10. 8(a) Custodial_Bid Schedule_Update.xlsx

XLSX spreadsheet 104 KB Posted

Attached to
8(a) Custodial Services for NSWC Carderock Federal contract opportunity
Solicitation number
N00167
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to 8(a) Custodial Services for NSWC Carderock, newest first.
File Type Posted
N00167R00240005.docx DOCX document
N0016722R0003.docx DOCX document
N0016722R00240004.docx DOCX document
N0016722R00240003.docx DOCX document
N0016722R00240002.docx DOCX document
Attachments - Inventory.xlsx XLSX spreadsheet
10. 8(a) Custodial All bldgs_Bid Schedule_Update.xlsx XLSX spreadsheet
N0016722R00240001 RFI RESPONSE.pdf PDF
N0016722R0024.pdf PDF
Wage Determination - 2015-4269 1222.pdf PDF
LC.NSWCCD 021-014 Past Performance Questionnaire.SEPT2021.docx DOCX document
Attachments -Custodial Inventory.xlsx XLSX spreadsheet
Att A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
N0016722R0024.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01APR23-29FEB24

COST ESTIMATE: 8(a) Custodial Contract, WEST BETHESDA SITE
Source: Historical Data and Market Research
Date Prepared:Prepared by:
For Official Use Only
FIRM FIXED PRICE WORKUnitProject ManagerCustodial TechniciansSupervisorQuality ManagerSSHOEnvironmental Mgr.
Hourly Rate
Fringes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Labor Costs - Per Hour Worked
Matching S.S.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Matching Medicare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Liability Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Workman's Compensation Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Pay Rate (per hr.)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly Amount (hrs.)40$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract Amount (hrs.)2080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Hourly Labor Costs
Direct Admin.
Phone Expense$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Tools$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Safety Equipment
Health Insurance
Sub-Total Hourly
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract - Total Hours 2,080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Federal Unemployment Tax -
State Unemployment - 7.5%/$8500
Gross - Based on 2,080 Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Direct Cost Per Hour Worked $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Cost Per Hour Worked

Add: Subcontractor Fees (0%)0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Overhead0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost plus OH$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Profit0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Unit Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Standard WorkQuantityLabor (Hours)MaterialsTotal LaborTotal HoursTotal Cost
Recurring Weekly Performance Requirements - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0001 $0.00

Weekly Performance Requirements - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0003 $0.00

Weekly Performance Requirements - Bldgs: 20, 30, 52, 101, 152, 155, 17852.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0005 $0.00

Weekly Performance Requirements - Bldgs: 6, 24, 126, 128, 12952.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0007 $0.00

QtyInd CostTotal Cost
Technical Instruction (TI) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00
Large Water Filters$0.00
Small Water Filters$0.00
Batteries (AA 24 per pack)$0.00

Total Other Direct Costs - CLIN 0001 0.00 $0.00

TI - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0003 0.00 $0.00

Other Direct Costs - Bldgs:
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0005 0.00 $0.00

Other Direct Costs - Bldgs: 6, 24, 126, 128, 129
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0007 0.00 $0.00

Nonrecurring Services (Yearly) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 32, 40, 41, 42, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.00300.00$0.00
Floor Care1.00180.00$0.00
Restroom Services1.00300.00$0.00
Group Shower/Locker Room Cleaning1.00120.00$0.00
Building Perimeter Services1.00120.00$0.00

Total Nonrecurring Services - CLIN 0002 $0.00

Nonrecurring Services (Yearly) - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, LQtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.0010.00$0.00
Floor Care1.0020.00$0.00
Restroom Services1.0030.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0004 $0.00

Nonrecurring Services (Yearly) - Bldgs: 20, 30, 52, 101, 152, 155, 178QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0006 $0.00

Nonrecurring Services (Yearly) - Bldgs: 6, 24, 126, 128, 129QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0008 $0.00

