This solicitation seeks proposals for the Cooperative Engagement Capability (CEC) System Production and Repair contract. The scope of work includes the manufacture, assembly, test, integration, and repair of USG-xB hardware suites and the Signal Data Processor, as well as production of spares, installation and check-out kits, and ancillary equipment. The contract will also provide associated engineering services for the United States Navy, Marine Corps, and foreign military sales customers. Offerors must submit any questions within 21 calendar days of issuance to allow the government time to respond prior to the proposal due date. The Naval Sea Systems Command is conducting the competitive solicitation on behalf of Program Executive Office Integrated Warfare Systems 6.0.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421R5208 Offeror's Questions and Government Responses
Question Number: Source Document Reference Excerpt of Content Question: Government Response
1 N/A N/A N/A
We recommend the Management section of the proposal has an adjectival rating in Section L vs pass or fail.
Given the vast scope of work (four contracts being combined into one) and the Navy’s expectations for total management of this contract through collaboration with the CEC Design Agent, the bidder should be able to demonstrate their ability to manage complex scope. A pass/fail rating does not lend credibility to the Contractor’s ability to manage the magnitude of this scope.
Thank you for your input, the Government will look into the recommendation.
2 Draft RFP CLIN 0008
AN/USG‐4B SYSTEM
FFP
AN/USG‐4B CEC SYSTEM MINUS THE CSSA, CSSA POWER SUPPLY AND
SDP. SECTION J Attachment XX TDP REFERENCE 8423589‐001, PRODUCT
STRUCTURE, USMC AN/USG‐4B AND PL8423544‐001, PROCESSING SET,
COOPERATIVE ENGAGEMENT TRANSMISSION, AN/USG‐4B (IGNORE CSSA
UNIT 27, CSSA POWER SUPPLY UNIT 28, SDP UNIT 39 AND Controller, Power Supply 8240795)
The RFP states to ignore CSSA, CSSA Power Supply, SDP, and Power Supply Controller 8240795. This is the same part number for the PS Controller that goes in the ECSC. The Power Supply Controller is not part of the USG‐4B system. We recommend updating CLIN 0008.
Concur. The Government will amend CLIN 0008 for the final solicitation.
3 Draft RFP CLIN 0020
SIGNAL DATA PROCESSOR ‐ NEXT (SDP‐NEXT)
CPIF
COOPERATIVE ENGAGEMENT CAPABILITY (CEC) SIGNAL DATA
PROCESSOR (SDP) ASSEMBLY WITH TRANSIT CASE (PART NUMBER TBD).
SHALL BE DELIVERED IN ACCORDANCE WITH THE TECHNICAL DATA
PACKAGE AND THE REQUIREMENTS OF THIS CONTRACT
CLIN 0020 Signal Data Processor – NEXT is titled ‘SDP with transit case.’ And is required to be delivered in accordance with the TBD TDP. During the Industry Day briefing and follow‐on 1‐1 conversations, the government indicated that the scope of this CLIN is the ‘transition to production’ effort. This aligns with the UNITs being set to hours. We recommend changing the title of the CLIN to align to the Government’s expectations. Further, we recommend the Government include a paragraph in the SOW that addresses the specific work required to be performed on this CLIN. We recommend this SOW section include language to clarify whether or not the Contractor will participate in design and development of the TDP and what level of TDP the contract can expect to receive.
Concur. The Government will amend CLIN 0020 for the final solicitation.
Additionally, Section C will be amended to include additional verbiage expanding on the NRE services CLIN and will be released as part of final solicitation.
4 Draft RFP 3.2.9
The Contractor shall develop, maintain, and submit a Program Protection Implementation Plan (PPIP) in accordance with CDRL A017. As part of the PPIP, the Contractor shall notify the Government of any part, information, material, or labor not provided by a Trusted Source and must obtain specific written authorization from the COR and IWS 6 Security Manager to proceed with its use. A Trusted Source is defined as a source that has the Government’s confidence in the source's ability to secure national security systems by assessing the integrity of the people and processes used to design, generate, manufacture, and distribute national security critical components. The Contractor shall flow down the Trusted Sources and export control requirements of this paragraph to all subcontractors performing under this contract.
