Attachment 5 - CEC Production_Sustainment CSDR Plan_redlines.xls
XLS spreadsheet 138 KB Posted
- Solicitation number
- N0002421R5208
About this file
This is a solicitation for the Cooperative Engagement Capability (CEC) System Production and Repair requirements. The Naval Sea Systems Command (NAVSEA) Program Executive Office Integrated Warfare Systems (PEO IWS) 6.0 is seeking proposals to manufacture, assemble, test, integrate, and repair USG-xB hardware suites and the Signal Data Processor (SDP) as well as produce spares, installation kits, and ancillary equipment. The solicitation also includes requirements for associated engineering services. Offerors must provide CEC systems for the United States Navy, Marine Corps, and foreign military sales customers. Questions are due within 21 calendar days of issuance, and the government will release responses to all offerors prior to the proposal due date. Additional details on requirements and the bidding process can be found in solicitation N0002421R5208 and associated documents provided in the Bidder's Library.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1 (METADATA)
| COST AND SOFTWARE DATA REPORTING PLAN | OMB No. 0704-0188 |
| The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. |
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1a. PROGRAM NAME | |
| CEC - Cooperative Engagement Capability | |
| 1b. PHASE/MILESTONE (check all that apply) | |
| Pre-A | |
| A | |
| B | |
| C-LRIP | |
| X | C-FRP |
| O&S | |
| 1c. PRIME MISSION PRODUCT | |
| AN/USG-xB Cooperative Engagement Capability | |
| 1d. ACQUISITION CATEGORY (ACAT) | |
| Pre-ACAT | |
| X | ACAT I (MDAP) |
| ACAT IA (MAIS) | |
| ACAT II | |
| ACAT III | |
| Other | |
| 2. COMMODITY TYPE | |
| Electronic System | |
| 3. PLAN ITERATION TYPE | |
| INITIAL | |
| X | REVISION |
| 4. CURRENT SUBMISSION DATE (YYYYMMDD) | |
| 20210910 | |
| 5. LAST APPROVED PLAN DATE (YYYYMMDD) | |
| 20210430 | |
| 6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.) | |
| Kapoor, Sanjeev | |
| 6b. ADDRESS (Include ZIP Code) | |
| 1333 Isaac Hull Ave, Washington Navy Yard |
Humphreys BLDG 197, 4E-3270 Washington, DC 20376
| 6c. TELEPHONE NUMBER (Include Area Code) | ||
| 202-781-0759 | ||
| 6d. E-MAIL ADDRESS | ||
| sanjeev.kapoor@navy.mil | ||
| 7. PLAN TYPE | ||
| GOVERNMENT | ||
| X | CONTRACT (PRIME) | |
| CONTRACT (SUB) | ||
| 8. PLAN GOVERNMENT PREPARING ORGANIZATION | ||
| PEO IWS 6.0 | ||
| 9a. CONTRACTOR NAME/ADDRESS | ||
| i. REPORTING ORGANIZATION NAME | ||
| TBD | ||
| ii. DIVISION NAME | ||
| TBD | ||
| iii. LOCATION | ||
| TBD | ||
| iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT: | ||
| X | CBDR REQUIRED FOR THIS ORGANIZATION | |
| 9b. CONTRACT NUMBER (List all that apply, separated by commas) | ||
| 9c. APPROPRIATION (check all that apply) | ||
| RDT&E | ||
| X | PROCUREMENT | |
| X | O&M | |
| X | FMS | |
| WCF | ||
| OTHER | ||
| 10a. APPROVED PLAN NUMBER | ||
| N-04-J-C11 | ||
| 10b. APPROVED PLAN REVISION NUMBER | ||
| 10c. APPROVED PLAN REQUIREMENTS | ||
| X | AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) | |
| X | AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only) | |
| TECHNICAL DATA REQUIRED | ||
| 10d. COST REPORT TYPE | ||
| X | FLEXFILE | |
| LEGACY DD 1921 SERIES | ||
| DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 2 (REPORTING)
| COST AND SOFTWARE DATA REPORTING PLAN | COST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN | |||||
| 11. WORK BREAKDOWN STRUCTURE (WBS) | 12. COST | 13. TECHNICAL DATA | ||||
| a. WBS | ||||||
| CODE | b. WBS | |||||
| LEVEL | c. WBS ELEMENT NAME | a. ACTUALS TO | ||||
| DATE (ATD) | b. LEGACY | |||||
| 1921-1 | c. LEGACY | |||||
| 1921-2 | d. LEGACY | |||||
| 1921-5 | e. EAC/FAC | |||||
| (See item 10d) | a. QUANTITY | b. SRDR | ||||
| FORMATS | c. |
MAINT. &
REPAIR
PARTS
| i. QUANTITY | ||
| DATA | ii. GFE |
QUANTITY
| 1.0 | 1 | Cooperative Engagement Capability (CEC) Program | ||||
| 1.1 | 2 | Prime Mission Product (PMP) | ||||
| 1.1.1 | 3 | First Article Units (FAU) | X | |||
| 1.1.1.1 | 4 | USG-2B Shipboard FAU | X | |||
| 1.1.1.1.1 | 5 | Below Deck Equipment | X | |||
