N0002423R2275

Section A - Solicitation/Contract Form

GENERAL CONTRACT INFORMATION

1) This is a Total Small Business Set-Aside under NAICS code 336612 with a size standard of 1,000 employees.

2) This is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) with a total ordering period of 84 months from date of contract award. The total ordering period will be separated into seven (7) individual Ordering Periods over the life of the contract.

Ordering Periods are as follows:

Ordering Period 1: date of contract award to 365 days after contract award Ordering Period 2: 366 days after contract award to 730 days after contract award Ordering Period 3: 731 days after contract award to 1,095 days after contract award Ordering Period 4: 1,096 days after contract award to 1,460 days after contract award Ordering Period 5: 1,461 days after contract award to 1,825 days after contract award Ordering Period 6: 1,826 days after contract award to 2,190 days after contract award Ordering Period 7: 2,191 days after contract award to 2,555 days after contract award

3) The guaranteed minimum order quantity is one (1) 40 foot Patrol Boat for each successful offeror in the first Ordering Period. The first Delivery Order (DO) will be placed concurrently with the basic contract award. The Government is not obligated to order any quantity beyond the guaranteed minimum order. The maximum quantity is seventy-three (73) 40 foot Patrol Boats over the 7 individual ordering periods.

4) The Contract maximum $ ceiling value will be $290,000,000 based on the program’s maximum Independent Government Estimate (IGE) for all scope included on this contract. The actual executed contract value will be the sum of all competitive orders placed under this IDIQ.

5) This is a Firm Fixed Price (FFP) Contract. Delivery Orders (DOs) will be issued against the CLINs established on the base IDIQ contract. Pricing on individual Delivery Orders shall not exceed the stepladder CLIN ceilings established in the CLIN Price Sheet (Attachment J-12) based on the quantity of items ordered in a specific ordering period. Individual delivery orders will be competed throughout the 7-year life of this contract.

6) Quantities noted in Section B and Attachment J-12 of the resultant contract are for proposal purposes only and are used for evaluation purposes. All quantities to be ordered under this contract shall be determined at the delivery order level in accordance with FAR 52.216-18 ORDERING.

7) The Government will use Attachment J-12 pricing to populate the potential max quantity and max amount in Section B of the awarded contracts.

Section B - Supplies or Services and Prices

SECTION B NOTES

SECTION B NOTES

Note A: The stepladder unit prices, by Ordering Period, for CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0009, 0010, 0012, 0013, and 0015 provided in Attachment J-12 CLIN Pricing Sheet shall represent the maximum stepladder unit prices and shall not be exceeded during execution of any future delivery orders placed under this contract.

Note B: Provisional amounts are subject to adjustment under the clause of this contract entitled “PROVISIONED ITEMS ORDERS – ALTERNATE II” for supplies or other requirements ordered pursuant to said clause. The amounts shown are for planning purposes only. Amount in actual orders, if any orders are issued, will be individually negotiated and priced. All orders hereunder are to be firm-fixed price.

Note C: Approximately 500 man-hours of engineering and 1,000 man-hours of production support labor and $100,000 material are estimated for each Ordering Period for CLIN 0017 Engineering and Industrial Services and CLIN 0018 Engineering Changes. These are estimates and do not indicate that the Government will necessarily order this amount or any at all. The actual amount of labor hours and material dollars will be determined in accordance with the CLIN 0017 and CLIN 0018 descriptions in Section C. The table below will be populated with information as entered into Attachment J-12.

CLIN 0017 Engineering and Industrial Services & CLIN 0018 Engineering Changes
Fully Loaded Engineering Rate

(per Hour)

Fully Loaded Production Rate (per Hour)
Fully Loaded Material Handling Rate
Ordering Period 1
TBD
TBD
TBD
Ordering Period 2
TBD
TBD
TBD
Ordering Period 3
TBD
TBD
TBD
Ordering Period 4
TBD
TBD
TBD
Ordering Period 5
TBD
TBD
TBD
Ordering Period 6
TBD
TBD
TBD
Ordering Period 7
TBD
TBD
TBD

Note D: Performance of CLINs 0008, 0011 and 0014 may be required at multiple locations. In the event the Government determines performance under CLINs 0008, 0011 or 0014 is necessary, the effort will be negotiated in accordance with FAR 52.243-1 Changes-Fixed-Price. CLINs 0008, 0011 and 0014 are excluded from evaluation under the Solicitation.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0001

73
Each

40PB Flight 2 Boat

FFP

The contractor shall construct the 40’ Patrol Boat Flight 2 (40PB Flt 2) Boat in accordance with Section C and the 40PB Flt 2 Specification, Attachment J-1. See Note A.