When will the USG provide the Program Protection Plan (PPP) to support the Program Protection Implementation Plan? Will the USG also provide the supporting Critical Item List?
The Government intends to have all GFI available to bidders as soon as possible but not later than the time the solicitation is released.
The Government will look into providing the supporting Critical Item List.
5 N/A Recommended Sample Questions N/A
1. Successful operation of the CEC systems depend on proper sub‐system and system level RF calibration in order to interact and operate at all frequencies and operating conditions. Describe the steps you would take during SFAT to ensure proper communications between a newly produced AN/USG‐3B system and other GFE antennas on the contractor’s outdoor range. Similar tasking is describe in Section C, paragraphs 3.5.3.3
2. When the fleet encounters a failure of a CEC end item, it is returned to the contractor’s facility and authorization is given to conduct initial testing and inspection. This tasking is described in Section C, paragraph
3.6.1. Describe, in detail, the testing and inspection activities you would employ upon receipt of a failed SDP‐S unit with a failure condition of (such as) Emcon Failures, Power Supply Faults, cross talk or loopback issues, to return it to A‐Condition.
3. When a unit is returned to the Production and Repairs contractor, work authorization for that repair is provided via Technical Instructions. This tasking is described in Section C, paragraph 3.6.1.2. What processes, tools, and methods would you employ to financially manage 10 simultaneous repairs and accurately track, forecast, and report these metrics to the government.
4. The scope of the Design Agent / Engineering Services contract includes maintaining and updating the overall hardware configuration baseline. The EFA antenna contains parts (TBD parts) that are nearing end of life.
What enhancements to the hardware baseline would you recommend? Describe the process by which you would coordinate with the CEC Design Agent to propose those enhancements. Similar tasking is described in Section C, paragraph 3.3.2, 3.3.3, and 3.3.4
5. The current SDP terminal will not support all of the requirements in BLK II and the future DMO demands.
The terminal is currently being redesigned to satisfy a new set of requirements. This contract will contain the scope to transition the new SDP NEXT to production. This scope is reflected in CLIN 0020 and Section C, paragraph TBD. Describe the process and testing methodologies you would use to ensure that the SDP NEXT product satisfies the all requirements, including terminal level and CEC System Spec.
Thank you for the input
Posted Date 4/16/2021. Answers to questions submitted prior to RFP release
Question Number: Source Document Reference Excerpt of Content Question: Government Response
6 Draft RFP SOW Sec 3.3.3. Obsolescence Management
The Contractor shall initiate actions to resolve obsolescence management issues with sufficient lead‐time to preclude impact to Government delivery requirements (including production and fleet requisitions) while meeting the other requirements of this SOW.
Recommend updating the obsolescence language in Section C, 3.3.3 Management of the contract to clarify resolution and funding of solutions
From The Contractor shall initiate actions to resolve obsolescence management issues with sufficient lead‐time to preclude impact to Government delivery requirements (including production and fleet requisitions) while meeting the other requirements of this SOW.
To The Contractor shall initiate actions to resolve obsolescence management issues as directed by the Government via Technical Instructions with sufficient lead‐time to preclude or mitigate impacts to Government delivery requirements (including production and fleet requisitions) to the best of the Contractor’s ability while meeting the other requirements of this SOW.
Thank you for your input, the Government will look into the recommendations.
7 Draft RFP SOW Sec 3.3.3. Obsolescence Management
The Contractor shall initiate actions to resolve obsolescence management issues with sufficient lead‐time to preclude impact to Government delivery requirements (including production and fleet requisitions) while meeting the other requirements of this SOW.
