3135_003_Released.pdf
PDF 250 KB Posted
- Attached to
- O&M of 6 Government-Owned MPF Vessels
- Solicitation number
- N00033-14-R-3135
About this file
Amendment 0003
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this amendment is to extend the Closing time and date for Volume 3, and to incorporate changes to the RFP. See attached.
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00033-14-R-3135
X 9B. DATED (SEE ITEM 11)
25-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2014
CODE
MILITARY SEALIFT COMMAND WASHINGTON D.C.
914 CHARLES MORRIS COURT SE
WASHINGTON NAVY YARD DC 20398-5540
N00033 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00033-14-R-3135
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
MODIFICATION BODY
1. The purpose of this amendment is to incorporate the following changes into the RFP.
2. SF 33, Block 9: Closing date and time is changed to;
- 4:00PM EST, on 05 September 2014 for Volumes 1 and 2, Solicitation Package and
Technical Proposal Requirements.
- 4:00PM EST, on 19 September 2014 for Volume 3, Past Performance Data and Price
Proposal.
3. Section C
a. 1.4.8.1; is changed to read; “In order to fill the Authorized Medical Allowance List
(AMAL 5500) level per each stock item thru the Navy Supply System, the Contractor shall select the line item for “Advanced Medical Kit” (AMK0 in order to meet the shipboard pharmaceutical requirements. This Kit will reduce the workload on the M-PIC (e.g.
Ship’s Master or Chief Mate) for replacement and disposal of shelf-life medical consumables that have expired. The Government will reimburse the cost for the AMK and it must conform to the applicable items approved by the MSC Force Surgeon for inclusion in the Kit. Any deviation, addition or substitution to the contents of the MSC
AMK must be approved by the MSC Force Surgeon.”
b. 1.8.5; The word “All” is added to begin the first sentence and the following two sentences are added at the end of the paragraph; “See Section J, Attachment Q – Training information for estimated cost and locations of training. Note: Information provided in
Attachment Q is for informational purposes only and is subject to change without notice and is therefore not in any way guaranteed by MSC.”
c. 1.7.1.1; The following sentence is added at the end of the paragraph;
“The Contractor is required to notify the COR in writing immediately as soon as a gap in a Certificate of Inspection (COI) billet is anticipated or identified and provide a corrective plan of action.”
d. 1.7.1.2; The following sentence is added as the third sentence in the paragraph; “Crews will work eight hours per day, seven days a week (including National Holidays).”
e. 1.8.5; The word “All” is added to begin the first sentence and the following two sentences are added at the end of the paragraph; “See Section J, Attachment Q – Training information for estimated cost and locations of training. Note: Information provided in
Attachment Q is for informational purposes only and is subject to change without notice and is therefore not in any way guaranteed by MSC.”
f. 1.8.15; The chart at C-1.8.15 is replaced with the following;
(1) Working knowledge is not required. Competency may be maintained if required by Contractor policy or procedures.
g. Paragraph 3.4.4 is changed to read; “A minimum of four (4) years’ experience serving aboard ocean-going ships as a Chief Engineer (ChEng) or First Assistant Engineer
(Main Propulsion Assistant (MPA)) and/or a combination of education and experience gained while employed by a Shipyard or while serving in the military performing duties substantially the same as a Port Engineer. This experience must demonstrate effective management of maintenance and repair of ocean-going ships.”
4. Section J
a. Attachment A – Technical Manual, Section 19.1; Both manning charts have been changed to replace Electronics Officer/Technician with “Electronics Officer” and to reflect the correct Steward Department totals.
b. Attachment L – Government Estimate of Reimbursables, projected availability schedule has been added.
c. Attachment Q – Training Information, Small Arms and Ships Reaction Force information has been updated.
d. Attachment O – Forms, Pricing forms have been updated.
5. Section L
a. L-14(e); Change to read: “Offerors must submit three separately bound volumes: (1)
Solicitation Package, (2) Technical Proposal, and (3) Past Performance Data and Price
Proposal as indicated below.”
b. L-14(e)(5); Change to read;
(1) Offerors shall submit the following number of copies/versions:
Competency Areas
Engineering
Officers
Port
Engineer
Deck
Officers
Shore based
Property
Administrator
SAMM software X X (1)
(1)
Logbook software X X
Ship log software
PENG Software
X (1)
Web based CMLS Software
X (1)
SHIPCLIP software
Shore Side Engineering Analysis Software (SEAS) (1)
Chemical Treatment of Shipboard Systems X X
Lube Oil Supply Contract X X (1)
Coatings Supply Contract
X X
Used Oil Analysis of Shipboard Equipment X X (1)
Bunker Fuel Analysis X X (1)
Vibration Analysis of Shipboard Equipment X X (1)
Volume 1
Solicitation Package, Volume 2
Technical Proposal
Volume 3
Past Performance Data and
Price Proposal
(1) Original (paper copy)
+ (1) Electronic Copy (CD)
(1) Original (paper copy)
+ (1) Electronic Copy (CD)
(1) Original (paper copy)
+ (1) Electronic Copy (CD)
c. L-15(A)(c); Change to read; “The Offeror must submit a complete Representations and
Certifications of all applicable provisions included in the solicitation through its System for Award Management (SAM) record. Any Representations and Certifications not available for response within SAM may be submitted within the Offeror’s proposal.
Items which are not applicable should be marked “N/A.”
d. L-15(A)(j); Change last sentence to read; “For the purpose of this section, adequate financial resources is an amount equal to the total value of 45 days of per diem payments for six vessels in FOS, plus the necessary resources to conduct two major availabilities simultaneously (estimated at $10,000,000 each).”
6. Offerors requesting additional information or clarifications relating to this Amendment shall submit such in writing to both gerald.t.robertson@navy.mil and diana.fischer@navy.mil.
All other terms and conditions remain unchanged.