concrete | 255 | C | 0 | 0 | 255 | 0 |
| 4E | Mezz | South | General Admin Area | Tile | 1199 | C | 0 | 0 | 1,199 | 0 |
| 4E | 2nd Floor | 200C3..01 | Coffee Mess Area | Tile | 150 | B | 0 | 150 | 0 | 0 |
| 4E | 2nd Floor | 205.02 | Coffee Mess Area | Concrete | 146 | B | 0 | 146 | 0 | 0 |
| 4E | 2nd Floor | South | General Admin Area | Carpet | 5,099 | C | 0 | 0 | 5,099 | 0 |
| 4E | 2nd Floor | North | General Admin Area | Carpet | 1,734 | C | 0 | 0 | 1,734 | 0 |
| 4E | 2nd Floor | North | Operations & Production | Concrete | 1,578 | C | 0 | 0 | 1,578 | 0 |
| 4E | 2nd Floor | South | Hallway | Tile | 1003 | C | 0 | 0 | 1,003 | 0 |
| 4E | 2nd Floor | South | Restrooms | Tile | 184 | C | 0 | 0 | 184 | 0 |
| 4E | 2nd Floor | | Stairways | Metal | 300 | C | 0 | 0 | 300 | 0 |
| 4E | 3rd Floor | | Office Suite | Carpet | 1415 | C | 0 | 0 | 1,415 | 0 |
| 5 | 1st Floor | Operations & Production | Tile | 305 | C | 0 | 0 | 305 | 0 |
| 5 | 1st Floor | Entrance/Exit | Ceramic | 655 | C | 0 | 0 | 655 | 0 |
| 5 | 1st Floor | Hallway | Concrete | 500 | C | 0 | 0 | 500 | 0 |
| 5 | 1st Floor | Stairway/Ramp | Wood | 1,500 | C | 0 | 0 | 1,500 | 0 |
| 5 | 1st Floor | Stairway | Metal | 250 | C | 0 | 0 | 250 | 0 |
| 5 | 1st Floor | Entrance/Exit | Ceramic | 150 | C | 0 | 0 | 150 | 0 |
| 5 | 2nd Floor | Operations & Production | Tile | 1,341 | C | 0 | 0 | 1,341 | 0 |
| 5 | 2nd Floor | Stairway | Metal | 250 | C | 0 | 0 | 250 | 0 |
| 5 | 3rd Floor | Operations & Production | Tile | 365 | C | 0 | 0 | 365 | 0 |
| 5 | 3rd Floor | Operations & Production | Wood | 976 | C | 0 | 0 | 976 | 0 |
| 5 | 3rd Floor | Stairway | Wood | 150 | C | 0 | 0 | 150 | 0 |
| 5 | 3rd Floor | Kitchen Coffee/Lunch Rm | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 7 | 1st Floor | | General Admin Area | Tile | 4,829 | C | 0 | 0 | 4,829 | 0 |
| 7 | 1st Floor | | General Admin Area | Carpet | 5,333 | C | 0 | 0 | 5,333 | 0 |
| 7 | 1st Floor | Hi Bay | Operations & Production | Concrete | 2,485 | C | 0 | 0 | 2,485 | 0 |
| 7 | 1st Floor | | Walkway | Wood | 1,468 | C | 0 | 0 | 1,468 | 0 |
| 7 | 1st Floor | | Lobby | Tile | 325 | C | 0 | 0 | 325 | 0 |
| 7 | 1st Floor | | Restrooms | Tile | 195 | C | 0 | 0 | 195 | 0 |
| 7 | 1st Floor | | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 7 | 1st Floor | Vending | Snack Area & Vending Machines | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 7 | 1st Floor | 109 | Kitchenette | Tile | 80 | B | 0 | 80 | 0 | 0 |
| 7 | 1st Floor | | Entrance/Exit | Concrete | 275 | C | 0 | 0 | 275 | 0 |
| 7 | 2nd Floor | | General Admin. Area | Tile | 2,164 | C | 0 | 0 | 2,164 | 0 |
| 7 | 2nd Floor | | General Admin. Area | Carpet | 8,147 | C | 0 | 0 | 8,147 | 0 |
| 7 | 2nd Floor | | Hallway | Tile | 675 | C | 0 | 0 | 675 | 0 |
| 7 | 2nd Floor | 223 | Coffee Mess Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 7 | 2nd Floor | | Restrooms | Tile | 527 | C | 0 | 0 | 527 | 0 |
| 7 | 2nd Floor | | Stairway | Concrete | 450 | C | 0 | 0 | 450 | 0 |
| 9 | 1st Floor | | General Admin. Area | Carpet | 2,082 | C | 0 | 0 | 2,082 | 0 |
| 9 | 1st Floor | Hallway | Lobby, hallways, metal catwalk & mach rm stairs | Tile | 1030 | C | 0 | 0 | 1,030 | 0 |
| 9 | 1st Floor | Hallway | Coffee Mess Area | Tile | 40 | B | 0 | 40 | 0 | 0 |
| 9 | 1st Floor | 135 | Restrooms | Tile | 223 | C | 0 | 0 | 223 | 0 |
| 9 | 1st Floor | 136 | Restrooms | Tile | 260 | C | 0 | 0 | 260 | 0 |
| 9 | 1st Floor | Hallway | Main Entrance/Exit | Tile | 174 | C | 0 | 0 | 174 | 0 |
| 9 | 2nd Floor | M139 | Locker Room - Men | Concrete | 840 | B | 0 | 840 | 0 | 0 |
| 9 | 2nd Floor | | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 9 | 2nd Floor | M137 | Locker Room/Lunch Area | Tile | 300 | B | 0 | 300 | 0 | 0 |
| 9 | 2nd Floor | M137 | General Admin. Area | Carpet | 427 | C | 0 | 0 | 427 | 0 |
| 10 | Basement | General Admin. Area | Tile | 1,112 | C | 0 | 0 | 1,112 | 0 |
| 10 | Basement | General Admin. Area | Carpet | 315 | C | 0 | 0 | 315 | 0 |
| 10 | Basement | Kitchenette | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 10 | Basement | Hallway | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 10 | Basement | Restroom - Men | Tile | 90 | C | 0 | 0 | 90 | 0 |
| 10 | Basement | Extrance/Exit | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 10 | 1st Floor | Operations & Production | Tile | 1,250 | C | 0 | 0 | 1,250 | 0 |
| 10 | 1st Floor | Extrance/Exit | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 10 | 2nd Floor | General Admin Area | Carpet | 609 | C | 0 | 0 | 609 | 0 |
| 10 | 2nd Floor | Restroom - Unisex | Tile | 75 | C | 0 | 0 | 75 | 0 |
| 10 | 2nd Floor | Exterior Stairway | Metal | 175 | C | 0 | 0 | 175 | 0 |
| 14 | 1st Floor | General Admin Area | Carpet | 605 | C | 0 | 0 | 605 | 0 |
| 14 | 1st Floor | Entrance/Exit | Concrete | 75 | C | 0 | 0 | 75 | 0 |
| 15 | 1st Floor West | | General Admin Area | Tile | 11,522 | C | 0 | 0 | 11,522 | 0 |
| 15 | 1st Floor West | | General Admin Area | Carpet | 3,108 | C | 0 | 0 | 3,108 | 0 |
| 15 | 1st Floor West | | Lobby | Tile | 1,200 | C | 0 | 0 | 1,200 | 0 |
| 15 | 1st Floor West | | Restrooms | Tile | 125 | C | 0 | 0 | 125 | 0 |
| 15 | 1st Floor West | ` | Entrance/Exit | Concrete | 175 | C | 0 | 0 | 175 | 0 |
| 15 | 1st Floor | Hallway | Coffee Mess Area | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 15 | 1st Floor | 100 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor | 106 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor | 115 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor | 121 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor | 124 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor | 131 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 15 | 1st Floor East | | Hallway | Tile | 50 | C | 0 | 0 | 50 | 0 |
| 15 | 1st Floor East | | General Admin Area | Carpet | 2,325 | C | 0 | 0 | 2,325 | 0 |
| 15 | 1st Floor East | | Lobby | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 15 | 1st Floor East | | Restrooms | Tile | 175 | C | 0 | 0 | 175 | 0 |
| 15 | 1st Floor East | | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 15 | 1st Floor East | | Entrance/Exit | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 15 | 2nd Floor East | | Lobby | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 15 | 2nd Floor East | | General Admin Area | Carpet | 2,325 | C | 0 | 0 | 2,325 | 0 |
| 15 | 2nd Floor East | | Restrooms | Tile | 175 | C | 0 | 0 | 175 | 0 |
| 15 | 2nd Floor East | | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 16 | Basement | Operations & Production | Tile | 1,047 | C | 0 | 0 | 1,047 | 0 |
| 16 | Basement | Operations & Production | Concrete | 2,700 | C | 0 | 0 | 2,700 | 0 |
| 16 | Basement | Restroom - Unisex | Tile | 40 | C | 0 | 0 | 40 | 0 |
| 16 | Basement | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 16 | 1st Floor | General Admin Area | Tile | 2,035 | C | 0 | 0 | 2,035 | 0 |
| 16 | 1st Floor | General Admin Area | Carpet | 1,408 | C | 0 | 0 | 1,408 | 0 |
| 16 | 1st Floor | Lobby | Tile | 300 | C | 0 | 0 | 300 | 0 |
| 16 | 1st Floor | Restrooms | Tile | 240 | C | 0 | 0 | 240 | 0 |
| 16 | 1st Floor | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 16 | 1st Floor | Entrance/Exit | Concrete | 175 | C | 0 | 0 | 175 | 0 |
| 16 | 2nd Floor | General Admin Area | Tile | 1,659 | C | 0 | 0 | 1,659 | 0 |
| 16 | 2nd Floor | General Admin Area | Carpet | 4,080 | C | 0 | 0 | 4,080 | 0 |
| 16 | 2nd Floor | Hallway | Tile | 350 | C | 0 | 0 | 350 | 0 |