Total for FFP Recurring For Labor - CLIN 0001$0.00
Total for FFP Recurring For Equipment - CLIN 0001$0.00
Total for Non Recurring Items Estimate - CLIN 0002$0.00
TOTAL COST ESTIMATE - CLIN 0001 & CLIN 0002$0.00
CLIN 0001 & CLIN 0002Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0003$0.00
Total for FFP Recurring For Equipment - CLIN 0003$0.00
Total for Non Recurring Items Estimate - CLIN 0004$0.00
TOTAL COST ESTIMATE - CLIN 0005 & CLIN 0006$0.00
CLIN 0003 & CLIN 0004Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0005$0.00
Total for FFP Recurring For Equipment - CLIN 0005$0.00
Total for Non Recurring Items Estimate - CLIN 0006$0.00
TOTAL COST ESTIMATE - CLIN 0005 & CLIN 0006$0.00
CLIN 0005 & CLIN 0006Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0007$0.00
Total for FFP Recurring For Equipment - CLIN 0007$0.00
Total for Non Recurring Items Estimate - CLIN 0008$0.00
TOTAL COST ESTIMATE - CLIN 0007 & CLIN 0008$0.00
CLIN 0007 & CLIN 0008Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00

Total Contract Cost $0.00

Prepared By: Print

Signature ____________________________________

Approved By: Print

Signature ____________________________________

01MAR24-28FEB25

COST ESTIMATE: 8(a) Custodial Contract, WEST BETHESDA SITE
Source: Historical Data and Market Research
Date Prepared:Prepared by:
For Official Use Only
FIRM FIXED PRICE WORKUnitProject ManagerCustodial TechniciansSupervisorQuality ManagerSSHOEnvironmental Mgr.
Hourly Rate
Fringes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Labor Costs - Per Hour Worked
Matching S.S.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Matching Medicare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Liability Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Workman's Compensation Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Pay Rate (per hr.)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly Amount (hrs.)40$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract Amount (hrs.)2080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Hourly Labor Costs
Direct Admin.
Phone Expense$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Tools$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Safety Equipment
Health Insurance
Sub-Total Hourly
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract - Total Hours 2,080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Federal Unemployment Tax -
State Unemployment - 7.5%/$8500
Gross - Based on 2,080 Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Direct Cost Per Hour Worked $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Cost Per Hour Worked

Add: Subcontractor Fees (0%)0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Overhead0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost plus OH$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Profit0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Unit Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Standard WorkQuantityLabor (Hours)MaterialsTotal LaborTotal HoursTotal Cost
Recurring Weekly Performance Requirements - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0009 $0.00

Weekly Performance Requirements - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0011 $0.00

Weekly Performance Requirements - Bldgs: 20, 30, 52, 101, 152, 155, 17852.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0013 $0.00

Weekly Performance Requirements - Bldgs: 6, 24, 126, 128, 12952.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0015 $0.00

QtyInd CostTotal Cost
Technical Instruction (TI) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00
Large Water Filters$0.00
Small Water Filters$0.00
Batteries (AA 24 per pack)$0.00

Total Other Direct Costs - CLIN 0009 0.00 $0.00

TI - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0011 0.00 $0.00

Other Direct Costs - Bldgs: 20, 30, 52, 101, 152, 155, 178
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0013 0.00 $0.00

Other Direct Costs - Bldgs: 6, 24, 126, 128, 129
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0015 0.00 $0.00

Nonrecurring Services (Yearly) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 32, 40, 41, 42, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.00300.00$0.00
Floor Care1.00180.00$0.00
Restroom Services1.00300.00$0.00
Group Shower/Locker Room Cleaning1.00120.00$0.00
Building Perimeter Services1.00120.00$0.00

Total Nonrecurring Services - CLIN 0010 $0.00

Nonrecurring Services (Yearly) - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, LQtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.0010.00$0.00
Floor Care1.0020.00$0.00
Restroom Services1.0030.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0012 $0.00

Nonrecurring Services (Yearly) - Bldgs: 20, 30, 52, 101, 152, 155, 178QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0014 $0.00

Nonrecurring Services (Yearly) - Bldgs: 6, 24, 126, 128, 129QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0016 $0.00

Total for FFP Recurring For Labor - CLIN 0009$0.00
Total for FFP Recurring For Equipment - CLIN 0009$0.00
Total for Non Recurring Items Estimate - CLIN 0010$0.00
TOTAL COST ESTIMATE - CLIN 0009 & CLIN 0010$0.00
CLIN 0009 & CLIN 0010Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0011$0.00
Total for FFP Recurring For Equipment - CLIN 0011$0.00
Total for Non Recurring Items Estimate - CLIN 0012$0.00
TOTAL COST ESTIMATE - CLIN 0011 & CLIN 0012$0.00
CLIN 0011 & CLIN 0012Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0013$0.00
Total for FFP Recurring For Equipment - CLIN 0013$0.00
Total for Non Recurring Items Estimate - CLIN 0014$0.00
TOTAL COST ESTIMATE - CLIN 0013 & CLIN 0014$0.00
CLIN 0013 & CLIN 0014Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0015$0.00
Total for FFP Recurring For Equipment - CLIN 0015$0.00
Total for Non Recurring Items Estimate - CLIN 0016$0.00
TOTAL COST ESTIMATE - CLIN 0015 & CLIN 0016$0.00
CLIN 0015 & CLIN 0016Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 1$0.003.00%$0.00$0.00$0.00

