SECTION_19 _MPF_Tech_Manual.pdf

PDF 249 KB Posted

Attached to
O&M of 6 Government-Owned MPF Vessels
Solicitation number
N00033-14-R-3135
Issued by

About this file

Section 19 of the MPF Tech Manual

View the file

Other files

File Type Posted
Q_and_A_Four_N00033-14-R-3135.pdf PDF
Attachment_O_-_Pricing_Forms_A-C_via_Amend_7.xls XLS spreadsheet
14-R-3135_-_Amendment_07.pdf PDF
Attachment_O_-_Pricing_Forms_A-C_via_Amend_6.xls XLS spreadsheet
14-R-3135_-_Amend_06.pdf PDF
14-R-3135_-_Conformed_Through_Amend_06.pdf PDF
Q_and_A_Three_N00033-14-R-3135_issued.pdf PDF
3135_conformed_through_0005.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
3135_0005_Released.pdf PDF
3135_004_released.pdf PDF
3135_004_released.pdf PDF
Q_and_A_Two_N00033-14-R-3135_final.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
3135_003_Released.pdf PDF
Attachment_Q_-_Training_Information.pdf PDF
Attachment_L_Government_Estimate_of_Reimbursable_Costs.pdf PDF
Q_and_A_One_N00033-14-R-3135_N00L_final.docx DOCX document
Attachment_B_-_DOL_Wage_Determinations.pdf PDF
N00033-14-R-3135_Section_J.docx DOCX document
3135_002_Released.doc DOC document
Attachment_P_-_Mission_Essential_Contractor_Services_Plan_Worksheet.doc DOC document
Attachment_Q_-_Training_Information.docx DOCX document
SIU_Stockham_2013.pdf PDF
STOCKHAM_SIU_CBA_2011.pdf PDF
SIU_CBA_2010.pdf PDF
Attachment_O_-_PASTPERFORMANCE_QUESTIONNAIRE.doc DOC document
AMO_Bobo_2013_distribution.pdf PDF
AMO_Stockham_and_Wheat_2011_distribution_Appendix_A.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
SIU_Bobo__2013.pdf PDF
N00033-14-R-3135_0001_Released.doc DOC document
STOCKHAM_AMO_MOU_2011.pdf PDF
AMO_BOBO_CBA_2011.pdf PDF
AMO_Stockham_2013_ _2014_Aggregate_Fringe_Contributions.pdf PDF
AMO_Bobo_2013_ _2014_Aggregate_Fringe_Contributions.pdf PDF
Attachment_O_-_PASTPERFORMANCE_QUESTIONNAIRE.doc DOC document
Attachment_L_Government_Estimate_of_Reimbursable_Costs.docx DOCX document
Attachment_F_Civilian_Equivelancies_Costing.pdf PDF
Attachment_K_Technical_Experience_Datasheet.docx DOCX document
Attachment_N_Cover_sheet.docx DOCX document
Attachment_C_Contract_Security_Classification_Specification_(DD254).pdf PDF
Revised_Scheduled_Government_Furnished_Property_-_BOBO_11132013v7.xlsx XLSX spreadsheet
Copy_of_Revised_Scheduled_Government_Furnished_Property_-_STOCKHAM_11132013v9b.xlsx XLSX spreadsheet
Attachment__J_-_Monthly_Budget_Status_Report.xlsx XLSX spreadsheet
N00033-14-R-3135_Released.doc DOC document
Attachment_G_SF-LLL_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_H_-_Invoice_Requirements.doc DOC document
Attachment_I_-_Past_Performance_Data.pdf PDF
Attachment_M_-_Award-Fee_Plan.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 19

MPF MANNING

19.1: The following identifies the manning requirements needed for the operation and maintenance of It is the Contractor’s responsibility to provide the manning detailed below for the proper operation and maintenance of the BOBO Class ships and USNS

STOCKHAM.

BOBO CLASS FOS

FLAGSHIP

FOS

NON-FLAGSHIP

COI RAV ROS-5

Deck Department

Master 1 1 1 1

Chief Mate (dayworker)

1 1 1 1 1 nd

Mate 1 1 1 rd

Mate (watchstanders)

1 2

AB/Bosun 1 1 1 1

Able Seamen 5 5 6 1

Ordinary Seamen/GVA 3 3 1

Total Deck Department 14 14 10 5 4

Engine Department

Chief Engineer 1 1 1 1 1 st Assistant Engineer

(dayworker) nd

Assistant Engineer 1 1 1 1 1 rd

Assistant Engineer

(watchstanders)

2 2 1 0 1

Electronics Officer 1 1

Storekeeper 1 1 1 1

QMED/Electrician 1 1

QMED/Pump 1 1

QMED 2 2 1

GUDE 1 1 3 1 1

Total Engine Department 12 12 7 6 6

Steward Department

Steward/Baker 1 1 1 1

Chief Cook 1 1 1

Steward’s Assistant 4 3

Total Steward Department 6 5 1 2

Total Manning 32 31 17 12 12

(*) Flag Ships: BOBO, LUMMUS, BUTTON, LOPEZ

STOCKHAM FOS

FOS

AFSB

COI RAV ROS-5

Deck Department

Master 1 1 1 1

Chief Mate (dayworker)

2nd Mate 1 2 1

3rd Mate (watchstanders)

1 2

AB/Bosun 1 1 1 1

Able Seamen 5 5 6 1

Ordinary Seamen/GVA 3 3 3 1

Total Deck Department 14 15 13 5 4

Engine Department

Chief Engineer 1 1 1 1 1

1st Assistant Engineer

(dayworker)

2nd Assistant Engineer 1 2 1 1 1

3rd Assistant Engineer

(watchstanders)

2 2 1 0 1

Electronics Officer 1 1

Storekeeper 1 1 1 1

QMED/Electrician 1 1

QMED/Pumpman 1

QMED 2 4 1

Oiler 3

GUDE 1 1 1 1

Total Engine Department 12 14 7 6 6

Steward Department

Steward/Baker 1 1 1 1

Chief Cook 1 1 1

Asst Cook Utility 2

Steward’s Assistant 2 3

Total Steward Department 4 7 1

Total Manning 30 36 20 12 12

File details come from the government source that posted it. Updated .