This solicitation seeks proposals for a build-to-print production contract for Network, Processing, and Storage Equipment comprising Common Processing System Technical Insertion Sixteen Modification 1 cabinets and portions of the Aegis Weapon System Aegis Modernization Upgrade equipment. The Naval Sea Systems Command will award a firm-fixed price contract for fiscal years 2020 through 2025 to the responsible offeror with the lowest price technically acceptable proposal. The contract scope includes manufacturing, assembling, and testing the computer, storage, and networking equipment as well as updating technical data and resolving diminishing manufacturing sources and material shortage issues. Proposals are due via the Federal Business Opportunities portal.

Word Conformed Copy Amendment 0005

View the file

Other files

File Type Posted
Bidders_Questions_N0002419R5600_Amend_0011.xlsx XLSX spreadsheet
Amendment_0011_Modification_Copy.docx DOCX document
Amendment_0011_Modification_Copy.pdf PDF
Amendment_0011_Conformed_Copy.pdf PDF
Amendment_0011_Conformed_Copy.docx DOCX document
Attachment_J-4_NPS_LRU_Production_Spares_20190827.xlsx XLSX spreadsheet
Amendment_0010_Conformed_Copy.docx DOCX document
Amendment_0010_Conformed_Copy_PDF.pdf PDF
Amendment_0010_Modification_Copy.docx DOCX document
Bidders_Questions_N0002419R5600_Amend_0010.xlsx XLSX spreadsheet
Amendment_0010_Modification_Copy_PDF.pdf PDF
Modification_Copy_Amendment_0009PDF.pdf PDF
Bidders_Questions_N0002419R5600_Amend_0009Aug262019.xlsx XLSX spreadsheet
Modification_Copy_Amendment_0009.docx DOCX document
Attachment_J-4_NPS_LRU_Production_Spares_20190826.xlsx XLSX spreadsheet
Conformed_Copy_Amendment_0009.docx DOCX document
Conformed_Copy_Amendment_0009_PDF.pdf PDF
Modification_Amendment_0008_PDF.pdf PDF
Modification_Amendment_0008_Word.docx DOCX document
Conformed_Amendment_0008_Word.docx DOCX document
Attachment_J-4_NPS_LRU_Production_Spares_20190812.xlsx XLSX spreadsheet
Conformed_Amendment_0008_PDF.pdf PDF
Modification_Amendment_0008_PDF.pdf PDF
Bidders_Questions_N0002419R5600_Amend_0008Aug222019.xlsx XLSX spreadsheet
Modification_Amendment_0008_Word.docx DOCX document
Attachment_J-4_NPS_LRU_Production_SparesN0002419R5600.xlsx XLSX spreadsheet
Amendment_07_Modification_Copy.docx DOCX document
Amendment_07_Conformed_Copy.pdf PDF
Bidders_Questions_N0002419R5600_Amend_0007.xlsx XLSX spreadsheet
Amendment_07_Conformed_Copy.docx DOCX document
Amendment_07_Modification_Copy.pdf PDF
AttachmentL1.N0002419R56000.7.22.2019.xlsx XLSX spreadsheet
N00024-19-R-5600_CDRL_Data_Package.pdf PDF
N0002419R5600Amendment_0006_Modification_Copy.pdf PDF
N0002419R5600Amendment_0006_Modification_Copy.docx DOCX document
N0002419R5600Amendment_0006_Conformed_Copy.pdf PDF
N0002419R5600Amendment_0006_Conformed_Copy.docx DOCX document
N0002419R5600Amendment_0005_Conformed_Copy.pdf PDF
N0002419R5600Amendment_0005_Modification_Copy.docx DOCX document
N0002419R5600Amendment_0005_Modification_Copy.pdf PDF
Bidders_Questions_N0002419R5600_Amend_0005.xlsx XLSX spreadsheet
Amend_0003_N0002419R5600_Conformed_Copy.docx DOCX document
Amend_0003_N0002419R5600_modification_copy.docx DOCX document
N0002419R5600Amendment_0004_Modification_Copy.docx DOCX document
Bidders_Questions_N0002419R5600_Amend_0004.xlsx XLSX spreadsheet
N0002419R5600Amendment_0004_Conformed_Copy.docx DOCX document
Amend_0003_N0002419R5600_Conformed_Copy.docx DOCX document
Attachment_J-4_NPS_LRU_Production_Spares_20190531.xlsx XLSX spreadsheet
Bidders_Questions_N0002419R5600_Amend_0003.xlsx XLSX spreadsheet
Amend_0003_N0002419R5600_modification_copy.docx DOCX document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002419R5600