| 1.1.1.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.1.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.1.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.1.1.2 | 5 | Production Readiness Review | X | X | ||
| 1.1.1.1.3 | 5 | Physical Config Audit | X | X | ||
| 1.1.1.1.4 | 5 | Functional Config Audit | X | X | ||
| 1.1.1.2 | 4 | USG-3B Airborne FAU | X | |||
| 1.1.1.2.1 | 5 | Below Deck Equipment | X | |||
| 1.1.1.2.1.1 | 6 | Hardware | X | X | X | |
| 1.1.1.2.1.2 | 6 | Software Release | X | X | ||
| 1.1.1.2.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.1.2.2 | 5 | Delta Production Readiness Review | X | X | ||
| 1.1.1.2.3 | 5 | Physical Config Audit | X | X | ||
| 1.1.1.2.4 | 5 | Functional Config Audit | X | X | ||
| 1.1.1.3 | 4 | USG-4B USMC FAU | X | |||
| 1.1.1.3.1 | 5 | Below Deck Equipment | X | |||
| 1.1.1.3.1.1 | 6 | Hardware | X | X | X | |
| 1.1.1.3.1.2 | 6 | Software Release | X | X | ||
| 1.1.1.3.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.1.3.2 | 5 | Delta Production Readiness Review | X | X | ||
| 1.1.1.3.3 | 5 | Physical Config Audit | X | X | ||
| 1.1.1.3.4 | 5 | Functional Config Audit | X | X | ||
| 1.1.1.4 | 4 | SDP-S FAU | X | |||
| 1.1.1.4.1 | 5 | Below Deck Equipment | X | |||
| 1.1.1.4.1.1 | 6 | Hardware | X | X | X | |
| 1.1.1.4.1.2 | 6 | Software Release | X | X | ||
| 1.1.1.4.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.1.4.2 | 5 | Production Readiness Review | X | X | ||
| 1.1.1.4.3 | 5 | Physical Config Audit | X | X | ||
| 1.1.1.4.4 | 5 | Functional Config Audit | X | X | ||
| 1.1.1.5 | 4 | CIOC FAU | X | |||
| 1.1.1.5.1 | 5 | Below Deck Equipment | X | |||
| 1.1.1.5.1.1 | 6 | Hardware | X | X | X | |
| 1.1.1.5.1.2 | 6 | Software Release | X | X | ||
| 1.1.1.5.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.1.5.2 | 5 | Production Readiness Review | X | X | ||
| 1.1.1.5.3 | 5 | Physical Config Audit | X | X | ||
| 1.1.1.5.4 | 5 | Functional Config Audit | X | X | ||
| 1.1.2 | 3 | AN/USG-2B SYSTEM (AEGIS) | X | |||
| 1.1.2.1 | 4 | Below Deck Equipment | X | |||
| 1.1.2.1.1 | 5 | Rack | X | |||
| 1.1.2.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.2.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.2.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.2.1.2 | 5 | ECSC | X | |||
| 1.1.2.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.2.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.2.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.2.1.3 | 5 | PDMC | X | |||
| 1.1.2.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.2.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.2.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.2.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.2.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.2.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.2.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.3 | 3 | AN/USG-2B SYSTEM (SSDS SINGLE MAST) | X | |||
| 1.1.3.1 | 4 | Below Deck Equipment | X | |||
| 1.1.3.1.1 | 5 | Rack | X | |||
| 1.1.3.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.3.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.3.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.3.1.2 | 5 | ECSC | X | |||
| 1.1.3.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.3.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.3.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.3.1.3 | 5 | PDMC | X | |||
| 1.1.3.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.3.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.3.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.3.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.3.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.3.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.3.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.3.1.5 | 5 | CEC Input/Output Convertor (CIOC) | X | |||
| 1.1.3.1.5.1 | 6 | Hardware | X | X | X | |
| 1.1.3.1.5.2 | 6 | Software Release | X | X | ||
| 1.1.3.1.5.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.4 | 3 | AN/USG-2B SYSTEM (SSDS DUAL MAST) | X | |||
| 1.1.4.1 | 4 | Below Deck Equipment | X | |||
| 1.1.4.1.1 | 5 | Rack | X | |||
