22RWP83_SOL_0005.pdf

PDF 439 KB Posted

Attached to
MANUFACTURE AND TESTING OF SPS-48 ANTENNA ARRAYS
Solicitation number
N0016422RWP83
Issued by

View the file

Other files

File Type Posted
22RWP83_sol_0006.pdf PDF
22RWP83_SOL_0004.pdf PDF
22RWP83_SOL_0003.pdf PDF
22RWP83_SOL_0002.pdf PDF
22RWP83_sol_0001.pdf PDF
22RWP83_sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 5 is to answ er the remaining questions previously posed to the Government and offer the availability of CAD in .stp and .log format. This Amendment w ill also add CDRL A005 (Government Property Inventory Report) and update the language in the SOW to include CDRL A005 (see sections 4.2 and 5.1). All other terms and conditions w ill remain unchanged.

OFFERS ARE RESPONSIBLE TO SIGN THE AMENDMENT AND SEND A COPY WITH THEIR PROPOSAL TO ACKNOWLEDGE THEIR RECEIPT OF

INFORMATION IN THIS AMENDMENT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016422RWP83

X 9B. DATED (SEE ITEM 11)

13-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2022

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

H. KROUT (812-854-3298)

BLDG 121

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016422RWP83

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A

QUESTIONS RECEIVED:

1. Can I get prints for part number G3400048-1?

a. This is a legacy material. We now use ABLESTIK 506-1-004 as adhesive strips; this material was described in the previous Amendment to this solicitation. It’s also listed as Item 10 in the disposables table of the Antenna Array Slat Manufacturing Procedure (89 WIS 10 3665).

2. Can I get prints for part number EA93093NA?

a. This is also a legacy material. See 5.2 of Antenna Array Slat Manufacturing Procedure (89 WIS 10

3665) for current materials and procedures. To clarify, we believe EA93093NA is referencing “Black Epoxy Ink” (drawing 195783, D-3).

3. Do you have a different CAD format? We are unable to open the file type provided.

a. We can provide .stp and .log files through DoD SAFE. The link will be provided upon receipt of a valid Joint Certification Program (JCP) certificate. For questions, please contact Heather Krout, heather.m.krout.civ@us.navy.mil.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK (SOW)

STATEMENT OF WORK

FOR

MANUFACTURE, FIRST ARTICLE ACCEPTANCE, AND PRODUCTION

OF AN/SPS-48E ARRAYS

14 July 2021

1. SCOPE

This statement of work (SOW) defines the requirements for manufacture of AN/SPS-48E arrays, First Article testing requirements and array production. Mandatory Government inspection points are defined as applicable. Government Furnished Material (GFM) and Government Furnished Equipment (GFE) information are provided in this SOW.

1.1 Background: The AN/SPS-48E radar set is a long range, three dimensional, air search radar system, that provides contact range, bearing and height information to be displayed on consoles/workstations. The antenna consists of multiple arrays that are exposed to weather. The antennas must be overhauled and restored on a regular basis to keep systems operational. The restoration effort requires new arrays to be used after existing arrays have reached the end of their service life. This acquisition meets the requirement for supplying new arrays in support of AN/SPS-48E antenna restorations.

2. APPLICABLE DOCUMENTS

The following documents of the revision or issue in effect at the date of the order or as otherwise specified by the delivery order (DO), form a part of this SOW to the extent described herein. The exact revision of documents is not cited in the text of the SOW for convenience of reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.

2.1. Procedures, Manufacturer’s Documents, and Drawings

NSWC Crane Documents

89 WIS 10 3665 Antenna Array Slat Manufacturing Process

89 WIS 10 0109 Quality Assurance (QA) In-process and Final Product Work Instruction

AN/SPS-48E Array Drawings

195784-2 Array Assembly (CCW Slot), Even (47 per System) 195783-2 Array Assembly (CW Slot), Odd (48 per System) 196153 Array, Slotted, Rev L, View C 196923 Flange Waveguide 196924 Flange Array 196635 Waveguide Stock Array 80962501 Array Cart 80962701 Array Leak Test Manifold 80962801 Array Leak Test Tank 8037-93-020 Linear Slat Test Station 8037-93-052 Tuning Mandrel

Military Standards

MIL-B-7883 Brazing of Steels, Copper, Copper Alloys, Nickel Alloys, Aluminum & Aluminum Alloys, Type V, Grade B

MIL-DTL-5541F Chemical Conversion Coatings on Aluminum and Aluminum Alloys MIL-H-6088 Heat Treatment of Aluminum Alloys

Commercial Documents

GPS43-104 Welding – Inert Gas Shielded Arc: Aluminum Alloys

3. REQUIREMENTS

3.1 General Requirements

3.1.1. As ordered via DO, the contractor shall manufacture and deliver AN/SPS-48E arrays.

3.1.2. The contractor shall provide labor, materials, equipment, and facilities as defined by DO and this SOW.

See Section 4 for information, materials, and equipment to be provided by the Government.