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0001

Each

Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet

DWG# 8563369

See Notes A, B, C FOB: Origin (Shipping Point)

PURCHASE REQUEST NUMBER: N0002418NR41140

PSC CD: 1265

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0002

Each

Network, Processing & Storage Equipment

Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0003

Each

Network, Processing & Storage Equipment

Water-Cooled Advanced Storage Area Network (ASAN) Cabinet

DWG# - 8563368

See Notes A, B, C

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0004

Each

Network, Processing & Storage Equipment

Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet

DWG# - 8563367

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0005

Each

Network, Processing & Storage Equipment

Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0006

Each

Network, Processing & Storage Equipment

Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet

DWG# - 8563366

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0007

Each

Network, Processing & Storage Equipment

Water-Cooled Digital Video Distribution System (DiVDS) Cabinet

DWG# - 8563370

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0008

Each

OPTION
Network, Processing & Storage Equipment

FFP

Air-Cooled Processing & Storage Subsystem (PS2) Cabinet

DWG# - 8601113-001

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0009

Each

OPTION
Tactical Equivalent - CCS Cabinet

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0010

Each

OPTION
Tactical Equivalent -CCS Cabinet - FMS

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0011

Each

OPTION
Tactical Equivalent - ASAN Cabinet

FFP

See Notes A, B, C

DWG# 8563496

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0012

Each

OPTION
Tactical Equivalent - ALIS Cabinet

FFP

See Notes A, B, C

DWG# 8563495

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013

Each

OPTION
Tactical Equivalent -ACEGIO1 Cabinet

FFP

See Notes A, B, C

DWG# 8563493

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014

Each

OPTION
Tactical Equivalent -ACEGIO2 Cabinet

FFP

See Notes A, B, C

DWG# 8563494

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015

Each

OPTION
Tactical Equivalent - DiVDS Cabinet

FFP

See Notes A, B, C

DWG# 8563498

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016

Each

OPTION
Tactical Equivalent

FFP

Air-Cooled PS2 Cabinet See Notes A, B, C

DWG# 8623321-000

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017

Each

First Article Requirement - CCS

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0018

Each

First Article Requirement - CCS - FMS

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0019

Each

First Article Requirement - ASAN

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0020

Each

First Article Requirement - ALIS

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0021

Each

First Article Requirement - ACEGIO1

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022

Each

First Article Requirement - ACEGIO2

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0023

Each

First Article Requirement - DiVDS

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0024

Each

First Article Unit Requirements

First Article Unit Requirements- Air Cooled PS2 See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0025

Each

Production Readiness Review (PRR)

See Notes A, B, D FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0026

Each

OPTION
Country of Origin Study

FFP

See Notes A, B, D

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0100

Each

OPTION
INCO, Spares & Repair

FFP

See Notes B, E FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0200

10,000
Hours
OPTION
Engineering Services

CPFF

Quantity 10,000 hours See Notes B, F FOB: Origin (Shipping Point)

PSC CD: K012

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0300

1
Lot
OPTION
ODC & Incidental Materials

COST

ODC & Incidental Materials for Engineering Services Government Estimated $71,000 See Notes B, F FOB: Origin (Shipping Point)

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0400

CDRLs (Exhibit A, B, and C)

Not Separately Priced (NSP) FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1001

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet See Notes A, B, C

DWG# 8563369

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1002

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1003

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Advanced Storage Area Network (ASAN) Cabinet

DWG# - 8563368

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1004

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet

DWG# - 8563367

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1005

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1006

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet

DWG# - 8563366

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1007

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Digital Video Distribution System (DiVDS) Cabinet