Total Contract Cost $0.00

Prepared By: Print

Signature ____________________________________

Approved By: Print

Signature ____________________________________

01MAR25 - 28FEB26

COST ESTIMATE: 8(a) Custodial Contract, WEST BETHESDA SITE
Source: Historical Data and Market Research
Date Prepared:Prepared by:
For Official Use Only
FIRM FIXED PRICE WORKUnitProject ManagerCustodial TechniciansSupervisorQuality ManagerSSHOEnvironmental Mgr.
Hourly Rate
Fringes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Labor Costs - Per Hour Worked
Matching S.S.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Matching Medicare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Liability Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Workman's Compensation Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Pay Rate (per hr.)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly Amount (hrs.)40$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract Amount (hrs.)2080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Hourly Labor Costs
Direct Admin.
Phone Expense$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Tools$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Safety Equipment
Health Insurance
Sub-Total Hourly
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract - Total Hours 2,080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Federal Unemployment Tax -
State Unemployment - 7.5%/$8500
Gross - Based on 2,080 Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Direct Cost Per Hour Worked $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Cost Per Hour Worked

Add: Subcontractor Fees (0%)0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Overhead0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost plus OH$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Profit0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Unit Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Standard WorkQuantityLabor (Hours)MaterialsTotal LaborTotal HoursTotal Cost
Recurring Weekly Performance Requirements - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0017 $0.00

Weekly Performance Requirements - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0019 $0.00

Weekly Performance Requirements - Bldgs: 20, 30, 52, 101, 152, 155, 17852.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0021 $0.00

Weekly Performance Requirements - Bldgs: 6, 24, 126, 128, 12952.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0023 $0.00

QtyInd CostTotal Cost
Technical Instruction (TI) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00
Large Water Filters$0.00
Small Water Filters$0.00
Batteries (AA 24 per pack)$0.00

Total Other Direct Costs - CLIN 0017 0.00 $0.00

TI - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0019 0.00 $0.00

Other Direct Costs - Bldgs: 20, 30, 52, 101, 152, 155, 178
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0021 0.00 $0.00

Other Direct Costs - Bldgs: 6, 24, 126, 128, 129
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0023 0.00 $0.00

Nonrecurring Services (Yearly) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 32, 40, 41, 42, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.00300.00$0.00
Floor Care1.00180.00$0.00
Restroom Services1.00300.00$0.00
Group Shower/Locker Room Cleaning1.00120.00$0.00
Building Perimeter Services1.00120.00$0.00

Total Nonrecurring Services - CLIN 0018 $0.00

Nonrecurring Services (Yearly) - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, LQtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.0010.00$0.00
Floor Care1.0020.00$0.00
Restroom Services1.0030.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0020 $0.00

Nonrecurring Services (Yearly) - Bldgs: 20, 30, 52, 101, 152, 155, 178QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0022 $0.00

Nonrecurring Services (Yearly) - Bldgs: 6, 24, 126, 128, 129QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0024 $0.00

Total for FFP Recurring For Labor - CLIN 0017$0.00
Total for FFP Recurring For Equipment - CLIN 0017$0.00
Total for Non Recurring Items Estimate - CLIN 0018$0.00
TOTAL COST ESTIMATE - CLIN 0017 & CLIN 0018$0.00
CLIN 0017 & CLIN 0018Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 2$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0019$0.00
Total for FFP Recurring For Equipment - CLIN 0019$0.00
Total for Non Recurring Items Estimate - CLIN 0020$0.00
TOTAL COST ESTIMATE - CLIN 0019 & CLIN 0020$0.00
CLIN 0019 & CLIN 0020Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 2$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0021$0.00
Total for FFP Recurring For Equipment - CLIN 0021$0.00
Total for Non Recurring Items Estimate - CLIN 0022$0.00
TOTAL COST ESTIMATE - CLIN 0021 & CLIN 0022$0.00
CLIN 0021 & CLIN 0022Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 2$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0023$0.00
Total for FFP Recurring For Equipment - CLIN 0023$0.00
Total for Non Recurring Items Estimate - CLIN 0024$0.00
TOTAL COST ESTIMATE - CLIN 0023 & CLIN 0024$0.00
CLIN 0023 & CLIN 0024Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 2$0.003.00%$0.00$0.00$0.00

Total Contract Cost $0.00

Prepared By: Print

Signature ____________________________________

Approved By: Print

Signature ____________________________________

01MAR26 - 28FEB27

COST ESTIMATE: 8(a) Custodial Contract, WEST BETHESDA SITE
Source: Historical Data and Market Research
Date Prepared:Prepared by:
For Official Use Only
FIRM FIXED PRICE WORKUnitProject ManagerCustodial TechniciansSupervisorQuality ManagerSSHOEnvironmental Mgr.
Hourly Rate
Fringes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Labor Costs - Per Hour Worked
Matching S.S.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Matching Medicare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Liability Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Workman's Compensation Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Pay Rate (per hr.)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly Amount (hrs.)40$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract Amount (hrs.)2080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Hourly Labor Costs
Direct Admin.
Phone Expense$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Tools$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Safety Equipment
Health Insurance
Sub-Total Hourly
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract - Total Hours 2,080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Federal Unemployment Tax -
State Unemployment - 7.5%/$8500
Gross - Based on 2,080 Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Direct Cost Per Hour Worked $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Cost Per Hour Worked

Add: Subcontractor Fees (0%)0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Overhead0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost plus OH$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Profit0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Unit Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Standard WorkQuantityLabor (Hours)MaterialsTotal LaborTotal HoursTotal Cost
Recurring Weekly Performance Requirements - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0025 $0.00

Weekly Performance Requirements - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0027 $0.00

Weekly Performance Requirements - Bldgs: 20, 30, 52, 101, 152, 155, 17852.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0029 $0.00

Weekly Performance Requirements - Bldgs: 6, 24, 126, 128, 12952.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0031 $0.00

QtyInd CostTotal Cost
Technical Instruction (TI) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00
Large Water Filters$0.00
Small Water Filters$0.00
Batteries (AA 24 per pack)$0.00

Total Other Direct Costs - CLIN 0025 0.00 $0.00

TI - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0027 0.00 $0.00

Other Direct Costs - Bldgs: 20, 30, 52, 101, 152, 155, 178
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0029 0.00 $0.00

Other Direct Costs - Bldgs: 6, 24, 126, 128, 129
Cleaning Supply Cart$0.00
Broom and Dust Pan Combo$0.00
Contractor Broom (30" fine bristles)$0.00
Vacuum$0.00
Floor Cleaning Machine (Advance 20")$0.00
Cleaning Pads for Machine$0.00
Dust Mop Handle (48")$0.00
Dry Mop Heads$0.00
Wet Mop Handles$0.00
Wet Mop Head$0.00
Mop Bucket w/Wringer (35 qt)$0.00
Toilet Brush$0.00
Bleach (1 gal bottle)$0.00
Floor Cleaning Solution (1 gal bottle)$0.00
Glass/Window Cleaner$0.00
Glass and Surface Wipes (900 per case)$0.00
Toilet Bowl Cleaner$0.00
Wood Polish$0.00
Gloves (Disposable)$0.00
Toilet Seat Cover Dispenser$0.00
Toilet Seat Cover$0.00
Toilet Paper Dispenser$0.00
Toilet Paper (96 rolls per case)$0.00
Urinal Splash Screen (6 per case)$0.00
Sanitary Napkin Receptacle$0.00
Sanitary Napkin Receptacle Liners (500 per case)$0.00
Paper Towel Dispenser (Manual Dispenser)$0.00
Paper Towels Roll (6 rolls per case)$0.00
Hand Soap Dispenser (Manual Dispenser)$0.00
Hand Soap (4 one gallon bottles per case)$0.00
Air Freshener Dispenser$0.00
Air Freshener (12 per case)$0.00
Trash Bags (12-16 gal 1000 per carton)$0.00
Trash Bags (20-30 gal 500 per carton)$0.00

Total Other Direct Costs - CLIN 0031 0.00 $0.00

Nonrecurring Services (Yearly) - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 32, 40, 41, 42, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.00300.00$0.00
Floor Care1.00180.00$0.00
Restroom Services1.00300.00$0.00
Group Shower/Locker Room Cleaning1.00120.00$0.00
Building Perimeter Services1.00120.00$0.00

