CEnIIC Industry Day Brief - Final.pdf

PDF 957 KB Posted

Attached to
PMW 760 C4I Engineering, Installation, and Integration Contract (CEnIIC)
Solicitation number
N00039-16-R-0024
Issued by

View the file

Other files

File Type Posted
Q&A RFP CEnIIC 14 February 2017.pdf PDF
RFP N00039-16-R-0024.docx DOCX document
RFP N00039-16-R-0024 Amendment 0001.pdf PDF
Attachment 3 - DD254 CEnIIC.pdf PDF
CEnIIC Industry Day TIF Tour- Final.pdf PDF
Attachment 4-5 SCA WD 15-4427 Rev.-1 CHARLESTON SC.pdf PDF
Attachment 5 - QASP CEnIIC.pdf PDF
Attachment 9 - Relevant Experience Form.docx DOCX document
Attachment 4-2 SCA WD 05-2241 Rev.-18 BATH ME.pdf PDF
CTII_RFI_COMMENT_FORM.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement PMW 760 N0003916R0024 Amendment 0002.pdf PDF
SPAWAR South Annex.pdf PDF
Attachment 4-6 SCA WD 15-5635 Rev.-2 SAN DIEGO CA.pdf PDF
RFP N00039-16-R-0024 Amendment 0003.pdf PDF
Attachment 2 - CDRLs CEnIIC.pdf PDF
Attachment 4-3 SCA WD 05-2301 Rev.-17 PASCAGOULA MS.pdf PDF
Q&A Draft RFP CEnIIC 16 December 2016.pdf PDF
Q&A Industry Day 5 January 2017.pdf PDF
Q&A RFP CEnIIC 28 February 2017.pdf PDF
RFP N00039-16-R-0024 Amendment 0002.pdf PDF
Attachment 12 - Staffing Plan.xlsx XLSX spreadsheet
Attachment 10 - Prime and Sub Cost Spreadsheets.xlsx XLSX spreadsheet
JBC Form 74 Rev 14 May 2015.pdf PDF
Attachment 4-1 SCA WD 15-2009 Rev.-2 MOBILE AL.pdf PDF
Attachment 4-7 SCA WD 15-2375 Rev.-1 MARINETTE WI.pdf PDF
Attachment 8 - Past Performance Questionnaire_Survey.docx DOCX document
Attachment 4-4 SCA WD 15-4341 Rev.-2 NORFOLK VA.pdf PDF
Attachment 11 - Resume Format.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information Dominance;

Anytime, Anywhere…

PEOC4I.NAVY.MIL

1 December 2016

Heidi Radaford, PCO

SPAWAR 2.1B9

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited (12 December 2016).

Program Executive Office Command, Control, Communications, Computers, and Intelligence (PEO C4I) SPAWAR 2.0 and PMW 760

C4I Engineering, Integration, and Installation Contract (CEnIIC) Industry Day

CEnIIC Industry Day Agenda

0830 – 0900 Contractor Check-in 0900 – 0915 Welcome & Rules of the Road Acquisition Strategy/Draft RFP 0915 – 1000 PEO C4I/PMW 760 Overview Scope Test and Integration Facility (TIF)

1000 – 1015 BREAK

1015 – 1030 Questions to Government 1030 – 1100 Government Caucus 1100 – 1130 Answer Session 1200 – 1400 TIF Tours

Welcome

• Welcome

• Housekeeping

• Restrooms

• Breaks

• Eating areas

• Smoking areas

• Lunch suggestions

Rules of the Road

• Questions are encouraged.

• Submit all solicitation-related questions in writing before the

Q&A session.

• Verbal questions may not be answered during the Q&A sessions, but will be recorded for response on the public site (see below).

• All questions and answers (along with the slides) will be posted on the SPAWAR E-Commerce website (https://e-commerce.spawar.navy.mil)

• Any changes to the draft RFP will be reflected in the final RFP when issued.

• No side bar discussions with Government Representatives https://e-commerce.spawar.navy.mil/ https://e-commerce.spawar.navy.mil/

Contract Strategy

• Maximize Competition

• Indefinite Delivery/Indefinite Quantity (IDIQ) Contract

• Cost Plus Fixed Fee (CPFF) Task Orders

• Firm Fixed Price (FFP) Task Orders

• Single Award

• Total Duration – 5 Years

• 5 year ordering period

• No option years

• Strategy satisfies the requirements and overarching concepts

• Provide Best Value approach

• Anticipated RFP issue date – 3 January 2017

• Anticipated Proposal due date – 20 February 2017

• Anticipated award date – September 1, 2017

Places of Performance/ Mandatory RFP Requirement

• The effort will be performed at the following locations:

• Charleston, SC

• Mobile, AL

• San Diego, CA

• Bath, ME

• Pascagoula, MS

• Marinette, WI

• Approximately 60% of the effort will be performed at the Government facilities (SSC-LANT Test and Integration Facility (TIF), Shipyards, and Shipboard); 40% of the effort will be performed at Contractor facility

• Mandatory RFP Requirement: Contractor shall establish and maintain office space and production space for fabrication, testing, and material storage within 25 miles of the TIF facility located at SSC LANT