DWG# - 8563370

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1008

Each

OPTION
Network, Processing & Storage Equipment

FFP

Air-Cooled Processing & Storage Subsystem (PS2) Cabinet

DWG# - 8601113-001

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1009

Each

OPTION
Tactical Equivalent -CCS Cabinet

FFP

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1010

Each

OPTION
Tactical Equivalent-CCS Cabinet -FMS

FFP

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1011

Each

OPTION
Tactical Equivalent - ASAN Cabinet

FFP

See Notes A, B, C

DWG# 8563496

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1012

Each

OPTION
Tactical Equivalent - ALIS Cabinet

FFP

See Notes A, B, C

DWG# 8563495

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1013

Each

OPTION
Tactical Equivalent -ACEGIO1 Cabinet

FFP

See Notes A, B, C

DWG# 8563493

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1014

Each

OPTION
Tactical Equivalent -ACEGIO2 Cabinet

FFP

See Notes A, B, C

DWG# 8563494

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1015

Each

OPTION
Tactical Equivalent - DiVDS Cabinet

FFP

See Notes A, B, C

DWG# 8563498

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1016

Each

OPTION
Tactical Equivalent

FFP

Air-Cooled PS2 Cabinet See Notes A, B, C

DWG# 8623321-000

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1100

Each

OPTION
INCO, Spares & Repair

FFP

See Notes B, E FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1200

10,000
Hours
OPTION
Engineering Services

CPFF

Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1300

Lot

OPTION
ODC & Incidental Materials

COST

ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000

FOB: Origin (Shipping Point)

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2001

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet

DWG# 8563369

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2002

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2003

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Advanced Storage Area Network (ASAN) Cabinet

DWG# - 8563368

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2004

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet

DWG# - 856367

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2005

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2006

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet

DWG# - 8563366

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2007

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Digital Video Distribution System (DiVDS) Cabinet

DWG# - 8563370

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2008

Each

OPTION
Network, Processing & Storage Equipment

FFP

Air-Cooled Processing & Storage Subsystem (PS2) Cabinet

DWG# - 8601113-001

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2009

Each

OPTION
Tactical Equivalent - CCS Cabinet

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2010

Each

OPTION
Tactical Equivalent -CCS Cabinet -FMS

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2011

Each

OPTION
Tactical Equivalent - ASAN Cabinet

FFP

See Notes A, B, C

DWG# 8563496

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2012

Each

OPTION
Tactical Equivalent - ALIS Cabinet

FFP

See Notes A, B, C

DWG# 8563495

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2013

Each

OPTION
Tactical Equivalent -ACEGIO1 Cabinet

FFP

See Notes A, B, C

DWG# 8563493

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2014

Each

OPTION
Tactical Equivalent -ACEGIO2 Cabinet

FFP

See Notes A, B, C

DWG# 8563494

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2015

Each

OPTION
Tactical Equivalent - DiVDS Cabinet

FFP

See Notes A, B, C

DWG# 8563498

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2016

Each

OPTION
Tactical Equivalent

FFP

Air-Cooled PS2 Cabinet See Notes A, B, C

DWG# 8623321-000

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2100

Each

OPTION
INCO, Spares & Repair

FFP

See Notes B, E FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2200

10,000
Hours
OPTION
Engineering Services

CPFF

Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2300

Lot

OPTION
ODC & Incidental Materials

COST

ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3001

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet

DWG# 8563369

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3002

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3003

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Advanced Storage Area Network (ASAN) Cabinet

DWG# - 8563368

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3004

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet

DWG# 8563367

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3005

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3006

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3007

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Digital Video Distribution (DiVDS) Cabinet

DWG# 8563370

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3008

Each

OPTION
Network, Processing & Storage Equipment

FFP

Air-Cooled Processing & Storage Subsystem (PS2) Cabinet

DWG# 8601113-001

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3009

Each

OPTION
Tactical Equivalent - CCS Cabinet

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3010

Each

OPTION
Tactical Equivalent -CCS Cabinet -FMS

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3011

Each

OPTION
Tactical Equivalent - ASAN Cabinet

FFP

See Notes A, B, C

DWG# 8563496

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3012

Each

OPTION
Tactical Equivalent ALIS

FFP

See Notes A, B, C

DWG# 8563495

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3013

Each

OPTION
Tactical Equivalent -ACEGIO1 Cabinet

FFP

See Notes A, B, C

DWG# 8563493

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3014

Each

OPTION
Tactical Equivalent -ACEGIO2 Cabinet

FFP

See Notes A, B, C

DWG# 8563494

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3015

Each

OPTION
Tactical Equivalent - DiVDS Cabinet

FFP

See Notes A, B, C

DWG# 8563498

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3016

Each

OPTION
Tactical Equivalent

FFP

Air-Cooled PS2 Cabinet See Notes A, B, C

DWG# 8623321-000

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3100

Each

OPTION
INCO, Spares & Repair

FFP

See Notes B, E FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3200

10,000
Hours
OPTION
Engineering Services

CPFF

Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 3300

Lot

OPTION
ODC & Incidental Materials

COST

ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4001

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet

DWG# 8563369

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4002

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4003

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Advanced Storage Area Network (ASAN) Cabinet