We recommend adding this section which is found in another NAVSEA Production contract
Obsolescence Solution Implementation In the event that the Contractor determines that one or more parts involved in the procurement and/or production of any of the requirements contained in this contract are obsolete, the Contractor shall provide written initial notice to the Contracting Officer per section X.X.X above, after discovering the DMSMS/obsolescence. The contractor’s initial notice shall include an analysis for performance of the requirements of the contract addressing the DMSMS/obsolescence issue including the following information
1. A description of the difference between the existing contractual requirement and the contractor’s recommendation to correct the problem, the comparative advantages and disadvantages of each, a justification when the proposed solution uses an item that has a function or characteristics that are different from the DMSMS/obsolete item, the effect of the change on the end item’s performance, and any pertinent objective test data.
2. A preliminary list and analysis of the contract requirements that must be changed if the contractor’s recommendation is accepted, including any suggested specification revisions.
3. Identification of the unit to which the change applies.
4. A budgetary cost estimate for the affected portions of the existing contract requirement. The cost impact associated shall take into account the Contractor’s allowable development and implementation costs, including any amount attributable to subcontracts under the Subcontracts paragraph of this clause.
5. A prediction of any collateral affects the recommended change would have to the agency.
6. A statement of the time by which a contract modification accepting the change must be issued in order to achieve the maximum cost reduction, noting any effect on the contract completion time or delivery schedule.
7. Identification of any previous submissions of a proposal to address the DMSMS/obsolescence issue, including the dates submitted, the agencies and contract numbers involved, and previous Government actions, if known.
Thank you for your input, the Government will look into the recommendations.
Cont'd
Approval/Rejection Requirements – The Government will either approve or reject the initial notice of DMSMS/obsolescence by providing written notice to the Contractor within twenty‐five (25) workdays after receipt of the initial notice by the Contracting Officer. The Government will provide explanation for any rejection. Where the Contracting Officer provides notification of approval, the Contractor’s obligations relating to such DMSMS/obsolescence recommendation shall be discharged to the extent that the deficiency is corrected. If the incorporation of such approved DMSMS/obsolescence change does not correct the deficiency, the Contractor shall remain responsible for resubmitting and obtaining acceptance of a follow‐on recommendation to resolve the DMSMS/obsolescence issue.
DMSMS/Obsolescence Disputes – Failure of the parties to agree upon any determination of the necessity for, or the designation of, a change to be made under this provision shall be a dispute within the meaning of the “Disputes” clause of this contract.
Rights and Remedies – The rights and remedies of the Government provided in this provision are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.
Subcontracts – The terms and conditions of this clause flow down to all relevant subcontracts.
Resolution and Funding – If the Government approves the recommendation made in the Contractor’s initial notification, any changes to the effort associated with the resolution of DMSMS/obsolescence issues arising under this special contract provision that causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, the provisions of FAR 52.243‐1 CHANGES – FIXEDPRICE or 52.243‐2 CHANGES – COST REIMBURSEMENT (as applicable) shall be followed.
Thank you for your input, the Government will look into the recommendations.
8 Draft RFP SOW N/A
It is critical to the success of the program that contractors across the Navy’s CEC program portfolio closely collaborate on enhancements impacting the system’s baseline. To this end, we recommend the inclusion of the following language in the Production and Repairs Statement of Work “The Contractor shall work in conjunction with other organizations or contractors, including the Design Agent and TDA to propose enhancements impacting the CEC System baseline.”
Thank you for your input, the Government will look into the recommendations.
Question Number: Source Document Reference Excerpt of Content Question: Government Response
9 Draft+N0002421R5208 Section B, SOW paragraph 3.5.3.3 ATP 8423557‐001‐REV E Not downloadable
Per Draft Section B, SOW paragraph 3.5.3.3 – System Final Acceptance Testing (SFAT); the government requires completion of the SFAT ATP that conforms to the outside range specifications, both of which are GFI. The SFAT ATP is not downloadable in the Technical Data Package (TDP) provided with the draft RFP. Will the government provide that information to industry so that we can ensure we can meet the outdoor range requirements per the SOW? (“Acceptance Test Procedure for the Cooperative Engagement Capability ANUSG‐2B, ANUSG‐3B, ANUSG‐4B, ANUSG‐5B, ANUSG‐7B, 8423557‐001 – REV E.pdf”)
The Government intends to have all GFI available to bidders as soon as possible but not later than the time the solicitation is released.