| 16 | 2nd Floor | Restrooms | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 16 | 2nd Floor | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 16 | 2nd Floor | Designated Wet Area | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 16 | 3rd Floor | Control Room | Tile | 754 | C | 0 | 0 | 754 | 0 |
| 16 | 3rd Floor | Operations & Production | Carpet | 3,710 | C | 0 | 0 | 3,710 | 0 |
| 16 | 3rd Floor | Stairway | Concrete | 150 | C | 0 | 0 | 150 | 0 |
| 17 | Basement West | | General Admin. Area | Carpet | 771 | C | 0 | 0 | 771 | 0 |
| 17 | Basement West | | Hallway | Concrete | 1,935 | C | 0 | 0 | 1,935 | 0 |
| 17 | Basement West | | Restroom - Unisex | Tile | 75 | C | 0 | 0 | 75 | 0 |
| 17 | Basement West | | Stairway | Tile | 550 | C | 0 | 0 | 550 | 0 |
| 17 | 1st Floor West | | General Admin Area | Tile | 324 | C | 0 | 0 | 324 | 0 |
| 17 | 1st Floor West | | General Admin Area | Carpet | 9,099 | C | 0 | 0 | 9,099 | 0 |
| 17 | 1st Floor West | | Lobby | Tile | 375 | C | 0 | 0 | 375 | 0 |
| 17 | 1st Floor West | | Hallway | Tile | 627 | C | 0 | 0 | 627 | 0 |
| 17 | 1st Floor West | | Restrooms | Tile | 365 | C | 0 | 0 | 365 | 0 |
| 17 | 1st Floor West | | Restroom - Unisex | Tile | 27 | C | 0 | 0 | 27 | 0 |
| 17 | 1st Floor West | | Entrance/Exit | Concrete | 750 | C | 0 | 0 | 750 | 0 |
| 17 | 1st Floor West | Vending | Snack Area & Vending Machines | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 17 | 1st Floor West | Hallway | Designated Wet Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 17 | 2nd Floor West | | Main Hallway | Tile | 1,624 | C | 0 | 0 | 1,624 | 0 |
| 17 | 2nd Floor West | | General Admin Area | Carpet | 8,137 | C | 0 | 0 | 8,137 | 0 |
| 17 | 2nd Floor West | | Lobby | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 17 | 2nd Floor West | | Restrooms | Tile | 574 | C | 0 | 0 | 574 | 0 |
| 17 | 2nd Floor West | | Stairway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 17 | 2nd Floor West | | Hallway | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 17 | 2nd Floor West | | Hallway | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 17 | 2nd Floor West | | Hallway | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 17 | Basement East | | General Admin Area | Tile | 1,736 | C | 0 | 0 | 1,736 | 0 |
| 17 | Basement East | | General Admin Area | Carpet | 1,308 | C | 0 | 0 | 1,308 | 0 |
| 17 | Basement East | | Lobby | Ceramic | 1,219 | C | 0 | 0 | 1,219 | 0 |
| 17 | Basement East | | Hallway | Tile | 380 | B | 0 | 380 | 0 | 0 |
| 17 | Basement East | | Restrooms | Tile | 455 | C | 0 | 0 | 455 | 0 |
| 17 | Basement East | | Stairway | Concrete | 175 | C | 0 | 0 | 175 | 0 |
| 17 | 1st Floor East | | General Admin Area | Carpet | 4,413 | C | 0 | 0 | 4,413 | 0 |
| 17 | 1st Floor East | | General Admin Area | Tile | 1,824 | C | 0 | 0 | 1,824 | 0 |
| 17 | 1st Floor East | | Lobby | Carpet | 1,514 | C | 0 | 0 | 1,514 | 0 |
| 17 | 1st Floor East | | Hallway | Carpet | 380 | C | 0 | 0 | 380 | 0 |
| 17 | 1st Floor East | | Hallway | Carpet | 20 | B | 0 | 20 | 0 | 0 |
| 17 | 1st Floor East | | Restrooms | Ceramic | 215 | C | 0 | 0 | 215 | 0 |
| 17 | 1st Floor East | | Stairway | Tile | 175 | C | 0 | 0 | 175 | 0 |
| 17 | 1st Floor East | | Entrance/Exit | Concrete | 270 | C | 0 | 0 | 270 | 0 |
| 17 | 2nd Floor East | | General Admin Area | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 17 | 2nd Floor East | | General Admin Area | Carpet | 5,495 | C | 0 | 0 | 5,495 | 0 |
| 17 | 2nd Floor East | | Kitchenette | Carpet | 30 | B | 0 | 30 | 0 | 0 |
| 17 | 2nd Floor East | | Hallway | Tile | 1,187 | C | 0 | 0 | 1,187 | 0 |
| 17 | 2nd Floor East | | General Admin Area | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 17 | 2nd Floor East | | Lobby | Carpet | 284 | C | 0 | 0 | 284 | 0 |
| 17 | 2nd Floor East | | Stairway | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 18 | Basement | | Stairways (3) | Concrete | 1000 | D | 0 | 0 | 0 | 1,000 |
| 18 | 1st Floor | Hallways, Common areas | Operations & Production | Concrete | 31,529 | C | 0 | 0 | 31,529 | 0 |
| 18 | 1st Floor | 115 | Kitchenette | Tile | 138 | C | 0 | 0 | 138 | 0 |
| 18 | 1st Floor | | General Admin Areas | Tile | 7,675 | C | 0 | 0 | 7,675 | 0 |
| 18 | 1st Floor | | General Admin Areas | Carpet | 7,000 | C | 0 | 0 | 7,000 | 0 |
| 18 | 1st Floor | 141 | Operations & Production | Tile | 3,700 | C | 0 | 0 | 3,700 | 0 |
| 18 | 1st Floor | 102 | Operations & Production | Concrete | 1,200 | C | 0 | 0 | 1,200 | 0 |
| 18 | 1st Floor | 1WR2 | Restrooms | Tile | 182 | C | 0 | 0 | 182 | 0 |
| 18 | 1st Floor | 1MR2 | Restrooms | Tile | 160 | C | 0 | 0 | 160 | 0 |
| 18 | 1st Floor | 1WR1 | Restrooms | Tile | 112 | C | 0 | 0 | 112 | 0 |
| 18 | 1st Floor | 1WR1A | Restrooms | Tile | 34 | C | 0 | 0 | 34 | 0 |
| 18 | 1st Floor | 1MR1 | Restrooms | Tile | 174 | C | 0 | 0 | 174 | 0 |
| 18 | 1st Floor | 1MR1A | Locker Room - Men | Tile | 204 | C | 0 | 0 | 204 | 0 |
| 18 | 1st Floor | | Stairway | Concrete | 200 | C | 0 | 0 | 200 | 0 |
| 18 | 1st Floor | | Control Room Stairs | Metal | 100 | C | 0 | 0 | 100 | 0 |
| 18 | 1st Floor | 108S5 | Annex Stairway | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 18 | 1st Floor | | Entrance/Exit | Concrete | 300 | C | 0 | 0 | 300 | 0 |
| 18 | 2nd Floor | 112S4 | Control Room Stairs | Metal | 150 | C | 0 | 0 | 150 | 0 |
| 18 | 2nd Floor | | Annex Stairway | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 18 | 2nd Floor | 204 | Coffee Mess Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 18 | 2nd Floor | 201 | Coffee Mess Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 18 | 2nd Floor | 241 | Coffee Mess Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 18 | 2nd Floor | | General Admin Areas | Tile | 1,575 | C | 0 | 0 | 1,575 | 0 |
| 18 | 2nd Floor | | General Admin Areas | Carpet | 5,336 | C | 0 | 0 | 5,336 | 0 |
| 18 | 2nd Floor | | Stairway | Metal | 275 | C | 0 | 0 | 275 | 0 |
| 19 | Basement A Wing | | Restroom - Unisex | Tile | 180 | C | 0 | 0 | 180 | 0 |
| 19 | Basement A Wing | | Stairways | Concrete | 475 | C | 0 | 0 | 475 | 0 |
| 19 | Basement A Wing | | Lunch Room/Coffee Mess | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 19 | Basement B Wing | | Operations & Production | Tile | 1,915 | C | 0 | 0 | 1,915 | 0 |
| 19 | Basement B Wing | | Operations & Production | Concrete | 2,506 | C | 0 | 0 | 2,506 | 0 |
| 19 | Basement B Wing | | General Admin Area | Carpet | 909 | C | 0 | 0 | 909 | 0 |
| 19 | Basement B Wing | | Hallway | Concrete | 750 | C | 0 | 0 | 750 | 0 |
| 19 | Basement B Wing | | Stairways | Concrete | 375 | C | 0 | 0 | 375 | 0 |
| 19 | Basement C Wing | | Vending Machine/Lunch Room | Tile | 2,545 | B | 0 | 2,545 | 0 | 0 |
| 19 | Basement C Wing | | Stairways | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 19 | Basement C Wing | | Vending Machine/Lunch Room | Tile | 100 | B | 0 | 100 | 0 | 0 |
| 19 | 1st Floor A Wing | | General Admin Area | Tile | 2,736 | C | 0 | 0 | 2,736 | 0 |
| 19 | 1st Floor A Wing | | General Admin Area | Carpet | 5,819 | C | 0 | 0 | 5,819 | 0 |
| 19 | 1st Floor A Wing | | Lobby | Terrazzo | 900 | C | 0 | 0 | 900 | 0 |
| 19 | 1st Floor A Wing | | Hallway | Tile | 1,190 | C | 0 | 0 | 1,190 | 0 |
| 19 | 1st Floor A Wing | | Restrooms | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 19 | 1st Floor A Wing | | Restroom - Men | Tile | 300 | C | 0 | 0 | 300 | 0 |
| 19 | 1st Floor A Wing | | Restroom - Unisex | Tile | 21 | C | 0 | 0 | 21 | 0 |
| 19 | 1st Floor A Wing | | Stairways | Concrete | 475 | C | 0 | 0 | 475 | 0 |
| 19 | 1st Floor A Wing | | Entrance/Exit | Concrete | 1,000 | C | 0 | 0 | 1,000 | 0 |
| 19 | 1st Floor A Wing | | Restroom - Women | Tile | 300 | C | 0 | 0 | 300 | 0 |
| 19 | 1st Floor A Wing | | Restroom - Men | Tile | 45 | C | 0 | 0 | 45 | 0 |
| 19 | 1st Floor B Wing | | General Admin Area | Tile | 2,873 | C | 0 | 0 | 2,873 | 0 |
| 19 | 1st Floor B Wing | | General Admin Area | Carpet | 9,087 | C | 0 | 0 | 9,087 | 0 |
| 19 | 1st Floor B Wing | | Lobby | Tile | 2,300 | C | 0 | 0 | 2,300 | 0 |
| 19 | 1st Floor B Wing | | Restroooms | Tile | 300 | C | 0 | 0 | 300 | 0 |
| 19 | 1st Floor B Wing | | Vending Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 19 | 1st Floor B Wing | | Locker Room - Men | Tile | 275 | C | 0 | 0 | 275 | 0 |
| 19 | 1st Floor B Wing | | Stairways | Concrete | 485 | C | 0 | 0 | 485 | 0 |
| 19 | 1st Floor B Wing | | Entrance/Exit | Concrete | 600 | C | 0 | 0 | 600 | 0 |
| 19 | 2nd Floor A Wing | | General Admin Area | Tile | 3,706 | C | 0 | 0 | 3,706 | 0 |
| 19 | 2nd Floor A Wing | | General Admin Area | Carpet | 3,866 | C | 0 | 0 | 3,866 | 0 |
| 19 | 2nd Floor A Wing | | Hallway | Tile | 1,190 | C | 0 | 0 | 1,190 | 0 |
| 19 | 2nd Floor A Wing | | Restroom - Men | Tile | 300 | C | 0 | 0 | 300 | 0 |
| 19 | 2nd Floor A Wing | | Stairways | Concrete | 475 | C | 0 | 0 | 475 | 0 |
| 19 | 2nd Floor B Wing | | Hallway | Tile | 929 | C | 0 | 0 | 929 | 0 |
| 19 | 2nd Floor B Wing | | General Admin Area | Carpet | 10,701 | C | 0 | 0 | 10,701 | 0 |
| 19 | 2nd Floor B Wing | | Lobby | Tile | 2,300 | C | 0 | 0 | 2,300 | 0 |
| 19 | 2nd Floor B Wing | | Restroom - Women | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 19 | 2rd Floor B Wing | | Nursing Room within Womens Restroom | Tile | 50 | C | 0 | 0 | 50 | 0 |
| 19 | 2nd Floor B Wing | | Stairways | Concrete | 450 | C | 0 | 0 | 450 | 0 |
| 19 | 2nd Floor C Wing | | General Admin Area | Tile | 1,152 | C | 0 | 0 | 1,152 | 0 |
| 19 | 2nd Floor C Wing | | Lobby | Terrazzo | 268 | C | 0 | 0 | 268 | 0 |
| 19 | 2nd Floor C Wing | | Stairways | Concrete | 275 | C | 0 | 0 | 275 | 0 |
| 19 | Mezz C Bay Lab | | General Admin Area | Tile | 1,200 | C | 0 | 0 | 1,200 | 0 |
| 19 | Mezz C Bay Lab | | Stairways | Metal | 175 | C | 0 | 0 | 175 | 0 |
| 19 | A Bay | A151 | Industrial Test Area | Concrete | 5901 | D | 0 | 0 | 0 | 5,901 |
| 19 | B Bay | B161 | Industrial Test Area | Concrete | 4362 | D | 0 | 0 | 0 | 4,362 |
| 19 | C Bay | C100 | Industrial Test Area | Concrete | 9870 | D | 0 | 0 | 0 | 9,870 |
| 21 | 1st Floor | | General Admin. Area | Tile | 2,454 | C | 0 | 0 | 2,454 | 0 |
| 21 | 1st Floor | | Operations & Production | Concrete | 2,190 | C | 0 | 0 | 2,190 | 0 |
| 21 | 1st Floor | | General Admin Area | Carpet | 500 | C | 0 | 0 | 500 | 0 |
| 21 | 1st Floor | | Lobby | Tile | 330 | B | 0 | 330 | 0 | 0 |
| 21 | 1st Floor | | Restrooms | Tile | 240 | C | 0 | 0 | 240 | 0 |
| 21 | 1st Floor | | Entrance/Exit | Concrete | 350 | C | 0 | 0 | 350 | 0 |
| 21 | 1st Floor | Shop | Designated Wet Area/Coffee Mess | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 21 | 1st Floor | Clinic | Designated Wet Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 22 | 1st Floor | General Admin. Area | Tile | 987 | C | 0 | 0 | 987 | 0 |
| 22 | 1st Floor | General Admin. Area | Carpet | 1,112 | C | 0 | 0 | 1,112 | 0 |
| 22 | 1st Floor | Lobby | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 22 | 1st Floor | Restrooms | Tile | 120 | C | 0 | 0 | 120 | 0 |
| 22 | 1st Floor | Restroom - Private | Tile | 35 | B | 0 | 35 | 0 | 0 |
| 22 | 1st Floor | Entrance/Exit | Concrete | 175 | C | 0 | 0 | 175 | 0 |
| 29 | 1st Floor | General Admin Area | Tile | 3,520 | C | 0 | 0 | 3,520 | 0 |
| 29 | 1st Floor | Entrance/Exit | Concrete | 225 | C | 0 | 0 | 225 | 0 |
| 29 | 1st Floor | Entrance/Exit | Concrete | 50 | C | 0 | 0 | 50 | 0 |
| 29 | 1st Floor | Designated Wet Area/Coffee Mess | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 29 | 1st Floor | Restrooms | Tile | 160 | C | 0 | 0 | 160 | 0 |
| 31 | 1st Floor | | Operations & Production | Tile | 3,560 | C | 0 | 0 | 3,560 | 0 |
| 31 | 1st Floor | | Restrooms | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 31 | 1st Floor | | Entrance/Exit | Concrete | 75 | C | 0 | 0 | 75 | 0 |
| 31 | 1st Floor | Entrance | Designated Wet Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 31 | 1st Floor | Interior | Designated Wet Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 40 | 1st Floor | 100 | Exterior Area Auditorium | Concrete | 100 | A | 100 | 0 | 0 | 0 |
| 40 | 1st Floor | 101 | Auditorium | Carpet | 3,121 | A | 3,121 | 0 | 0 | 0 |
| 40 | 1st Floor | 102 | Vestibule Auditorium | Terrazzo | 102 | A | 102 | 0 | 0 | 0 |
| 40 | 1st Floor | 102A | Lobby | Carpet | 1,026 | A | 1,026 | 0 | 0 | 0 |
| 40 | 1st Floor | | Stairway 3 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 1st Floor | 103 | Stage | WOOD | 529 | C | 0 | 0 | 529 | 0 |
| 40 | 1st Floor | 105 | Green Room | Carpet | 150 | A | 150 | 0 | 0 | 0 |
| 40 | 1st Floor | 106A | Entrance Area | Concrete | 375 | A | 375 | 0 | 0 | 0 |
| 40 | 1st Floor | 106B | Entrance East | Terrazzo | 53 | A | 53 | 0 | 0 | 0 |
| 40 | 1st Floor | 107 | Main Entrance Lobby | Terrazzo | 3,104 | A | 3,104 | 0 | 0 | 0 |
| 40 | 1st Floor | 108 | Entrance West | Terrazzo | 120 | A | 120 | 0 | 0 | 0 |
| 40 | 1st Floor | | Stairway 1 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 1st Floor | 109 | Conference Room | Carpet | 2,035 | A | 2,035 | 0 | 0 | 0 |
| 40 | 1st Floor | 110 | Conference Room | Carpet | 702 | A | 702 | 0 | 0 | 0 |
| 40 | 1st Floor | 111 | Conference Room | Carpet | 1,048 | A | 1,048 | 0 | 0 | 0 |
| 40 | 1st Floor | | Hallway | Carpet | 888 | A | 888 | 0 | 0 | 0 |
| 40 | 1st Floor | 112 | Guest Services Area | Carpet | 668 | A | 668 | 0 | 0 | 0 |
| 40 | 1st Floor | 114 | Security IT | Carpet | 470 | A | 470 | 0 | 0 | 0 |
| 40 | 1st Floor | 115 | Security Admin Area | Carpet | 461 | A | 461 | 0 | 0 | 0 |
| 40 | 1st Floor | 116 | Check In | Carpet | 299 | A | 299 | 0 | 0 | 0 |
| 40 | 1st Floor | 100C2 | Atrium | Terrazzo | 1,131 | A | 1,131 | 0 | 0 | 0 |
| 40 | 1st Floor | 100 E1 | Elevator 1 | Tile | 38 | C | 0 | 0 | 38 | 0 |
| 40 | 1st Floor | 100 E2 | Elevator 2 | Tile | 38 | C | 0 | 0 | 38 | 0 |
| 40 | 1st Floor | 117C | Entranct Vestibule | Terrazzo | 59 | A | 59 | 0 | 0 | 0 |
| 40 | 1st Floor | 117D | Exterior Entrance | Concrete | 75 | A | 75 | 0 | 0 | 0 |
| 40 | 1st Floor | | Stairwell 2 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 1st Floor | 120 | Restroom - Men | Tile | 224 | C | 0 | 0 | 224 | 0 |
| 40 | 1st Floor | 121 | Restroom - Women | Tile | 337 | C | 0 | 0 | 337 | 0 |
| 40 | 1st Floor | 122 | Cafeteria - Dining area | Terrazzo | 5,464 | A | 5,464 | 0 | 0 | 0 |
| 40 | 1st Floor | 123 | Cafeteria - Food Prep | Tile | 2,100 | A | 2,100 | 0 | 0 | 0 |
| 40 | 1st Floor | 124 | Cafeteria - Food Prep | Tile | 626 | A | 626 | 0 | 0 | 0 |
| 40 | 1st Floor | 126 | Cafeteria - Walk in | Concrete | 132 | C | 0 | 0 | 132 | 0 |
| 40 | 1st Floor | 127 | Cafeteria - Walk in | Concrete | 132 | C | 0 | 0 | 132 | 0 |
| 40 | 1st Floor | 128 | Cafeteria - Pantry | Tile | 128 | C | 0 | 0 | 128 | 0 |
| 40 | 1st Floor | 129 | Cafeteria - Office | Tile | 73 | C | 0 | 0 | 73 | 0 |
| 40 | 1st Floor | 130 | Cafeteria - Food Prep | Tile | 224 | C | 0 | 0 | 224 | 0 |
| 40 | 1st Floor | 131 | Cafeteria - Janitorial | Tile | 70 | C | 0 | 0 | 70 | 0 |
| 40 | 1st Floor | 132 | Cafeteria - Storage | Tile | 140 | C | 0 | 0 | 140 | 0 |
| 40 | 1st Floor | 133 | Cafeteria - Locker | Tile | 116 | C | 0 | 0 | 116 | 0 |
| 40 | 1st Floor | 134 | Restroom | Tile | 91 | C | 0 | 0 | 91 | 0 |
| 40 | 1st Floor | 135 | Cafeteria - Captains Dining | Carpet | 485 | A | 485 | 0 | 0 | 0 |
| 40 | 1st Floor | 100C1 | Cafeteria - Corridor | Tile/Carpet | 1,165 | C | 0 | 0 | 1,165 | 0 |
