Attachment 13 - N0002421R5208 CEC Production Proposed Labor Mix.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
Cooperative Engagement Capability (CEC) System Production and Repair
Solicitation number
N0002421R5208
Issued by

About this file

This document provides details for a federal solicitation seeking proposals for the Cooperative Engagement Capability System Production and Repair requirements. The Navy's Naval Sea Systems Command Program Executive Office Integrated Warfare Systems is soliciting proposals to manufacture, assemble, test, integrate and repair USG-xB hardware suites and CEC Signal Data Processor systems, as well as produce spares, installation kits and ancillary equipment, and provide associated engineering services. Proposals are due within twenty-one calendar days of the original solicitation issue date to allow the government time to prepare responses. Questions regarding the solicitation should be submitted electronically to the points of contact provided by the specified due date. The Cooperative Engagement Capability program supports integrated fire control for air and missile defense by coordinating sensor data across strike force units to provide a composite air picture and enable cooperative engagement.

View the file

Other files

File Type Posted
N0002421R5208-0009.pdf PDF
N0002421R5208-0009 Conformed.pdf PDF
Exhibit A - N0002421R5208 CDRLs_10.18.21.pdf PDF
20211018-Bidders Question-RFP.pdf PDF
N0002421R5208-0008 Conformed.pdf PDF
N0002421R5208-0008.pdf PDF
N0002421R5208-0007 Conformed.pdf PDF
20211013-Bidders Question-RFP.pdf PDF
N0002421R5208-0007.pdf PDF
N0002421R5208-0006 Conformed.pdf PDF
N0002421R5208-0006.pdf PDF
N0002421R5208-0005 Conformed.pdf PDF
N0002421R5208-0005.pdf PDF
20211005-Bidders Question-RFP.pdf PDF
N0002421R5208-0004.pdf PDF
20210927-Bidders Questions-RFP.pdf PDF
Attachment 5 - CEC Production_Sustainment CSDR Plan_redlines.xls XLS spreadsheet
N0002421R5208-0004 Conformed.pdf PDF
Attachment 4 - N0002421R5208 SPARES List_09.14.21.xlsx XLSX spreadsheet
20210914-Bidders Questions-RFP.pdf PDF
N0002421R5208-0003.pdf PDF
N0002421R5208-0003 Conformed.pdf PDF
N0002421R5208-0002 Conformed.pdf PDF
N0002421R5208-0002.pdf PDF
N0002421R5208-0001.pdf PDF
N0002421R5208-0001 Conformed.pdf PDF
20210824-Bidders Questions.pdf PDF
Attachment 5 - CEC Production_Sustainment CSDR Plan.pdf PDF
Attachment 1 - DD254 for N0002421R5208.pdf PDF
Attachment 14 - Cost-Price Workbook.xlsx XLSX spreadsheet
Attachment 2 - N0002421R5208 GFP List.xlsx XLSX spreadsheet
Supplement A1 - TDP Option Selection Worksheet .docx DOCX document
Attachment 11 - N0002421R5208 Question_Comment Template.docx DOCX document
RFP N0002421R5208.pdf PDF
Attachment 15 - Press Release Information Form.docx DOCX document
Attachment 4 - N0002421R5208 - SPARES List.xlsx XLSX spreadsheet
Exhibit - A N0002421R5208 CDRLs_.docx DOCX document
Attachment 3 - NAVSEA 4340_2 GFI listing_JULY2021.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ES CLINS Definitions

Labor CategoryDefinition
Senior-Level Program SupportBachelors degree and at least 15 years of experience
Mid-Level Program SupportBachelors degree and 8-15 years of experience; or
10 years experience without a bachelors degree
Entry-Level Program SupportBachelors degree and less than 8 years experience; or
3-10 years experience without a bachelors degree
Senior-Level EngineeringBachelors degree in engineering (or similar field) and 15 years or more of experience
Mid-Level EngineeringBachelors degree in engineering (or similar field) and 8-15 years of experience
Entry-Level EngineeringBachelors degree in engineering (or similar field) and less than 8 years experience