FOB: Destination

PURCHASE REQUEST NUMBER: N0002423NR55028

PSC CD: 1940

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0002

73
Each

Removable Well Deck Kickstand

The contractor shall deliver the removable portion of the Well Deck Kickstand with the boat(s) in accordance with Section C and Attachment J-1. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0003

73
Each

40 PB Shipping - Williamsburg, VA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0004

73
Each

Shipping: Long Term Machinery Presv.

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0005

73
Each

Pre-Delivery Inspection and Trial (PDIT)

In accordance with Section C and in accordance with Attachment J-1. See Note A.

FOB: Origin (Shipping Point)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0006

13
Each

OEM Craft Familiarization – Norfolk, VA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0007

13
Each

OEM Craft Familiarization – San Diego,CA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0008

7
Each

OEM Craft Familiarization – INTL.

In accordance with Section C. See Note D.

Not Separately Priced.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0009

13
Each

OEM Mn Prop Dies Eng Trng - Norfolk, VA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0010

13
Each

OEM Mn Prop Dies Eng Trng - San Diego,CA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0011

7
Each

OEM Mn Prop Dies Eng Trng - INTL.

In accordance with Section C. See Note D.

Not Separately Priced.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0012

13
Each

OEM Waterjet Systems Trng – Norfolk, VA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0013

13
Each

OEM Waterjet Systems Trng – San Diego,CA

In accordance with Section C. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0014

7
Each

OEM Waterjet Systems Trng - INTL.

In accordance with Section C. See Note D.

Not Separately Priced.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0015

1
Each

40PB Flt 2 Non Recurring Design INTEG

Functional and Transitional Design Data in accordance with Section C and Attachment J-1. See Note A.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0016

1
Lot

Provisioned Item Order

Vessel, Spare Parts, Materials and Support Equipment. In accordance with Section C. See Note B.

Not Separately Priced.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0017

1
Lot

Engineering and Industrial Services

In accordance with Section C. See Note C.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

CLIN Number 0018

1
Lot

Engineering Changes

In accordance with Section C. See Note C.

FOB: Destination

MAX

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

Section C - Descriptions and Specifications

SECTION C

STATEMENT OF WORK

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PART 1 – GENERAL STATEMENT OF WORK

PART 2 – CONTRACT LINE-ITEM NUMBER (CLIN) DESCRIPTIONS

PART 3 – STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION

PART 1 - GENERAL STATEMENT OF WORK

This Statement of Work (SOW) defines the effort required for the design, construction, testing, configuration and program management for the acquisition of up to seventy-three (73) 40 foot Patrol Boats (40PBs), including the effort required to apply appropriate program management, deliverable tracking, logistics, training, installation, testing, and technical documentation.

Only the Procuring Contracting Officer (PCO) and Administrative Contracting Officer (ACO) have the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to perform different or additional work. The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by the PCO or the ACO.

The award of the contract does not indicate that the Government has approved or certified the design provided with the proposal. The Contractor shall remain fully responsible for delivering the craft, which fully meets the requirements of this Contract.

This contract provides a package of non-deviational Government design drawings and informational data located in Attachment J-4 GFI List, Item #15. The informational package is primarily unmodified data from the initial contract. Note that some of these artifacts may be very similar to artifacts required in the accomplishment of work on this contract. The informational data is provided to assist the contractor in completing the design and data requirements of this contract, but it is not warranted for accuracy or relevance. In addition, compliance with the informational package is NOT required.

Award of this contract does not guarantee all of these efforts shall be conducted. The Contractor shall only conduct efforts upon award of a specific delivery order invoking the CLIN’s in Section B in accordance with the detailed description in Parts 2 and 3 of the SOW, the contract and associated attachments. All future orders will be placed in accordance with FEDERAL ACQUISITION REGULATION (FAR) 16.504 INDEFINITE-QUANTITY CONTRACTS and 16.505 ORDERING. The following high-level description provides an overview of the detailed requirements in the subsequent sections of the SOW and the remainder of the contract.

Quantities The total quantity planned for the 7-year Indefinite Delivery; Indefinite Quantity (IDIQ) contract is for up to seventy-three (73) 40PB’s with fifty-three (53) crafts for NECC, ten (10) for other Navy customers and ten (10) for U.S. Navy Foreign Military Sales, pending funding authorization. In accordance with FAR Clause 52.216-19, the minimum guarantee is one (1) 40 foot Patrol Boat for each successful offeror in the first Ordering Period.

Design, Management and Production The Contractor shall be responsible for managing all activities (Program management, design, engineering, logistics, reporting, scheduling, production, quality control, training, testing, and warranty support) required to successfully execute, track and report on the execution under this contract. After award the Government shall conduct a series of Design Reviews, Production Readiness Review(s) and Initial Hull Verification with the Contractor that shall occur prior to the start of production per Section C-3.042-3 of the SOW.

Data The Program shall pay for design integration development required to support the Preliminary Design Review (PDR) and Critical Design Reviews (CDR) and a Design Data package in the initial phase of the contract. The Technical Data Package (TDP) as defined in this SOW shall be delivered with each boat sufficient to support operation, training, maintenance, repair and upgrade through the service life of the boat.

Government Furnished Equipment The Navy is working with other Government agencies to procure various components of the Government tactical electronics package which shall be provided as Government Furnished Equipment (GFE) to the Contractor for integration into each boat during its production phase. The Contractor shall be responsible for receipt and safe storage of Government Furnished Equipment (GFE), and then installation, testing and proper operation onboard the boat.

Data Rights In order to support awards of additional boats of the same configuration, the Government requires Government Purpose Rights to all drawings, designs, specifications, production engineering data and work packages per DFARS clause 252.227-7013 (Rights in Technical Data – Non-Commercial Items) that would permit a qualified contractor to repair and maintain the boat.

Preservation, Delivery and Spares All Boats shall be delivered to an east coast stock point. Due to anticipated staggered delivery from the Contractor, when ordered, some boats may be preserved for long term storage (up to twelve (12) months) prior to being put in service.

Training If ordered, the Contractor shall develop and provide crew familiarization to the training elements of various units within the command structure. Approximately two (2) Boat familiarization classes are planned per year with three (3) in FY23 in conjunction with Initial Production boat delivery and the second and third in coordination with the fielding of the full rate production boats. Additionally, the Contractor shall provide OEM engine and waterjet training classes at the Government designated Norfolk, VA and/or San Diego, CA and/or International locations. Approximately two (2) sets OEM (engine/jet) training classes, three (3) sets on each coast, are planned during the Period of Performance. Exact numbers shall be specified on the individual delivery orders.

Miscellaneous Technical and Production Support A PIO CLIN has been included in order to facilitate ordering support or materials not originally envisioned at the time of award but that becomes evident over the conduct of the contract. If a part breaks during Government testing that is not covered under warranty, the Government may order, via the PIO CLIN, a replacement part and installation services at the Governments test location as a corrective action.

PART 2 – BASE YEAR CONTRACT LINE-ITEM NUMBER (CLIN) DESCRIPTIONS

CLIN
Description
0001
40PB Flight 2 Boat
0002
Removable Well Deck Kickstand
0003
40PB Shipping – Williamsburg, VA
0004
Shipping - Long Term Machinery Preservation
0005
Pre-Delivery Inspection and Trial (PDIT)
0006
OEM Boat Familiarization Training – Norfolk, VA
0007
OEM Boat Familiarization Training - San Diego, CA
0008
OEM Boat Familiarization Training - International
0009
OEM Main Propulsion Diesel Engine Training - Norfolk, VA
0010
OEM Main Propulsion Diesel Engine Training - San Diego, CA
0011
OEM Main Propulsion Diesel Engine Training - International
0012
OEM Waterjet Systems Training - Norfolk, VA
0013
OEM Waterjet Systems Training - San Diego, CA
0014
OEM Waterjet Systems Training - International
0015
40PB Flight 2 Non-Recurring Design Integration
0016
Vessel Spare Parts, Materials and Support Equipment Provisioned Item Order
0017
Engineering & Industrial Services
0018
Engineering Changes

CLIN 0001 40PB FLIGHT 2 BOAT

The Contractor shall construct the boat in accordance with the requirements of the Specification Description, Attachment J-1, and of the Contract Section C. Government Furnished Information outlined in Attachment J-4 is provided to support the Specification Attachment J-1. Incorporated under CLIN 0001, and subsequent option Boat CLINS, are CLINS that may be ordered under the executed individual delivery orders. Not all CLINS may be ordered for all boats under the boat CLIN. A complete and final approved copy of the Technical Data Package(s) shall be delivered with each boat and shall be prepared in accordance with this Contract, the 40PB Statement of Work (Section C C-3.085), Specification, (Attachment J-1), and the Data Requirements List (DRL), (Attachment J-2). Cost associated with the required Technical Data Package shall be incorporated into price of CLIN 0001. All costs associated with design integration and start of production (e.g. jig development, tooling) should be priced in CLIN 0001.

CLIN 0002 REMOVABLE WELL DECK KICKSTAND

The Contractor shall deliver the removable portion of the Well Deck Kickstand with the boat(s) when ordered.

CLIN 0003 40PB SHIPPING – WILLIAMSBURG, VA

The Contractor shall deliver boat(s) to the US East Coast location, on a cradle, as specified in Section F.

CLIN 0004 40PB SHIPPING - LONG TERM MACHINERY PRESERVATION – CHEATHAM ANNEX (CAX) Where specified in the delivery order, Contractor shall accomplish long term machinery preservation IAW OEM instructions and the requirements of the Contract.