| 40 | 2nd Floor | 201 | Projection Room | Carpet | 401 | A | 401 | 0 | 0 | 0 |
| 40 | 2nd Floor | | Stairwell 1 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 2nd Floor | 202 | Balcony Auditorium | Carpet | 1,890 | A | 1,890 | 0 | 0 | 0 |
| 40 | 2nd Floor | | Stairwell 3 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 2nd Floor | 204 | Conference Room | Carpet | 624 | A | 624 | 0 | 0 | 0 |
| 40 | 2nd Floor | 201C1 | Lobby | Carpet | 1,920 | A | 1,920 | 0 | 0 | 0 |
| 40 | 2nd Floor | 206 | Conference Room | Carpet | 2,278 | A | 2,278 | 0 | 0 | 0 |
| 40 | 2nd Floor | 207 | Conference Room | Carpet | 730 | A | 730 | 0 | 0 | 0 |
| 40 | 2nd Floor | 208 | Conference Room | Carpet | 1,184 | A | 1,184 | 0 | 0 | 0 |
| 40 | 2nd Floor | 200C2 | Hallway | Carpet | 629 | A | 629 | 0 | 0 | 0 |
| 40 | 2nd Floor | | Stairway 2 | Composition | 312 | C | 0 | 0 | 312 | 0 |
| 40 | 2nd Floor | 210 | Conference Room | Carpet | 832 | A | 832 | 0 | 0 | 0 |
| 40 | 2nd Floor | 211 | Conference Room | Carpet | 920 | A | 920 | 0 | 0 | 0 |
| 40 | 2nd Floor | 212 | Break away Room 1 | Carpet | 285 | A | 285 | 0 | 0 | 0 |
| 40 | 2nd Floor | 213 | Break away Room 2 | Carpet | 288 | A | 288 | 0 | 0 | 0 |
| 40 | 2nd Floor | 214 | Janitors Closet | Tile | N/A | N/A | 0 | 0 | 0 | 0 |
| 40 | 2nd Floor | 216 | Restroom - Men | Tile | 219 | C | 0 | 0 | 219 | 0 |
| 40 | 2nd Floor | 217 | Restroom - Women | Tile | 243 | C | 0 | 0 | 243 | 0 |
41 1st Floor Operations & Production Tile 100 C 0 0 100 0
| 60 | 1st Floor | | Operations & Production | Tile | 6,345 | C | 0 | 0 | 6,345 | 0 |
| 60 | 1st Floor | | Command VIP Areas | Carpet | 10,530 | C | 0 | 0 | 10,530 | 0 |
| 60 | 1st Floor | | Stairway | Terrazzo | 400 | B | 0 | 400 | 0 | 0 |
| 60 | 1st Floor | | Atrium Floor | Terrazzo | 10,900 | B | 0 | 10,900 | 0 | 0 |
| 60 | 1st Floor | | Operations & Production | Bonded | 9,600 | C | 0 | 0 | 9,600 | 0 |
| 60 | 1st Floor | | Lobby | Terrazzo | 1,275 | B | 0 | 1,275 | 0 | 0 |
| 60 | 1st Floor | | Restrooms | Tile | 625 | C | 0 | 0 | 625 | 0 |
| 60 | 1st Floor | | Restrooms | Tile | 1,000 | C | 0 | 0 | 1,000 | 0 |
| 60 | 1st Floor | 100M1 | Nursing Room | Carpet | 109 | C | 0 | 0 | 109 | 0 |
| 60 | 1st Floor | | Locker Room - Men | Tile | 500 | C | 0 | 0 | 500 | 0 |
| 60 | 1st Floor | | Locker Room - Women | Tile | 525 | C | 0 | 0 | 525 | 0 |
| 60 | 1st Floor | South | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 1st Floor | North | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 1st Floor | | Entrance/Exit | Concrete | 1,250 | C | 0 | 0 | 1,250 | 0 |
| 60 | 1st Floor | | Lunch Room/Coffee Mess Area | Tile | 200 | B | 0 | 200 | 0 | 0 |
| 60 | 1st Floor | | Kitchen | Tile | 25 | B | 0 | 25 | 0 | 0 |
| 60 | 2nd Floor | | Operations & Production | Tile | 6,345 | C | 0 | 0 | 6,345 | 0 |
| 60 | 2nd Floor | | General Admin Area | Carpet | 11,105 | C | 0 | 0 | 11,105 | 0 |
| 60 | 2nd Floor | | Stairway | Terrazzo | 400 | B | 0 | 400 | 0 | 0 |
| 60 | 2nd Floor | | Hallway | Terrazzo | 6,500 | C | 0 | 0 | 6,500 | 0 |
| 60 | 2nd Floor | | Operations & Production | Bonded | 10,900 | C | 0 | 0 | 10,900 | 0 |
| 60 | 2nd Floor | | General Admin Area | Terrazzo | 1,500 | C | 0 | 0 | 1,500 | 0 |
| 60 | 2nd Floor | | Restrooms | Tile | 455 | C | 0 | 0 | 455 | 0 |
| 60 | 2nd Floor | | Restrooms | Tile | 455 | C | 0 | 0 | 455 | 0 |
| 60 | 2nd Floor | South | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 2nd Floor | North | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 2nd Floor | | Lunch Room/Coffee Mess Area | Tile | 200 | B | 0 | 200 | 0 | 0 |
| 60 | 3rd Floor | | Operations & Production | Tile | 6,345 | C | 0 | 0 | 6,345 | 0 |
| 60 | 3rd Floor | | General Admin Area | Carpet | 11,105 | C | 0 | 0 | 11,105 | 0 |
| 60 | 3rd Floor | | Stairway | Terrazzo | 400 | B | 0 | 400 | 0 | 0 |
| 60 | 3rd Floor | | Hallway | Terrazzo | 6,500 | C | 0 | 0 | 6,500 | 0 |
| 60 | 3rd Floor | | Operations & Production | Bonded | 10,900 | C | 0 | 0 | 10,900 | 0 |
| 60 | 3rd Floor | | General Admin Area | Terrazzo | 1,500 | C | 0 | 0 | 1,500 | 0 |
| 60 | 3rd Floor | | Restrooms | Tile | 455 | C | 0 | 0 | 455 | 0 |
| 60 | 3rd Floor | | Restrooms | Tile | 455 | C | 0 | 0 | 455 | 0 |
| 60 | 3rd Floor | South | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 3rd Floor | North | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 3rd Floor | | Lunch Room/Coffee Mess Area | Tile | 200 | B | 0 | 200 | 0 | 0 |
| 60 | 4th Floor | South | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 4thFloor | North | Stairway | Concrete with non-slip rubber covering | 375 | C | 0 | 0 | 375 | 0 |
| 60 | 4th Floor | 403 | Fitness Center | Carpet | 387 | A | 387 | 0 | 0 | 0 |
| 61 | 1st Floor | General Admin Area | Tile | 615 | C | 0 | 0 | 615 | 0 |
| 61 | 1st Floor | Operations & Production | Concrete | 3,650 | C | 0 | 0 | 3,650 | 0 |
| 61 | 1st Floor | Office | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 61 | 1st Floor | Lobby | Concrete | 175 | C | 0 | 0 | 175 | 0 |
| 61 | 1st Floor | Restroom - Unisex | Tile | 75 | C | 0 | 0 | 75 | 0 |
| 61 | 1st Floor | Entrance/Exit | Concrete | 125 | C | 0 | 0 | 125 | 0 |
| 80 | 1st Floor | | General Admin Area | Tile | 3,692 | C | 0 | 0 | 3,692 | 0 |
| 80 | 1st Floor | | Operations & Production | Concrete | 3,328 | C | 0 | 0 | 3,328 | 0 |
| 80 | 1st Floor | | Lobby | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 80 | 1st Floor | | Restrooms | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 80 | 1st Floor | | Stairway | Concrete | 200 | C | 0 | 0 | 200 | 0 |
| 80 | 1st Floor | | Entrance/Exit | Concrete | 275 | C | 0 | 0 | 275 | 0 |
| 80 | 1st Floor | 103 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 1st Floor | 105 | Designated Wet Area/Coffee Mess | Tile | 25 | B | 0 | 25 | 0 | 0 |
| 80 | 1st Floor | 113 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 1st Floor | 119 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 2nd Floor | | General Admin Area | Tile | 6,025 | C | 0 | 0 | 6,025 | 0 |
| 80 | 2nd Floor | | General Admin Area | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 80 | 2nd Floor | | Lobby | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 80 | 2nd Floor | | Restrooms | Tile | 400 | C | 0 | 0 | 400 | 0 |
| 80 | 2nd Floor | | Stairway | Concrete | 200 | C | 0 | 0 | 200 | 0 |
| 80 | 2nd Floor | 201 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 2nd Floor | 202 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 2nd Floor | 214 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 2nd Floor | 217 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 2nd Floor | 218 | Designated Wet Area/Coffee Mess | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 3rd Floor | | General Admin Area | Tile | 6,795 | C | 0 | 0 | 6,795 | 0 |
| 80 | 3rd Floor | | General Admin Area | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 80 | 3rd Floor | | Lobby | Tile | 250 | C | 0 | 0 | 250 | 0 |
| 80 | 3rd Floor | | Restroooms | Tile | 200 | C | 0 | 0 | 200 | 0 |
| 80 | 3rd Floor | | Stairway | Concrete | 200 | C | 0 | 0 | 200 | 0 |
| 80 | 3rd Floor | 304 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 3rd Floor | 313 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 80 | 3rd Floor | | Designated Wet Area | Tile | 25 | B | 0 | 25 | 0 | 0 |
| 80 | 3rd Floor | 316 | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 81 | 1st Floor | Operations & Production | Tile | 175 | C | 0 | 0 | 175 | 0 |
| 81 | 1st Floor | Restroom - Unisex | Tile | 125 | C | 0 | 0 | 125 | 0 |
| 81 | 1st Floor | Entrance/Exit | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 100 | 1st Floor | General Admin. Area | Tile | 709 | C | 0 | 0 | 709 | 0 |
