6-1 WBS Cost Data

LABOR (Unburdened)MATERIAL (Unburdened)SUBCONTRACTS (Unburdened)Indirect CostsFeeOther Costs Not Shown Elsewhere
FY18FY19FY19FY19FY19FY20FY20FY20TotalFY18FY19FY19FY19FY19FY20FY20FY20TotalFY18FY19FY19FY19FY19FY20FY20FY20TotalFY18FY19FY19FY19FY19FY20FY20FY20TotalFY18FY19FY19FY19FY19FY20FY20FY20TotalFY18FY19
DescriptionWBSAPPNQ4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1
Hardware1.1.1RDTE
Hardware1.1.1RDTE
Software1.1.2RDTE
Integration, Assembly, Test, and Checkout1.1.3RDTE
Project Management2.1.2RDTE
Financial Management2.1.3RDTE
Logistics Management2.1.4RDTE
Contract Management2.1.6RDTE
Travel2.1.7RDTE
Studies & Design2.2.1RDTE
Certification Authority2.2.5RDTE
Systems Engineering Management2.2.6RDTE
Configuration Management2.2.8RDTE
Logistics Engineering2.2.9RDTE
Cybersecurity Engineering2.2.11RDTE
System DT&E2.3.1RDTE
System OT&E2.3.2RDTE
Security Testing2.3.4RDTE
Systems Integration/Interoperability Testing2.3.5RDTE
Technical Publications2.5.1RDTE
Peculiar Support Equipment2.7.1RDTE
Common Support Equipment2.7.2RDTE

6-2 WBS Labor Hours

LABOR BY HOURS (Provide in Hours)
DescriptionWBSAPPNBasis Of EstimateFY18FY19FY19FY19FY19FY20FY20FY20Total
Hardware1.1.1RDTEQ4Q1Q2Q3Q4Q1Q2Q3
Hardware1.1.1RDTE
Software1.1.2RDTE
Integration, Assembly, Test, and Checkout1.1.3RDTE
Project Management2.1.2RDTE
Financial Management2.1.3RDTE
Logistics Management2.1.4RDTE
Contract Management2.1.6RDTE
Travel2.1.7RDTE
Studies & Design2.2.1RDTE
Certification Authority2.2.5RDTE
Systems Engineering Management2.2.6RDTE
Configuration Management2.2.8RDTE
Logistics Engineering2.2.9RDTE
Cybersecurity Engineering2.2.11RDTE
System DT&E2.3.1RDTE
System OT&E2.3.2RDTE
Security Testing2.3.4RDTE
Systems Integration/Interoperability Testing2.3.5RDTE
Technical Publications2.5.1RDTE
Peculiar Support Equipment2.7.1RDTE
Common Support Equipment2.7.2RDTE

6-3 SW SLOC

Unhide Rows below for detailed instructions
SLOC Info Table Preparation Instructions
Column NameDescription
ReleaseRelease associated to identified Software Component
Software Component NameNames of components to be estimated. May include rollup level components as well as lower level components that roll up
Removed Code SLOCIdentifies code included in legacy system that is not to be included in this release
New Code SLOC (No Autogen)Describes the amount of code in an entirely new component.
Reused Code SLOCPre-existing code that is treated as a black box and plugged into the product (i.e., no changes to the code).
Percent Integration for ReusedRepresents the percentage of effort required to integrate the reused software into an overall product and to test the resulting product as compared to the normal amount of integration and test effort for software of comparable size. If Unknown - Defaults to 5%
Adapted Code SLOCPre-existing code that is treated as a white box and is modified for use with the product (i.e., a pre-existing module to which code is added and/or deleted and/or modified).
Modified Code SLOCAmount of code within an Adapted module that must be added, deleted, or modified for use in the new software project
Percent Code ModifiedRepresents the percentage of the adapted software's code which is modified in order to adapt it to the new objectives and environment (i.e., Modified Code SLOC / Adapted Code SLOC).
Percent Design ModifiedRepresents the percentage of the adapted software's design which is modified in order to adapt it to the new objectives and environment. If Unknown - Defaults to Percent of Code Adapted
Percent Integration for AdaptedRepresents the percentage of effort required to integrate the adapted software into an overall product and to test the resulting product as compared to the normal amount of integration and test effort for software of comparable size. If Unknown - Defaults to Percent of Code Modified
Logical / Physical SLOC *Identifies whether user provided SLOC counts are in Physical or Logical lines of code
Logical / Physical SLOC FactorFactor to convert user provided SLOC to logical lines of code
% Autogen - NewPercentage of New SLOC that is autogenerated. Not recommended for use in the model (i.e., use zero)
Rationale / BasisBasis for SLOC values

Component Level SLOC Info Table

Release!Software Component Name
james.w.cain1: Value used to uniquely identify component in lookupsRemoved Code SLOC
murphey: Identifies code included in legacy system that is not to be included in this releaseNew Code SLOC
murphey: Describes the amount of entirely new code that does not reuse any design, code, or test artifacts, is not autogenerated, and is not included in a legacy componentReused Code SLOC
murphey: Pre-existing code that is treated as a black box and plugged into the product (i.e., no changes to the code).Percent Integration for Reused

murphey: Represents the percentage of effort required to integrate the reused software into an overall product and to test the resulting product as compared to the normal amount of integration and test effort for software of comparable size.