DWG# - 8563368

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4004

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet

DWG# - 856367

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4005

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet

DWG# - 8563365

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4006

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet

DWG# - 8563366

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4007

Each

OPTION
Network, Processing & Storage Equipment

FFP

Water-Cooled Digital Video Distribution System (DiVDS) Cabinet

DWG# - 8563370

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4008

Each

OPTION
Network, Processing & Storage Equipment

FFP

Air-Cooled Processing & Storage Subsystem (PS2) Cabinet

DWG# - 8601113-001

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4009

Each

OPTION
Tactical Equivalent - CCS Cabinet

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4010

Each

OPTION
Tactical Equivalent -CCS Cabinet -FMS

FFP

See Notes A, B, C

DWG# 8563497

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4011

Each

OPTION
Tactical Equivalent - ASAN Cabinet

FFP

See Notes A, B, C

DWG# 8563496

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4012

Each

OPTION
Tactical Equivalent - ALIS Cabinet

FFP

See Notes A, B, C

DWG# 8563495

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4013

Each

OPTION
Tactical Equivalent -ACEGIO1 Cabinet

FFP

See Notes A, B, C

DWG# 8563493

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4014

Each

OPTION
Tactical Equivalent -ACEGIO2 Cabinet

FFP

See Notes A, B, C FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4015

Each

OPTION
Tactical Equivalent - DiVDS Cabinet

FFP

See Notes A, B, C

DWG# 8563498

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4016

Each

OPTION
Tactical Equivalent

FFP

Air-Cooled PS2 Cabinet See Notes A, B, C

DWG# 8623321-000

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4100

Each

OPTION
INCO, Spares & Repair

FFP

See Notes B, E FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4200

10,000
Hours
OPTION
Engineering Services

CPFF

Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4300

Lot

OPTION
ODC & Incidental Materials

COST

ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 5000

Each

OPTION
PIO

FFP

FOB: Origin (Shipping Point)

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35; however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.

(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

CLAUSES INCORPORATED BY FULL TEXT

B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)

The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

NOTE A

NOTE A - The minimum quantity that shall be procured under this contract is four (4) units of Water Cooled CCS (CLIN 0001 OR 0002) and two (2) units of any cabinet configurations (CLIN 0003 thru 0008) and one (1) unit of any cabinet configurations (CLIN 0009 thru 0016).

NOTE B

NOTE B – Option item to which the option clause in Section I applies and which is to be supplied only if, and to the extent, said option is exercised.

NOTE C

NOTE C – The table below establishes stepladder pricing for CLINs 0001 through 0016, 1001 through 1016, 2001 through 2016, 3001 through 3016, 4001 through 4016. If exercised, the Section B amounts shall be established through unilateral modification in accordance with Section I clause 52.217-7 and the stepladder pricing in the below table. Furthermore, the Government has the right to unilaterally increase the quantity ordered under any of these line items after they have been initially exercised as long as it occurs before the latest option exercise date stated under FAR 52.217-7. If this quantity increase occurs within a 60-day period of other quantities ordered under the line item, then pricing for all hardware under that line item procured within this 60-day period shall be adjusted to the unit price from the stepladder pricing appropriate for the total quantity being procured. For quantity increases not occurring within a 60-day period of when other quantities are exercised under the line item the Government will use unit pricing from the stepladder pricing applicable to the quantity of hardware being added and the pricing of previous quantities under said line item shall not change. For funding and administrative purposes, at the time of option exercise and quantity order increases, the Contracting Officer may unilaterally establish separately priced contract line items (CLINs) or subcontract line items (SLINs).

Note C- Table 1 (BASE YEAR) – Step-Ladder Line Items –Unit Price

CLIN
Qty 1
Qty 2-3
Qty 4-6
Qty 7-12
Qty 13-18
Qty 19-24
Qty 25+
0001
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0002
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0003
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0004
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0005
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0006
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0007
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0008
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0009
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0010
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0011
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0012
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0013
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0014
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0015
$ -
$ -
$ -
$ -
$ -
$ -
$ -
0016
$ -
$ -
$ -
$ -
$ -
$ -
$ -

Note C- Table 2 (OPTION YEAR 1) – Step-Ladder Line Items –Unit Price

CLIN
Qty 1
Qty 2-3
Qty 4-6
Qty 7-12
Qty 13-18
Qty 19-24
Qty 25+
1001
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1002
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1003
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1004
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1005
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1006
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1007
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1008
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1009
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1010
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1011
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1012
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1013
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1014
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1015
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1016
$ -
$ -
$ -
$ -
$ -
$ -
$ -