| 100 | 1st Floor | Entrance/Exit | Tile | 30 | C | 0 | 0 | 30 | 0 |
| 100 | 1st Floor | Restrooms | Tile | 180 | C | 0 | 0 | 180 | 0 |
| 100 | 1st Floor | Locker Room | Tile | 100 | C | 0 | 0 | 100 | 0 |
| 104 | 1st Floor | | Restrooms | Tile | 112 | A | 112 | 0 | 0 | 0 |
| 104 | 1st Floor | | Entrance/Exit | Concrete | 75 | C | 0 | 0 | 75 | 0 |
| 104 | 1st Floor | | General Admin/Wet Area | Carpet | 25 | A | 25 | 0 | 0 | 0 |
| 104 | 1st Floor | 100, 101, 101A, 105A | Offices | Carpet | 987 | C | 0 | 0 | 987 | 0 |
| 108 | 1st Floor | Restroom - Unisex | Tile | 150 | C | 0 | 0 | 150 | 0 |
| 108 | 1st Floor | Entrance/Exit | Concrete | 25 | C | 0 | 0 | 25 | 0 |
| 109 | Mezzanine | M00C1 | Corridor | Carpet | 126 | C | 0 | 0 | 126 | 0 |
| 109 | Mezzanine | M02 | Operations | Carpet | 492 | C | 0 | 0 | 492 | 0 |
| 109 | Mezzanine | M01 | Operations | Carpet | 456 | C | 0 | 0 | 456 | 0 |
110 1st Floor Restrooms Tile 33 C 0 0 33 0
| 116 | 1st Floor | General Admin Area | Carpet | 680 | C | 0 | 0 | 680 | 0 |
| 116 | 1st Floor | Operations & Production | Concrete | 600 | C | 0 | 0 | 600 | 0 |
| 116 | 1st Floor | Restroom - Unisex | Tile | 65 | C | 0 | 0 | 65 | 0 |
| 116 | 1st Floor | Entrance/Exit | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 125A | 1st Floor | Restroom - Unisex | Tile | 107 | C | 0 | 0 | 107 | 0 |
| 125A | 1st Floor | Entrance/Exit | Concrete | 53 | C | 0 | 0 | 53 | 0 |
| 125A | 1st Floor | Lunch Room | Tile | 313 | B | 0 | 313 | 0 | 0 |
| 143 | 1st Floor | | General Admin Area | Carpet | 1311 | C | 0 | 0 | 1,311 | 0 |
| 143 | 1st Floor | | Operations & Production | Concrete | 3,523 | C | 0 | 0 | 3,523 | 0 |
| 143 | 1st Floor | | Restrooms | Tile | 163 | C | 0 | 0 | 163 | 0 |
| 143 | 1st Floor | | Entrance/Exit | Concrete | 50 | C | 0 | 0 | 50 | 0 |
| 143 | 1st Floor | 108 | Coffee Mess Area | Tile | 269 | B | 0 | 269 | 0 | 0 |
| P | 1st Floor | Restroooms | Tile | 890 | C | 0 | 0 | 890 | 0 |
| P | 1st Floor | Conference Room | Carpet | 607 | A | 607 | 0 | 0 | 0 |
| P | 1st Floor | General Admin. Area | Carpet | 7095 | C | 0 | 0 | 7,095 | 0 |
| P | 1st Floor | Kitchen - Coffee Mess | Tile | 173 | B | 0 | 173 | 0 | 0 |
| P | 1st Floor | Entry room | Tile | 77 | C | 0 | 0 | 77 | 0 |
| Q | 1st Floor | Restroooms | Tile | 690 | C | 0 | 0 | 690 | 0 |
| Q | 1st Floor | Conference Room | Carpet | 577 | A | 577 | 0 | 0 | 0 |
| Q | 1st Floor | General Admin. Area | Carpet | 8013 | C | 0 | 0 | 8,013 | 0 |
| Q | 1st Floor | Kitchen - Coffee Mess | Tile | 88 | B | 0 | 88 | 0 | 0 |
| Q | 1st Floor | Entry room | Tile | 77 | C | 0 | 0 | 77 | 0 |
TOTAL 720,263
| Building No. | Service Class Totals (SF) | | | |
| A | B | C | D |
| 1 | 4,226 | 7,657 | 31,493 | 0 |
| 2 | 11,611 | 45 | 27,810 | 0 |
| 3 | 0 | 225 | 58,439 | 0 |
| 4 | 0 | 0 | 14,704 | 0 |
| 4E | 0 | 689 | 43,342 | 0 |
| 5 | 0 | 50 | 6,442 | 0 |
| 7 | 0 | 145 | 27,123 | 0 |
| 9 | 0 | 1,180 | 4,446 | 0 |
| 10 | 0 | 50 | 4,076 | 0 |
| 14 | 0 | 0 | 680 | 0 |
| 15 | 0 | 140 | 22,080 | 0 |
| 16 | 0 | 50 | 19,598 | 0 |
| 17 | 0 | 560 | 47,283 | 0 |
| 18 | 0 | 60 | 60,294 | 1,000 |
| 19 | 0 | 2,685 | 63,553 | 20,133 |
| 21 | 0 | 370 | 5,734 | 0 |
| 22 | 0 | 35 | 2,544 | 0 |
| 29 | 0 | 20 | 3,955 | 0 |
| 31 | 0 | 40 | 4,035 | 0 |
| 40 | 36,643 | 0 | 5,771 | 0 |
| 41 | 0 | 0 | 100 | 0 |
| 60 | 387 | 14,000 | 108,004 | 0 |
| 61 | 0 | 15 | 4,640 | 0 |
| 80 | 0 | 215 | 22,465 | 0 |
| 81 | 0 | 0 | 400 | 0 |
| 100 | 0 | 0 | 1,019 | 0 |
| 104 | 137 | 0 | 1,062 | 0 |
| 108 | 0 | 0 | 175 | 0 |
| 109 | 0 | 0 | 1,074 | 0 |
| 110 | 0 | 0 | 33 | 0 |
| 116 | 0 | 0 | 1,445 | 0 |
| 125A | 0 | 313 | 160 | 0 |
| 143 | 0 | 269 | 5,047 | 0 |
| P | 607 | 173 | 8,062 | 0 |
| Q | 577 | 88 | 8,780 | 0 |
| Total | 54,188 | 29,074 | 615,868 | 21,133 |
att 1_Option Bldgs
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | | | | | | | | | |
| CUSTODIAL INVENTORY Option Buildings | | | | | | | | | | |
| Building | Floor No. | Room No. | Function | Floor Type | Area (SF) | Service Class | SC A | SC B | SC C | SC D |
| 11 | Basement | | Approx. 8 rms. Gen Admin Space | Tile | 2,874 | C | 0 | 0 | 2,874 | 0 |
| 11 | 1st Floor | | Unisex Restroom | Tile | 36 | B | 0 | 36 | 0 | 0 |
| 11 | 1st Floor | | Approx. 2 rms. Gen Admin Space | Carpet | 1466 | C | 0 | 0 | 1,466 | 0 |
| 11 | 1st Floor | | Approx. 3 rms. Gen Admin Labs | Tile | 2,376 | C | 0 | 0 | 2,376 | 0 |
| 11 | 1st Floor | | Des. Wet Area - Coffee Mess | Carpet | 50 | B | 0 | 50 | 0 | 0 |
| 11 | 2nd Floor | 203-B | Mens Restroom | Tile | 87 | B | 0 | 87 | 0 | 0 |
| 11 | 2nd Floor | 217 | Womens Restroom | Tile | 94 | B | 0 | 94 | 0 | 0 |
| 11 | 2nd Floor | | Approx. 6 rms. Gen Admin Space | Carpet | 1,702 | C | 0 | 0 | 1,702 | 0 |
| 11 | 2nd Floor | | Des. Wet Area - Coffee Mess | Carpet | 50 | B | 0 | 50 | 0 | 0 |
| 12 | Basement | General Laboratory Space | Concrete | 4,690 | C | 0 | 0 | 4,690 | 0 |
| 12 | Basement | Approx. 5 rms. Gen Admin Labs | Tile | 0 | C | 0 | 0 | 0 | 0 |
| 12 | Basement | Des. Wet Area - Coffee Mess | Tile | 0 | B | 0 | 0 | 0 | 0 |
| 12 | 1st Floor | General Laboratory Space | Concrete | 7,062 | C | 0 | 0 | 7,062 | 0 |
| 12 | 1st Floor | Approx. 7 rms. Gen Admin Labs | Tile | 0 | C | 0 | 0 | 0 | 0 |
| 12 | 1st Floor | Des. Wet Area - Coffee Mess | Tile | 0 | B | 0 | 0 | 0 | 0 |
| 12 | 1st Floor | Mens Restroom | Tile | 70 | B | 0 | 70 | 0 | 0 |
| 12 | 1st Floor | Womens Restroom | Tile | 68 | B | 0 | 68 | 0 | 0 |
| 12 | Mezz | Hallway Outside Mens and Womens Room | Tile | 164 | C | 0 | 0 | 164 | 0 |
| 12 | Mezz | Mens Restroom | Tile | 116 | B | 0 | 116 | 0 | 0 |
| 12 | Mezz | Womens Restroom | Tile | 116 | B | 0 | 116 | 0 | 0 |
| 12 | Mezz | Approx. 3 rms. Gen Admin Space | Carpet | 2,881 | B | 0 | 2,881 | 0 | 0 |
| 12 | Mezz | Des. Wet Area - Coffee Mess | Carpet | 1231 | B | 0 | 1,231 | 0 | 0 |
| 13 | Basement | General Laboratory Space | Concrete | 972 | C | 0 | 0 | 972 | 0 |
| 13 | Basement | Approx. 5 rms. Gen Admin Labs | Tile | 4,473 | C | 0 | 0 | 4,473 | 0 |
| 13 | 1st Floor | General Laboratory Space | Concrete | 1,562 | C | 0 | 0 | 1,562 | 0 |
| 13 | 1st Floor | New Part Gen. Admin. Space | Carpet | 1,248 | B | 0 | 1,248 | 0 | 0 |
| 13 | 1st Floor | Approx. 5 rms. Gen Admin Labs | Tile | 3,450 | C | 0 | 0 | 3,450 | 0 |
| 13 | 1st Floor | Approx. 12 rms. Gen Admin Space | Carpet | 1,254 | C | 0 | 0 | 1,254 | 0 |
| 13 | 1st Floor | Womens Restroom | Tile | 109 | B | 0 | 109 | 0 | 0 |
| 13 | 1st Floor | Mens Restroom | Tile | 108 | B | 0 | 108 | 0 | 0 |
| 13 | 1st Floor | Des. Wet Area - Coffee Mess | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 13 | 2nd Floor | Mens Restroom | Tile | 117 | B | 0 | 117 | 0 | 0 |
| 13 | 2nd Floor | Womens Restroom | Tile | 126 | B | 0 | 126 | 0 | 0 |
| 13 | 2nd Floor | General Admin Areas | Carpet | 2,702 | C | 0 | 0 | 2,702 | 0 |
| 13 | 2nd Floor | General Admin Areas | Tile | 1,610 | C | 0 | 0 | 1,610 | 0 |
| 13 | 2nd Floor | Des. Wet Area - Coffee Mess | Carpet | 50 | B | 0 | 50 | 0 | 0 |
| 32 | 1st Floor | Mens Restroom | Tile | 114 | B | 0 | 114 | 0 | 0 |
| 32 | 1st Floor | Womens Restroom | Tile | 114 | B | 0 | 114 | 0 | 0 |
| 32 | 1st Floor | Approx. 10 rms Gen. Admin. Space | Carpet | 7,222 | C | 0 | 0 | 7,222 | 0 |
| 32 | 1st Floor | General Admin Space | Tile | 235 | C | 0 | 0 | 235 | 0 |
| 32 | 1st Floor | Des. Wet Area - Coffee Mess | Carpet | 38 | B | 0 | 38 | 0 | 0 |
| 42 | 1st Floor to 3rd Floor | | Center Stairwell (S1) | Tile/Comp | 496 | C | 0 | 0 | 496 | 0 |
| 42 | 1st Floor to 3rd Floor | | NE Stairwell (S2) | Tile/Comp | 489 | C | 0 | 0 | 489 | 0 |
| 42 | 1st Floor to 3rd Floor | | SW Stairwell (S3) | Tile/Comp | 500 | C | 0 | 0 | 500 | 0 |
| 42 | 1st Floor | 119 | Nursing Room | Carpet | 113 | C | 0 | 0 | 113 | 0 |
| 42 | 1st Floor | 115/116 | Restroom | Tile | 309 | B | 0 | 309 | 0 | 0 |
| 42 | 2nd Floor | 218/219 | Restroom | Tile | 309 | B | 0 | 309 | 0 | 0 |
| 42 | 3rd Floor | 309/310 | Restroom | Tile | 306 | B | 0 | 306 | 0 | 0 |
| 42 | 1st Floor | 117 | Kitchen | Tile | 92 | B | 0 | 92 | 0 | 0 |
| 42 | 2nd Floor | 220 | Kitchen | Tile | 92 | B | 0 | 92 | 0 | 0 |
| 42 | 3rd Floor | 311 | Kitchen | Tile | 92 | B | 0 | 92 | 0 | 0 |
| 42 | 1st Floor | | Office/Admin Area | Carpet | 8538 | C | 0 | 0 | 8,538 | 0 |
| 42 | 2nd Floor | | Office/Admin Area | Carpet | 8697 | C | 0 | 0 | 8,697 | 0 |
| 42 | 3rd Floor | | Office/Admin Area | Carpet | 8739 | C | 0 | 0 | 8,739 | 0 |
| 42 | 1st Floor | | Storage/File Room | Tile | 656 | C | 0 | 0 | 656 | 0 |
| 42 | 2nd Floor | | Storage/File Room | Tile | 372 | C | 0 | 0 | 372 | 0 |
| 42 | 3rd Floor | | Storage/File Room | Tile | 376 | C | 0 | 0 | 376 | 0 |
| 68 | 1st Floor | Mens Restroom | Tile | 173 | B | 0 | 173 | 0 | 0 |
| 68 | 1st Floor | Womens Restroom | Tile | 188 | B | 0 | 188 | 0 | 0 |
| 68 | 1st Floor | Des. Wet Area - Coffee Mess | Tile | 55 | B | 0 | 55 | 0 | 0 |
| 68 | 1st Floor | General Laboratory Area | Concrete | 7,446 | C | 0 | 0 | 7,446 | 0 |
| 68 | 1st Floor | General Administration Areas | Carpet | 2,316 | C | 0 | 0 | 2,316 | 0 |
| 68 | 1st Floor | General Administration Areas | Tile | 2140 | C | 0 | 0 | 2,140 | 0 |
| 157 | 1st Floor | Unisex Restroom | Tile | 43 | B | 0 | 43 | 0 | 0 |
| 157 | 1st Floor | Approx. 10 Rms. Gen. Admin Space | Tile | 1,748 | C | 0 | 0 | 1,748 | 0 |
| 157 | 1st Floor | General Laboratory Space | Concrete | 3,456 | C | 0 | 0 | 3,456 | 0 |
| 157 | 1st Floor | Office | Carpet | 1,590 | B | 0 | 1,590 | 0 | 0 |
| 157 | 1st Floor | Des. Wet Area - Coffee Mess | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 191 | 1st Floor | | 17-W to 191 Covered Walkway | Concrete | 200 | C | 0 | 0 | 200 | 0 |
| 191 | 1st Floor | 130 | Mens Restroom | Tile | 166 | B | 0 | 166 | 0 | 0 |
| 191 | 1st Floor | 134 | Womens Restroom | Tile | 161 | B | 0 | 161 | 0 | 0 |
| 191 | 1st Floor | | Des. Wet Area - Coffee Mess | Carpet | 50 | B | 0 | 50 | 0 | 0 |
| 191 | 1st Floor | | Approx. 31 Rms. Gen. Admin Space | Carpet | 7,647 | C | 0 | 0 | 7,647 | 0 |
| 191 | 1st Floor | | North Hallway | Tile | 364 | C | 0 | 0 | 364 | 0 |
| 191 | 1st Floor | | 191 to 192 Covered Walkway | Concrete | 250 | C | 0 | 0 | 250 | 0 |
| 192 | 1st Floor | 150 | Mens Restroom | Tile | 160 | B | 0 | 160 | 0 | 0 |
| 192 | 1st Floor | 152 | Womens Restroom | Tile | 178 | B | 0 | 178 | 0 | 0 |
| 192 | 1st Floor | | Des. Wet Area - Coffee Mess | Tile | 50 | B | 0 | 50 | 0 | 0 |
| 192 | 1st Floor | | General Administrative Spaces | Tile | 1,731 | C | 0 | 0 | 1,731 | 0 |
| 192 | 1st Floor | | General Administrative Spaces | Carpet | 6,371 | C | 0 | 0 | 6,371 | 0 |
| 193 | 1st Floor | 102 | Mens Restroom | Tile | 111 | B | 0 | 111 | 0 | 0 |
| 193 | 1st Floor | 103 | Womens Restroom | Tile | 99 | B | 0 | 99 | 0 | 0 |
| 193 | 1st Floor | | Des. Wet Area - Coffee Mess | Carpet | 50 | B | 0 | 50 | 0 | 0 |
| 193 | 1st Floor | | General Administrative Spaces | Tile | 6,260 | C | 0 | 0 | 6,260 | 0 |
| 193 | 1st Floor | | General Administrative Spaces | Tile | 346 | C | 0 | 0 | 346 | 0 |
| 193 | 1st Floor | | Mechanical Equipment Rooms | Concrete | 496 | C | 0 | 0 | 496 | 0 |
| L | 1st Floor | 103 | Womens Restroom | Tile | 71 | B | 0 | 71 | 0 | 0 |
| L | 1st Floor | 118 | Mens Restroom | Tile | 71 | B | 0 | 71 | 0 | 0 |
| L | 1st Floor | | Des. Wet Area - Coffee Mess | Tile | 50 | B | 0 | 50 | 0 | 0 |
| L | 1st Floor | | General Administrative Spaces | Tile | 0 | C | 0 | 0 | 0 | 0 |
| L | 1st Floor | | General Administrative Spaces | Carpet | 1,967 | C | 0 | 0 | 1,967 | 0 |
| 20 | Basement | | Operations | Tile | 236 | B | 0 | 236 | 0 | 0 |
| 20 | Basement | | Operations | Carpet | 200 | B | 0 | 200 | 0 | 0 |
| 20 | Basement | | Stairway | Concrete | 100 | B | 0 | 100 | 0 | 0 |
| 20 | 1st Floor | | Hallway | Tile | 751 | B | 0 | 751 | 0 | 0 |
| 20 | 1st Floor | | General Admin Area | Carpet | 950 | B | 0 | 950 | 0 | 0 |
| 20 | 1st Floor | | Lobby | Carpet | 450 | B | 0 | 450 | 0 | 0 |
| 20 | 1st Floor | | Restrooms | Tile | 100 | B | 0 | 100 | 0 | 0 |
| 20 | 1st Floor | | Entrance/Exit | Concrete | 475 | B | 0 | 475 | 0 | 0 |
| 20 | 1st Floor | Entrance | Designated Wet Area | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 20 | 1st Floor | Entrance | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 20 | Outside Vending | | Designated Wet Area | Tile | 15 | B | 0 | 15 | 0 | 0 |
| 30 | 1st Floor | | General Admin Area | Tile | 597 | B | 0 | 597 | 0 | 0 |
| 30 | 1st Floor | | General Admin Area | Carpet | 2,648 | B | 0 | 2648 | 0 | 0 |
| 30 | 1st Floor | | Lobby | Tile | 245 | B | 0 | 245 | 0 | 0 |
| 30 | 1st Floor | | Restrooms | Tile | 315 | B | 0 | 315 | 0 | 0 |
| 30 | 1st Floor | | Entrance/Exit | Concrete | 75 | B | 0 | 75 | 0 | 0 |
| 30 | 1st Floor | Kitchen | Designated Wet Area/CM | Tile | 20 | B | 0 | 20 | 0 | 0 |
| 52 | 1st Floor | Restroom | Tile | 63 | B | 0 | 63 | 0 | 0 |
| 52 | 1st Floor | Offices | Carpet | 400 | B | 0 | 400 | 0 | 0 |
| 52 | 1st Floor | Common Area | Carpet | 281 | B | 0 | 281 | 0 | 0 |
| 52 | 1st Floor | Hallway | Tile | 234 | B | 0 | 234 | 0 | 0 |
| 52 | 1st Floor | Kitchen | Tile | 118 | B | 0 | 118 | 0 | 0 |
| 101 | 1st Floor | Lobby | Tile | 180 | C | 0 | 0 | 180 | 0 |
| 101 | 1st Floor | Restrooms | Tile | 342 | C | 0 | 0 | 342 | 0 |
| 101 | 1st Floor | Entrance/Exit | Concrete | 75 | C | 0 | 0 | 75 | 0 |
| 152 | 1st Floor | Restroom | Tile | 88 | B | 0 | 88 | 0 | 0 |
| 152 | 1st Floor | Laundry Room | Tile | 105 | B | 0 | 105 | 0 | 0 |
| 152 | 1st Floor | Exercise Room | Carpet | 377 | B | 0 | 377 | 0 | 0 |
| 152 | 1st Floor | Common Area | Carpet | 304 | B | 0 | 304 | 0 | 0 |
| 152 | 1st Floor | Sleeping Quarters | Carpet | 548 | B | 0 | 548 | 0 | 0 |
| 155 | Guard Station | | General Admin Area | Tile | 125 | B | 0 | 125 | 0 | 0 |
| 155 | Guard Station | | Entrance/Exit | Concrete | 25 | B | 0 | 25 | 0 | 0 |
| 155 | Guard Station | Gate #3 | Restroom | Tile | 30 | B | 0 | 30 | 0 | 0 |
| 178 | Guard Station | | General Admin Area | Tile | 70 | B | 0 | 70 | 0 | 0 |
| 178 | Guard Station | Gate #2 | Designated Wet Area | Tile | 25 | B | 0 | 25 | 0 | 0 |
| 178 | Guard Station | | Entrance/Exit | Concrete | 25 | B | 0 | 25 | 0 | 0 |
| 6 | 1st Floor | General Admin Area | Tile | 80 | C | 0 | 0 | 80 | 0 |
| 6 | 1st Floor | Operations & Production | Concrete | 85 | C | 0 | 0 | 85 | 0 |
| 6 | 1st Floor | Entrance/Exit | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| 6 | 1st Floor | Restroom - Men | Tile | 275 | B | 0 | 275 | 0 | 0 |
| 6 | 1st Floor | Locker Room - Men | Tile | 700 | B | 0 | 700 | 0 | 0 |
| 6 | Mezz | Locker Room/ Wet Area | Tile | 100 | B | 0 | 100 | 0 | 0 |
24 1st Floor Restroom Tile 50 B 0 50 0 0
| 126 | 1st Floor | | Restroom | Tile | 18 | B | 0 | 18 | 0 | 0 |
| 126 | 1st Floor | 102 | Office | Tile | 205 | B | 0 | 205 | 0 | 0 |
| 128 | 1st Floor | 101 | Restroom - Women | Tile | 35 | B | 0 | 35 | 0 | 0 |
| 128 | 1st Floor | 103 | Restroom/Shower Area - Men | Tile | 254 | B | 0 | 254 | 0 | 0 |
| 129 | 1st Floor | | Operations & Production | Tile | 297 | C | 0 | 0 | 297 | 0 |
| 129 | 1st Floor | | Operations & Production | Concrete | 2,768 | C | 0 | 0 | 2768 | 0 |
| 129 | 1st Floor | | Restroom - Men | Tile | 60 | B | 0 | 60 | 0 | 0 |