Evaluation Factors

• Factor 1: Management Approach

• Subfactor 1.1: Program Management/Execution Plan

• Subfactor 1.2: Sample Management Scenario

• Subfactor 1.3: Key Personnel

• Subfactor 1.4: Small Business Utilization

• Factor 2: Technical Approach

• Subfactor 2.1: Systems Engineering

• Subfactor 2.2: Production and Integration

• Factor 3: Past Performance

• Factor 4: Cost

Government will award based on Best Value

Organizational Conflict of Interest

• DFARS Clause 5252.209-9203 Organizational Conflict of Interest

– All Offerors shall submit the following regardless of potential OCI determination:

• Offerors shall identify and describe any contractual efforts they or any affiliate, joint venture, or subcontractor are presently providing to PEO C4I, SPAWAR, SSC Pacific, SSC Atlantic, or any other activity where the effort relates to PMW 760

• Offerors shall include name of contractor, joint venture, affiliate, or subcontractor; the contracting agency; contract number; a short description of the work; and whether the Offeror believes the listed effort results in a potential OCI for this solicitation. The Offeror shall specifically address why it believes no OCI exists, if applicable.

• The PCO will evaluate responses and determine if any potential

OCI exists

• Program Executive Office for Command, Control, Communications, Computers, and Intelligence (PEO C4I), PMW 760 (Ship Integration) is responsible for installation of integrated C4I capabilities aboard new construction ships.

• Integrated C4I capabilities provide robust communications for operations, maritime, and flight safety.

• Network capabilities

• Communications

• Command and Control

• Intelligence

PEO C4I Background

PEO C4I Background

• Supports various military shipbuilding programs

• Amphibious Ships (LPD, LX(R))

• Special mission ships (EPF)

• Auxiliary (T-ATS, T-AO 205 Class, LCU 1700 Class)

• Surface Combatants (DDG, FF)

PEO C4I Design Integration Process

TIF Shipyard

Design / Integration Engineering

ILS Collection Non-Pushed Items

TIF Schedule

GGI, GGE

Delivery

Platform C4I Baseline

Integrated

GFI, GFE

Packages

Radio Comms Suite

Distributed Systems

SSES

Systems

IRD

ILS

Ship Schedule A, C

New Construction

CDD

Acquisition Systems

AWP: Availability Work Package; CDD: Capability Development Document; GFI: Government Furnished Information; GFE: Government Furnished Equipment;

GGI: Government-to-Government Information; GGE: Government-to-Government Equipment; ILS: Integrated Logistics Support; IRD: Installation Requirement Drawings ;SSES: Ship Signal Exploitation Space http://www.google.com/imgres?imgurl=http://www.austal.com/images/JHSV_Underway_media1.jpg&imgrefurl=http://www.austal.com/index.cfm?objectid=7626D3FC-65BF-EBC1-2197648EEE2D3DD0&h=349&w=641&sz=67&tbnid=gNTwmpobUma5MM:&tbnh=75&tbnw=137&prev=/images?q=jhsv+1&zoom=1&q=jhsv+1&hl=en&usg=__mXc-Z8SHXaTpKfL0gcASp_AWBYs=&sa=X&ei=wMHRTNW6DpT4swOjtZXoCg&ved=0CC4Q9QEwBA

• Expectations

• Learning curve (follow hull)

• Cross platform efficiencies (commonality)

• Reduce total costs to the Government

• Phases of Work

• Requirements/Design Engineering

• TIF

• Shipboard Installation

• Post Delivery Support

• Types of Work

• Design/Systems Engineering

• Production/Integration

• Installation/Testing

• Configuration Management/Integrated Logistics Support

Performance Objectives and Scope

Design/Systems Engineering

• Design Requirements (e.g., Arrangement, HVAC/Power, Cable)

• Impact Assessments

• Design Decision Matrix

• C4I GFI/GGI

• Provided to Shipyard/Planning Yard

• TIF Design

• Bills of Material

• Engineering Change

Proposals

• Human Systems Integration

• Systems Engineering (management, design, and specifications management)

• SoS Work Breakdown Structure

• Specifications Tree

• Functional Interface

Diagram

• Specialty Engineering

Studies

• Turnkey Execution Plan

Production/Integration

• Platform TIF Integration

• Production Management

• Production and Fabrication

• Procure/fabricate cabling, equipment, racks, ancillary hardware, etc.

• Build integrated assemblies, assemble components inside equipment cabinets, build test fixtures, etc.

• TIF Completion and Pack-out

• Platform Shipboard Integration

Installation/Testing

• Testing

• Test Plan and Procedures

• TIF Testing

• Shipboard Testing

• Environmental Testing

• Installation

• Installation Plan

• Equipment Installation

• Space Turnover Support

• Trials Support

• Post- Sea Trials Support

CM/ILS

• Baselines

• Non-POR equipment

• As-Built drawings

• Configuration Management

• Drawings

• WBS

• Specifications

• Technical Data Packages

• GFI/GFE

• C4I Logistics Packages

• Certifications

Platform Forecast

Note: Notional Schedule subject to change. Platform Hull Numbers removed for Public Release.

Detailed Platform Forecast

Detailed Platform Forecast (cont’d)

Government TIF

• Located at SPAWAR Systems Center–Atlantic (SSC-LANT) in Charleston, SC

• Land-based validation of design

• Verifies interoperability of System of Systems

• Production and validation period for non-2Z equipment and intra-compartment cables

• Land-based environment conducive to production

• Allows for change management within Government controls (pre- GFE delivery)

• Enables technology insertion

• Avoid builder delays

• Risk Mitigation

• Integration period early in the ship construction cycle

• Test Procedure Development

• Allows for Industrial Test procedure development and validation

• Allows for mission-based test execution

• Approx. 40,000 sq. feet

• Interior is reconfigurable

• Capable of housing 8 different hulls of equipment simultaneously

• False deck/plenum HVAC

• Material Management Area

• Operated at Closed Secret Security Level

• Permanent assets include antenna for HF, VHF, UHF, UHF SATCOM

• Hosting capability for ship set equipment

• Two antenna platforms for SHF, EHF, other

• 100 Mbs network connection to Defense Research and

Engineering Network (DREN)

• Upgrade in progress to 10 Gbs with SIPR connectivity

• No chill water required to date

• Spaces Typically Emulated in TIF

• Main communications center/Command and Control System Center (CCSC)

• Transmitter/receiver rooms

• SSES spaces

• Elements of the TIF

• Reconfigurable bulkheads

• Reconfigurable wireways

• Typically intra-compartment cables go to the ship

• Power

• Can emulate ship’s power if required

• Permanent TIF Power Panels

• Wireways/Arrangements built IAW GFI

• Equipment Configuration updates supported

• Firmware/hardware/software updates absorbed if possible

• Only mock up required obstructions

• Evaluated by engineering team using 3D design

• Sized to accommodate platform space arrangements

• Build Packages developed specific to TIF production/integration

TIF Tours

TIF Tour Schedule

1200 – 1230: TIF Tour 1

1230 – 1300: TIF Tour 2

1300 – 1330: TIF Tour 3

1330 – 1400: TIF Tour 4

• EPF 9

• Warehouse and Inventory Management

TIF Tour

Group 1 (1200) Group 2 (1230) Group 3 (1300) Group 4 (1330) Theodore Orlando Richard Barnhart Kelly Baldwin Michael Dollens

John Cox Christy L. Loyer Tim Galegher Jay O'Donnell Don Barnard Ronald Steven Amell Bryan Newman Mike Virnig

Mark Kohlheim Bambi Thompson

Hoyt Ken Ritter Johathan Adkins

Mike Quinn Michael Andrew Hoyt Lori Ventimiglia Diana Manchak Dena Elrod Joshua G. Hatter Rod Smith Lauren Zamler Toni Taylor Craig Herring Gene Hindman Dr. Gary Durante Steve Golle Zach Conover Sharon Oliver Paul Fagala

Michael Lood Kimberly P. Garee Jeffrey Liegl Jon Brisar Michael Punkosky Gabriel Bell Drew Miller Mark Stusnick Tracey "Emmett"

Combs

Directions from Building 3112 to Building 1648 (TIF)

• Leave Building 3112 and turn left onto Tank Road

• Exit though Gate 4 and turn left onto Remount Road

• Turn right at the flashing light onto Virginia Avenue

• Follow Virginia Avenue for approximately 1.5 miles

• Turn left onto Noisette Blvd (across the railroad tracks)

Noisette will turn to the right, go straight on Avenue B North

• Go straight at the stop sign

• Once past the chain link fence, turn left on Upham Street towards the security checkpoint

• Take the first left past the checkpoint, and Building 1648 will be in front of you on the left (see map next slide)

Map

Security Checkpoint

Building 1648 TIF

Parking

Overflow Parking

Break

0830 – 0900 Contractor Check-in 0900 – 0915 Welcome & Rules of the Road Acquisition Strategy/Draft RFP 0915 – 1000 PEO C4I/PMW 760 Overview Scope Test and Integration Facility (TIF)

1000 – 1015 BREAK

1015 – 1030 Questions to Government 1030 – 1100 Government Caucus 1100 – 1130 Answer Session 1200 – 1400 TIF Tours

Question and Answer Session

Slide Number 1
Slide Number 2
Welcome
Rules of the Road
�Contract Strategy�
Places of Performance/�Mandatory RFP Requirement
Evaluation Factors
Organizational Conflict of Interest
PEO C4I Background
PEO C4I Background
PEO C4I Design�Integration Process
Performance Objectives and Scope
Design/Systems Engineering
Production/Integration
Installation/Testing
CM/ILS
Platform Forecast
Detailed Platform Forecast
Detailed Platform Forecast (cont’d)
Detailed Platform Forecast (cont’d)
Detailed Platform Forecast (cont’d)
Government TIF
Slide Number 23
Slide Number 24
Slide Number 25
TIF Tour
Directions from Building �3112 to Building 1648 (TIF)
Map
Slide Number 29
Question and Answer �Session