23RWM38_SOL_0005.pdf
PDF 401 KB Posted
- Solicitation number
- N0016423RWM38
About this file
This document is an amendment to a solicitation updating the questions and answers section. The solicitation is for ship alteration and installation of AN/SLQ-32(V)6 and MK-53 Decoy Launching System equipment on a U.S. Navy aircraft carrier. The Department of the Navy Naval Sea Systems Command issued the solicitation. Questions were submitted and answered regarding labor categories, level of effort, cost elements, and other proposal requirements. Engineering technicians are required, and the level of effort is a recommendation only. Offerors may propose different labor mixes with justification. Costs for other direct costs will include appropriate burden rates. The pre-award survey requirement is waived for offerors with an acceptable accounting system. Revised attachments provide updated labor categories and instructions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23RWM38_SOL_0004.pdf | ||
| 23RWM38_SOL_0003.pdf | ||
| 23RWM38_SOL_0002.pdf | ||
| 23RWM38_SOL_0001.pdf | ||
| 23RWM38_SOL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is hereby issued to update the Questions and Answ ers section. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016423RWM38
X 9B. DATED (SEE ITEM 11)
05-Oct-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Nov-2022
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
C. WININGER (812-854-0000)
BLDG 3373
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016423RWM38
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
QUESTIONS AND ANSWERS
Question: Why are there two different dates for submission of the questions? Clause L-215-H007 states 31 October 2022, but Section L.1.1 states 14 days after issuance of the solicitation.
Answer: We have changed language in Section L.1.1 that states, “All questions shall be submitted via email to Calli Wininger at calli.j.wininger.civ@us.navy.mil no later than 31 October 2022”.
UPDATE: This date has now been changed to 10 November 2022 on Amendment 0002.
Question: It seems there may be a typo on the form under Section 1? [Referencing PPQ] It references the WNY, Seaport, and PEO IWS. Will the Government issue a correction?
Answer: This has been corrected in Amendment 0002.
Question: Please confirm the Offeror must propose the LOE per labor category as provided in Attachment 1?
Answer: The Offeror is not required to propose the LOE identified in Attachment 01. Per L.4.4.1, the LOE identified in Attachment 01 is the Government recommended labor mix, which provides the estimated composition of hours by labor category for proposal purposes. An Offerors’ cost summary shall not propose fewer total hours than identified in the estimated LOE. If an Offeror deems additional labor categories necessary to complete the tasking, the Offeror shall identify the additional categories and provide a detailed description of the tasking to be performed by that labor category. If the Offeror opts to propose a different labor mix, a detailed justification shall be provided supporting the change. If an Offeror proposes additional labor hours and/or a different labor mix, justification shall be provided supporting the change and any additional LOE will be included in the total LOE awarded. Section L Paragraph L.4.4.1 has been revised to clarify the LOE requirements.
Question: Section L.4.2.3.2, it is required for the offeror to provide a “Personnel Turnover Mitigation Plan” to include ”tenure and turnover rates for key positions over the past five years”. The solicitation does not define “key positions”. Can the government please provide a definition for key positions?
Answer: Section L.4.2.3.2 has been revised.
Question: Section L.2.2 Electronic Submission – Request the Government confirm how long the drop off link is viable for submitting the proposal. The solicitation requires it is requested two (2) business days prior to RFP deadline? The Friday prior to submission is a federal holiday.
Answer: Solicitation closing date has been extended to 23 November 2022; therefore, this will no longer be an issue.
Question: Section B, CLIN 0002 and 1002 state COST ONLY. Please confirm this should include the Offeror’s burdens IAW disclosed accounting practices.
Answer: Cost only CLINs may include Offeror’s applicable burdens IAW disclosed accounting practices.
Estimated ODCs amounts are provided in L.4.4.5, which include unburdened ODC expenses only. ODC estimates in L.4.4.5 do not account for any burdens. Offerors shall apply appropriate burdens IAW with its disclosure statement. ODCs are not subject to fee and shall be COST ONLY.
Question: Section B, ODC CLINS 0002 and 1002 and Section L.4.4.5 states, “Each Offeror may apply appropriate burdens in accordance with disclosure statement.” For consistency of pricing across all offerors, request the wording is revised from “may” to “shall.”
