Text version

J-12a

TEP Weighting10%68%23%75%25%75%25%75%25%75%25%75%25%75%25%
OP1OP2OP3OP4OP5OP6OP7
Est. Section BStep 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 3 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Step 1 Quantity (Price Each)Step 2 Quantity (Price Each)Section B/TEP TotalOP1 Weighted AvgOP2 Weighted AvgOP3 Weighted AvgOP4 Weighted AvgOP5 Weighted AvgOP6 Weighted AvgOP7 Weighted Avg
CLINExtended DescriptionEstimated Max Qty.12-67-122-67-122-67-122-67-122-67-122-67-122-67-12
0001PB40 Flight 2 Boat73$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0002PB40 Removable Well Deck Kickstand73$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0003PB40 Shipping - Williamsburg, VA73$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004PB40 Shipping- Long Term Preservation73$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
000540PB PDIT73$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0006OEM Boat Familiarization – East Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0007OEM Boat Familiarization – West Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0008OEM Boat Familiarization – International$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0009OEM Main Prop Diesel Eng Training - East Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0010OEM Main Prop Diesel Eng Training - West Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0011OEM Main Prop Diesel Eng Training - International$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0012OEM Waterjet Systems Training – East Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0013OEM Waterjet Systems Training – West Coast13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0014OEM Waterjet Systems Training – International$0.00$0.00$0.00$0.00$0.00$0.00$0.00
001540PB Flight 2 Non Recurring Design Integration1$0.00
0016Vessel Spare Parts, Materials and Support Equipment (PIO)Price will be negotated when requirements are defined.
0017Engineering and Industrial ServicesPrice is based on the burdened labor rate times hours and burdened material dollars from Attachment. J-12b.$ 700,000.00
0018Engineering ChangesPrice is based on the burdened labor rate times hours and burdened material dollars from Attachment. J-12b.$ 700,000.00
Total Evaluated Contract Price**$1,400,000.00
To Be Filled in by Contractor
Section B Max Pricing (Column S), for those CLINs with Step Ladder Pricing, is equal to the maximum quantity multiplied by the weighted average stepladder unit prices proposed. The weightings are contained in row 3 of this spreadsheet.

The TEP in S24 is for evaluation purposes only. The TEP is not indicitive of an Offerors maximum contract value. The Maximum Contract Ceiling is outlined in Section A, Note 4 of the contract.

&"-,Bold"&12&K000000N00024-23-NR-55028 Attachment J-12a PB40 Flight 2 Pricing Sheet

&"Times New Roman,Bold"**CLINs 0017 and 0018 must be included in the total price calculation in the "Total per CLIN" column. For CLINs 0017 and 0018, use totals in Attachment J-12b, Summary. Insert "NSP" for CLINs that are not separately priced.

J-12b

COLOR CODING KEY
To Be Filled in by Contractor
Auto-fill calculation
No Data Required
Note: Fully Loaded rates should include all overheads and profit
25%75%
TotalEngineeringProduction
Estimated Labor Hours1,5005001,000
CLINSFully Loaded Engineering Rate
(per hour)Fully Loaded Production Rate
(per hour)**Material Handling Rate

(percentage)

CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP1
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP2
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP3
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP4
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP5
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP6
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP7
*Material Handling Rate MUST be a percentage (i.e. 5%, 10%, 15%)

Estimated Material $ 100,000.00

TOTAL EVALUATED PRICE FOR CLINS 0017, 0018
Ordering
PeriodEngineeringProductionMaterials

(with MH Rate)

CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP1$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP2$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP3$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP4$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP5$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP6$ - 0$ - 0$ 100,000.00
CLIN 0017 Engineering & Industrial Services & CLIN 0018 Engineering Changes - OP7$ - 0$ - 0$ 100,000.00

&"-,Bold"&12N00024-23-NR-55028 Attachment J-12b CLIN Pricing Sheet