AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID PAGE OF
1 7
2. AMENDMENT/MOD.NO. 3. EFFECTIVE DATE 4. REQUISITION NO.: 5. PROJECT NO.(if applicable)
0002 21 May 2019
6. ISSUED BY: CODE: N00104 7. ADMINISTERED BY (if other than item 6)
CODE:
NAVSUP WEAPON SYSTEMS SUPPORT MECH.
5450 CARLISLE PIKE
SUITE 312, WS E17
MECHANICSBURG, PA 17055-0788
N771.17 - Marsha Williams (717) 605-2727
8. NAME AND ADDRESS OF CONTRACTOR (X) 9A. AMENDMENT OF SOLICITATION NO.
N00104-18-R-G005
9B. DATED (see item 11):
10 A. MODIFICATION OF CONTRACT/ORDER NO
CODE: FACILITY
CODE: 10B. DATED(see item 13):
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended. Offers must acknowledge this amendment prior to the hour and date specified in the solicitation as amended,by one of the following methods: (a) By completing items 8 and 15 and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be by telegram or letter, provided each telegram or lettermakes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is is not required to sign this document and return copies to the issuing office (attn: 0271.A6)
14. DESCRIPTION OF AMENDMENT/MODIFICATION
This amendment consists of:
Part I - Vendor Questions and Government Responses
Part II – Changes to the RFP
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type/print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type/print
15B. CONTRACTOR/OFFERER (signature) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE (SPCC OVPT) (REV 10-84) (LOCAL) Prescribed by GSA
RFP Number: N00104-18-R-G005
Amendment Number: 0002
Part I: The following Vendor Questions/Clarifications ‘Q’ have been submitted. The Government Response ‘R’ follows each question/clarification. These questions/clarifications and responses in this section are provided for informational purposes only; neither the questions nor the responses set forth below amend the terms and conditions of the Request for Proposal (RFP) unless stated below.
Q.1 - Can you please confirm if CLIN 0003 – part number is wrong? We believe it should be 6854893.
NSN is correct.
R.1 – Yes, the part number for CLIN 0003 is wrong and should read part number 6854893. The NSN is correct. See revised schedule pages, attached. See Change 2 in Part II – Changes to The Request For Proposal of this modification and Attachment 1 for the corrected schedule pages.
Q.2 – CLIN 0005, Control Assembly – This part is no longer used, as confirmed by the Navy Program office. The part is no longer produced per the Original Equipment Manufacturer (OEM), Rolls‐Royce and the prior repair source no longer repairs this part. Can this part be removed from the RFQ?
R.2. – Yes, CLIN 0005, NSN 7H 2835-01-287-9385, Nomenclature – Control Assembly, TE; Part Number 23039916 is deleted from the Request For Proposal. CLIN 0005 is deleted and the subsequent CLINs are renumbered. See Change 2 in Part II – Changes to The Request For Proposal of this modification and Attachment 1 for the corrected schedule pages.
Q.3 – CLIN 0006, turbine casing assembly – StandardAero has a U.S. Navy (USN) approved proprietary hard face coating that can be applied to the casing struts. StandardAero developed this coating as the USN was removing engines early due to heavy wear on the struts. Will the USN consider this in their evaluation of proposals?
R.3 – There is no approved process for the use of this hard face coating at this time and it should not be applied to the struts. CLIN 0006, NSN 7HE 2835-01-321-3218 shall be repaired in accordance with the Statement of Work specified in Section C of the Request for Proposal.
Q.4 - Section B Item 4 – Indicates a multiple award IDIQ. Can the USN please confirm its intention to award IDIQ’s to multiple suppliers (i.e. StandardAero and RWG)?
R.4 – Per Section M01 –Evaluation Factors –
In accordance with FAR Clause 52.216-27 – Single or Multiple Awards the government may make award to the two approved sources under this solicitation.
The government may issue up to two separate awards from this solicitation to the eligible, and responsible Offerors whose offers, are conforming to the solicitation requirements and prices are determined to be fair and reasonable. The government reserves the right to award to a single Offeror if an agreement cannot be reached on a fair and reasonable price with multiple offerors or if multiple offers are not received.