10 Draft+N0002421R5208 TDP TDP Marking All SDP related drawing are marked with a Raytheon copyright. Will this marking be retained in the TDP delivered to the successful offeror?
The TDP and related drawings are not restricted. The Government will work to have all drawings appropriately marked for RFP release.
11 Industry Day N/A Consolidation At Industry Day, it was mentioned that four contracts are being consolidated. What four contracts does this include?
This contract is actually a consolidation of three contracts CEC Production Contract (N00024‐15‐C‐5228) SDP‐S Production Contract (N00024‐17‐C‐5201) BRAVO Repair Contract (N00024‐17‐C‐5200)
12 Draft RFP CLIN 0030 N/A
CLIN 0030 Configuration, Obsolescence and Technic (CM, DM, DMSMS). The UNIT says “Lot”. This points to Section C, para 3.3 Management. Based on Note C, this CLIN is an option and tasks will get assigned via a TI.
Should the unit of measure be Hours vice Lot?
How is the cost for this CLIN estimated? And will a rate table be used?
CLIN 0030 has been updated to reflect hours in the formal solicitation.
A labor mix and hours for Offerors to propose against has been provided.
13 N/A Calibration Clause N/A We recommend including ANSI/NCSL Z540‐1 standard for testing equipment calibration as one of the standards listed in the calibration clause since it is the common industry standard.
Please follow the calibration requirements set forth by the Government in the formal solcitation.
14 Draft+N0002421R5208 TDP SDP Fabrication details Will Gerber files be provided for all CCAs in the SDP? The TDP contains schematics in some cases, not all (in particular for the 8360211 RED DDS PROCESSOR and 8360257 RED CEP PROCESSOR). Will all schematics and parts list be provided in the RFP to facilitate pricing?
No, Gerber files are only provided for print wire boards that are assembled into non‐COTS or non‐ modified COTs CCA's.
No, Schematics and parts lists may be derived from the TDP which has been provided with the formal solicitation.
15 Draft+N0002421R5208 TDP SDP Fabrication details Will firmware and software to be loaded on the SDP processors be provided along with approved test procedures and test equipment?
Firmware and software to be loaded on the SDP processor will be provided after contract award.
The Contractor is responsible for developing test procedures in accordance with the requirements of the solicitation. Any test equipment provided by the government will be listed in the GFE list.
16 N/A N/A Terms of Use Will the Terms of Use be updated in light of new CUI guidance especially as it relates to providing information to subcontractors/suppliers?
The current Terms of Use Agreement is to be followed.
17 Draft RFP CLIN 0001
SLIN 0001AA
FIRST ARTICLE UNITS (FAU) COOPERATIVE ENGAGEMENT CAPABILITY
(CEC) PL8486904‐009
SLIN 0001AB
FIRST ARTICLE UNITS (FAU) COOPERATIVE ENGAGEMENT CAPABILITY
(CEC) PL8360086‐001
SLINs 0001AA and 0001B specify First Article Units for the Shipboard and Airborne systems, respectively. The descriptions for these SLINs list their respective part numbers, however, unlike CLINs 0004 and 0007, there is no qualifying information excluding any units (e.g. SDP, Power Supply Controller, and PAAA). Additionally, SLIN 0001AC identifies a First Article Unit for the SDP separate from the other FAU SLINs. Please clarify the specific units, if any, to be excluded in SLINs 0001AA and 0001B.
SLIN description(s) have been updated to reflect any exclusions in the formal solicitation.