CLIN 0005 - PREDELIVERY INSPECTION AND TRIAL (PDIT)

The Contractor shall conduct PDIT IAW Section C-3.094-2.

CLIN 0006 - OEM BOAT FAMILIARIZATION – NORFOLK, VA

The Contractor shall provide basic familiarization on boat operation, components, maintenance, and basic repairs as described in Section C SOW.

CLIN 0007 - OEM BOAT FAMILIARIZATION – SAN DIEGO, CA

The Contractor shall provide basic familiarization on boat operation, components, maintenance, and basic repairs as described in Section C SOW.

CLIN 0008 - OEM BOAT FAMILIARIZATION – INTERNATIONAL

The Contractor shall provide basic familiarization on boat operation, components, maintenance, and basic repairs as described in Section C SOW

CLIN 0009 - OEM MAIN PROPULSION DIESEL ENGINE TRAINING - NORFOLK, VA

The Contractor shall provide OEM engine training at a Government facility as described in Section C SOW.

CLIN 0010 – OEM MAIN PROPULSION DIESEL ENGINE TRAINING - SAN DIEGO, CA

The Contractor shall provide OEM engine training at a Government facility as described in Section C SOW.

CLIN 0011 – OEM MAIN PROPULSION DIESEL ENGINE TRAINING - INTERNATIONAL

The Contractor shall provide OEM engine training at a Government facility as described in Section C SOW.

CLIN 0012 - OEM WATERJET SYSTEMS TRAINING - NORFOLK, VA

The Contractor shall provide OEM waterjet training at a Government facility as described in Section C SOW.

CLIN 0013 - OEM WATERJET SYSTEMS TRAINING – SAN DIEGO, CA

The Contractor shall provide OEM waterjet training at a Government facility as described in Section C SOW.

CLIN 0014 - OEM WATERJET SYSTEMS TRAINING - INTERNATIONAL

The Contractor shall provide OEM waterjet training at a Government facility as described in Section C SOW.

CLIN 0015 – 40PB FLIGHT 2 NON-RECURRING DESIGN INTEGRATION

The Functional Design referenced in the Attachment J-1 40PB Flt 2 Specification, here referenced throughout, is an intermediate level of design that is sufficiently developed to allow significant design characteristics such as powering, stability, structure, range, and payload to be quantified with a moderate level of analytical rigor. This level of design shall be sufficient to identify conflicting requirements and trade-offs necessary to achieve a converged design. This shall include preliminary identification of commercially available major components such as main propulsion engines, marine gear, and propulsor. This level of design shall provide confirmation that all design requirements can be met.

The Transitional Design, and here referenced throughout, is defined as the most advanced stage of design where the details necessary for production are added to the contract-level design. All components and materials are identified with sufficient detail to support production planning activities such as ordering parts and materials and developing work packages for the production shop. The technical data package generated during this phase is commensurate with a Production Level TDP as defined in MIL-STD-31000A.

In accordance with the requirements outlined in this contract and associated attachments, the Contractor shall furnish all resources necessary to perform the Preliminary and Critical Contract Design Reviews, the Production Readiness Reviews and the Technical Data Package development for the 40PB at the Contractor’s facilities.

The Contractor shall provide the management effort necessary to ensure the on-schedule completion of the Preliminary and Critical Design. The Contractor shall identify and take steps to correct all problems and potential problems arising during contract performance. The completion of the Preliminary and Critical Design Reviews and Production Readiness Reviews shall be in accordance with the contractor’s submitted IMS.

The Functional and Transitional Design Data shall be prepared by the Contractor and shall be submitted to the Government in accordance with the 40PB Statement of Work (Section C- Part 3), Specification (Attachment J-1), and the Data Requirements List (DRL) (Attachment J-2).

The Contractor shall be responsible for all production costs to include creation of production data, and establishing required production lines.

The 40PB Flight 2 Non-Recurring Design Integration will only be included in the first Delivery Order issued to the Contractor.

CLIN 0016 – VESSEL SPARE PARTS, MATERIALS AND SUPPORT EQUIPMENT PROVISIONED ITEM ORDER (PIO) The Contractor shall provide spare and repair parts, special tools, and test equipment in accordance with the requirements herein and the clause C-217-H003 “PROVISIONED ITEM ORDER – ALTERNATE II” requirement in this contract.

CLIN 0017 – ENGINEERING & INDUSTRIAL SERVICES

The Contractor shall provide Engineering & Industrial Services in support of the 40PB. If procured, the Contractor shall provide engineering services (ES), conduct engineering studies, provide engineering analysis and trade-off studies, and/or support efforts to identify engineering changes as directed by the Government and without causing delay or disruption to the work performed under this Contract, or any other Government contract, or any other work in process for the Government. The Contractor shall provide approximately 1,500 man-hours of engineering and production support labor and $100,000 of material total to perform Engineering & Industrial Services in support of the 40PB(s). The specific tasks shall be defined in each delivery order and will be priced in accordance with the rates established in Section B Note C and Attachment J-12.