Q.5 - How does the USN plan to award individual orders?
R.5 – The United States Navy plans to award individual orders as outlined in Section C02 – ORDERING
PROCEDURES
C02 – ORDERING PROCEDURES:
If Multiple awards are made, after the minimum contract amount has been satisfied, each Awardee will be given a fair opportunity to be considered for each delivery order exceeding $3,500.00, IAW FAR 16.505(b)(1).
1. Unless an exception applies IAW FAR 16.505(b)(2), awardees will be provided a fair opportunity to be considered for each order using the following procedures:
(i) The government will provide a fair notice of the intent to make a purchase to all awardees. The notice will include a description of the supplies to be delivered and the factors upon which the award will be made. These factors may include, either singly, or in combination, price, delivery, urgency, and capacity to perform the work.
(ii) Each multiple award contractor may submit its proposal in response to the Government’s request for order proposal. All proposals must be received in writing by the time specified in the Government’s notice of intent to make a purchase.
(iii) The Government will issue orders based upon an assessment of the offers using the factors specified in the Government’s notice of intent to make a purchase.
(iv) Orders shall be issued by the POC in writing and shall be dated and numbered. They shall set forth as applicable (1) the supplies, data, or other items being ordered and include attachments,
(2) the quantities to be furnished, (3) delivery date, (4) packaging and shipping instructions and
(5) funds obligated. An order is considered “issued” when the Government electronically signs and distributes the order into the Electronic Data Access (EDA) System. The issued order will then be electronically delivered to the Contractor’s representative.
Q.6 – Will the price the Offeror submits in its response to the referenced RFP become a ceiling price?
R.6 – Yes, the IDIQ Firm Fixed Prices are a “ceiling price”. The contractor has the opportunity to submit lower pricing or maintain the pricing that is identified in the base contract. However, contractors may not increase their prices from what is specified in the base contract.
IDIQ quantity limitation are establish in Section I23 – 52.216-19 Order Limitations (OCT 1995). The quantities listed are corrected as shown in See Change 3 in Part II – Changes to The Request For Proposal of this modification.
Q.7 – Will the USN compete work on a task order basis or on an annual basis, other?
R.7 - It depends on the Government’s demand. It is anticipated that awards will be issued on an annual basis, however, if the demand spikes additional task orders could be issued on an as needed basis.
Q.8 - Will the multiple award prime contract holders be required to submit updated pricing on an annual basis?
R.8 – No, pricing will only be provided in the solicitation phase and updated pricing will not be requested or be required on an annual basis.
Q.9 - Section C Item C02 – states if multiple awards are made each awardee shall have a fair opportunity to be considered for each Delivery Order (DO). Would we be able to change our price on each competition for each specific DO?
R.9 – Yes. Per Section C02 – Ordering Procedures 1((i) – The government will provide a fair notice of the intent to make a purchase to all awardees. The notice will include a description of the supplies to be delivered and the factors upon which the award will be made. These factors may include, either singly, or in combination, price, delivery, urgency, and capacity to perform the work.
The contractor may choose to submit a lower price or delivery based upon the government’s need, which will be conveyed to the contractor in the request for quote. Alternately, the contractor may choose to maintain the prices identified in the base contract.
Q.10 – Section C.1. Statement of Work o What happens if repairable assets are received in an incorrect configuration or missing parts? StandardAero suggests wording be added in the SOW to allow 1) USN to supply replacement parts based on our submitted Record of Discrepancy and/or 2) StandardAero to invoice O&A to replace the missing parts. A stop turn time should also be considered while this type of situation is resolved.
o To keep pricing reasonable, we would recommend that replacement of higher dollar parts with very low replacement factors (ex. Gearbox housing, PTO housing, PTO shaft) be excluded from the FFP. A specific list of these parts can be provided along with fixed pricing for each part. Requirements for parts on this list would be determined based on inspection of the asset.
R10 - Part 1 – No, the Government will not be providing replacement parts. The contractor is responsible for providing all replacement parts.