Answer: Section L.4.4.5 has been revised.
Question: Section C, 4.4(c) states, “Responsibility for the provision of mechanical and electrical tools and test equipment shall rest with the contractor at no cost to the Government.” Respectfully request the Government clarify their intent of this sentence and if they are referring to standard industrial tools? Most small businesses do not possess test equipment and/or such items as Blown Optical Fiber (BOF) that must be leased for installation of fiber paths and should be considered an allowable and allocable cost to the contract.
Answer: This has been revised in Amendment 0002.
Question: Section L.4.4.1, Level of Effort (CLINs 0001 and 1001) – Financial reporting for CDRLs A001 and A016 should be deemed allocable and allowable as a direct charge to the contract. To ensure pricing consistency, request the Government revise the LOE and include hours to support government required financial reporting support.
Answer: The hours identified in the LOE refer to the labor categories required to execute the technical aspects of the SOW. Other corporate and local-level management as well as general and administrative support to include administrative/financial/clerical, program control, and contract business management/administration (to include progress report preparation) are considered to be overhead in nature except for those oversight or administrative functions performed by the proposed Program Manager. The Offeror is, however, permitted to propose such effort as a direct charge if it is in accordance with its standard DCAA-approved practice to do so. Such hours shall be added to the total number of technical hours proposed as management and support hours. If no management and support hours are proposed, the hours will not be allowed as a direct charge under the resulting contract. The proposed level of effort should be reflected in clause H-216-H002. This requirement applies equally to the prime and subcontractor(s), if applicable.
Question: Section L.4.5.2, Pre-Award Survey (SF1408) – Request submission of an SF1408 is not required if the offeror has an acceptable accounting system as deemed by DCMA.
Answer: See Amendment 0002 Summary of Changes – Section L.4.5.2.
Question: In the Government’s Attachment_001_LOE, the Engineer labor categories (rows 2-7, Column A) provide the E1-E6 eCraft Code and the SCA five digit code 30081-30086. Is the Government’s intention for offerors to bid degreed engineers or engineering technicians?
Answer: Engineering Technicians. This has been corrected in Amendment 0002.
Question: In the Government’s Attachment_010_Prime_Offeror_Cost_Summary_Format, the Instructions tab Note 1 (Row 1) states: “Labor Categories should be mapped using column B for eCRAFT or Bureau of Labor Statisctics (BLS) labor categories and column C for labor category code.” Should this read: Note 1-- Labor Rates Worksheet:
Labor Categories should be mapped using column D or F for eCRAFT or Bureau of Labor Statistics (BLS) labor categories and column E or G for labor category code.”?- Answer: Attachments 010 and 011 have been updated in Amendment 0002.
Question: Would the Government consider an experience equivalent for any of the LOE labor categories?
Answer: The Government did not require minimum education or experience qualifications for this solicitation.
Question: Attachment 1, LOE, the Engineers have both ecraft and WD codes. Please confirm the categories should be Engineering Technicians (30081 – 30086). Please confirm the ecraft code for Sr. System Engineer should be ESY. For pricing consistency, should Offerors use ESY2?
Answer: Attachment 01, LOE, has been corrected in Amendment 0002. QA Supervisor code has also been added.
Answer: Subject RF connectors are not required. The connectors (item 61) are part of the SEI RF cable assemblies TPS-2810AN-6000-TPS (50 ft) and TPS-2810AN-12000-TPS (100 ft) with subject connectors fully attached. The “TPS” cables are GFP furnished and are called out as item 33 on drawing 8781408 REV A.
Question: Our vendors are having a difficult time identifying the following part number (below).
DWG 8781408 REV A
ITEM NUMBER 61
QTY 3 EA
DESCRIPTION: CONNECTOR, RECEPTACLE, ELECTRICAL (COAXIAL, RF) [SERIES
BNC, SOCKET CONTACT]
Answer: Subject RF connectors are not required. The connectors (item 61) are part of the SEI RF cable assemblies TPS-2810AN-6000-TPS (50 ft) and TPS-2810AN-12000-TPS (100 ft) with subject connectors fully attached. The “TPS” cables are provided as GFM and are called out as item 33 on drawing 8781408 REV A.
(End of Summary of Changes)