| 129 | 1st Floor | | Lunch Room | Tile | 150 | B | 0 | 150 | 0 | 0 |
| 129 | 1st Floor | | Coffee Mess Area | Tile | 25 | B | 0 | 25 | 0 | 0 |
| 129 | 1st Floor | | Designated Wet Area | Tile | 100 | B | 0 | 100 | 0 | 0 |
| 129 | 1st Floor | | Entrance/Exit | Concrete | 100 | C | 0 | 0 | 100 | 0 |
| | | | Total SF | 16,029 | | | | | |
| | Building No. | Service Class Totals (SF) | | | | | | | |
| | | A | B | C | D | | | | |
| | 11 | 0 | 317 | 8,418 | 0 | | | | |
| | 12 | 0 | 4,482 | 11,916 | 0 | | | | |
| | 13 | 0 | 1,808 | 16,023 | 0 | | | | |
| | 32 | 0 | 266 | 7,457 | 0 | | | | |
| | 42 | 0 | 1,200 | 28,976 | 0 | | | | |
| | 68 | 0 | 416 | 11,902 | 0 | | | | |
| | 157 | 0 | 1,683 | 5,204 | 0 | | | | |
| | 191 | 0 | 377 | 8,461 | 0 | | | | |
| | 192 | 0 | 388 | 8,102 | 0 | | | | |
| | 193 | 0 | 260 | 7,102 | 0 | | | | |
| | L | 0 | 192 | 1,967 | 0 | | | | |
| | 20 | 0 | 3312 | 0 | 0 | | | | |
| | 30 | 0 | 3900 | 0 | 0 | | | | |
| | 52 | 0 | 1096 | 0 | 0 | | | | |
| | 101 | 0 | 0 | 597 | 0 | | | | |
| | 152 | 0 | 1422 | 0 | 0 | | | | |
| | 155 | 0 | 180 | 0 | 0 | | | | |
| | 178 | 0 | 120 | 0 | 0 | | | | |
| | 6 | 0 | 1075 | 265 | 0 | | | | |
| | 24 | 0 | 50 | 0 | 0 | | | | |
| | 126 | 0 | 223 | 0 | 0 | | | | |
| | 128 | 0 | 289 | 0 | 0 | | | | |
| | 129 | 0 | 335 | 3165 | 0 | | | | |
| | Total | 0 | 12,002 | 4,027 | 0 | | | | |
att 1_Class of Service Defined
| | FREQUENCY BY SERVICE CLASS | | | |
| Spec Item | Work Item | A | B | C | D |
| Space Cleaning | | | | |
| 3.2.1.1 | Emptying Waste Containers | D | 2W | W | W |
| 3.2.1.2 | Emptying Recycling Containers | 2W | W | W | M |
| 3.2.1.3 | Low Area Cleaning | 2M | M | 4Y | 0 |
| 3.2.1.4 | Kitchenette, Lunch and Break Room Cleaning | D | D | D | D |
| 3.2.1.5 | High Area Cleaning | 2Y | Y | Y | 0 |
| 3.2.1.6 | Interior Window Cleaning | 2Y | 2Y | 2Y | 0 |
| Exterior Window Cleaning | 2Y | 2Y | 2Y | 0 |
| 3.2.1.7 | Window Blinds Cleaning | 2Y | 2Y | 0 | 0 |
| 3.2.1.8 | Entrance Cleaning | 2W | W | M | 0 |
| 3.2.1.9 | Interior Glass Surfaces Cleaning | 2M | M | 4Y | 0 |
| 3.2.1.10 | Drinking Fountains Cleaning | D | D | D | 3W |
| Floor Care | | | | |
| 3.2.2.1 | Sweeping and Dust Mopping | 2W | W | 2M | M |
| 3.2.2.2 | Vacuuming Carpets and Rugs | 2W | W | 2M | M |
| 3.2.2.3 | Cleaning Walk-off Mats | D | D | W | W |
| 3.2.2.4 | Spray Cleaning and Buffing | M | 6Y | 4Y | 2Y |
| 3.2.2.5 | Damp Mopping | W | 2M | M | 4Y |
| 3.2.2.6 | Stripping, Coating, and Buffing | 4Y | 2Y | 2Y | Y |
| 3.2.2.7 | Carpet and Rug Deep Cleaning | 2Y | Y | Y/2 | Y/2 |
| Restroom Services | | | | |
| 3.2.3.1 | Restroom Cleaning | S | S | S | D |
| 3.2.3.2 | Restroom Servicing | S | S | S | D |
| Group Shower/Locker Rooms | | | | |
| 3.2.4 | Damp Mop/Disinfect Floors | D | D | D | D |
| 3.2.4 | Machine Clean/Scrub and Disinfect Floors | 2M | 2M | 2M | 2M |
| 3.2.4 | Restrooms - Cleaned and Disinfected | D | D | D | D |
| 3.2.4 | Restrooms - Consumables Restocked and Wasted Emptied | D | D | D | D |
| 3.2.4 | Showers - Clean and Disinfect Horizontal Surfaces | D | D | D | D |
| 3.2.4 | Showers - Clean and Disinfect Vertical Surfaces | M | M | M | M |
| 3.2.4 | Spot Clean Locker Surfaces, Doors, and Hardware | D | D | D | D |
| Building Perimeter Services | | | | |
| 3.2.6.1 | Debris Removal | 2W | W | M | 0 |
| 3.2.6.2 | Emptying Perimeter Waste Containers | 2W | W | 2M | 2M |
| KEY | |
| S | Once per shift |
| D | Daily |
| 2W | Two times per week |
| W | One time per week |
| 2M | Two times per month |
| M | One time per month |
| 6Y | Six times per year |
| 4Y | Four times per year |
| 3Y | Three times per year |
| 2Y | Two times per year |
| Y | One time per year |
| M/18 | One time every 18 months |
| Y/2 | One time every two years |
att 2_Battery Operated Fixtures
| NSWC CARDEROCK | | | | | |
| BATTERY OPERATED FIXTURE LOCATIONS Base Buildings | | | | | |
| Building | Floor | Mens/Womens Room | # of Faucets | # of Toilets | # of Urinals |
| 1 | 2nd | Mens | | 1 | 1 |
| 1 | 2nd | Womens | 2 | | |
| 4-E | 1st | Mens | 2 | 3 |
| 4-E | 1st | Womens | 2 | |
17-W 1st Mens 1
| 19-A | 1st | Mens | | 1 | |
| 19-B | 1st | Mens | | | 1 |
| 19-B | 1st | Mens | 1 | | |
| 40 | 1st & 2nd | Mens & Womens | 14 | | |
| | Total | 22 | 7 | 7 |
att 2_Option Battery Fixtures
| NSWC CARDEROCK | | | | | |
| BATTERY OPERATED FIXTURE LOCATIONS Option Buildings | | | | | |
| Building | Floor | Mens/Womens Room | # of Faucets | # of Toilets | # of Urinals |
| 42 | 1st, 2nd & 3rd | Mens & Womens | 18 | | |
191 1st Mens 1
att 3_Kitchenette Water Filters
| NSWC CARDEROCK | | | |
| KITCHENETTE WATER FILTER LOCATIONS Base Buildings | | | |
| Building | Floor No. | Room No. | Notes |
| 1 | 3 | 303 | Kitchenette |
| 1 | 1 | Wood Shop | Coffee Mess |
| 1 | B | B108 | Kitchenette |
2 1 115a Kitchenette
| 3 | 3 | 351 | Kitchenette |
| 3 | Bsmt | 10 | Coffee Mess |
| 4 | 1 | 109a | Kitchenette |
| 4 | 2 | 205.02 | Kitchenette |
| 4 | B | B02A | Kitchenette |
| 4 | 2 | 220 | Kitchenette |
| 7 | 2 | 223 | Coffee Mess |
| 7 | 1 | 109 | Kitchenette |
9 2 Lunch Rm Kitchenette
| 15 | 1 | 100B | Kitchenette |
| 15 | 2 | 200B | Kitchenette |
17 2 203 Kitchenette
| 19 | Bsmt | A35 | Kitchenette |
| 19 | Bsmt | At stairs | Kitchenette |
| 19 | 1 | B117 | Coffee Mess |
| 19 | 1 | B169 | Coffee Mess |
| 19 | 2 | B225 | Coffee Mess |
21 1 105 Kitchenette
| 60 | 1 | 115B | Kitchenette |
| 60 | 1 | 126A | Kitchenette |
| 60 | 2 | 241A | Kitchenette |
| 60 | 3 | 308 | Kitchenette |
| 60 | 3 | 341A | Kitchenette |
125A 1 Lunch Rm Kitchenette att 3_Option Kitchenette Filter
| NSWC CARDEROCK | | | |
| KITCHENETTE WATER FILTER LOCATIONS Option Buildings | | | |
| Building | Floor No. | Room No. | Notes |
| 12 | Mezzanine | | Coffee Mess |
| 12 | 2 | | Coffee Mess |
| 42 | 1 | 117 | Kitchenette |
| 42 | 2 | 220 | Kitchenette |
| 42 | 3 | 311 | Kitchenette |
192 1 154 Kitchenette att 3_Water Cooler Filters
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | | | | | | |
| WATER COOLER INVENTORY Base Buildings | | | | | | | |
| Building | Location | Type | Serial # | SVC DATE | COMMENTS | | |
| 1 | Wood Shop E. stairs to BLDG #2 | Vertex | xx88 | | | YRS | |
| 1 | Project Room #2 | | | | | YRS | NA |
| 1 | West Mezz. | Oasis | 1821 | | New Unit 4/19 | YRS | |
| 1 | Mezz by Rm 330 | Oasis | 7412 | | New Unit 8/17 | YRS | |
| 1 | 3rd Fl. Rm. 317 | Vertex | 4411 | | | | H & C |
| 1 | 2nd Fl by Rm 223 | Oasis Tri Temp | 5075 | | | YRS | H & C |
| 1 | 2nd Fl by Rm B-1-201 (lavs) | Vertex | 4401 | | | YRS | H & C |
| 1 | 2nd Fl by vending area | Vertex | 1745 | | | YRS | H & C |
| 1 | Fitness Center- Bsmt | | | | | YRS | NA |
| 1 | 3rd Fl Hallway | Vertex | 5343 | | | YRS | |
| 2 | 1st Fl Kitchen | Oasis | 1812 | New Unit 4/19 | YRS |
| 2 | 3rd Fl Hall nr Rm #313 | Vertex | 4416 | | YRS |
| 2 | 3rd. Fl Hallway nr Restrooms | Oasis | 5032 | New Unit 5/17 | |
| 3 | 1st Fl by lavs/stairs | Vertex | 4407 | | YRS |
| 3 | Main Entrance to BLdg #3 | Oasis | 2898 | New Unit 6/15 | YRS |
| 3 | Basement Shaker Lab | Oasis | | New 9/20 | YRS |
| 3 | 2nd Floor Hallway East | Oasis Tri Temp | 3184 | | YRS |
| 3 | 2nd Fl near bathrooms | Vertex | x102 | | YRS |
| 3 | 2nd Fl Hall inside secure cage | Oasis H/C | 2925 | New Unit 1/13 | YES |
| 3 | 3rd FL by lavs/stairs | Vertex | 1878 | | YES |
| 3 | 3rd Fl by Rm #335 | Oasis | 5025 | New Unit 6/15 | YES |
| 3 | Room 351-Mess | Vertex | 5900 | | |
| 3 | Room 338 | Oasis | 2927 | New Unit 10/16 | |
| 4 | East End-1st Fl by bathrooms | LBG H/C | 4759 | | YES | |
| 4 | East End-1st Fl by bathrooms | Vertex H/C | 5398 | New Unit 6/15 | | |
| 4 | 1st Fl Rm 109-Coffee Mess | Vertex | 5402 | | YES | |
| 4 | 2nd Fl Rm 205-211 | Oasis H/C | 1964 | | YES | |
| 4 | 2nd Fl by SW Stairwell | Vertex | 5893 | | YES | |
| 4 | West Fitting Rm | Oasis H/C | 2881 | | YES | |
| 4 | Basement by Curators Shop | LBG H/C | x213 | | YES | |
| 4 | Basement Metcal Lab | Vertex | xx82 | | | Locked - No Access |
5 CWC Top Fl Oasis Tri Temp 4022 Back in Service YES
| 7 | 1st Fl by 114 | Oasis | 6114 | | H/C |
| 7 | 1st Fl Kitchen | Vertex | 3500 | YES | |
| 7 | 2nd Fl IMAT Kitchen | New Culligan | 2051 | YES | |
| 7 | 2nd Fl IMAT by Mns Rm | Oasis TriTemp | 1967 | YES | |
| 9 | 2nd Fl Break Rm | Ice Maker | Filter only | YES | |
| 9 | 1st Fl, Floor 1 | Oasis H/C | 2894 | | H/C |
| 9 | 2nd Fl Break Rm | EDDIPURE | 1635 | | |
| 10 | Bsmt-Hallway | Vertex | 2456 | YES |
| 10 | 2nd Fl Office Area | Vertex | 1799 | YES |
| 15 | 1st Fl by Rm117 | Oasis | 9527 | New Unit 2/19 | |
| 15 | 1st Fl by Elevator | Vertex | 5368 | | |
| 15 | 1st Fl | Coffee Maker | Filter Only | | YES |
| 15 | 2nd Fl by Rm 202 (elevator) | Vertex | 3033 | | NO |
| 16 | Basement Channel Area | LBGUV | x162 | | NO |
| 16 | 1st Fl Entrance | Oasis C | 5037 | New Unit 5/15 | YES |
| 16 | 3rd Floor Channel Area | Vertex | 3536 | | YES |
| 17 | Basement By Restrooms E | Vertex | x702 | | NO |
| 17 | 1st Fl by Rm 100 W | Oasis H/C | 2915 | | NO |
| 17 | 1st Fl In Rm 120 W | Oasis | 2918 | New Unit 7/16 | YES |
| 17 | 1st Fl by Restrooms E | Oasis Tri Temp | 2324 | | NO |
| 17 | 2nd Fl by Mens Rm W | Vertex | 2467 | | NO |
| 17 | Rm. 234 | Sunroc Corp | 2579 | | |
| 17 | Rm. 236 | OASIS | 7401 | New Unit 8/15 | |
| 18 | 1st Fl by Ladies Rm | Vertex | 5337 | | YES | |
| 18 | 1st Fl in Rm 141 | Oasis | 9525 | New Unit 2/19 | YES | |
| 18 | 1st Fl by Rm 173 S | Vertex | 3028 | | YES | |
| 18 | 2nd Fl Mach., Shop Break Area | Vertex | 2473 | | YES | |
| 18 | 2nd Fl in Rm 241 | Oasis H/C | 1530 | | YES | PF2LR HC |
| 18 | 1st Fl by Big Pool (lavs E) | Oasis | 7458 | New Unit 8/16 | | |
| 18 | 1st Fl btwn B106 & B108 | Vertex | 2451 | | | |
| 19 | Bsmt Vending Area | LBGUV | 3409 | | NO | |
| 19 | Bsmt by Rm B-19 | Oasis C | 7429 | | NO | |
| 19 | Bsmt A Bay Rm A-15 | Aquabar | 4308 | | | |
| 19 | Bsmt A Bay | Ice Machine | filter only | | YES | |
| 19 | B117 | sink | filter only | | | |
| 19 | 1st Fl by Auditorium | Oasis | 7433 | New Unit 07/17 | | |
| 19 | 1st Fl by Rm B 128 | LBGUV | 4471 | | NO | |
| 19 | 1st Fl A Bay Hallway (lavs) | Oasis C | 5026A | | NO | |
| 19 | 1st fl by Rm A122 | Vertex | 5339 | | YES | |
| 19 | 2nd Fl by Rm B 228 | Vertex | xx56 | | YES | |
| 19 | 2nd Fl by Rm B 265 | Oasis H/C | 2892 | New Unit 10/14 | NO | |
| 19 | 2nd Fl by Rm B 200 | Oasis H/C | 1070 | | YES | PF2LR HC |
| 19 | 2nd Fl by Rm A 228 | Oasis | 9521 | New Unit 9/17 | YES | |
21 East Hallway Vertex xx38
29 1st floor Oasis H/C 2919 NO
31 1st Floor Oasis H/C 2917 YES
40 Rm 115 LBG 3508
| 60 | 1st Fl Annapolis Rm Kitchen | Oasis | 224 | New 7/15 | YES |
| 60 | 1st Fl Lunch/Vend Area | Vertex H/C | 3020 | | YES |
| 60 | 2nd Fl Lunch/Vend Area | Oasis | 5028 | New Unit 10/14 | |
| 60 | 3rd Fl Lunch/Vend Area | Vertex | 5344 | | YES |
| 60 | 3rd Fl Rm. 308 | Oasis H/C | 2698 | | |
| 60 | Penthouse Lunch/Cardio Room 400 | Oasis | 5022 | New Unit 3/15 | YES |
| 80 | 1st Fl by Rm 113 | Oasis | 7709 | New Unit 8/17 | YES |
| 80 | 2nd Fl by Rm 214 | Oasis | 7658 | New Unit 8/17 | YES |
| 80 | 3rd Fl by Rm 315 | Oasis | | New Unit 9/20 | YES |
100 Entrance Oaisis H/C 2891 Bad Compressor Need to Replace
104 Garage Vertex 4397 YES
108 Test Pnd Shower/Bathroom Oasis C 2923 YES
| 111 | West Nish Custodial | LBGUV | x194 | | YES |
| 111 | LAS Custodial | Oasis H/C | 2895 | New Cooler | YES |
116 Dive Locker Vertex 5342 Locked - No Access
143 Receiving Area Oasis C 5031A New Unit 7/14 NO att 3_Option Water Filters
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | | | | | |
| WATER COOLER INVENTORY Option Buildings | | | | | | |
| Building | Location | Type | Serial # | SVC DATE | COMMENTS | |
| 11 | 1st Fl | Oasis Temp H/C | 2924 | | | YES |
| 11 | 2nd Floor | Oasis C | 5036A | | New Unit 5/14 | YES |
| 12 | 2nd Fl by Stairway | Water Solutions | 1998 | New Unit 6/14 | NO |
| 12 | 2nd FL Rm 202 | Oasis Tri Temp | 8522 | | YES |
| 12 | 2nd Fl | Vertex | 2739 | | NO |
| 12 | 1st Fl. South Exit | OASIS | 7456 | New Unit 7/16 | |
| 13 | Basement Hallway | Vertex | 5351 | NO |
| 13 | 1st Fl by side Door | Vertex | 1831 | YES |
| 13 | 1st Fl Kitchen | Oasis H/C | 1966 | YES |
| 13 | 2nd Floor | Vertex | 3019 | YES |
| 68 | 1st Fl Vend Area | Vertex | 3674 | YES |
| 68 | 1st Fl Rm 102 | Oasis H/C | 2916 | NO |
157 Rm 101- Old Wind Tunnel Oasis H/C 2893 NO
| 191 | 1st Fl by Rm 134 | Vertex | 1840 | | NO |
| 191 | 1st Fl Kitchen Area | Oasis H/C | 2896 | New Unit 5/14 | YES |
| 191 | 1st Floor by 114 | Oasis | 7432 | New Unit 8/17 | |
192 Hallway Near Restrooms Oasis H/C 2926 New Unit 5/14 YES
193 1st Fl by Bathrooms Oasis H/C 9856 New Unit 5/18 YES
L Hallway Vertex 2472 YES
30 Lobby Entrance Oasis 5029 New 8/17 YES
52 Break Room Oasis 7374
6 Near Machine Room, Ice Maker Oasis 7705 New Oasis 8/17
NO
att 4_Perimeter Services Base
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | |
| PERIMETER SERVICES Base Buildings | | |
| Building | Function | Service Class |
| 1 | PERIMETER SERVICES | A |
| 2 | PERIMETER SERVICES | A |
| 3 | PERIMETER SERVICES | A |
| 4 | PERIMETER SERVICES | B |
| 4E | PERIMETER SERVICES | B |
| 5 | PERIMETER SERVICES | B |
| 7 | PERIMETER SERVICES | B |
| 9 | PERIMETER SERVICES | B |
| 10 | PERIMETER SERVICES | B |
| 14 | PERIMETER SERVICES | B |
| 15 | PERIMETER SERVICES | B |
| 16 | PERIMETER SERVICES | B |
| 17 | PERIMETER SERVICES | B |
| 18 | PERIMETER SERVICES | B |
| 19 | PERIMETER SERVICES | B |
| 21 | PERIMETER SERVICES | B |
| 22 | PERIMETER SERVICES | B |
| 29 | PERIMETER SERVICES | B |
| 31 | PERIMETER SERVICES | B |
| 40 | PERIMETER SERVICES | B |
| 41 | PERIMETER SERVICES | B |
| 60 | PERIMETER SERVICES | B |
| 61 | PERIMETER SERVICES | B |
| 80 | PERIMETER SERVICES | B |
| 81 | PERIMETER SERVICES | B |
| 100 | PERIMETER SERVICES | B |
| 104 | PERIMETER SERVICES | B |
| 108 | PERIMETER SERVICES | B |
| 109 | PERIMETER SERVICES | B |
| 110 | PERIMETER SERVICES | B |
| 116 | PERIMETER SERVICES | B |
| 125A | PERIMETER SERVICES | B |
| 143 | PERIMETER SERVICES | B |
| P | PERIMETER SERVICES | B |
| Q | PERIMETER SERVICES | B |
att 4_Perimeter Services Option
| NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION | | |
| PERIMETER SERVICE Option Buildings | | |
| Building | Function | Service Class |
| 11 | PERIMETER SERVICES | B |
| 12 | PERIMETER SERVICES | B |
| 13 | PERIMETER SERVICES | B |
| 32 | PERIMETER SERVICES | B |
| 42 | PERIMETER SERVICES | B |
| 68 | PERIMETER SERVICES | B |
| 109 | PERIMETER SERVICES | B |
| 157 | PERIMETER SERVICES | B |
| 191 | PERIMETER SERVICES | B |
| 192 | PERIMETER SERVICES | B |
| 193 | PERIMETER SERVICES | B |
| L | PERIMETER SERVICES | B |
| 20 | PERIMETER SERVICES | B |
| 30 | PERIMETER SERVICES | B |
| 52 | PERIMETER SERVICES | B |
| 101 | PERIMETER SERVICES | B |
| 152 | PERIMETER SERVICES | B |
| 155 | PERIMETER SERVICES | B |
| 178 | PERIMETER SERVICES | B |
| 6 | PERIMETER SERVICES | B |
| 24 | PERIMETER SERVICES | B |
| 126 | PERIMETER SERVICES | B |
| 128 | PERIMETER SERVICES | B |
| 129 | PERIMETER SERVICES | B |
Att 5_Key Personnel
| KEY PERSONNEL | | | |
| 8(a) Custodial | | | |
| Labor Category | QTY | Hrs per week | Skill Sets and Experience |
| Project Manager (Part Time) | 1 | 8 | The PM shall have at least five (5) years of experience in managing a workforce providing services on contracts of similar size, scope and complexity. |