Note C- Table 3 (OPTION YEAR 2) – Step-Ladder Line Items –Unit Price

CLIN
Qty 1
Qty 2-3
Qty 4-6
Qty 7-12
Qty 13-18
Qty 19-24
Qty 25+
2001
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2002
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2003
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2004
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2005
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2006
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2007
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2008
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2009
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2010
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2011
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2012
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2013
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2014
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2015
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2016
$ -
$ -
$ -
$ -
$ -
$ -
$ -

Note C- Table 4 (OPTION YEAR 3) – Step-Ladder Line Items –Unit Price

CLIN
Qty 1
Qty 2-3
Qty 4-6
Qty 7-12
Qty 13-18
Qty 19-24
Qty 25+
3001
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3002
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3003
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3004
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3005
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3006
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3007
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3008
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3009
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3010
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3011
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3012
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3013
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3014
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3015
$ -
$ -
$ -
$ -
$ -
$ -
$ -
3016
$ -
$ -
$ -
$ -
$ -
$ -
$ -

Note C- Table 5 (OPTION YEAR 4) – Step-Ladder Line Items –Unit Price

CLIN
Qty 1
Qty 2-3
Qty 4-6
Qty 7-12
Qty 13-18
Qty 19-24
Qty 25+
4001
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4002
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4003
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4004
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4005
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4006
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4007
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4008
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4009
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4010
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4011
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4012
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4013
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4014
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4015
$ -
$ -
$ -
$ -
$ -
$ -
$ -
4016
$ -
$ -
$ -
$ -
$ -
$ -
$ -

NOTE D

NOTE D –The Estimated Firm Fixed Price (FFP) amount for CLINs 0017-0026 is provided in the table below. (Offeror to fill in Table below)

CLIN
0017
0018
0019
0020
0021
0022
0023
0024
0025
0026
Unit Price
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

NOTE E

NOTE E – Stepladder pricing for CLINs 0100, 1100, 2100, 3100 and 4100 is as established in Attachment J-4. The Section B Firm Fixed Price (FFP) amount and the funding provided in each modification shall be unilaterally established based on the stepladder pricing in Attachment J-4. Every sixty (60) days beginning upon contract award, the Government shall review all modifications placed within that timeframe to determine the final unit price. The final unit price shall be based on the total number of parts required for spares/INCO and Network, Processing and Storage Equipment production modifications placed within that 60-day timeframe.

NOTE F

NOTE F – The quantity of labor hours is the maximum order quantity. Labor hours for each task shall be established through negotiation in each modification via a Government-provided Statement of Work (SOW). Total hour ceilings shall be the only variable negotiated within each modification. The Cost Plus Fixed Fee (CPFF) amount provided in each modification shall be established unilaterally using the composite Rate per Hour proposed in the table below. (Offeror to fill in Table below)

CLIN
0200
1200
2200
3200
4200
Est. Cost/Hour
$
$
$
$
$
Est. Fixed Fee/Hour*
$
$
$
$
$
Total Est. CPFF/Hour
$
$
$
$
$

*The Offeror shall propose not less than zero (0) and no more than eight (8) percent for fixed fee.

The quantity of hours does not indicate that the Government will necessarily require this amount or any at all.

NOTE G

NOTE G – PERIOD OF PRICING AVAILABILITY

The Government shall issue modifications against the listed CLINs per the periods of performance listed in the table below. Periods established in this table are not to be confused with the delivery schedule, the individual modification periods (12 months), option exercise periods, or the contract’s total period of performance (60 months).

CLINs/SLINs
Pricing Availability
0001-0016, 0100, 0200, 0300
Date of Contract Award to 12 months after Award
0017-0026
Date of Contract Award to 36 months after Award
1001-1016, 1100, 1200, 1300
Date of Option Exercise to 12 months after Option Exercise
2001-2016, 2100, 2200, 2300
Date of Option Exercise to 12 months after Option Exercise
3001-3016, 3100, 3200, 3300
Date of Option Exercise to 12 months after Option Exercise
4001-4016, 4100, 4200, 4300
Date of Option Exercise to 12 months after Option Exercise

Section C - Descriptions and Specifications

CONTRACT LINE ITEM DESCRIPTION

C-1 DELIVERABLES

The Network, Processing and Storage (NPS) Equipment is comprised of CPS TI-16 Mod 1 and portions of the AAU Equipment Suites, under CLINs 0001-0016 (if exercised 1001-1016, 2001-2016, 3001-3016, 4001-4016) – If procured, the Contractor shall manufacture, assemble, test, and deliver the following Network, Processing and Storage Equipment in accordance with the applicable Technical Data Package (Attachment J-2) and the requirements defined in the statement of work of this contract.

