22RWP83_SOL_0004.pdf

PDF 374 KB Posted

Attached to
MANUFACTURE AND TESTING OF SPS-48 ANTENNA ARRAYS
Solicitation number
N0016422RWP83
Issued by

View the file

Other files

File Type Posted
22RWP83_sol_0006.pdf PDF
22RWP83_SOL_0005.pdf PDF
22RWP83_SOL_0003.pdf PDF
22RWP83_SOL_0002.pdf PDF
22RWP83_sol_0001.pdf PDF
22RWP83_sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add questions and answ ers generated from potential contractors, as w ell as attache draw ings 195783, 196925, 198717, 198720, and 200152. All other terms and conditions w ill remain unchanged.

OFFERORS ARE RESPONSIBLE TO SIGN THE AMENDMENT AND SEND A COPY WITH THEIR PROPOSAL TO SHOW ACKNOWLEDGEMENT OF

INFORMATION PRESENTED IN THE AMENDMENT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016422RWP83

X 9B. DATED (SEE ITEM 11)

13-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Feb-2022

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

H. KROUT (812-854-3298)

BLDG 121

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016422RWP83

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

QUESTIONS RECEIVED:

1. There are 4 different brazing assemblies (196153-1, -2, -3 & -4). -1 & -2 (CW) seem the same while -3 & - 4 (CCW) seem the same since they use the same parts. What are the differences?

a. See -1, -2, -3, and -4 configuration tables on drawing 196153. The slots are oriented differently for the waveguide in each assembly.

2. Can I get a list?

a. See above.

3. Of the assembly files sent, only 196153-3 is able to be opened.

a. We’re working to get files that will open properly.

4. 196635 Waveguide stock print: print shows -1 & -2 versions but there are 4 different brazing assemblies

(196153-1, -2, -3 & -4). What’s the difference between the brazing assemblies?

a. See Table in A-1 & B-1 on drawing 196635. The table lists which version is used with each configuration of 196153.

5. Can I get prints for these part numbers:

a. 200152 Attached

b. 195783 Attached

c. 196925 Attached

d. 198720 Attached

e. 198717 Attached

6. Can we get more information on the epoxy used to attach the dielectric to the waveguide?

a. Manufacturer: LOCTITE

b. Model: ABLESTIK 506-1-004

c. It is not epoxy. It’s a flexible film adhesive. It comes in strips ~21.7” X 1.710”. It must be kept cold (-40 F) until use.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs 4 14-JUL-2021 Exhibit B AN/SPS-48 Radar Array

Drawings

40 27-JUN-2017

Attachment 1 SGFP Form 4 14-JUL-2021 Attachment 2 89 WIS 10 3665 Rev C 73 22-MAR-2021

N0016422RWP83

Attachment 3 89 WIS 10 0109 Rev D 27 13-NOV-2020 Attachment 4 Past Performance

Questionnaire

6 20-OCT-2021

Attachment 5 GPS43-104 Rev 8 Specification

6 01-JUL-1976

Attachment 6 TABLE 1: SOW

REQUIREMENTS

Attachment 7 Training Plan 12255- 8843-940026

15 30-APR-2019

Attachment 8 Drawing 200152 1 18-AUG-1989 Attachment 9 89 WIS 14 9409 36 24-AUG-2020 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs 4 14-JUL-2021 Exhibit B AN/SPS-48 Radar Array

Drawings

40 27-JUN-2017

Attachment 1 SGFP Form 4 14-JUL-2021 Attachment 10 Drawing 200152 1 18-AUG-1989 Attachment 11 Drawing 198720 1 02-APR-2020 Attachment 12 Drawing 198717 1 02-APR-2020 Attachment 13 Drawing 196925 1 12-FEB-1987 Attachment 14 Drawing 195783 1 08-JUL-2020 Attachment 2 89 WIS 10 3665 Rev C 73 22-MAR-2021 Attachment 3 89 WIS 10 0109 Rev D 27 13-NOV-2020 Attachment 4 Past Performance

Questionnaire

6 20-OCT-2021

Attachment 5 GPS43-104 Rev 8 Specification

6 01-JUL-1976

Attachment 6 TABLE 1: SOW

REQUIREMENTS

Attachment 7 Training Plan 12255- 8843-940026

15 30-APR-2019

Attachment 8 Drawing 200152 1 18-AUG-1989 Attachment 9 89 WIS 14 9409 36 24-AUG-2020

(End of Summary of Changes)

File details come from the government source that posted it. Updated .