Total Nonrecurring Services - CLIN 0026 $0.00

Nonrecurring Services (Yearly) - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, LQtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.0010.00$0.00
Floor Care1.0020.00$0.00
Restroom Services1.0030.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0028 $0.00

Nonrecurring Services (Yearly) - Bldgs: 20, 30, 52, 101, 152, 155, 178QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0030 $0.00

Nonrecurring Services (Yearly) - Bldgs: 6, 24, 126, 128, 129QtyUnit Priced hr.Estimated Use hr.Estimated Use Cost
Space Cleaning1.006.00$0.00
Floor Care1.0018.00$0.00
Restroom Services1.0025.00$0.00
Building Perimeter Services1.0010.00$0.00

Total Nonrecurring Services - CLIN 0032 $0.00

Total for FFP Recurring For Labor - CLIN 0025$0.00
Total for FFP Recurring For Equipment - CLIN 0025$0.00
Total for Non Recurring Items Estimate - CLIN 0026$0.00
TOTAL COST ESTIMATE - CLIN 0025 & CLIN 0026$0.00
CLIN 0025 & CLIN 0026Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 3$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0027$0.00
Total for FFP Recurring For Equipment - CLIN 0027$0.00
Total for Non Recurring Items Estimate - CLIN 0028$0.00
TOTAL COST ESTIMATE - CLIN 0027 & CLIN 0028$0.00
CLIN 0027 & CLIN 0028Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 3$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0029$0.00
Total for FFP Recurring For Equipment - CLIN 0029$0.00
Total for Non Recurring Items Estimate - CLIN 0030$0.00
TOTAL COST ESTIMATE - CLIN 0029 & CLIN 0030$0.00
CLIN 0029 & CLIN 0030Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 3$0.003.00%$0.00$0.00$0.00
Total for FFP Recurring For Labor - CLIN 0031$0.00
Total for FFP Recurring For Equipment - CLIN 0031$0.00
Total for Non Recurring Items Estimate - CLIN 0032$0.00
TOTAL COST ESTIMATE - CLIN 0031 & CLIN 0032$0.00
CLIN 0031 & CLIN 0032Prev. OY CostGrowth %Growth CostMonthly CostTotal Cost
Option Base YearN/A0.00%$ - 0$0.00$0.00
Option Year 3$0.003.00%$0.00$0.00$0.00

Total Contract Cost $0.00

Prepared By: Print

Signature ____________________________________

Approved By: Print

Signature ____________________________________

01MAR27 - 29FEB28

COST ESTIMATE: 8(a) Custodial Contract, WEST BETHESDA SITE
Source: Historical Data and Market Research
Date Prepared:Prepared by:
For Official Use Only
FIRM FIXED PRICE WORKUnitProject ManagerCustodial TechniciansSupervisorQuality ManagerSSHOEnvironmental Mgr.
Hourly Rate
Fringes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Labor Costs - Per Hour Worked
Matching S.S.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Matching Medicare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Liability Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Workman's Compensation Insurance$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Pay Rate (per hr.)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly Amount (hrs.)40$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract Amount (hrs.)2080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Hourly Labor Costs
Direct Admin.
Phone Expense$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Tools$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Safety Equipment
Health Insurance
Sub-Total Hourly
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Contract - Total Hours 2,080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Federal Unemployment Tax -
State Unemployment - 7.5%/$8500
Gross - Based on 2,080 Hours$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Direct Cost Per Hour Worked $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Cost Per Hour Worked

Add: Subcontractor Fees (0%)0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Overhead0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost plus OH$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Add: Profit0%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Unit Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Standard WorkQuantityLabor (Hours)MaterialsTotal LaborTotal HoursTotal Cost
Recurring Weekly Performance Requirements - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 68, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 143, P and Q.52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0033 $0.00

Weekly Performance Requirements - Bldgs: 11, 12, 13, 32, 42, 68, 109, 157, 191, 192, 193, L52.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0035 $0.00

Weekly Performance Requirements - Bldgs: 20, 30, 52, 101, 152, 155, 17852.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00
Quality Manager$0.00$0.000.00$0.00
SSHO$0.00$0.000.00$0.00
Environmental Manager$0.00$0.000.00$0.00

Total $0.00 $0.00 0.00 $0.00

Total Labor Costs - CLIN 0037 $0.00

Weekly Performance Requirements - Bldgs: 6, 24, 126, 128, 12952.00
Project Manager$0.00$0.000.00$0.00
Custodial Technicians$0.00$0.000.00$0.00
Supervisor$0.00$0.000.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .