N00030-15-R-0202_Amendment_A00002.docx
DOCX document 37 KB Posted
- Solicitation number
- N00030-15-R-0202
About this file
General Intent The purpose of this amendment is to revise the solicitation and answer questions posed by a potential offeror. This amendment does not change the due date for receipt of proposals which remains 15 April 2015 at 3.00 pm local time. Offerors must acknowledge receipt of this amendment in block 14 of the SF26.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00030-15-R-0202_Amendment_A00001.docx | DOCX document | |
| N00030-15-R-0202_Contract_Data_Requirements_List.pdf | ||
| N00030-15-R-0202_Attachment_L-1__PAST_PERFORMANCE_INFORMATION.doc | DOC document | |
| N00030-15-R-0202_Attachment_L-3__CONSENT_LETTER.doc | DOC document | |
| N00030-15-R-0202_Request_fo_Proposal.docx | DOCX document | |
| N00030-15-R-0202_Contractor_Acquired_Property_(CAP).xlsx | XLSX spreadsheet | |
| N00030-15-R-0202_Contract_Data_Requirements_List.pdf | ||
| N00030-15-R-0202_Government_Property_Template_20150203.xlsx | XLSX spreadsheet | |
| N00030-15-R-0202_Attachment_L-2__PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| N00030-15-R-0202_Technical_Library_.xlsx | XLSX spreadsheet | |
| N00030-15-R-0202_DD_254.pdf | ||
| Draft_Request_For_Proposal_N00030-15-R-0202.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| A00002 |
| See Block 16C |
| PR 1168CTBD1 |
| N/A |
| 6. ISSUED BY |
| CODE |
| N00030 |
| 7. ADMINISTERED BY (If other than Item 6) |
CODE
Strategic Systems Programs ATTN: Cheryl Wetzel, SPN30 Strategic Systems Programs (SSP) 1250 10th Street SE, Suite 3600 Washington Navy Yard, DC 20374-5127
| 8. NAME AND ADDRESS OF CONTRACTOR |
| () |
| 9A. AMENDMENT OF SOLICITATION NO. |
N00030-15-R-0202
| To Be Determined |
| X |
| 9B. DATED (SEE ITEM 11) |
April 01, 2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|X| The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is |_| extended, |X| is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing Items 8 and 15, and returning copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| () | |
| A. | THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE NEXT PAGE
Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer)
OMB Approval 2700-0042
| NSN 7540-01-152-8070 | 30-105 | STANDARD FORM 30 (REV. 10-83) |
| PREVIOUS EDITION UNUSABLE | Computer Generated | Prescribed by GSA |
| FAR (48 CFR) 53.24 |
General Intent: The purpose of this amendment is to revise the solicitation and answer questions posed by a potential offeror. This amendment does not change the due date for receipt of proposals which remains 15 April 2015 at 3.00 pm local time. Offerors must acknowledge receipt of this amendment in block 14 of the SF26.
Amendment:
Section J, List of Attachments, EXHIBIT C, as set forth in the solicitation: At the end thereof ADD:
| Document |
| Description |
| No. of pages |
| date |
| EXHIBIT E |
| Questions and Answers |
| 1 |
| 01 April, 2015 |
Section L, Instructions, Conditions, and Notices to Offerors, Table L-5.2, Summary of Proposal Delivery Requirements: DELETE in its entirety and in lieu thereof INSERT:
Table L-5.2 Summary of Proposal Delivery Requirements
| PROPOSAL COMPONENT |
| Delivery Media/Description |
| Page Limits |
| VOLUME I EXECUTIVE SUMMARY |
| See Table L-5.1 |
| 10 pages |
| First Page, Title Page and Table of Contents for Volume I |
| IAW FAR 52.215-1, separately identified, but included in Volume I |
| None |
| Section I: Executive Summary |
| Separately identified, but included in Volume I |
| Included within 10 pages |
| Section II: Company Information |
| Separately identified, but included in Volume I |
| Included within 10 pages |
| Section III: Master Table of Contents |
| Separately identified, but included in Volume I |
| Included within 10 pages |
| Section IV: Terms and Conditions |
| Separately identified, but included in Volume I |
| Included within 10 pages |
| VOLUME II COST/PRICE |
| See Table L-5.1 |
| 40 |
| First Page, Title Page and Table of Contents for Volume II |
| IAW FAR 52.215-1, separately identified, but included in Volume II |
| None |
| Section I: Contract Amounts and Costs |
| Separately identified, but included in Volume II |
| Included within 40 pages |
| Section II: Subcontractor Costs |
| Separately identified, but included in Volume II |
| Included within 40 pages |
| Section III: Subcontracting Plan |
| Separately identified, but included in Volume II |
| Included within 40 pages |
| Section IV: Solicitation |
| Separately identified, but included in Volume II |
| Not included within the 40 pages |
| Section V: Other Information |
| Separately identified, but included in Volume II |
| Included within 40 pages |
| Section VI: Use of Existing Government Property |
| Separately identified, but included in Volume II |
| Included within 40 pages |
| VOLUME III TECHNICAL |
| See Table L-5.1 |
| 50 pages, but not including resumes, or pages listed under Section L-3.7 |
| First Page, Title Page and Table of Contents for Volume III |
| IAW FAR 52.215-1, separately identified, but included in volume III |
| None |
| Section I: Introduction |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
| Section II: Technical/Management Approach |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
| Section III: Personnel |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
| Section IV: Facilities & Equipment |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
| Section V: Past Performance |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
| Section VI: Small Business |
| Separately indentified, but included in Volume III |
| Included within 50 pages |
-------End of Page-------
| N00030-15-R-0202 | |
| Amendment A00001 | |
| Page 3 |
EXHIBIT E
QUESTIONS AND ANSWERS
1. Reference: Past Performance Information (PPI), Attachment L-1.
Question: Can the PPI Attachment L-1 pages be condensed as long as all required information is provided in the exact same order? (e.g., removal of the instructions on top of page 1 of the PPI, put phone numbers and e-mails on the same line, selecting only applicable contract types, extra spacing and additional lines.)
Answer: No, pages cannot be condensed. Table L-5.2 Summary of Proposal Delivery Requirements, Volume III Technical, Section IV: Solicitation has been amended to “50 pages, but not including resumes, or pages listed under Section L-3.7.” Additional 10 pages added to facilitate responses.
2. Reference: Solicitation.
Question: Can the Government provide any additional information to assist in the development of the proposal?
Answer: All documents necessary to provide a response to the solicitation are provided in the Request for Proposal.
-------End of Page-------