R10 – Part 2 – No, O&A pricing will not be considered. All pricing and Repair Turn-Around Times (RTAT) should reflect the worst case scenario to repair the unit, if that is going to be an issue.
R10 – Part 3 – The Government will not be providing replacement parts.
Q.11 - Section C.2.2. – States that repair assets may not be considered Beyond Economic Repair, but can be determined to be Beyond Physical Repair. Can the USN please provide definitions for Beyond Economic Repair and Beyond Physical Repair?
R.11 – Beyond Physical Repair means the unit cannot be returned to service due to excessive damage or component obsolescence regardless of cost.
Beyond Economic Repair means, it is not economically feasible to repair the unit and the cost to repair it would be greater than the cost to replace it or purchase it new.
Q.12 - Section F Item F04 – States that the contractor is to induct repair assets immediately upon receipt if there is an open DO. Can this language be changed to “within 3 working days” for the first asset and “within 3 working days” following each prior induction on that DO?
R.12 – The Government will change this language to read “the contractor is required to make inductions within 3 working days (excluding weekends and holidays) of receipt of material, if there is an open delivery order for that particular asset. See Change 4 in Part II – Changes to The Request For Proposal of this modification for the corrected language.
Q.13 - Section K32 (page 110) – requires the bidder to provide evidence that pricing is fair and reasonable. Is this required in a competitive RFP?
R.13 – Normally competition establishes price reasonableness. However, the Contracting Officer is responsible for making a determination of price reasonableness on every award. If competition is not received or additional information is required by the Contracting Officer to make that determination, the offeror may be required to submit that information later if requested. The Government is requesting this information at the same time pricing is submitted to avoid delays in award.
Q.14 - Section M, Evaluation Factors – notes that the Government may make award to the two approved sources. The next point notes that the Government may issue up to two separate awards.
Can the USN please confirm if there are only two (2) approved sources?
R.14 – Yes, there are two approved sources.
Part II: Changes to the Request for Proposal (RFP) – The following changes are hereby made and incorporated into the RFP:
Change 1 – The closing date specified in block 9, page 1 of the Request for Proposal is hereby extended from: 2:00 PM May 28, 2019 to: 2:00 PM June 24, 2019.
Change 2 – Reference Q1 and Q2.
CLIN 0003, The part number is changed to 6854893 and CLIN 0005, NSN 7HH 2835-01-031-7639 D3 is deleted from Schedule Pages 2 – 12 of the RFP and the subsequent CLIN’s are renumbered. Attachment 1 to this Amendment replaces pages 2-12.
Change 3 – Reference Q6.
Section I23 – 52.216-29 Order Limitation (Oct 1995) shown n page 76 of the RFP is changed as shown below to update the “maxinim order” quantities shown in section (b)(1) & (b)(2).
I23 - 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than A QUANTITY OF 5 EA_ [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of A QUANTITY OF 565 EACH [insert dollar figure or quantity];
(2) Any order for a combination of items in excess of A QUANTITY OF 565 EACH [insert dollar figure or quantity]; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 15 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
Change 4 – Reference Q12.
Section F04 – Time of Delivery shown on page 32 of the RFP is changed to read as follows:
F04 - TIME OF DELIVERY
Deliveries for items repaired/modified hereunder shall be made within the Repair Turn Around Time (RTAT) set forth in pages 2-12. RTAT is expressed in the number of days from induction of the failed assembly at the contractor's plant to acceptance by the Government of the same "repaired" assembly. Note, the contractor is required to make inductions within 3 working days (excluding weekends and holidays) of receipt of material, if there is an open delivery order for that particular asset.
Transaction Item Reporting WEBCAVS: Delivery of performance shall be on a daily basis (excluding weekends and holidays ) as required by the occurrence of the events identified in Section C hereof.
1. Contractor shall complete WEBCAVS "Receipt" transaction immediately upon receiving the articles to be serviced.
2. Contractor is required to make inductions immediately upon receipt for the items with open delivery orders for that particular assembly.
3. In the event the articles are received for which there are no open delivery orders, the contractor shall refer to Section C02 of this Contract.