| 1.1.4.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.4.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.4.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.4.1.2 | 5 | ECSC | X | |||
| 1.1.4.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.4.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.4.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.4.1.3 | 5 | PDMC | X | |||
| 1.1.4.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.4.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.4.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.4.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.4.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.4.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.4.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.4.1.5 | 5 | CEC Input/Output Convertor (CIOC) | X | |||
| 1.1.4.1.5.1 | 6 | Hardware | X | X | X | |
| 1.1.4.1.5.2 | 6 | Software Release | X | X | ||
| 1.1.4.1.5.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.5 | 3 | AN/USG-2B SYSTEM (LUSV) | X | |||
| 1.1.5.1 | 4 | Below Deck Equipment | X | |||
| 1.1.5.1.1 | 5 | Rack | X | |||
| 1.1.5.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.5.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.5.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.5.1.2 | 5 | ECSC | X | |||
| 1.1.5.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.5.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.5.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.5.1.3 | 5 | PDMC | X | |||
| 1.1.5.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.5.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.5.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.5.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.5.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.5.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.5.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.6 | 3 | AN/USG-3B SYSTEM - Airborne | X | |||
| 1.1.6.1 | 4 | Airborne Equipment | X | |||
| 1.1.6.1.1 | 5 | End Fire Array (EFA) Antenna | X | |||
| 1.1.6.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.6.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.6.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.6.1.2 | 5 | Tranceiver Cabinet | X | |||
| 1.1.6.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.6.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.6.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.7 | 3 | AN/USG-4B SYSTEM - Ground Mobile | X | |||
| 1.1.7.1 | 4 | Ground Mobile Equipment | X | |||
| 1.1.7.1.1 | 5 | Rack | X | |||
| 1.1.7.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.7.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.7.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.7.1.2 | 5 | PDMC MEIC | X | |||
| 1.1.7.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.7.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.7.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.7.1.3 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.7.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.7.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.7.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.8 | 3 | AN/USG-7B SYSTEM - FMS Australia Shipboard | X | |||
| 1.1.8.1 | 4 | Below Deck Equipment | X | |||
| 1.1.8.1.1 | 5 | Rack | X | |||
| 1.1.8.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.8.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.8.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.8.1.2 | 5 | ECSC | X | |||
| 1.1.8.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.8.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.8.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.8.1.3 | 5 | PDMC | X | |||
| 1.1.8.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.8.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.8.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.8.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.8.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.8.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.8.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.9 | 3 | AN/USG-8B SYSTEM - FMS Canada Shipboard | X | |||