(a) As used herein, the term “Engineering & Industrial Services” means work under this Contract, ordered by the Contracting Officer. Engineering & Industrial Services do not include performance of work for the correction of Contractor responsible defects.

(b) If issued, orders will be on a firm fixed price (FFP) basis.

1. Priced Orders. For each proposed order, the Contractor agrees that it will submit such cost and pricing data as the Contracting Officer may require. Proposed labor and material costs shall use the rates set forth in Section B Note C of this contract. Travel time necessary for performance of such services shall be included in computing the labor hours of service. Proposed travel costs, if any, shall comply with FAR 31.205-46. Promptly after receipt of proposal, the Contractor and the Contracting Officer shall negotiate the price and schedule for the proposed order. Upon execution and receipt of the priced order, the Contractor shall promptly commence the work specified in the order.

2. Undefinitized Order. Whenever the Contracting Officer determines that urgent demands or requirement prevent the issuance of a priced order, he/she may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount, and a schedule for definitization. The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (3) below. The clause entitled “Contract Definitization” (DFARS 252.217-7027) shall be included in any undefinitized order.

3. Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines that it cannot feasibly perform the order, or if the Contractor does not concur with the maximum ceiling amount. However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen days of issuance of the order, the Contractor notifies the Contracting Officer in writing of its rejection of the order.

CLIN 0018 – ENGINEERING CHANGES

This CLIN is reserved for any Engineering Changes or Requests for Variance that are required following issuance of a given delivery order.

The Contractor shall provide Engineering Changes or Requests for Variance in support of the 40PB. If procured, the Contractor shall provide engineering changes or requests for variance as directed by the Government and without causing delay or disruption to the work performed under this Contract, or any other Government contract, or any other work in process for the Government. The Contractor shall provide approximately 1,500 man-hours of engineering and production support labor and $100,000 of material total to perform Engineering Changes or Requests for Variance in support of the 40PB(s). The specific tasks shall be defined in each delivery order and will be priced in accordance with the rates established in Section B Note C and Attachment J-12.

(a) As used herein, the term “Engineering Changes” means work under this Contract, ordered by the Contracting Officer. Engineering Changes and Requests for Variance do not include performance of work for the correction of Contractor responsible defects.

(b) If issued, orders will be on a firm fixed price (FFP) basis.

1. Priced Orders. For each proposed order, the Contractor agrees that it will submit such cost and pricing data as the Contracting Officer may require. Proposed labor and material costs shall use the rates set forth in Section B Note C of this contract. Travel time necessary for performance of such services shall be included in computing the labor hours of service. Proposed travel costs, if any, shall comply with FAR 31.205-46. Promptly after receipt of proposal, the Contractor and the Contracting Officer shall negotiate the price and schedule for the proposed order. Upon execution and receipt of the priced order, the Contractor shall promptly commence the work specified in the order.

2. Undefinitized Order. Whenever the Contracting Officer determines that urgent demands or requirement prevent the issuance of a priced order, he/she may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount, and a schedule for definitization. The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (3) below. The clause entitled “Contract Definitization” (DFARS 252.217-7027) shall be included in any undefinitized order.

3. Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines that it cannot feasibly perform the order, or if the Contractor does not concur with the maximum ceiling amount. However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen days of issuance of the order, the Contractor notifies the Contracting Officer in writing of its rejection of the order.

PART 3 –STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION

C-3.040 GENERAL ADMINISTRATIVE REQUIREMENTS

This Statement of Work describes the work to design and produce the 40’ Patrol Boat Flight 2 (40PB Flt 2) described in Attachment J-1. It includes management and program support requirement to achieve a successful program, provide the requisite data to support the program identified in Attachment J-2, and store and integrate the Government Furnished Equipment in Attachment J-3 with the support of Government Furnished Information in Attachment J-4. Most of the data in Attachments J-2, J-3 & J-4 are considered Controlled Unclassified Information (CUI) and therefore, the Contractor shall exchange data with the Government via a Government provided Integrated Digital Environment (IDE) utilizing appropriate Public Key Infrastructure/Information Assurance protocols described in Attachment J-10.

The Contractor is responsible for carefully and critically reviewing the Contract Drawings and this Specification prior to commencing the engineering design effort. If the Contractor finds any error, omission, discrepancy, or lack of clarity, the Contractor shall notify the Government’s Contracting Officer, in writing, not less than 15 days before commencing any work affected thereby, and request approval from the Government of the Contractor’s resolution of the problem.