If Unknown - Defaults to 5%Adapted Code SLOC
murphey: Pre-existing code that is treated as a white box and is modified for use with the product (i.e., a pre-existing module to which code is added and/or deleted and/or modified).Modified Code SLOC

murphey: Amount of code that must be added, deleted, or modified within an Adapted module for use in the new software project.

Either input (Modified Code SLOC) or (Percent Code Modified/Percent Design Modified/Percent Integration for Adapted).

Values (either input or calculated) must be present for Percent Code Modified/Percent Design Modified/Percent Integration for Adapted Percent Code Modified murphey: Represents the percentage of the adapted software's code which is modified in order to adapt it to the new objectives and environment (i.e., Modified Code SLOC / Adapted Code SLOC).

Either input (Modified Code SLOC) or (Percent Code Modified/Percent Design Modified/Percent Integration for Adapted).

Values (either input or calculated) must be present for Percent Code Modified/Percent Design Modified/Percent Integration for Adapted Percent Design Modified murphey: Represents the percentage of the adapted software's design which is modified in order to adapt it to the new objectives and environment.

If Unknown - Defaults to Percent of Code Modified

Either input (Modified Code SLOC) or (Percent Code Modified/Percent Design Modified/Percent Integration for Adapted).

Values (either input or calculated) must be present for Percent Code Modified/Percent Design Modified/Percent Integration for Adapted Percent Integration for Adapted murphey: Represents the percentage of effort required to integrate the adapted software into an overall product and to test the resulting product as compared to the normal amount of integration and test effort for software of comparable size.

If Unknown - Defaults to Percent of Code Modified

Either input (Modified Code SLOC) or (Percent Code Modified/Percent Design Modified/Percent Integration for Adapted).

Values (either input or calculated) must be present for Percent Code Modified/Percent Design Modified/Percent Integration for Adapted Logical / Physical SLOC james.w.cain1: Identifies whether user provided SLOC counts are in Physical or Logical lines of code.

Default assumes LogicalLogical / Physical SLOC Factor
james.w.cain1: Factor to convert user provided SLOC to logical lines of code. Default (=1) assumes Logical% Autogen - New
james.w.cain1: Percentage of New SLOC that is autogenerated. Default assumes 0%.Rationale / Basis

murphey: Rationale / Basis for estimated values should be provided here.

james.w.cain1: Value used to uniquely identify component in lookups murphey: Identifies code included in legacy system that is not to be included in this release murphey: Describes the amount of entirely new code that does not reuse any design, code, or test artifacts, is not autogenerated, and is not included in a legacy component murphey: Pre-existing code that is treated as a black box and plugged into the product (i.e., no changes to the code).

murphey: Represents the percentage of effort required to integrate the reused software into an overall product and to test the resulting product as compared to the normal amount of integration and test effort for software of comparable size.

If Unknown - Defaults to 5% murphey: Pre-existing code that is treated as a white box and is modified for use with the product (i.e., a pre-existing module to which code is added and/or deleted and/or modified).

murphey: Amount of code that must be added, deleted, or modified within an Adapted module for use in the new software project.

Either input (Modified Code SLOC) or (Percent Code Modified/Percent Design Modified/Percent Integration for Adapted).

Values (either input or calculated) must be present for Percent Code Modified/Percent Design Modified/Percent Integration for Adapted

---------Logical1.00000-
------...Logical1.00000-
---------Logical1.00000-
---------Logical1.00000-
---------Logical1.00000-
End of Table

6-4 Cost Summary Roll-up Prime Offeror Name:

Year 1Year 2Total
Cost ElementsRFP Labor CategoryRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Labor Category
Labor Category 1Program Manager
Labor Category 2Senior Software Engineer
Etc.Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
FCCOM
Total Prime Contractor Labor Cost
Material
Material and Handeling Charge
Subcontractor 1 Cost
Subcontractor 2 Cost