| 1.1.9.1 | 4 | Below Deck Equipment | X | |||
| 1.1.9.1.1 | 5 | Rack | X | |||
| 1.1.9.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.9.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.9.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.9.1.2 | 5 | ECSC | X | |||
| 1.1.9.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.9.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.9.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.9.1.3 | 5 | PDMC | X | |||
| 1.1.9.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.9.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.9.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.9.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.9.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.9.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.9.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.10 | 3 | AN/USG-10B SYSTEM - FMS Japan Shipboard | X | |||
| 1.1.10.1 | 4 | Below Deck Equipment | X | |||
| 1.1.10.1.1 | 5 | Rack | X | |||
| 1.1.10.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.10.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.10.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.10.1.2 | 5 | ECSC | X | |||
| 1.1.10.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.10.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.10.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.10.1.3 | 5 | PDMC | X | |||
| 1.1.10.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.10.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.10.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.10.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.10.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.10.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.10.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.11 | 3 | AN/USG-11B SYSTEM - FMS Japan Airborne | X | |||
| 1.1.11.1 | 4 | Airborne Equipment | X | |||
| 1.1.11.1.1 | 5 | End Fire Array (EFA) Antenna | X | |||
| 1.1.11.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.11.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.11.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.11.1.2 | 5 | Tranceiver Cabinet | X | |||
| 1.1.11.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.11.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.11.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.12 | 3 | AN/USG-12B SYSTEM - FMS Australia Airborne | X | |||
| 1.1.12.1 | 4 | Airborne Equipment | X | |||
| 1.1.12.1.1 | 5 | End Fire Array (EFA) Antenna | X | |||
| 1.1.12.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.12.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.12.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.12.1.2 | 5 | Tranceiver Cabinet | X | |||
| 1.1.12.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.12.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.12.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.13 | 3 | BACKFIT KITS FOR AN/USG-2 AND LBTS | X | |||
| 1.1.13.1 | 4 | Below Deck Equipment | X | |||
| 1.1.13.1.1 | 5 | Rack | X | |||
| 1.1.13.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.13.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.13.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.13.1.2 | 5 | ECSC | X | |||
| 1.1.13.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.13.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.13.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.13.1.3 | 5 | PDMC | X | |||
| 1.1.13.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.13.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.13.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.13.1.4 | 5 | Technician's Control Device (TCD) | X | |||
| 1.1.13.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.13.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.13.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.14 | 3 | BACKFIT KITS FOR AN/USG-2A | X | |||
| 1.1.14.1 | 4 | Below Deck Equipment | X | |||
| 1.1.14.1.1 | 5 | Rack | X | |||
| 1.1.14.1.1.1 | 6 | Hardware | X | X | X | |
| 1.1.14.1.1.2 | 6 | Software Release | X | X | ||
| 1.1.14.1.1.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.14.1.2 | 5 | ECSC | X | |||