C-3.042-1 REFERENCED DOCUMENTS

(a) American Boat and Yacht Council H-24.18.5

(b) American Society of Mechanical Engineers Y14.100, Engineering Drawing Packages, 2013

(c) American Standard Test Method F1321-14, Standard Guide for Conducting a Stability Test, 2014

(d) DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide (October 2005)

(e) Defense Federal Acquisition Regulation Supplement

(f) NSWCCD-23-TM-2009/61 Rev A, U.S. Navy Boat Example Data Package, November 2011

(g) NSWCCD-80-TR-2014/038, Weight Management Process Guidance for Boats and Craft, December 2014

(h) Performance by Design: Hydrodynamics for High-Speed Vessels (Blount)

(i) The Prediction of Porpoising Inception For Modern Planing Craft (Celano)

(j) NSWCCD-83-TM-2020/10, “Essential Cybersecurity Components (ECSC) Data Collection and Documentation”

C-3.042-2 TECHNICAL ORDER OF PRECEDENCE

In case of inconsistency between the requirements of the Contract, this Statement of Work, and the documents referenced in this Specification, the following order of precedence applies:

1. Contract requirements,

2. Specification requirements,

3. Contract Drawings,

4. Other Government specifications and standards, industry standards, and similar referenced documents.

The following are not considered inconsistencies subject to an order of precedence determination:

1. Silence of one document with respect to details shown in another.

2. Broad boat requirements compared to detailed system or component requirements.

C-3.042-3 CONFERENCES AND REVIEWS

The Contractor shall conduct a Post Award Conference (PAC), Preliminary Design Review (PDR), Critical Design Review (CDR), Production Readiness Review (PRR) and Progress Reviews. The Contractor shall prepare Agendas and Minutes (DI-001) for all conferences, meetings and reviews. The Contractor shall provide web-based video and teleconference log-in enabled access for all conferences, reviews and meetings.

Post Award Conference:

The Contractor shall conduct a Post Award Conference (PAC) within thirty (30) days of contract award. The Contractor shall hold the Conference at the Contractor’s facility. The Contractor shall prepare Post Award Conference Agendas and Minutes (DI-001-01). The purpose of the conference is to:

1. Review the contract and technical documents.

2. Review the technical and schedule requirements including the integrated master schedule and requirements of design reviews.

3. Discuss the roles and working relationships between the Contractor and the Government.

4. Proposed list of deviation and departures from contract drawings.

Design Reviews (DR):

The Contractor shall conduct Design Reviews (DRs) no later than delineated in the submitted and approved IMS. Design reviews are intended to evaluate design maturity and risk level. Scheduling of design reviews shall be contingent on successful completion of data elements identified for each review. Sufficient interim progress reviews shall be scheduled prior to the design reviews to ensure the Contractor is able to achieve the defined entrance and exit criteria for each review. It is the responsibility of the Contractor to review all contract drawing products and complete the design. The Contractor shall be responsible for identifying any discrepancies or interferences with the provided government data. The contractor shall be solely responsible for the development and accuracy of production data and products. The Contractor shall hold DRs at the Contractor’s facility. The Contractor’s ballistics integration agent and design agent (if used) shall attend both design reviews. The OEMs for the Propulsion Engine and Waterjet shall attend the Critical Design Review and are optional for the Preliminary Design Review. Additional Design Reviews may be scheduled at the Contractor’s request or may be required as exit criteria from the PDR/CDR to close out open action items/issues. The Contractor shall prepare Design Review Agendas and Minutes (DI-001-02, DI-001-03).

Government Specification Review:

The Contactor shall conduct a review of Attachment J-1, 40PB Flt 2 Specification, and Attachment J-2, Data Requirements List. The review shall focus on the technical requirements applicable to proven commercial boat building practices and the required mission system interfaces. The Contractor shall identify potentially constraining requirements, offer alternative requirements and equipment that may result in similar boat performance, consider different technical solutions or equipment to address past warranty claims, and identify any alternative commercial standards. Status and results of this review shall be an agenda topic at all Design Reviews.

Preliminary Design Review (PDR):

The Contractor shall present the plan for completing the functional design products and producing transitional and production data. The Contractor shall present the flow of data starting with the government provided Technical Data Package all the way to the production floor. Intermediate products such as 3-D models, cut files, shop drawings, rigging, fabrication and installation procedures, and the software used to create these products shall be identified. The Contractor shall describe their quality control processes they shall have in place to identify and mitigate/correct errors and risks in the package. The Contractor shall present a preliminary draft of all functional DRLs, arrangements, open design issues, and their plan for completion. Contractor shall create a risk assessment including all PDR agenda items. Risk shall be assessed against adherence to the Integrated Master Schedule and compliance with Attachment J-1, 40PB Flt 2 Specification.

As a minimum, the following topics shall be reviewed during Preliminary Design Review:

a) Update of the Integrated Master Schedule (DI-002).

b) Status Review of Technical Design Analyses (DI-012), Drawings (DI-013), Weigh Control Program Plan. (DI-030) and Weight Estimates: CBWE only (DI-031) Deliverables.

c) 3-D Product Model (DI-022).

d) Ballistic Protection System Design Approach including Materials, Attachment Method and Gap Coverage IAW with Attachment J-1 Specification Section 164.

e) Cabin / Workstation Layout and Draft Ergonomic Study (DI-012-12).

f) Design and Build Plan.

g) Draft Master Technical Data Index.

h) Government-Furnished Information/Government Furnished Equipment (GFI/GFE) Design Integration including planning review of the Inventory Management Procedures and Inventory Listings (DI-005).

i) Review of updated Bill of Materials (BOM) (DI-015), identifying any changes.

j) Logistics approach including ILSMP and CMP.

k) Long Lead Time Items as identified in the Master Equipment List (DRL-014).

l) Deviations and departures from spec and contract drawings.

m) Identification of technical risks and mitigations.

n) Review of CDR deliverables list.

The following represent the minimal exit criteria and shall serve as the basis for PDR Agenda, and form the basis for the Government’s determination for successfully meeting the design review requirements:

a) Integrated Master Schedule IAW Section C-3.042-4, submit with Government comments incorporated.

b) Draft Technical Design Analyses (DI-012) analyses or government concurrence to use GFI analysis.

c) A low risk assessment of draft DI-031 CBWE.

d) Government concurrence of Ballistics Protection System Approach.

e) Proposed list of deviation and departures from contract drawings.

f) Defined Logistics Approach (ILSMP (DI-006) and CMP (DI-007)).

g) Long lead time Item identification.

h) Identified technical risks with Government concurrence of mitigation plans defined.

Critical Design Review (CDR):

The Critical design review shall be focused on verifying the completion of all functional design products, defining a list of all transitional design products and their status. As a minimum, the following topics shall be reviewed during the Critical Design Review:

a) Status of progress and issues since the Preliminary Design Review.

b) Update of the Integrated Master Schedule.

c) Status Review of Technical Design Analyses (DI-012), Drawings (DI-013), Weigh Control Program Plan. (DI-030) and Weight Estimates: CBWE only (DI-031) Deliverables.

d) Review of the 3-D Product Model structure and major system components (DI-022).

e) Ballistic Protection System Status.

f) Draft Test Plans (DI-025).

g) Contractor proposed list of Transitional design products.

h) Quality Management Plan Review (DI-039).

i) Logistics data requirements and logistics schedules for the Final BOM (DI-015), ILSMP (DI-006) and CMP (DI-007).

j) Review Planning efforts for Crew Familiarization Plan (DI-023) in support of CLINs 003,004,005.

k) Engineering Change Proposal status.

l) Approved all Requests for Deviation/Waiver.

m) Review of discussion topics for the PRR.

n) Update to identified technical risks and mitigations.

Exit Criteria

a) Low Risk IMS

b) Approval of Technical Design Analyses (DI-012), Drawings (DI-013), Weigh Control Program Plan (DI-030) and Weight Estimates: CBWE only (DI-031) Deliverables.

c) Concurrence with Ballistic Protection System Design Approach.

d) All RFV/RFWs Approved.

e) All submitted ECP’s Approved.

f) All Structure and major system components displayed in 3-D product model.

g) Government and Contractor concurrence of list of transitional design products.

h) Government concurrence of all technical risk mitigated to low.

Production Readiness Review:

A Production Readiness Review (PRR) for the Initial Production phase shall be held upon the completion of the design but no earlier than four (4) weeks after CDR. The PRR shall demonstrate that:

a) The design is materially complete and sufficiently mature to start construction.

b) The flow of Production Information shall support production with no work stoppages due to lack of engineering information to the production team.

c) The status of material ordering and delivery shall support the proposed build schedule.

d) Sufficient resources are available to support the production plan.

e) All required materials are in place to support production.

f) The production plan supports the PRR submitted IMS.

Any potential risk areas shall be identified and mitigation plans in place. The Government should be satisfied that all requirements specified in the Attachment J-1, System Specification, have been incorporated into the design. Within fourteen (14) days from the PRR completion, the Government shall notify the Contractor whether or not the Start of Construction of boat 1 is authorized.

For the PRR, the Contractor shall prepare a Production Readiness Review (PRR) Agendas and Minutes (DI-001-04). The following represent the exit criteria and shall serve as the basis for PRR Agendas, and form the basis for the Government’s determination for “Start of Construction” authorization:

1. Status Contract Requirements - The following data items shall be submitted in accordance with the contract and shall be evaluated by the Government at the PRR:

a) DI–002: Integrated Master Schedule.

b) DI–008: Engineering Change Proposals (ECPs).

c) DI–009: Non-Engineering Change Proposals (NECPs).