INCO, SPARES, REPAIR CLINs 0100 (if exercised, 1100, 2100, 3100, and 4100) – If procured, the Contractor shall test and deliver INCO/spares and repair parts. The INCO/spare and repair part descriptions and quantities shall be as established in each contract modification.

ENGINEERING SERVICES CLINs 0200 (if exercised, 1200, 2200, 3200, and 4200) - If procured, the Contractor shall provide engineering services (ES), conduct engineering studies, provide engineering analysis and trade-off studies, and/or support engineering changes as directed by the Government. The specific tasks shall be defined in each contract modification.

OTHER DIRECT COSTS (ODCs) CLIN 0300 (if exercised, 1300, 2300, 3300 and 4300) – If procured, the Contractor shall provide any travel or incidental material consumed in the performance of the required Engineering Services. The specific ODC details shall be defined in each contract modification.

FIRST ARTICLE CLINs 0017-0024 – The Contractor shall support and complete first article requirements as defined in the Statement of Work.

PRR CLIN 0025 – The Contractor shall successfully support and complete a Production Readiness Review (PRR) as defined in the Statement of Work.

COUNTRY OF ORIGIN STUDY CLIN 0026 – The Contractor shall determine the components for the country of origin for all major electronic assemblies/subassemblies as defined in the Statement of Work.

DATA/CDRLs CLIN 0400 - The data to be furnished hereunder shall be prepared in accordance with the requirements of this contract and the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A, B and C. The item is Not Separately Priced (NSP).

PROVISIONED ITEMS ORDERS CLIN 5000 - Provisioned Items Orders will be placed in accordance with the Section C clause PROVISIONED ITEMS ORDERS. The supplies or services shall be identified in each Order.

SECTION C-2 STATEMENT OF WORK

THE FOLLOWING STATEMENT OF WORK (SOW) IS APPLICABLE TO ALL LINE ITEMS UNLESS OTHERWISE SPECIFIED

This SOW will refer to CPS and portions of the AAU equipment suite throughout this document indicating this alignment of functions and requirements, which is reflected in the title of this future contract “Network, Processing, and Storage Equipment”. This Statement of Work (SOW) defines the efforts required for the manufacture, assembly, and test of the Network, Processing and Storage Equipment. The Contractor’s facilities shall be cleared at the secret level in accordance with the attached DD 254 (Attachment # J-1).

1.0 SCOPE

This Statement of Work (SOW) defines the efforts required for the manufacture, assembly, and test of the Network, Processing and Storage Equipment, spares, and associated technical services, including logistics product development. The Network, Processing and Storage Equipment is comprised of the Common Processing System (CPS) Technology Insertion (TI) 16 Mod 1 and portions of the Aegis Weapon System (AWS) Aegis Modernization (AMOD) Upgrade (AAU) equipment suite. The Network, Processing and Storage Equipment is designed to support the Program Executive Office for Integrated Warfare Systems’ (PEO IWS) implementation of an Open Architecture (OA) for Navy combat systems. The equipment maximizes flexibility and modularity by incorporating commercial hardware and software compliant with Open Architecture Computing Environment (OACE) technologies and standards, when available. The equipment provides the computer processing and memory, data storage and extraction, and Input/Output (I/O) interfaces to support host software applications of Navy combat systems.

1.1 BACKGROUND

The Network Processing Storage equipment supports the hardware resource requirements for multiple Combat and Weapon Systems. Technical requirements have been driven by AEGIS new ship construction (SCN), AEGIS Modernization (AMOD), AEGIS Ashore (AA), Ship Self Defense System (SSDS), Aircraft Carrier – Tactical Support Center (CV-TSC), Surface Electronic Warfare Improvement Program (SEWIP), Guns Weapon System (GWS), Foreign Military Sales (FMS), Fast Frigate (FFG), U.S. Coast Guard (USCG), MQ-25 Unmanned Carrier Aviation (UCA) UCA Mission Control System (UMCS), Amphibious Ships, and Littoral Combat Ship (LCS).

The CPS TI-16 Mod 1 portion of the contract consists of two different Enclosure Assemblies (MCE and EMCORP) and three variants – a Core Computing System (CCS) Cabinet, an Advanced Storage Area Network (ASAN) Cabinet, and a Processing and Storage Subsystem (PS2) air-cooled Cabinet. The CCS provides core computing resources for Navy Combat System application programs. The ASAN Cabinet provides storage for load files, program data storage, video files, data extraction files, database management, and other mass storage and archive requirements for the Combat System. The PS2 cabinet combines processing and storage into a single cabinet with reduced processing and storage capacities.