3.1.3. The contractor shall submit Progress Status and Management Reports. (CDRL A001)

3.2. Facilities Requirements

Note: The contractor must take into consideration that arrays are precision mechanical devices that are critical to proper radar operation. The contractor must take care to avoid mishandling can cause damage to the precision components. Even the slightest nick, dent, scratch, or shaving can have a severe negative impact on end item performance. Excessive handling operations add damage risk to the manufacturing program.

3.2.1. The contractor shall possess, or have access to, a work facility that keeps array handling and shipping operations to a minimum.

3.2.2. The contractor shall possess, or have access to, a work facility with machining, brazing, painting, and testing operations that meet the requirements of this SOW. The Government will perform in-process inspections at the contractor’s facility and off-site facilities as defined in 89 WIS 10 3665 during the array manufacturing process.

3.2.3. The contractor’s painting facilities shall be capable of meeting the physical size requirements for arrays as well as the requirements of Amerlock 2 for primer, PSX 700SG for paint, and the requirements of all other paint related steps in 89 WIS 10 3665.

3.2.4. The contractor’s machining facilities shall include machining equipment and space capable of meeting all precision machining requirements for arrays. Machining activities and equipment shall allow minimal handling processes to reduce the risk of damage to arrays.

3.2.5. The contractor’s brazing facilities shall include brazing equipment and space capable of meeting all brazing requirements for arrays as specified in MIL-B-7883, Brazing of Steels, Copper, Copper Alloys, Nickel Alloys, Aluminum Alloys; Type V, Grade B. Specifically, the brazing equipment shall accommodate the large (tall) size of the individual arrays in order to fully meet the MIL-B-7883 requirements (perpendicular dip).

3.2.6. The contractor’s facility shall be large enough to accommodate all equipment listed in Table A-1 of document number 89 WIS 10 3665. Specifically, the contractor’s facility shall accommodate a Rapid Engineering’s Model 8820 (or equivalent) batch oven. The outside footprint of the Rapid Engineering batch oven is 25’ length X 14’ wide, X 10’ high. The contractor shall be responsible for the proper installation (electrical, gas, water, ventilation, etc.) required for the safe operation of the equipment purchased or provided as GFE. Note the batch oven is called out specifically due to its large size. The contractor shall be responsible for de-installation of the GFE batch oven at the conclusion of the contract.

3.2.7. The contractor’s facilities shall be capable of maintaining a temperature of 72 °F ± 5 °F.

3.3. Logistics/Configuration Management (CM) Requirements

3.3.1. The contractor shall be responsible for ensuring each end item delivered to the Government conforms to the approved product drawings.

3.3.2. If the contractor believes there are errors in the drawings and process documents provided, the contractor shall inform the Government via a Government Information Deficiency Report. If the Government confirms there are errors, the Government will update the drawings/processes. (CDRL A002)

3.4. AN/SPS-48E Array First Article Manufacturing and Test Requirements (CLIN 0001) As ordered via DO and this SOW, the contractor may be required to deliver First Article arrays, Part Number 195784-2 and Part Number 195783-2. First Article testing may be waived for previously qualified manufacturers of the AN/SPS-48 arrays, within the past 3 years. The First Article components shall be subjected to pre-assembly inspection of materials ordered/received. After the Government has verified that the correct materials were ordered and received for array manufacturing, the contractor shall proceed with the array manufacturing processes contained in the guidance documentation. The contractor shall perform First Article testing in accordance with Table 1. The contractor shall manufacture First Article arrays using the same equipment/facilities as the production arrays. First Article testing is a joint effort between the contractor and Government as indicated in Table 1. The contractor shall make personnel available to respond to questions from the Government’s First Article Inspection team. The contractor shall make all procurement and contractor created documentation for this effort available to the Government’s First Article Inspection team as required during audit/test conduct.

TABLE 1 – FIRST ARTICLE TEST TABLE

TEST

NUMBER

TEST TITLE VALIDATION

METHOD

RESPONSIBLE

PARTY FOR

CONDUCT

TEST

LOCATION

GUIDANCE

DOCUMENT(S)

1 Incoming Material Inspection

Inspection Government with Contractor Support

Contractor or Subcontractor facility

SOW: Verify the correct materials were ordered and received prior to assembly.

2 Pre Conversion Coating Inspection

Inspection Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

3 Post Conversion Coating Inspection

Inspection Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

4 Post Radome Installation & RF Testing

Inspection and Test

Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

5 Phase Block Installation, RF Testing, and Painting Test and Inspection

Inspection and Test

Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s), Linear Slat Test Station, and array drawings.

6 Post Leak Test and Final QA Test and Inspection

Inspection Government with Contractor Support

Contractor or Subcontractor facility

3.4.1. The contractor shall resolve any issues found with the First Article products (data and hardware). First Article test data and hardware shall meet the requirements of all drawings/documents is section J.

3.4.2. The contractor shall conduct a First Article Test closeout meeting showing successful completion of all first article requirements. The contractor shall be responsible for testing as indicated in Table 1 and delivery of First Article Test data sheets in accordance with 89 WIS 10 3665 for arrays. The Government will be responsible for any damage to arrays during conduct of any Government performed testing. The contractor shall be responsible for any mechanical defects found at Government test/inspection points such as correction of any painting and/or physical discrepancies. CDRL A003, Test/Inspection Report, First Article Test Report. First Article testing may be waived for previously qualified manufacturers of the AN/SPS-48 arrays. (CDRL A003, Test/Inspection Report, First Article Test Report) The contractor shall produce the first article in the same facility that will be used for production.

3.5. AN/SPS-48E Array Production and Test (CLIN 0002, CLIN 0003)

3.5.1. The contractor shall manufacture 195784-2 arrays as ordered via DO. The contractor shall test 195784-2 arrays in accordance with the applicable drawings and processes. The contractor shall have a throughput capability of fifty-five (55) part number 195784-2 arrays per quarter-year (220 part number 195784-2 arrays annually). (CLIN 0002)

TABLE 2 – PRODUCTION TEST TABLE

TEST

NUMBER

TEST TITLE VALIDATION

METHOD

RESPONSIBLE

PARTY FOR

CONDUCT

TEST

LOCATION

GUIDANCE

DOCUMENT(S)

1 Pre Conversion Coating Inspection

Inspection Contractor Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

2 Post Conversion Coating Inspection

Inspection Contractor Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

3 Post Radome Installation & RF Testing

Inspection and Test

Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

4 Phase Block Installation, RF Testing, and Painting Test and Inspection

Inspection and Test

Government with Contractor Support

Contractor or Subcontractor facility

SOW, test data sheet(s), Linear Slat Test Station, and array drawings.

5 Post Leak Test RF Test

Inspection Contractor Contractor or Subcontractor facility

SOW, test data sheet(s) and array drawings.

6 Post Leak Test and Final QA

Inspection Contractor Contractor or Subcontractor facility

3.5.2. The contractor shall manufacture 195783-2 arrays as ordered via DO. The contractor shall test 195783-2 arrays in accordance with the applicable drawings and processes. The contractor shall have a throughput capability of fifty-five (55) part number 195783-2 arrays per quarter (220 part number 195783-2 arrays annually). (CLIN 0003)

3.5.3. Other than RF testing, the contractor shall be responsible for testing and delivery of data sheets in accordance with 89 WIS 10 3665 for arrays. All RF testing will be performed by the Government at an off-site facility with array test capability. This includes phase block installation and any associated RF testing. It also includes pre and post radome installation RF testing. The contractor shall be responsible for any mechanical defects in test/inspection point (Item 1, Table 2; Item 2, Table 2, and Item 6, Table 2) such as correction of any painting and/or physical discrepancies. The RF testing to be performed by the Government is in procedure number 89 WIS 10 3665, section 5.8.1, 5.8.2, 5.12.1, 5.12.2, and 5.17. The Government must perform the RF testing off-site due to limited availability of test equipment resources. The test equipment items cannot be provided to the array manufacturer. (CDRL A004, Test/Inspection Report, Production Test Report)

3.6. Special Tooling and Equipment (CLIN 0004)

3.6.1. The array manufacturing effort requires some specific equipment and tooling. The Government and contractor shall provide equipment in Table A-1 of document number 89 WIS 10 3665 as indicated in Table 3 below. Some equipment is not required for this effort. Those items are marked “not required” in Table 3. Items to be provided by the contractor are identified with Contractor Acquired Contractor Owned (CACO) in the far right-hand column. Items to be provided by the Government are identified with “GFE” in the far-right hand column. The contractor shall ensure personnel are trained in the proper use of the equipment in Table 3. The GFE in Table 3 shall be delivered to the Government at the conclusion of the contract. The contractor shall maintain all GFE equipment throughout contract execution.