| 1.1.14.1.2.1 | 6 | Hardware | X | X | X | |
| 1.1.14.1.2.2 | 6 | Software Release | X | X | ||
| 1.1.14.1.2.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.14.1.3 | 5 | PDMC | X | |||
| 1.1.14.1.3.1 | 6 | Hardware | X | X | X | |
| 1.1.14.1.3.2 | 6 | Software Release | X | X | ||
| 1.1.14.1.3.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.14.1.4 | 5 | Technician's control device | X | |||
| 1.1.14.1.4.1 | 6 | Hardware | X | X | X | |
| 1.1.14.1.4.2 | 6 | Software Release | X | X | ||
| 1.1.14.1.4.3 | 6 | Subsystem Integration Assembly Test and Checkout | X | X | ||
| 1.1.15 | 3 | Signal Data Processor (SDP) -007 | X | |||
| 1.1.15.1 | 4 | Hardware | X | X | X | |
| 1.1.15.2 | 4 | Software Release | X | X | ||
| 1.1.16 | 3 | SIGNAL DATA PROCESSOR -004 TO -005 MODIFICATION | X | |||
| 1.1.16.1 | 4 | Hardware | X | X | X | |
| 1.1.16.2 | 4 | Software Release | X | X | ||
| 1.1.17 | 3 | SIGNAL DATA PROCESSOR -004 TO -007 MODIFICATION | X | |||
| 1.1.17.1 | 4 | Hardware | X | X | X | |
| 1.1.17.2 | 4 | Software Release | X | X | ||
| 1.1.18 | 3 | SIGNAL DATA PROCESSOR -005 TO -007 MODIFICATION | X | |||
| 1.1.18.1 | 4 | Hardware | X | X | X | |
| 1.1.18.2 | 4 | Software Release | X | X | ||
| 1.1.19 | 3 | FMS SIGNAL DATA PROCESSOR | X | |||
| 1.1.19.1 | 4 | Hardware | X | X | X | |
| 1.1.19.2 | 4 | Software Release | X | X | ||
| 1.1.20 | 3 | SIGNAL DATA PROCESSOR NEXT (SDP-NEXT) | X | |||
| 1.1.20.1 | 4 | Non-Recurring Engineering/Design | X | X | ||
| 1.1.20.2 | 4 | Hardware Procurements | X | X | X | |
| 1.1.20.3 | 4 | Software Release | X | X | ||
| 1.2 | 2 | Platform Integration, Assembly, Test, and Checkout | X | X | ||
| 1.3 | 2 | Systems Engineering | ||||
| 1.3.1 | 3 | Engineering Studies and Analyses | X | X | ||
| 1.3.2 | 3 | Obsolescence Management | X | X | ||
| 1.4 | 2 | Program Management | X | X | ||
| 1.5 | 2 | Systems Test and Evaluation | ||||
| 1.5.1 | 3 | Manufacturing Acceptance Testing | X | X | ||
| 1.5.2 | 3 | Final system test and integration | X | X | ||
| 1.6 | 2 | Training | ||||
| 1.6.1 | 3 | Equipment | X | X | ||
| 1.6.2 | 3 | Services | X | X | ||
| 1.6.3 | 3 | Facilites | X | X | ||
| 1.7 | 2 | Data | X | X | ||
| 1.8 | 2 | Peculiar Support Equipment | ||||
| 1.8.1 | 3 | Test and Measurement Equipment | X | X | X | |
| 1.8.2 | 3 | Shipping and Handling Equipment | X | X | X | |
| 1.9 | 2 | Common Support Equipment | ||||
| 1.9.1 | 3 | Test and Measurement Equipment | X | X | X | |
| 1.9.2 | 3 | Shipping and Handling Equipment | X | X | X | |
| 1.10 | 2 | Operational/ Site Activation by Site | X | X | ||
| 1.11 | 2 | Contractor Logistics Support | X | |||
| 1.11.1 | 3 | Repairs | X | X | ||
| 1.11.1.1 | 4 | Shipboard Repairs | X | X | ||
| 1.11.1.1.1 | 5 | Material | X | X | X | X |
| 1.11.1.1.2 | 5 | Labor | X | X | ||
| 1.11.1.1.3 | 5 | ODCs | X | X | X | X |
| 1.11.1.2 | 4 | Airborne Repairs | X | X | ||
| 1.11.1.2.1 | 5 | Material | X | X | X | X |
| 1.11.1.2.2 | 5 | Labor | X | X | ||
| 1.11.1.2.3 | 5 | ODCs | X | X | X | X |
| 1.11.1.3 | 4 | Ground Mobile Repairs | X | X | ||
| 1.11.1.3.1 | 5 | Material | X | X | X | X |
| 1.11.1.3.2 | 5 | Labor | X | X | ||
| 1.11.1.3.3 | 5 | ODCs | X | X | X | X |
| 1.11.1.4 | 4 | FMS Repairs | X | X | ||
| 1.11.1.4.1 | 5 | Material | X | X | X | X |
| 1.11.1.4.2 | 5 | Labor | X | X | ||
| 1.11.1.4.3 | 5 | ODCs | X | X | X | X |
| 1.11.1.5 | 4 | Stockpoint | X | X | X | X |
| 1.12 | 2 | Industrial Facilities | X | X | ||
| 1.13 | 2 | Initial Spares and Repairs | X | X | ||
| 1.13.1 | 3 | Spares | X | X | ||
| 1.13.1.1 | 4 | CET | X | X | X | X |
| 1.13.1.2 | 4 | CEC Input/Output Convertor (CIOC) | X | X | X | X |
| 1.13.1.3 | 4 | ECSC | X | X | X | X |
| 1.13.1.4 | 4 | PDMC | X | X | X | X |
| 1.13.1.5 | 4 | Technician's Control Device (TCD) | X | X | X | X |
| 1.13.1.6 | 4 | End Fire Array (EFA) Antenna | X | X | X | X |
| 1.13.1.7 | 4 | Tranceiver Cabinet | X | X | X | X |
| 1.13.1.8 | 4 | Shipboard Spares | X | X | X | X |
| 1.13.1.9 | 4 | Airborne Spares | X | X | X | X |
| 1.13.1.10 | 4 | Ground Mobile Spares | X | X | X | X |
| 1.13.1.11 | 4 | FMS Spares | X | X | X | X |
| 1.13.1.12 | 4 | SDP-007 Spares | X | X | X | X |
