About this file

This document contains questions and answers related to a solicitation for the production of Consoles, Displays and Peripherals equipment. The solicitation seeks the manufacture, assembly and test of Build-To-Print production of Common Display System Technical Insertion Sixteen Modification 1 equipment and portions of the Aegis Weapon System Aegis Modernization Upgrade. The Naval Sea Systems Command will award a firm-fixed price contract for fiscal year 2020 through 2025 requirements, including labor, material and other costs to produce the equipment, ancillary items, and spares. Engineering services are also included to maintain technical data and address diminishing manufacturing sources issues. Offerors must meet the requirements of a Lowest Price, Technically Acceptable evaluation in accordance with FAR 15.101-2. Deliveries are anticipated as free on board at origin.

Bidders Questions

View the file

Other files

File Type Posted
N00024-19-R-5601_Amendment_004_Conformed_Copy.pdf PDF
N00024-19-R-5601_Amendment_004_Conformed_Copy.doc DOC document
N00024-19-R-5601_Amendment_004_Modification.pdf PDF
FBO_Bidders_Questions_8.19.19.xlsx XLSX spreadsheet
N00024-19-R-5601_Amendment_004_Modification.doc DOC document
Attachment_J-4_CDP_Spares_List_Updated.xlsx XLSX spreadsheet
N00024-19-R-5601_Amendment_003_Conformed_Copy.docx DOCX document
N00024-19-R-5601_Amendment_003_Modification.docx DOCX document
FBO_Bidders_Questions_8.12.19.xlsx XLSX spreadsheet
N00024-19-R-5601_Amendment_003_Modification.pdf PDF
N00024-19-R-5601_Amendment_003_Conformed_Copy.pdf PDF
Amendment_0002_Modification.pdf PDF
Amendment_0002_Conformed_Copy.pdf PDF
Amendment_0002_Modification.doc DOC document
Amendment_0002_Conformed_Copy.doc DOC document
FBO_Bidders_Questions_8.2.19.xlsx XLSX spreadsheet
N00024-19-R-5601_Amendment_001.pdf PDF
N00024-19-R-5601_Amendment_001.doc DOC document
N00024-19-R-5601.pdf PDF
Exhibit_A,_B_&_C_-_N00024-19-R-5601_CDRL_Data_Package_25_June_2019.pdf PDF
Attachment_L-2_Contract_Award_Announcement_Information.docx DOCX document
N00024-19-R-5601.doc DOC document
Attachment_J-1_-_DD254_for_N00024-19-R-5601_-_Signed.pdf PDF
Attachment_L-3_Bidder's_Question_Submittal_Form.docx DOCX document
Attachment_J-8_-_Contract_Burdened_Pricing_Rates.xlsx XLSX spreadsheet
Attachment_J-4_-_CDP_Spares_List.xlsx XLSX spreadsheet
Attachment_L-1_Compliance_Checklist.docx DOCX document
Attachment_J-3_-_Government_Furnished_Information_Library_List.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidders Questions

DateQuestion N0.RFP Reference/Discussion (if necessary)QuestionAnswer
7/24/191RFP M.3 (1) Page 174Does the methodology described in this section mean that the Government will select a random quantity from each of the bands listed in Section B Note C and then multiply by price and add them all together to obtain the TEP for that CLIN? That is, to obtain the “TEP” for the CLIN a different random quantity within EACH of the 5 bands is used? Or is the methodology to select a random quantity from just ONE random band within the CLIN? Are the random selections held consistent across each of the CLINs listed in Note C?The Government redirects offerors to this part of section M for the answer, the Government will choose one quantity from the range of 1-250 units. The random selection will be held consistent across each of the CLINs.
7/24/192RFP 3.4 Page 56Please clarify what “requirements” must be met to move into FRP. Are these simply the “areas” enumerated in Section 3.4.1.Prior to entering into full rate production, a successful Production Readiness Review must be conducted in accordance with section 3.4.1 and successful First Article Requirements in accordance with section 3.4.2 must be completed on at least one of CLINs 0006-0008. Successful completion of the Production Readiness Review and First Article requirements requires adjudication of all action items and discrepancies identified during conduct of these events.
7/24/193RFP M.3 (2)The delivery requirements of Section B, Note J are unclear. Are physical units to be delivered under CLINS 0006-0080, or is the scope to be priced only to conduct the activities as listed in Section 3.4.2 of the SOW?Physical First Article Units are not to be delivered under CLIN 0006-0008. CLIN 0006-0008 is the labor required to perform the work identified in Section C, paragraph 3.4.2. The equipment required for this effort shall be procured from the production CLINs 0001-0003. Section B, note J has been revised to state First Article Requirements instead of First Article Units
7/24/194Note L Page 36Are the PIO rates to be incorporated into the TEP and if so, using what methodology? Attachment J-8 requests 10 years of rates and Note I states pricing on CLIN 5000 could be executed 5 years after the initial contract award and at FFP. What is the Government’s intent on use and scope applied to this CLIN? It would appear to expose a contractor to unlimited risk.The PIO rates are not to be incorporated into the TEP. Please only provide 5 years of rates as determined by the RFP. PIO is bound by the last possible date of the contract, which would be no longer than 60 months from award if all options are exercised. The Government intends to use this for only emergent requirements related to the original requirement that should present themselves in the future.
7/30/195TDPRequest the drawing and parts lists for Part Numbers 8563180 and 8563181The drawings and parts lists will be provided by the Government.
7/30/196Attachment J-4Request the drawing or part list for part number 8567957 from the spare list Attachment J-4 as there is nothing in the RFP and the vendor that is specified does not recognize that part number.The drawing and parts list will be provided by the Government.
7/30/197RFP 3.12.4 Page 66The RFP excerpt above requires the development of both IMI and PPP based instructor led curriculum. Should the offeror make the assumption that the development of the training packages is a new development effort? Presumably approved CDS training curriculum already exists.Yes, training does exist for Ti16 CDS Water-Cooled. It is currently being test for functionality and will be provided at the time of award.
7/30/198Section I, FAR 52.230-2; Section K, FAR 52.230-1, paragraph (a)Prior to 01 July 2018, the Truth in Negotiation Act (TINA) threshold was $750,000. That was subsequently raised to $2,000,000 via FAR 52.230-2 Cost Accounting Standards (DEVIATION 2018-O0015) and FAR 52.230-1, Cost Accounting Standards Notices and certification (DEVIATION 2018-O0015. We recommend the government increase the threshold in section K to $2,000,000 and incorporate the FAR 52.230-1 and FAR 52.230-2 deviations into the solicitation.The Government agrees and has changed both clauses to match the deviation per the FAR.
7/30/199Page 160 Section L, Subsection 2.1Please consider allowing Microsoft Office 2016 documents to be compliant for this Solicitation.The Government here makes the delineation between Microsoft Windows and Microsoft Office. The Government stated Windows 2010 to mean Windows 10 complient. As such, the Government accepts Microsoft Office 2016 documents as being compliant.