2. Functional Design Completion: DI- 012, 013, 030, 031 comprise the functional design and shall be one hundred (100) percent complete. These products and documents that comprise the functional design shall have a documented resolution to all comments related to contract compliance concerns. The contractor must have reviewed the government provided Technical Data Package and attachments for any omissions or errors. Any identified discrepancies shall be fully resolved.

3. Transitional Design Maturity: The Contractor shall demonstrate that the transitional design is one hundred (100) percent complete. The transitional design is represented by the 3D Product Model (DI-022), the agreed upon list of transitional design products and the the Accepted Weight Estimate (DI-031).

4. Finalized Comprehensive Test Plans (DI-025).

5. Identification of Quality Control Scale Weighings.

6. Requests for Deviation or Waiver (RFD/RFW)(DI-010): There shall be no open RFDs or RFWs at PRR.

7. Contract Problem Identification Reports (DI-036) shall have a documented resolution at PRR.

8. Materials and Purchased Parts: Status of Material, Parts and Inventory, including but not limited to Inventory Management and long lead items status.

9. Bill of Materials (BOM)(DI-015) shall be complete.

10. GFM Status: status of GFE/GFI receipt.

11. Construction Facilities: The Contractor shall provide evidence of facilities readiness.

12. Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production. This includes presentation of required manning per hull to support IMS milestones.

13. Production Information (PI): The Contractor shall demonstrate that sufficient PIs, or production work packages, support Start of Construction, and that engineering will stay in front of production during the entire construction phase. The Contractor’s plan should address capacity of the engineering team to produce PIs, revise/update issued PI to support ongoing construction and develop the TDP items required in conjunction with boat trials. (For example, four (4) weeks of PI shall be available at start of production, 50% of engineering working 40PB can produce 2 weeks of PI per week, 25% of assigned engineering is supporting revisions/updates and 25% is assigned to TDP development). The PI shall be verified by the Government.

14. Approved Quality Management Program (DI-039).

15. Sub-Contractor Support: status / availability of major subcontractors.

16. Risk Assessment: an updated assessment of Program and Production risk and the risk management approach to eliminate or mitigate those risks.

Initial Hull Verification:

Prior to entering outfitting/rigging production shall be paused on the first boat of the first delivery order issued to the Contractor which includes procurement of boats. The Contractor shall complete hull verification of critical dimensions (i.e. hull scan) and periodic weight report (DI-031) including all quality control weighings prior to outfitting/rigging phase on the first boat. Government shall verify hull compliance with AWE (DI-031) and Contractual hull lines. Within fourteen (14) days of submittal of hull scan and weight report the Government shall authorize the contractor to continue production of boat 1 and start production of remaining hulls.

Progress Reviews:

Progress Reviews shall be held at the Contractor’s facility on a quarterly basis. The Progress Review may be done in person or via teleconference. At the agreement of the Government and the Contractor. Specific Progress Reviews may be waived, per quarter, at the agreement of the Contractor and the Government. Progress Reviews shall be scheduled at the agreement of the Contractor and the Government to minimize disruptions to production schedule. Intent is to evaluate the contract’s progression and discuss any issues pertaining to this order. The Contractor shall prepare Agendas and Minutes (DI-001).

C-3.042-4 SCHEDULE

(a) The Contractor shall prepare an event-based Integrated Master Schedule (DI-002) that depicts all activities required for the performance of this Contract using the DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide as guidance. The overall program shall be captured in a schedule, which shall be maintained as an accurate depiction of program execution and status of percentage complete for events. The Contractor shall develop and adhere to this schedule commensurate with their program approach. The proposed IMS for construction of the 40PB shall include the Key Events shown on Table C-3 below, activities/milestones associated with design and construction; long lead material ordering and in-yard need dates; GFE need dates; engineering activities; progress reviews, testing, certification, and logistics. The Contractor shall identify the process for modifying the proposed IMS in response to approved changes to the technical basline. The Contractor shall identify internal design and production key events leading up to the Contract Milestones in the schedules and shall identify critical paths for completion of each Contract Milestone and key event. The schedules shall be kept current with schedule modifications and completed tasks.

(b) The Contractor shall baseline and update the schedule monthly at a minimum or when a new Delivery Order is issued or a change to the contract schedule that impacts delivery dates. The update shall include percentage complete relative to the original baseline or at the request of the Government to change key program milestones (i.e., start of production, Trials, delivery). The Contractor shall provide status towards major project milestones and any pertinent risks associated to achieve those milestones in a quarterly report. Changes to the IMS shall not constitute a waiver by the Government of any contract delivery schedule.

(c) The IMS shall show task interdependencies by identifying the task sequencing relationships and the duration of all tasks; indicate the critical path for the most likely duration of the proposed IMS. The Contractor shall provide the ground rules and assumptions used in estimating task durations; and explain the tasks that involve critical risk, critical technologies and any unusual aspects of the proposed…