| 1.13.1.13 | 4 | SDP-004 to -005 Spares | X | X | X | X |
| 1.13.1.14 | 4 | SDP-004 to -007 Spares | X | X | X | X |
| 1.13.1.15 | 4 | SDP-005 to -007 Spares | X | X | X | X |
| 1.13.1.16 | 4 | SDP-NEXT Spares | X | X | X | X |
| Subtotal Cost | X | X | ||||
| Reporting Contractor G&A | X | X | ||||
| Reporting Contractor Undistributed Budget | X | X | ||||
| Reporting Contractor Management Reserve | X | X | ||||
| Reporting Contractor FCCM | X | X | ||||
| Total Cost | X | X | ||||
| Reporting Contractor Profit/Loss or Fee | X | X | ||||
| Total Price | X | X | ||||
| DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019 |
DD Form 2794, Pg 3 (EVENTS)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||||
| 14. CSDR SUBMISSION EVENTS | |||||||
| a. | |||||||
| EVENT ID | b. | ||||||
| DATA REPORT(S) | c. | ||||||
| SUBMISSION EVENT NAME | d. | ||||||
| REPORT CYCLE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Award Plus 12 months | Initial | 20230430 | 20230630 | ||
| 2 | Maintenance and Repair Parts Data Report | Initial Maintenance and Repair Report | Initial | 20230430 | 20230630 | ||
| 3 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report #1 | Interim | 20240430 | 20240630 | ||
| 4 | Maintenance and Repair Parts Data Report | Maintenance and Repair Report #1 | Interim | 20240430 | 20240630 | ||
| 5 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report #2 | Interim | 20250430 | 20250630 | ||
| 6 | Maintenance and Repair Parts Data Report | Maintenance and Repair Report #2 | Interim | 20250430 | 20250630 | ||
| 7 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report #3 | Interim | 20260430 | 20260630 | ||
| 8 | Maintenance and Repair Parts Data Report | Maintenance and Repair Report #3 | Interim | 20260430 | 20260630 | ||
| 9 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report #4 | Interim | 20270430 | 20270630 | ||
| 10 | Maintenance and Repair Parts Data Report | Maintenance and Repair Report #4 | Interim | 20270430 | 20270630 | ||
| 11 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report #5 | Interim | 20280430 | 20280630 | ||
| 12 | Maintenance and Repair Parts Data Report | Maintenance and Repair Report #5 | Interim | 20280430 | 20280630 | ||
| 13 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Completion | Final | 20281031 | 20281231 | ||
| 14 | Maintenance and Repair Parts Data Report | Final Maintenance and Repair Report | Final | 20281031 | 20281231 | ||
| DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 4 (REMARKS)
| COST AND SOFTWARE DATA REPORTING PLAN |
| 15. REMARKS |
| NON-RECURRING/RECURRING DEFINITIONS |
| Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management. |
Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit \fabrication, assembly and check out.
Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.
Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.
Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.
Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.
Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.
Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.
Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles.
Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.
| COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES | |
| Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable | |
| 1921-3 CONTRACTOR BUSINESS DATA REPORT | |
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate | Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. |
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.
| WBS INDEX AND DICTIONARY |
| The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element. |
The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.
For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements."
| END ITEMS/ORDER LOTS SCOPE IDIQ |
| Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders." |
| CONTRACTOR COST AND HOUR REPORT UNIT/SUBLOT REPORTING |
| The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7." |
| QUANTITY REPORTING |
| a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section. |
b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable."