Total Cost

Target Fee

Total Cost Plus Target Fee

6-5 Basis Of Estimate

DescriptionWBSBasis of Estimate Narative
Hardware1.1.1
Software1.1.2
Integration, Assembly, Test, and Checkout1.1.3
Project Management2.1.2
Financial Management2.1.3
Logistics Management2.1.4
Contract Management2.1.6
Travel2.1.7
Studies & Design2.2.1
Certification Authority2.2.5
Systems Engineering Management2.2.6
Configuration Management2.2.8
Logistics Engineering2.2.9
Cybersecurity Engineering2.2.11
System DT&E2.3.1
System OT&E2.3.2
Security Testing2.3.4
Systems Integration/Interoperability Testing2.3.5
Technical Publications2.5.1
Support Equipment2.7

6-6 BOM

WBS BOE Reference Item Description Vendor Identification Basis of Price Basis of Requirement Make/Sole Source/Competitive Identification of Cost Category Supporting Data/Definitions Quantitiy Unit price Total Cost

Total BOM Cost $ - 0

6-7 FFP Proposal

CLINCLIN DESCRIPTIONEST. QTY (A)UNIT PRICE (B)TOTAL EVALUATED PRICE (A * B)
1001KGV-11M Production672
2001KGV-11M Production763
3001KGV-11M Production236

6-8 Engineering Services CLINs

COST SUMMARY FORMAT - PRIME CONTRACTOR

Prime Offeror Name:
DCAA Point of Contact Information:
Period (For Each CLIN 0002, 0102, 1002, 2002, and 3002)
Cost ElementsLabor CategoryCategory Level (Senior, Mid, Junior)Actual Current Labor RateEscalation RateLabor RateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor:
Employee Name 1
Employee Name 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Costs:
Fringe Benefits
Subtotal
Overhead
Subtotal
G&A
Total Prime Contractor Indirect Cost
Total Direct and Indirect Labor cost
COM (If Applicable)
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

6-8 (cont) Total

COST SUMMARY FORMAT - PRIME CONTRACTOR

Prime Offeror Name:
DCAA Point of Contact Information:
Total for All Years
Cost ElementsLabor CategoryCategory Level (Senior, Mid, Junior)HoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor:
Employee Name 1
Employee Name 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Costs:
Fringe Benefits
Subtotal
Overhead
Subtotal
G&A
Total Prime Contractor Indirect Cost
Total Direct and Indirect Labor cost
COM (If Applicable)
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract
Escalation AnalysisPercent
Escalation from Current Actual to Base Period (if applicable)
Escalation from Base Period to Option Period 1
Escalation from Option Period 1 to Option Period 2
Escalation from Option Period 2 to Option Period 3
Maximum Escalation Allowed by SeaPort-e IDIQ Contract

6-8 (cont)Supporting Cost Data

SUPPORTING COST DATA - PRIME CONTRACTOR'S CURRENT DIRECT & INDIRECT RATES

Company Name:
DCAA Point of Contact Information:
Historical Rates
Direct Labor:

Employee Name

Labor CategoryHistorical Year 1Historical Year 2Historical Year 3
(Actual Current Labor Rate)Proposed Option Period Labor RateProposed Option Period Labor RateProposed Option Period Labor RateProposed Option Period Labor RateProposed Option Period Labor RateReason for difference between actual current labor rate and proposed labor rates. Reason for difference between proposed rates and DCMA/DCAA Forward Pricing Rate Agreement (FPRA) rates.
Ex: John DoeEx: Sr. Program Mgr$$$$$
Ex: Jane DoeEx: Sr. Systems Engineer$$$$$
Ex: New Employee 1Ex: Jr. Junior Analyst$$$$$
$$$$$
$$$$$
Indirect Rates:Historical Year 1Historical Year 2Historical Year 3Proposed Option RateProposed Option RateProposed Option RateProposed Option RateProposed Option RateReason for difference between actual current labor rate and proposed labor rates. Reason for difference between proposed rates and DCMA/DCAA Forward Pricing Rate Agreement (FPRA) rates.
Fringe
Overhead CTR Site
Overhead GOV Site
G&A
Material and Handling
Other
Rate PeriodStart DateEnd Date
Historical Year 1:
Historical Year 2:
Historical Year 3:
Proposed Base Period:
Proposed Option 1:
Proposed Option 2:
Proposed Option 3:
Note to Offerors: The Offeror shall provide both historical and proposed labor rates for the named personnel identified above. The offeror shall provide only proposed labor rates for the unnamed personnel identified above. The Offeror shall provide historical rates in Columns C, D and E; year 3 shall contain the Offeror's most recent annual labor rates. The Offeror shall then identify their proposed labor rates for those same individuals in columns F, G, H, I, and J. The Offeror shall provide similar historical and proposed indirect rates for the items listed on lines 16 through 20. The Offeror shall identify the Start and End dates for each of their rate periods in the table on lines 24-32.