TABLE 3 – SPECIALIZED EQUIPMENT LISTING

Item Equipment Description Model or P/N GFE/CACO

1. Granite Table Monarch Tools Not Required

2. Oven 8820 GFE

3. Tape Measure Any Commercial Type CACO

4. Scalpel XJA06 CACO

5. Feeler Gauge 000M CACO

6. Impulse Sealing Machine 24PC/OB CACO

7. Meter Fluke 54-2 CACO

8. 1D Scanner Kit 80990301 CACO

9. Radome Gauges 80980001 CACO

10. Tuning Mandrel 8037-93-052 GFE

11. Array leak test manifold 80962701 GFE

12. Array leak test tank 80962801 GFE

13. Roll Cart 80980101 GFE

14. Roll Tune Chamber 8037-93-020 GFE

15. Deburring Block CACO

16. Thermocouple Wire Assy. Fiberglass J Type with K Plug

CACO

17. Array Cart 80962501 GFE

18. ITT Ref Array w/Radome Odd and Even Not Required

19. ITT Chromated Ref Array without Radome

Odd and Even Not Required

20. Small Freezer CACO

21. Large Freezer -40º C CACO

22. Aluminum Baking Table with Vac Manifold Assembly

CACO

23. White Cargo Case with Handles 25"x24" CACO

Item Equipment Description Model or P/N GFE/CACO

24. White Cooler/Radome Case 34"x34" CACO

25. Black Cleaning Rod 20ft CACO

26. Wooden Tables CACO

27. Shipping Container Dollies CACO

28. Water Hose CACO

29. Etching Dip Tank with Basket GFE

30. Dip Tubes GFE

31. Hot Plate Kalorik CACO

32. Extension Cord 100ft CACO

33. White Wooden Array Box GFE

34. Air Regulator 4ZK76 CACO

35. Paint Gun Dayton, 4RR10A CACO

36. Vacuum Pump 0523-101Q-SG588DX CACO

37. Pneumatic Poly Gun 250-A CACO

38. Poly Scraper Tool CACO

39. Vacuum Bag Connectors VV399 CACO

40. Oven Grease Gun CACO

41. Gram Scale HL-2000 CACO

4. GOVERNMENT FURNISHED ITEMS

4.1. Government Furnished Information (GFI) - The Government will provide all Government generated and Original Equipment Manufacturer (OEM) documentation listed in Section 2 of this SOW. The contractor shall be responsible for obtaining any commercially available documentation.

4.2. Government Furnished Equipment (GFE) - Any equipment marked as GFE in Table 3 shall be considered GFE. The contractor shall take action for disposition of the GFE, as directed by the Government, at the conclusion of the contract. (CDRL A005, Government Property (GP) Inventory Report)

4.3. Government Furnished Material (GFM) - The Government will provide the dielectric (radome) material listed in drawings PL195784 and PL195783. The contractor is responsible for providing all other material required for manufacturing of arrays.

5. DELIVERABLES

5.1. The following data deliverables shall be completed and submitted in accordance with the requirements listed in the Contractor Data Requirements Lists (CDRL).

CDRL: A001

DID Number: DI-MGMT-80227 DID Title: Contractor's Progress, Status, and Management Report SOW Paragraph: 3.1.3

CDRL: A002

DID Number: DI-MGMT-80596 DID Title: Government Furnished Information Deficiency Report SOW Paragraph: 3.3.2

CDRL: A003

DID Number: DI-NDTI-80809B DID Title: Test/Inspection Report Subtitle: First Article Test Report SOW Paragraph: 3.4.3

CDRL: A004

DID Number: DI-NDTI-80809B DID Title: Test/Inspection Report Subtitle: Production Test Report SOW Paragraph: 3.5.3

CDRL: A005

DID Number: DI-MGMT-80441 DID Title: Government Property (GP) Inventory Report SOW Paragraph: 4.2

6. SPECIAL CONDITIONS

6.1. Security - Work performed under this contract is not expected to be classified. If classified documents or products are required, a security clearance at the appropriate level shall be required to handle classified documentation and gain access to ships.