| FINAL COST REPORT |
| Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred." |
| POST AWARD CONFERENCE (PAC) |
| The Reporting Entity shall attend and participate in a post award CSDR conference which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04-M-1 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04-M-1, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and functional element codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary." |
| RESOURCE DISTRIBUTION TABLE (RDT) |
| The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DoDI 5000.02 and DoDM 5000.04-M-1. |
| PERIOD OF PERFORMANCE (POP) |
| If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance." |
| FAC vs EAC |
| The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as ""Forecast at Completion"" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes. |
| SUSTAINMENT |
| a. Reporting Entity shall provide the following Quantity information in the Remarks section of the Cost and Hour Report: number of systems supported by this contract, and number of repairs performed. The Reporting Entity must state the nominal capacity planned for each Delivery Order (e.g., the # of repairs, # of overhauls, # of flight hours, etc.) identified in the plan. This requirement is intended to capture what services are being bought with each effort. |
b. The intent of the cost reports is to capture the entire value of the contract. The contractor should not omit any CLINs, subCLINs, Delivery Orders or Task Orders, including Firm Fixed Price (FFP) efforts.
| COVID-19 IMPACTS |
| The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic. |
Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.
If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.
If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.
DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 5 (SCOPE DEF)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||
| INTRA-CONTRACT SCOPE REPORTING DEFINITION | |||||
| 16. ORDERS/LOTS | |||||
| a. ID | b. NAME | c. PHASE/MILESTONE | |||
| 1 | Lot 1 / Base Year | C-FRP | |||
| 2 | Lot 2 / Option Year 1 | C-FRP | |||
| 3 | Lot 3 / Option Year 2 | C-FRP | |||
| 4 | Lot 4 / Option Year 3 | C-FRP | |||
| 5 | Lot 5 / Option Year 4 | C-FRP | |||
| 17. END ITEMS | |||||
| a. ID | b. NAME | ||||
| A | USG-2B Shipboard AEGIS / LUSV | ||||
| B | USG-2B Shipboard SSDS | ||||
| C | USG-3B Airborne | ||||
| D | USG-4B Ground Mobile | ||||
| E | USG-7B, USG-8B, USG-10B FMS Shipboard | ||||
| F | USG-11B, USG-12B FMS Airborne | ||||
| G | BACKFIT KIT: -2/LBTS to 2B | ||||
| H | BACKFIT KIT: -2A to 2B | ||||
| I | SDP-007 | ||||
| J | CET | ||||
| K | ECSC | ||||
| L | CIOC | ||||
| 18. OPTIONAL REQUIREMENTS | |||||
| a. ORDER/LOT ID | b. END ITEM ID | c. UNIT REPORTING | |||
| (X if applicable) | d. SEQUENCING |
(X if applicable)
| 1 | A | X | X |
| 1 | B | X | X |
| 1 | C | X | X |
| 1 | D | X | X |
| 1 | E | X | X |
| 1 | F | X | X |
| 1 | G | X | X |
| 1 | H | X | X |
| 1 | I | X | X |
| 1 | J | X | X |
| 1 | K | X | X |
| 1 | L | X | X |
| 2 | A | X | X |
| 2 | B | X | X |
| 2 | C | X | X |
| 2 | D | X | X |
| 2 | E | X | X |
| 2 | F | X | X |
| 2 | G | X | X |
| 2 | H | X | X |
| 2 | I | X | X |
| 2 | J | X | X |
| 2 | K | X | X |
| 2 | L | X | X |
| 3 | A | X | X |
| 3 | B | X | X |
| 3 | C | X | X |
| 3 | D | X | X |
| 3 | E | X | X |
| 3 | F | X | X |
| 3 | G | X | X |
| 3 | H | X | X |
| 3 | I | X | X |
| 3 | J | X | X |
| 3 | K | X | X |
| 3 | L | X | X |
| 4 | A | X | X |
| 4 | B | X | X |
| 4 | C | X | X |
| 4 | D | X | X |
| 4 | E | X | X |
| 4 | F | X | X |
| 4 | G | X | X |
| 4 | H | X | X |
| 4 | I | X | X |
| 4 | J | X | X |
| 4 | K | X | X |
| 4 | L | X | X |
| 5 | A | X | X |
| 5 | B | X | X |
| 5 | C | X | X |
| 5 | D | X | X |
| 5 | E | X | X |
| 5 | F | X | X |
| 5 | G | X | X |
| 5 | H | X | X |
| 5 | I | X | X |
| 5 | J | X | X |
| 5 | K | X | X |
| 5 | L | X | X |
| DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019 |