CPS TI-16 Mod 1 provides solutions to address diminishing manufacturing supply and obsolescence issues with TI 16 Mod 0. Additionally, the CPS TI 16 Mod 1 procurement incorporates AAU components. TI 16 Mod 1 mitigates DMS impacts to the TI 12 AAU configuration, drives the AWS design toward the use of “common building blocks” thereby reducing the count of line repairable units (LRUs), incorporates IA requirements and system protection features into the initial design, and upgrades AWS processors and displays to allow the implementation of ACB 16 improvements.

The portions of the AAU contract will produce four variants of populated cabinets – an AEGIS LAN Interconnect System (ALIS) cabinet, an AEGIS Conversion Equipment Group Input/Output (ACEGIO) #1 Cabinet, and ACEGIO #2 Cabinet, and a Digital Video Display System (DiVDS) Cabinet. The ALIS cabinet provides the mechanism for Combat System and external systems to communicate with the AEGIS Weapons System, the core connectivity between cabinets that host AEGIS Weapons System Elements, and the capabilities for cabinet management, network switching, intrusion detection, firewall services, gateway services, a detonation chamber, and cross domain solutions. The ACEGIO cabinets provide legacy equipment interface support, network time protocol dissemination electro-mechanical integration, and installation of legacy VME / interface cards. The DiVDS provides shipboard operators with access to analog video data from multiple sources to include consoles, camera locations, tactical applications and video walls.

2.0 APPLICABLE DOCUMENTS.

The following documents form part of the SOW to the extent specified herein. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW shall be considered the superseding requirement. These documents are updated frequently; the Contractor shall refer to the latest approved version of these documents.

2.1 Government Documents

Title
Date

Program Executive Office, Integrated Warfare Systems (PEO IWS) – Deputy Commander, Naval Sea Systems Command Research and System Engineering Warfare Systems Engineering and Human Systems Integration Directorate (NAVSEA 05H) Technical Review Manual (TRM) v2.0 18 Dec 2009

PEO IWS AEGIS Weapon System Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan
June 2005
PEO IWS Program Plan PEO IWS Instruction 4130.1B PEO IWS Enterprise Configuration Control Process,
02 May 2017
PEOIWSINST 5000.8 Risk Management
13 January 2014

Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Contracts Handbook 09 December 2009

Public Law (P.L.) 102 – 484, Section 4219 (h)
23 September 1996
Federal Acquisition Regulation (FAR)
15 June, 2018
Naval Operations Instruction 2450.2 Electromagnetic Compatibility Program Within the Department of the Navy
08 January 1990

Configuration Management Plan (CMP) for Program Executive Office, Integrated Warfare Systems

(PEO IWS) 1.0

17 January 2014

Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Instruction 9078.22, Naval Ships Critical Safety Items (CSI) Program Technical Requirements 15 May 2008

Naval Operations Instruction 3432.1 , Operations Security
04 August 2011

Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Clinger-Cohen Act (CCA) Compliance Guide April 2008

Department of the Navy DON Policy on Digital Product/Technical Data Memorandum
23 October 2004
SECNAV Instruction 5000.2E Department of the Navy Implementation and Operation of the Defense Acquisition System and Joint Capabilities Integration and Development System
01 September 2011

2.2 Joint Chiefs of Staff, Department of Defense, and DoD Services Documents

Title
Date

Defense Acquisition Guidebook 4.3.3.4.7, Production Readiness Review (PRR) https://dag.dau.mil 06 August 2013

DoD 5220.22M Defense Security Service (DSS) National Industrial Security Program Operating manual (NISPOM)
28 February 2006
Department of Defense Instruction (DoDI) 5000.1 The Defense Acquisition System
12 May 2003
Department of Defense Instruction (DoDI) 5000.2 Operation of the Defense Acquisition System
25 November 2013
Department of Defense Instruction (DoDI) 5000.4-M-1 Cost and Software Data Reporting (CSDR) Manual
04 November 2011
Defense Federal Acquisition Regulations (DFARS) 252.211-7000
October 2010
Department of Defense Standard DoD-STD-1679A
22 October 1983
DCPR-1 Configuration Management Process
06 February 2003
Department of Defense Instruction (DoDI) 8500.1
14 March 2014
Department of Defense Instruction (DoDI) 5200.39 Critical Program Information (CPI) Protection within the Department of Defense
16 July 2008
Department of Defense Instruction (DoDI) 4140.67 Department of Defense Counterfeit Prevention Policy
26 April 2013
Department of Defense Instruction (DoDI) 4160.21-M Defense Materiel Disposition Manual
August 1997
Department of Defense Instruction (DoDI) 4160.28 Department of Defense Demilitarization (DEMIL) Program
07 April 2011
Defense Federal Acquisition Regulations (DFARS) 252.245-7003 Contractor Property Management System Administration
April 2012