6.2. Place of Performance - The majority of work under this contract shall be performed at the prime contractor’s facility and/or subcontractor facilities. Contractor must perform 51% of the fabrication in-house on each DO awarded, in order to control schedule. Work must be performed in accordance with this SOW and consistent with the requirements of the specific DO, as necessary.

6.3. Inspections - The Government reserves the right to perform in-process inspections at the contractor’s facility. The Government will inspect all work before acceptance, according to defined specifications as outlined in this SOW and DOs. Workmanship defects and/or transportation damage found upon delivery to the Government shall not be accepted and shall be redone/reworked by the contractor at no additional cost to the Government.

Best inspection practices shall be utilized by the contractor to ensure all dimensional requirements of an individual DO are met. The Government retains the right to inspect any or all components in process to ensure dimensional specifications are met within the DO requirements. Delivered products or any products that do not meet Government defined requirements will be returned to the contractor. The contractor shall be financially responsible for all material and labor that does not meet Government defined requirements.

Material certifications shall be required for all metal alloy material supplied under this contract to include plating and heat treating, whether fabricated by the contractor or supplied for Government fabrication. Process certifications and personnel certification shall also be furnished where applicable and in accordance with the requirements of each DO.

6.4. Quality – The contractor shall have a quality program that is ISO 9001-2015 compliant or meets the following requirements: monitor and control critical processes; continuously improve processes; establish mechanisms for performance feedback; and maintain an effective root cause analysis and corrective action system.

Quality inspection points are defined in the GFI provided for this tasking. This is a “build to print” task after successful completion of First Article testing/inspections. Successful completion of First Article testing/inspections ensures that the contractor is capable of meeting the quality requirements of the GFI. The Government reserves the right to perform reviews of the contractor’s facility and processes at any time during contract execution to ensure the contractor remains capable of meeting the quality requirements of the GFI.

6.5. Safety/Environmental

6.5.1. During the course of this contract, the contractor shall abide by all applicable Occupational Safety and Health Administration (OSHA) regulations and all applicable local, state, and federal regulations.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs 4 14-JUL-2021 Exhibit B AN/SPS-48 Radar Array

Drawings

40 27-JUN-2017

Attachment 1 SGFP Form 4 14-JUL-2021 Attachment 10 Drawing 200152 1 18-AUG-1989 Attachment 11 Drawing 198720 1 02-APR-2020 Attachment 12 Drawing 198717 1 02-APR-2020 Attachment 13 Drawing 196925 1 12-FEB-1987 Attachment 14 Drawing 195783 1 08-JUL-2020 Attachment 2 89 WIS 10 3665 Rev C 73 22-MAR-2021 Attachment 3 89 WIS 10 0109 Rev D 27 13-NOV-2020 Attachment 4 Past Performance

Questionnaire

6 20-OCT-2021

Attachment 5 GPS43-104 Rev 8 Specification

6 01-JUL-1976

Attachment 6 TABLE 1: SOW

REQUIREMENTS

Attachment 7 Training Plan 12255- 8843-940026

15 30-APR-2019

Attachment 8 Drawing 200152 1 18-AUG-1989 Attachment 9 89 WIS 14 9409 36 24-AUG-2020 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs A001_A005 5 14-JUL-2021 Exhibit B AN/SPS-48 Radar Array

Drawings

40 27-JUN-2017

Attachment 1 SGFP Form 4 14-JUL-2021 Attachment 10 Drawing 200152 1 18-AUG-1989 Attachment 11 Drawing 198720 1 02-APR-2020 Attachment 12 Drawing 198717 1 02-APR-2020 Attachment 13 Drawing 196925 1 12-FEB-1987 Attachment 14 Drawing 195783 1 08-JUL-2020 Attachment 2 89 WIS 10 3665 Rev C 73 22-MAR-2021 Attachment 3 89 WIS 10 0109 Rev D 27 13-NOV-2020 Attachment 4 Past Performance

Questionnaire

6 20-OCT-2021

Attachment 5 GPS43-104 Rev 8 Specification

6 01-JUL-1976

Attachment 6 TABLE 1: SOW

REQUIREMENTS

Attachment 7 Training Plan 12255- 8843-940026

15 30-APR-2019

Attachment 8 Drawing 200152 1 18-AUG-1989 Attachment 9 89 WIS 14 9409 36 24-AUG-2020

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The following have been added by full text:

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-- Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that--

(1) It [ ___ ] will, [ ___ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--

It [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of provision)

(End of Summary of Changes)