18 Draft RFP CLIN 0001
AN/USG‐4B SYSTEM
FFP
AN/USG‐4B CEC SYSTEM MINUS THE CSSA, CSSA POWER SUPPLY AND
SDP. SECTION J Attachment XX TDP REFERENCE 8423589‐001, PRODUCT
STRUCTURE, USMC AN/USG‐4B AND PL8423544‐001, PROCESSING SET,
COOPERATIVE ENGAGEMENT TRANSMISSION, AN/USG‐4B (IGNORE CSSA
UNIT 27, CSSA POWER SUPPLY UNIT 28, SDP UNIT 39 AND Controller, Power Supply 8240795)
CLIN 0001 specifies First Article Units for distinct configurations (ie, Shipboard, Airborne, and SDP‐S). Missing from this list is the Land Mobile USMC system (reference CLIN 0008 AN/USG‐4B). Is it the Government’s desire to exclude the USG‐4B system from the First Article requirements?
This has been addressed in the formal solicitation.
22 TDP/Bidder's Library Content What is the process to obtain approval for sharing/distributing Government Furnished Information (GFI)/content contained in the Bidder’s Library with suppliers, subcontractors, and team members/Industry partners?
See the DD Form 254 and Terms of Use Agreement.
Additional Information:
The Marine Corp piece/antenna is included under this contract.
Based on the market research conducted under Request for Information (RFI) N00024‐19‐R‐5201 for the consolidated CEC System Production and Repair effort, the Government is not setting aside any portion of the effort for small business.
With regards to evaluation criteria, see the formal solicitation
The SDP‐S quantities identified reflect historical and projected demand.
The Government intends to identify all GFE that will be provided, including special test equipment.
Posted Date 8/24/2021. Answers to questions submitted prior to RFP release
Question Number: Source Document Reference Excerpt of Content Question: Government Response
The Government is seeking the ability of the production contractor to maintain and sustain the baseline and incorporate changes during performance. This includes obsolescence and change management and as material issues arise the production contractor being able to keep the production line running in order to meet Fleet demands. Also important is the relationship between the production contractor and the Design Agent to manage effectively to assist with Fleet readiness. The details for the best value evaluation have been identified in Sections L/M in the formal solicitation.
Technology insertion will be desired/necessary to manage obsolescence and drive performance requirements.
The final solicitation specifies how to build and price TBD (FMS) CLINs.
SDP‐Next is a follow‐on to the SDP product line and is for the transition of design drawings of the ECP into production. This CLIN is CPIF with planned LOE as provided in the formal solicitation.
The Government plans to utilize the current CEC configurations to support LUSV and FFG.
With regards to the Outdoor Range, see the formal solicitation.
The final solicitation addresses the collaboration with the Design Agent.
See the formal solicitation for how SDP‐Next will be evaluated.
The Design Agent contract develops and maintains the performance baseline. It is a separate five year contract competitively awarded to Raytheon in 2019 and is on a different timeline than the production effort.
The existing CEC contracts are DA/ES (Design Agent) competitively awarded to Raytheon in 2019;
CEC System Production competitively awarded to DRS in 2015;
SDP Production competitively awarded to DRS in 2017;
Legacy Repair sole source to Raytheon; and Bravo Repair sole source to DRS.
The TDPs to include the CSSA and SDP are available in the Bidder's Library and are the most current and will continue to be available during the competition.
Design of the SDP‐Next is under development via a separate contract vehicle. This solicitation will include NRE hours to facilitate the incorporation of the new design into production once it is available.
There have been updates to the CLIN structure for the FMS variants and TDP management. CSSA has been included in the final solicitation.
The Government has included the Value Engineering Change Proposal clause in the solicitation.
The solicitation has been updated to include additional information on if changes are made to the design. There will be additional information as part of the process through the CM plan.
The solicitation will identify the GFE to be provided and a timeline for providing to stand up facilities.
The Design Agent has access to a land based test site so the production facility should not consider it a challenge that there is not enough GFE to go around.