3135_002_Released.doc

DOC document 47 KB Posted

Attached to
O&M of 6 Government-Owned MPF Vessels
Solicitation number
N00033-14-R-3135
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Q_and_A_Four_N00033-14-R-3135.pdf PDF
Attachment_O_-_Pricing_Forms_A-C_via_Amend_7.xls XLS spreadsheet
14-R-3135_-_Amendment_07.pdf PDF
Attachment_O_-_Pricing_Forms_A-C_via_Amend_6.xls XLS spreadsheet
14-R-3135_-_Amend_06.pdf PDF
14-R-3135_-_Conformed_Through_Amend_06.pdf PDF
Q_and_A_Three_N00033-14-R-3135_issued.pdf PDF
3135_conformed_through_0005.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
3135_0005_Released.pdf PDF
3135_004_released.pdf PDF
3135_004_released.pdf PDF
Q_and_A_Two_N00033-14-R-3135_final.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
SECTION_19 _MPF_Tech_Manual.pdf PDF
3135_003_Released.pdf PDF
Attachment_Q_-_Training_Information.pdf PDF
Attachment_L_Government_Estimate_of_Reimbursable_Costs.pdf PDF
Q_and_A_One_N00033-14-R-3135_N00L_final.docx DOCX document
Attachment_B_-_DOL_Wage_Determinations.pdf PDF
N00033-14-R-3135_Section_J.docx DOCX document
Attachment_P_-_Mission_Essential_Contractor_Services_Plan_Worksheet.doc DOC document
Attachment_Q_-_Training_Information.docx DOCX document
SIU_Stockham_2013.pdf PDF
STOCKHAM_SIU_CBA_2011.pdf PDF
SIU_CBA_2010.pdf PDF
Attachment_O_-_PASTPERFORMANCE_QUESTIONNAIRE.doc DOC document
AMO_Bobo_2013_distribution.pdf PDF
AMO_Stockham_and_Wheat_2011_distribution_Appendix_A.pdf PDF
Attachment_O_-_Pricing_Forms_A-C.xls XLS spreadsheet
SIU_Bobo__2013.pdf PDF
N00033-14-R-3135_0001_Released.doc DOC document
STOCKHAM_AMO_MOU_2011.pdf PDF
AMO_BOBO_CBA_2011.pdf PDF
AMO_Stockham_2013_ _2014_Aggregate_Fringe_Contributions.pdf PDF
AMO_Bobo_2013_ _2014_Aggregate_Fringe_Contributions.pdf PDF
Attachment_O_-_PASTPERFORMANCE_QUESTIONNAIRE.doc DOC document
Attachment_L_Government_Estimate_of_Reimbursable_Costs.docx DOCX document
Attachment_F_Civilian_Equivelancies_Costing.pdf PDF
Attachment_K_Technical_Experience_Datasheet.docx DOCX document
Attachment_N_Cover_sheet.docx DOCX document
Attachment_C_Contract_Security_Classification_Specification_(DD254).pdf PDF
Revised_Scheduled_Government_Furnished_Property_-_BOBO_11132013v7.xlsx XLSX spreadsheet
Copy_of_Revised_Scheduled_Government_Furnished_Property_-_STOCKHAM_11132013v9b.xlsx XLSX spreadsheet
Attachment__J_-_Monthly_Budget_Status_Report.xlsx XLSX spreadsheet
N00033-14-R-3135_Released.doc DOC document
Attachment_G_SF-LLL_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_H_-_Invoice_Requirements.doc DOC document
Attachment_I_-_Past_Performance_Data.pdf PDF
Attachment_M_-_Award-Fee_Plan.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT BODY

1. The purpose of this amendment is to incorporate the following changes into the RFP.

2. SF 33, Block 9: Closing date and time is changed to read: 4:00PM, on 05 September 2014.

3. Section C

a. Paragraph 1.1.4 is changed to read:

C-1.1.4: Area of Operations. The ships and the cargoes are designed for worldwide, extended independent underway operations in remote geographic locations. Therefore, self-sufficiency in operations and maintenance is an important mission requirement. For planning purposes and without guarantee, the Government anticipates prepositioning three of the vessels in the Indian Ocean (Diego Garcia - Squadron 2) and three of the vessels in the Western Pacific (Guam/Saipan – Squadron 3) for 92% of the time. Deviations from projected ship locations shall not be the basis for adjustment to the contract price.

b. Paragraph 1.7.7.1 is changed to read:

Deductions for Key Shoreside Personnel. Lapses in Key Shoreside Personnel coverage, or reductions in the dedication levels of Key Shoreside Personnel to less than dedication levels proposed by the Contractor in its final offer, will be subject to deduction in the applicable contract per diem rate.

c. Paragraph 1.8.5; Change reference in third bullet to read “C-1.8.12.”

4. Section F Phase-Out Plan is added to the chart entitled “Required Delivery Schedule” at paragraph F-6.

5. Section J

a. Attachment A – Technical Manual, The Steward Department Total for Non-flagship BOBO class vessels in Section 19 has been changed to 5.

b. Attachment B – Wage Determination cover sheets are added to the CBAs provided via amendment 0001.

c. Attachment P – “Mission Essential Contractor Services Plan Worksheet” is added.

d. Attachment Q – “Training Information” is added.

6. Section L

a. Change last sentence of paragraph L-14(e)(1) to read: “A maximum of four pages should be used to address the Sample Tasking at the 10th bullet of Paragraph L-15.B(c)B.I. The remainder of the pages shall be devoted to the remaining elements (bullets) of the Technical Approach at L-15.B.(c)B.I.

b. Add Paragraph L-15.A.(l) to read: “Mission-Essential Contractor Services Plan. In accordance with DFARS 252.237-7023 and 252.237-7024, all offerors shall submit a Mission-Essential Contractor Services Plan and complete and provide Attachment P to the RFP.”

c. Change reference in 2nd bullet of Paragraph L-15.B.(c).B.I from C-1.7.8 to “C-3.4.”

d. Change 3rd bullet of Paragraph L-15.B(c).B.I to read:

• Provide resumes for all the proposed shoreside personnel considered to be key. In addition, the offeror shall complete the table provided under Attachment K.3, identifying shore side personnel it believes to be key. If the proposed individual is not a current employee, then a signed “letter of intent” should be submitted.

e. Correct lettering of sub paragraphs at Section L-15(C)(I) and change newly lettered Paragraph L-15(C)(I)(d) to read:

“All offerors are requested to address historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns) in the Performance Data Sheet, (Attachment I). In addition, large businesses shall address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan, DOD Requirements.) in the Performance Data Sheet (Attachment I). This information may fill box 14 and up to one continuation page.”

7. Offerors requesting additional information or clarifications relating to this Amendment shall submit such in writing to both gerald.t.robertson@navy.mil and diana.fischer@navy.mil.

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .