This is a competitive solicitation for the manufacture, assembly, and test of Build-To-Print production of Consoles, Displays and Peripherals equipment, including Common Display System Technical Insertion Sixteen Modification 1 and portions of the Aegis Weapon System Aegis Modernization Upgrade equipment. The Naval Sea Systems Command intends to issue full and open solicitation N00024-19-R-5601 to acquire all labor, material, and other direct costs required from Fiscal Year 2020 through 2025. This includes manufacturing, assembling, and testing consoles, displays, peripherals equipment, ancillary equipment, and spares. Engineering services will also be provided to update and maintain the Technical Data Package, provide technical data for follow-on configurations, and resolve Diminishing Manufacturing Sources issues. A firm-fixed price contract will be awarded to the responsible offeror providing the lowest price technically acceptable proposal according to FAR 15.101-2. Deliveries are anticipated free on board at origin. All responsible sources may submit proposals to be considered by the agency, with all information communicated through the Federal Business Opportunities portal.
Amendment 0002 Modification PDF Document
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002418NR41254
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. To change "First Article Units" to First Article Requirement" in Section M.3 (2)
2. To change "First Article Units" to First Article Requirement" in Section B, Note J
3. To add an option for "Additional 4-port Network Interface CARD (NIC) with 2 GLC-LH-SMD transceivers" to the conifgurations and HMI Options Tables for the base and option years in Section B, Note D
4. Section M.3 updated.
5. To delete non-applicable information on Bidder's Questions posted in Amendment 0001 and re-post the Excel spreadsheet in Amendment 0002.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R5601
X 9B. DATED (SEE ITEM 11)
27-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2019
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
N0002419R5601
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
NOTE D
NOTE D- Stepladder pricing for configuration and HMI options for incorporation under CDP hardware base contract line items (CLINs) 0001-0003, and if Option CLINs are exercised 1001-1003, 2001-2003, 3001-3003, and 4001-4003 shall be established at contract award and detailed in the tables below. The Section B amounts in the tables below shall be established and funded through unilateral modification in accordance with Section I clause 52.217-7 and the stepladder pricing detailed in the tables below. During contract execution, the pricing detailed in the tables below will be combined with the pricing established in Note C of Section B to provide the fully integrated console price under CLINs 0001-0003, 1001-1003, 2001-2003, 3001-3003 and 4001-4003. The Government will detail the specific Configuration / HMI Option item description within the respective SLIN extended description in Section B at time of modification award, providing direction to the contractor for which Configuration/HMI Option to incorporate with the console variant being procured.
The Government may procure any selection of the items identified in the tables below. Furthermore, the Government retains the right to unilaterally increase the quantity procured for each of the specific configurations and HMI options identified in the tables below (base CLINs 0001-0003 and if options are exercised; 1001-1003, 2001-2003, 3001-3003 and 4001-4003) as long as it occurs before the latest option exercise date stated under Section I clause 52.217-7. If a quantity increase for a specific configuration and HMI option occurs within a 60-day period of other quantities procured for that speciifc configuration and HMI option, then pricing for the total quantity procured for that specific configuration and HMI option within this 60-day period shall be adjusted to the unit price from the stepladder pricing tables below for the total quantity procured of that item. Conversely, for any quantity increases of a specific configuration and HMI option not occurring within a 60-day period, the Government will utilize the unit pricing from the stepladder pricing tables below applicable to the quantity of each specific configuration and HMI option and the pricing of previous quantities procured of each specific configuration and HMI option shall not change.
For funding and administrative purposes, at the time of option exercise and quantity purchase increases, the Contracting Officer may unilaterally establish separately priced contract line items (CLINs) or subcontract line items (SLINs) to procure items under Note D. The Section B Firm Fixed Price (FFP) amount and the funding provided in each modification shall be unilaterally established based on the stepladder pricing in the tables below.
Therefore, the final unit price of any specific item will be based on the total number of units procured for that item within that 60-day timeframe. The Government will retain the unilateral right to amend issued modifications at the final unit price.
Note D - Table 1
Configuration & HMI Options (to be incorporated under CLINS 0001 – 0003)
Configuration / HMI Option 1 2-17 18-50 51-100 101-250
Add Joystick: FAR RHS/ FAR LHS/ Center RHS/Center
LHS $ $ $ $ $
Add Hand Controller: FAR RHS/ FAR LHS/ Center RHS/Center LHS $ $ $ $ $
Add Integrated Headset $ $ $ $ $ Add Additional Illuminated Writing Surface (LHS/RHS) $ $ $ $ $ Add Uninterrupted Power Supply (UPS) $ $ $ $ $
Add Daisy Data 6x7 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/Center RHS/Center LHS $ $ $ $ $
Add x11 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/ Center RHS/ Center LHS $ $ $ $ $
Add Additional 4-port Network Interface Card (NIC) with 2 GLC-LH-SMD transceivers $ $ $ $ $
Note D - Table 2
Configuration & HMI Options (to be incorporated under CLINS 1001 – 1003)
Configuration / HMI Option 1 2-17 18-50 51-100 101-250
Add Joystick: FAR RHS/ FAR LHS/ Center RHS/Center
LHS $ $ $ $ $
Add Hand Controller: FAR RHS/ FAR LHS/ Center RHS/Center LHS $ $ $ $ $
Add Integrated Headset $ $ $ $ $ Add Additional Illuminated Writing Surface (LHS/RHS) $ $ $ $ $ Add Uninterrupted Power Supply (UPS) $ $ $ $ $
Add Daisy Data 6x7 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/Center RHS/Center LHS $ $ $ $ $
Add x11 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/ Center RHS/ Center LHS $ $ $ $ $
Note D - Table 3
Configuration & HMI Options (to be incorporated under CLINS 2001 – 2003)
Configuration / HMI Option 1 2-17 18-50 51-100 101-250
Add Joystick: FAR RHS/ FAR LHS/ Center RHS/Center
LHS $ $ $ $ $
Add Hand Controller: FAR RHS/ FAR LHS/ Center RHS/Center LHS $ $ $ $ $
Add Integrated Headset $ $ $ $ $ Add Additional Illuminated Writing Surface (LHS/RHS) $ $ $ $ $ Add Uninterrupted Power Supply (UPS) $ $ $ $ $
Add Daisy Data 6x7 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/Center RHS/Center LHS $ $ $ $ $
Add x11 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/ Center RHS/ Center LHS $ $ $ $ $
Note D - Table 4
Configuration & HMI Options (to be incorporated under CLINS 3001 – 3003)
Configuration / HMI Option 1 2-17 18-50 51-100 101-250
Add Joystick: FAR RHS/ FAR LHS/ Center RHS/Center
LHS $ $ $ $ $
Add Hand Controller: FAR RHS/ FAR LHS/ Center RHS/Center LHS $ $ $ $ $
Add Integrated Headset $ $ $ $ $ Add Additional Illuminated Writing Surface (LHS/RHS) $ $ $ $ $ Add Uninterrupted Power Supply (UPS) $ $ $ $ $
Add Daisy Data 6x7 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/Center RHS/Center LHS $ $ $ $ $
Add x11 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/ Center RHS/ Center LHS $ $ $ $ $
Note D - Table 5
Configuration & HMI Options (to be incorporated under CLINS 4001 – 4003)
Configuration / HMI Option 1 2-17 18-50 51-100 101-250
Add Joystick: FAR RHS/ FAR LHS/ Center RHS/Center
LHS $ $ $ $ $
Add Hand Controller: FAR RHS/ FAR LHS/ Center RHS/Center LHS $ $ $ $ $
Add Integrated Headset $ $ $ $ $ Add Additional Illuminated Writing Surface (LHS/RHS) $ $ $ $ $ Add Uninterrupted Power Supply (UPS) $ $ $ $ $
Add Daisy Data 6x7 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/Center RHS/Center LHS $ $ $ $ $
Add x11 VAB Panel w/ Tactile Cover: FAR RHS/ FAR LHS/ Center RHS/ Center LHS $ $ $ $ $
NOTE J
NOTE J – Firm Fixed Pricing (FFP) for First Article Requirement (FAR), Production Readiness Review (PRR) and Country of Origin Study shall be proposed in Section B.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
M.1 GENERAL INFORMATION
This section contains specific evaluation factors for award of a contract pursuant to this solicitation. A contract will be awarded to the responsible Offeror whose proposal is determined by the Government to offer the LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) proposal in accordance with FAR 15.101-2. Award will be made only to an Offeror whose proposal is determined to be technically acceptable. Offerors are advised that a rating of “Unacceptable” in any single evaluation factor, will result in the proposal being rated technically unacceptable overall. Offerors are also advised that the Government will not evaluate any proposal information not contained within the body of the proposal. Letters of transmittal and/or cover letters that forward the proposal to the Government are not considered part of the body of the proposal.
Statements and representations made in the Offeror’s proposal may be subject to verification by the Defense Contract Audit Agency, the Defense Contract Management Agency or otherwise, or through an onsite survey by Government evaluators.
The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced within the stepladder ranges and/or between line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more stepladder prices or contract line items are significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
Evaluation of options will not obligate the Government to exercise the option(s).
The Government will not entertain any proposed revisions to the terms and conditions contained in this solicitation submitted as part of the Offeror’s proposal, including any attachment/exhibit referenced therein.
Therefore, any offer that includes “redlines,” condition(s) of offer, or any other deviation from the requirements of the solicitation may be rejected by the Government as non-compliant.
Offerors are advised that the Government reserves the right to conduct site visits and/or a pre-award survey prior to award to any prospective Offeror.
Offerors are advised that the Government intends to make an award subject to the availability of funds.
Offerors are advised that proposals that include Cost and/or Price information in the Technical and Past Performance Volumes may result in the proposal being evaluated as “Unacceptable.”
The successful Offeror shall have been granted a SECRET facility security clearance by a military department prior to the date of award. Any firm lacking the requisite security clearance and intending to respond to this procurement shall, within fourteen (14) days of issuance of this solicitation, request initiation of such clearance action in writing from the Naval Sea Systems Command, Code: SEA 00P, 1333 Isaac Hull Avenue SE, Washington Navy Yard DC 20376. Appropriate clearance action in accordance with established procedures will be initiated by the Naval Sea Systems Command, but the Naval Sea Systems Command does not represent that such action can be completed and clearance granted prior to expiration of offers.
Proposals that do not include all the information and materials prescribed in Section L, above, may be disqualified from consideration for award upon receipt without further review by the Government.
M.2 EVALUATION FACTORS OTHER THAN COST OR PRICE
General: The Government’s Technical and Past Performance Evaluation of proposals will be based on the factors listed below and described in Section L of this solicitation.
TECHNICAL AND PAST PERFORMANCE FACTORS
FACTOR 1 – MANUFACTURE, ASSEMBLY, TEST, and ENGINEERING
1. In order to be acceptable, the Offeror’s proposal shall clearly demonstrate their ability to manufacture, assemble, test, and deliver the items detailed in the TDP. The Offeror shall provide examples of previous experience in producing products of same or similar complexity.
In order to be acceptable, the Offeror shall guarantee the availability of proposed facilities that can safely and reliably meet the Console, Display and Peripheral Equipment requirements.
In order to be acceptable, the Offeror’s management information system shall ensure complete TDP compliance prior to ordering material and prior to release of material for manufacturing. In order to be found acceptable the Offeror’s management information system shall also ensure complete inventory management of delivered products.
In order to be acceptable, the Offeror’s shall demonstrate a clear understanding of the Configuration Management and Engineering Change Proposal (ECP) processes described in Section C Statement of Work paragraph C.3.6.
In order to be acceptable, the Offeror’s quality management approach shall be ANSI/ISO 9001:2015 certified.
2. In order to be acceptable, the Offeror’s proposed CWBS shall clearly demonstrate the major process activities, beginning with contract award through FAU and PRR and shipment of shipsets per the required delivery schedule, while linking back all required steps to the proposed IMS.
3. In order to be acceptable, the Offeror’s proposed IMS (Appendix A) and Facilities (Appendix B) shall clearly demonstrate the ability to produce and deliver in accordance with the following delivery requirements and throughput:
The Offeror shall be capable of producing up to fifty (50) console units per month and one hundred
(100) tactical equivalent consoles, displays and peripheral units per month with the following delivery requirements:
• The Console Equipment (0001-0003, 1001-1003, 2001-2003, 3001-3003, 4001- 4003) not to exceed ten (10) months from modification execution if units are subject to first article requirements or eight (8) months from modification execution if units are not subject to first article requirements.
• Tactical Equivalent Consoles, Displays and Peripheral Equipment (0004-0005, 1004-1005, 2004- 2005, 3004-3005, 4004-4005) not to exceed six (6) months from modification execution.
4. In order to be acceptable, the Offeror’s proposed BOM (Appendix C) shall demonstrate a clear understanding of the Console, Display and Peripheral Equipment TDP and account for all material required to successfully complete the Government’s requirements as described in the SOW and TDP.
5. In order to be acceptable, the Offeror’s proposed Engineering Services (Appendix D) shall demonstrate a clear understanding of the various engineering services tasks including, detailed technical documentation and/or trouble shooting the Network, Processing and Storage Equipment and account for all material required to successfully complete the Government’s requirements as described in the SOW and TDP.
FACTOR 2: PAST PERFORMANCE
The Past Performance factor will be rated on an Acceptable/Unacceptable basis. The Government will use information provided by the Offeror, as well as any other information deemed necessary to assess the Offeror’s ability to meet the solicitation requirements. This assessment will be based on a demonstrated record of past performance, taking into consideration the recency and relevancy of the past performance data as well as how well the offeror performed on prior contracts. The Government may also evaluate the past performance of an Offeror’s proposed major subcontractors. When assessing past performance, the Government will focus its assessment on the past performance of the Offeror and its proposed major subcontractors as it relates to all solicitation requirements, such as quality, price, schedule, and performance, including the contractor’s record of conforming to specifications and to standards of good workmanship; the contractor’s adherence to contract schedules, including administrative aspects of performance; the contractor’s history for reasonable and cooperative behavior and commitment to customer satisfaction; and general, the contractor’s business-like concern for the interests of its customers. In the investigation of an Offeror’s past performance, the Government reserves the right to contact former customers, Government agencies and other private and public sources of information. Offerors are cautioned that in conducting the past performance assessment, the Government may use data provided in its proposal and may use data obtained from PPIRS, FAPIIS, eSRS and CPARS. It is incumbent upon the offeror to explain the relevance of the data provided. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of providing thorough and complete past performance source data rests with the offerors..
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, unknown past performance shall be considered acceptable. The evaluation will include information provided by the Offeror demonstrating compliance with the requirements of FAR 52.219-8 and 52.219-9.
To be considered acceptable, the Offeror’s Technical and Past Performance proposals (Factors 1 and 2) shall meet the Government’s minimum requirements as set forth in this solicitation.
M.2.1 RATINGS DEFINITIONS
The Offeror’s technical proposal will be evaluated and a determination made as to the acceptability of each, in accordance with the following definitions:
Factor 1 - the Government will evaluate the Offeror’s proposal using the following ratings:
• Acceptable: Proposal meets the requirements of the solicitation.
• Unacceptable: Proposal does not meet the requirements of the solicitation.
Factor 2 - the Government will evaluate the Offeror’s proposal using the following ratings:
• Acceptable: Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
• Unacceptable: Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
M.3 PRICE FACTOR EVALUATION AND TOTAL EVALUATED PRICE (TEP) TO THE
GOVERNMENT
The Government will evaluate all FPP CLINs for price reasonableness and material balance. Cost and Price Realism will NOT be conducted for FFP CLINs. Cost Realism will be conducted for CPFF CLINs.
The Government will determine a Total Evaluated Price (TEP) to the Government for each Offeror by adding together the following values:
Total Evaluated Stepladder Price for the Console, Display and Peripheral Equipment (see #1 below) + $ Total Evaluated Price for FAUs and PRR (see #2 below) + $ Total Evaluated Price for INCO/Spares (see #3 below) + $ Total Evaluated Price for Engineering Services (see #4 below) + $ Total Other Direct Costs in support of Engineering Services (see#5 below) + $
TOTAL EVALUATED PRICE (TEP) = $
(1) The Total Evaluated Stepladder Price for the Console, Display and Peripheral Equipment is determined by adding together the Government’s evaluation of the Offeror’s proposed FFP amounts, in accordance with the stepladder pricing tables in Section B, Notes C, D, E and F, using the Government’s randomly selected quantity for Contract Line Item Numbers (CLINs) 0001-0005, 1001-1005, 2001-2005, 3001-3005 and 4001-4005. The Government has determined that it is just as likely that any potential quantities within the stepladder ranges will be awarded and because the Government seeks reasonable pricing for all stepladder priced line items, the Government will randomly select, prior to receipt of proposals, a single quantity to be evaluated for each line item. The Government will then utilize the randomly selected quantity to determine the amount to be included in the TEP for each CLIN by multiplying the randomly selected quantity by the Offeror’s proposed price for the associated line item. The selection of a random quantity is for evaluation purpose only and does not obligate the Government to award/exercise at that randomly selected quantity. The randomized quantities will not be disclosed to Offerors until after award.
(2) The Total Evaluated Price for First Article Requirement(s) (FAU) and Production Readiness Review (PRR) CLINs 0006-0010 is determined by adding together the Government’s evaluation of the Offeror’s proposed FFP amounts, in accordance with the pricing tables in Section B, Note J.
(3) The Total Evaluated Stepladder Price for Spares is determined by adding together the Government’s evaluation of the Offeror’s proposed FFP amounts, in accordance with the pricing tables in Attachment J-4.
These tables will be evaluated using the Government’s selected quantities for CLINs 0100, 1100, 2100, 3100 and 4100. The Government has determined that it is just as likely that any one of the quantities will be awarded and because the Government seeks reasonable pricing for all stepladder line items, the Government will select, prior to receipt of proposals, a quantity for each line item.. The Government will then utilize the selected quantity to determine the amount to be included in the TEP for each CLIN. The selection of a quantity is for evaluation purpose only and does not obligate the Government to award/exercise at that selected quantity. The selected quantities will not be disclosed to Offerors until after award.
(4) The Total Evaluated Price for Engineering Services CLINs 0200, 1200, 2200, 3200 and 4200 is determined by adding together the Government’s evaluation of the Offeror’s proposed CPFF amounts, in accordance with the pricing tables in Section B, Note H.
(5) The Government estimate for Incidental Materials and Other Direct Costs shall be incorporated into the
Total Evaluated Price per Note H.
M.4 BASIS FOR AWARD
Award will be made on the basis of the proposal with lowest Total Evaluated Price (TEP) meeting or exceeding the acceptability standards for non-cost factors (Total Evaluated Price is defined in M.3). To be technically acceptable, the proposal shall be acceptable in Factor 1 and Factor 2. If any non-price factor is unacceptable, then the entire proposal will be unacceptable regardless of price.
Offerors are notified that, in accordance with FAR clause 52.215-1, which is incorporated in Section L, the Government intends to make an award on the basis of initial proposals without conducting discussions. The Government will not perform a tradeoff analysis in its evaluation. The Government will evaluate all Offerors' price proposals to determine their TEP first, in accordance with Paragraph M.3 of this solicitation. The technical proposal of the Offeror with the lowest TEP will be evaluated for technical acceptability first. If the Offeror with the lowest TEP is found to be technically acceptable, the Government will not evaluate the technical acceptability of any other proposals. If the Offeror with the lowest TEP is found to be technically unacceptable then the Government will evaluate the technical acceptability of the Offeror with the next lowest TEP and so on until a technically acceptable Offeror is determined. If, at any point, in this ordered-process the Government determines that it is necessary to enter into discussions, the Government may evaluate the technical proposals of all Offerors not otherwise excluded from competition.
(End of Summary of Changes)
M.4 BASIS FOR AWARD