2.3 Military Standards (MIL-STD)

Title
Date

MIL-STD-129P DoD Standard Practice, Military marking for Shipment and Storage, 19 September 2007

MIL-STD 130N Department of Defense Standard Practice Identification Marking of U.S. Military Property 15 June 2007

MIL-STD-882E System Safety
11 May 2012
MIL-STD-1378E Requirements for Employing Standard Electronic Modules
21 April 1989
MIL-STD-461F Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
10 December 2007
MIL-STD 973 Configuration Management
17 April 1992
MIL-STD-3034A, Department of Defense Standard Practice: Reliability Centered Maintenance (RCM) Process
29 April 2014

2.4 Other Military Documents

Title
Date
MIL-D-23140D Drawings, Installation Control, for Shipboard Electronic Equipment
30 April 1992
MIL-DTL-31000C Technical Data Packages, Detail Specification
09 July 2004

MIL-PRF-29612B Training Data Products

31 August 2001

ASTM F 1166 Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities
01 October 2013

2.5 Handbooks

Title
Date
MIL-HDBK-881A Work Breakdown Structures For Defense Materiel Items
02 January 1998
MIL-HDBK-237D Electromagnetic Environmental Effects and Spectrum Supportability Guidance for the Acquisition Process
20 May 2005
MIL-HDBK-61B Configuration Management Guidance
10 September 2002

2.6 Non-Government Documents/ Commercial Standards

Title
Date
ANSI/ASQC Q9001-2008 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
15 November 2008
ANSI/EIA-649B, “Configuration Management Standard”
01 April 2011

2.7 Non-Government Documents

Title
Date
ASME Y14.24-2012, Types and Applications of Engineering Drawings
2012

American Society for Testing of Materials (ASTM)

ASTM F1337-10

Standard Practice For Human Engineering Program Requirements For Ships And Marine Systems, Equipment, And Facilities

IEEE/EIA 12207.0-2008 Software Life Cycle Processes
31 January 2008
IEEE/EIA 12207.1-1997 Software Life Cycle Processes – Life Cycle Data
21 December 1998
IEEE/EIA 12207.2-1997 Software Life Cycle Processes – Implementation Considerations
1998

International Organization for Standards (ISO) ISO 9001:2015, Quality Management Systems – Requirements 30 November 2008

International Organization for Standards (ISO) ISO 10007:2003 Quality Management Guidelines for Configuration Management 01 June 2003

Institute of Electrical and Electronics Engineers (IEEE)/EIA-649-1998 National Consensus Standard for Configuration Management
10 July 1998

3.0 REQUIREMENTS.

3.1 GENERAL. The Contractor shall furnish all cleared labor and materials, other than the items provided by the Government as GFE/GFP as identified in Section H, necessary for the manufacture, assembly, and test of the Network, Processing and Storage Equipment, spares, and associated technical services, including logistics product development. Program information, deliveries, and data shall be handled in accordance with the Contract Security Specification, (DD Form 254, Attachment J-1).

3.2 Program Management and Control (Applicable to All CLINs). The Contractor shall provide program management oversight to ensure all work conducted within this contract is planned and executed in a manner that will achieve all quality, schedule, and cost objectives.

3.2.1 Program Management Office. The Contractor shall establish a Program Management Office that is responsible for the management and control of Program Management Plan (CDRL A001) elements in order to support the successful on-time delivery of the contract requirements. The Program Management Plan shall incorporate detailed production planning, milestones, and metrics capable of supporting the execution of all tasks required by the Contract and this SOW.

Deliverable Data Item (See DD-1423):

CDRL A001: “Program Management Plan”

3.2.2 Program Manager. The Contractor shall designate a Program Manager who will ensure all work conducted within this contract is planned and executed in a manner that will achieve all management, technical, logistics, budget, and schedule objectives.

3.2.3 Subcontractor Management (Applicable to all CLINs).The Contractor is responsible for executing the…