X020 SDP-Next

Labor CategoryHours Per CLIN 0020, 1020, 2020, 3020, 4020Breakout
Program SupportSenior20%
Senior112Mid35%
Mid196Entry45%
Entry252
Engineering
Senior380
Mid665
Entry855
SDP-Next CLIN 0020 Labor Mix ProfileHours
Functional CategoryNRE
Configuration Management40Totals
Sr. Production Manager13Engineering TotalProgram Support Total
Production Management151901559
Production Planning370STT Ratio
Program Finance3277%23%
Sr. Program Management8
Program Management78
Program Admin4
Material Planning180
Manufacturing Engineering510
Design Engineering941
Test Engineering80
Quality Engineering137
Floor Assembly Supervision53
Total2460

X024 Repair 1

Labor CategoryHours Per CLIN (0024, 1024, 2024, 3024, 4024)Breakout
Program SupportSenior20%
Senior2675Mid35%
Mid4682Entry45%
Entry6019
Engineering
Senior5,325
Mid9,318
Entry11,981
Repair CLIN 0024 Labor Mix ProfileHours
Functional Category
Configuration Management1664Totals
Sr. Repair Manager832Engineering TotalProgram Support Total
Repair Management24962662413376
Repair Planning2496STT Ratio
Program Finance83267%33%
Sr. Program Management832
Program Management3392
Program Admin832
Material Planning3328
Manufacturing Engineering3328
Design Engineering1664
Test Engineering8320
Quality Engineering8320
Floor Assembly Supervision1664
Total40,000

X027 Stockpoint

Labor CategoryHours Per CLIN (CLINs 0027, 1027, 2027, 3027, and 4027)Breakout
Program SupportSenior20%
Senior136Mid35%
Mid238Entry45%
Entry306
Engineering
Senior464
Mid812
Entry1,044
Stockpoint Labor Mix ProfileHours
Functional Category
Configuration Management0Totals
Sr. Repair Manager26Engineering TotalProgram Support Total
Repair Management542320680
Repair Planning104STT Ratio
Program Finance20877%23%
Sr. Program Management26
Program Management54
Program Admin208
Material Planning208
Manufacturing Engineering573
Design Engineering161
Test Engineering520
Quality Engineering832
Floor Assembly Supervision26
Total3000

X028 Engineering Services

Labor CategoryHours Per CLIN (CLINs 0028, 1028, 2028, 3028, and 4028)Breakout
Program SupportSenior20%
Senior224Mid35%
Mid391Entry45%
Entry503
Engineering
Senior1,176
Mid2,059
Entry2,647
ESS Labor Mix ProfileHours
Functional Category
Configuration Management260Totals
Sr. Production Manager104Engineering TotalProgram Support Total
Production Management2658821118
Production Planning52STT Ratio
Program Finance2684%16%
Sr. Program Management104
Program Management520
Program Admin26
Material Planning104
Manufacturing Engineering2080
Design Engineering2080
Test Engineering578
Quality Engineering1040
Floor Assembly Supervision0
Total7000

X030 CM & TDM

Labor CategoryHours Per CLIN (CLINs 0030, 1030, 2030, 3030, and 4030)Breakout
Program SupportSenior20%
Senior2080Mid35%
Mid3640Entry45%
Entry4680
Engineering
Senior2,662
Mid4,659
Entry5,990
0030 CM & TDMHours
Functional CategoryEngineering TotalProgram Support Total
Configuration Management41601331210400
Sr. Production Manager416STT Ratio
Production Management166456%44%
Production Planning416
Program Finance416
Sr. Program Management416
Program Management2496
Program Admin416
Material Planning416
Manufacturing Engineering3328
Design Engineering4160
Test Engineering4160
Quality Engineering1248
Floor Assembly Supervision0
Total23712

Proposed Labor Mix

SDP-Next Recurring
Labor Category1-2526-5051-120
Assembly802,0804,080
CCA Test10300700
Configuration265278
Design Engineering150180210
Floor Assembly Supervision99274414
Manufacturing Engineering152455759
Planning218436655
Production Management9521,1421,3321,0571,2681,479
Senior Production Management228276322
Program Administrative103865
Program Finance158190222
Program Management1,0571,2681,4799521,1421,332
Senior Program Management688296
Quality Engineering9581,3981,830
Quality Inspection338461,659
Systems Production Test1233,1906,258
Test Engineering144432720Grand Total
Total4,46512,63920,87937,983
IPT9

Sheet2

File details come from the government source that posted it. Updated .