N0002419R5600Amendment_0004_Conformed_Copy.docx
DOCX document 421 KB Posted
- Solicitation number
- N00024-19-R-5600
About this file
This solicitation seeks proposals for the production of Network, Processing, and Storage Equipment. The Naval Sea Systems Command intends to award a firm-fixed price contract to provide all labor, materials, and other costs required to fabricate, manufacture, assemble, and test computer processing, storage, and networking equipment, ancillary equipment, and spares for Common Processing System Technical Insertion Sixteen Modification 1. The scope also includes engineering services to update and maintain the technical data package, provide technical data for future configurations, and address Diminishing Manufacturing Sources and Material Shortage issues. Deliveries are anticipated free on board at origin. All responsible sources may submit proposals by the specified due date.
Amendment 0004 Conformed Copy of N00024-19-R-5600.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002419R5600
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0001
Each
Network, Processing & Storage Equipment
FFP
Water-Cooled Core Computing System (CCS) Cabinet
DWG# 8563369
See Notes A, B, C FOB: Origin (Shipping Point)
PURCHASE REQUEST NUMBER: N0002418NR41140
PSC CD: 1265
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0002
Each
Network, Processing & Storage Equipment
Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0003
Each
Network, Processing & Storage Equipment
Water-Cooled Advanced Storage Area Network (ASAN) Cabinet
DWG# - 8563368
See Notes A, B, C
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0004
Each
Network, Processing & Storage Equipment
Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet
DWG# - 8563367
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0005
Each
Network, Processing & Storage Equipment
Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0006
Each
Network, Processing & Storage Equipment
Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet
DWG# - 8563366
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0007
Each
Network, Processing & Storage Equipment
Water-Cooled Digital Video Distribution System (DiVDS) Cabinet
DWG# - 8563370
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0008
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Air-Cooled Processing & Storage Subsystem (PS2) Cabinet
DWG# - 8601113-001
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0009
Each
| OPTION |
| Tactical Equivalent - CCS Cabinet |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0010
Each
| OPTION |
| Tactical Equivalent -CCS Cabinet - FMS |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0011
Each
| OPTION |
| Tactical Equivalent - ASAN Cabinet |
FFP
See Notes A, B, C
DWG# 8563496
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0012
Each
| OPTION |
| Tactical Equivalent - ALIS Cabinet |
FFP
See Notes A, B, C
DWG# 8563495
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0013
Each
| OPTION |
| Tactical Equivalent -ACEGIO1 Cabinet |
FFP
See Notes A, B, C
DWG# 8563493
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0014
Each
| OPTION |
| Tactical Equivalent -ACEGIO2 Cabinet |
FFP
See Notes A, B, C
DWG# 8563494
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0015
Each
| OPTION |
| Tactical Equivalent - DiVDS Cabinet |
FFP
See Notes A, B, C
DWG# 8563498
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0016
Each
| OPTION |
| Tactical Equivalent |
FFP
Air-Cooled PS2 Cabinet See Notes A, B, C
DWG# 8623321-000
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0017
Each
First Article Requirement - CCS
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0018
Each
First Article Requirement - CCS - FMS
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0019
Each
First Article Requirement - ASAN
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0020
Each
First Article Requirement - ALIS
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0021
Each
First Article Requirement - ACEGIO1
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0022
Each
First Article Requirement - ACEGIO2
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0023
Each
First Article Requirement - DiVDS
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0024
Each
First Article Unit Requirements
First Article Unit Requirements- Air Cooled PS2 See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0025
Each
Production Readiness Review (PRR)
See Notes A, B, D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0026
Each
| OPTION |
| Country of Origin Study |
FFP
See Notes A, B, D
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0100
Each
| OPTION |
| INCO, Spares & Repair |
FFP
See Notes B, E FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0200
| 10,000 |
| Hours |
| OPTION |
| Engineering Services |
CPFF
Quantity 10,000 hours See Notes B, F FOB: Origin (Shipping Point)
PSC CD: K012
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0300
| 1 |
| Lot |
| OPTION |
| ODC & Incidental Materials |
COST
ODC & Incidental Materials for Engineering Services Government Estimated $71,000 See Notes B, F FOB: Origin (Shipping Point)
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0400
CDRLs (Exhibit A, B, and C)
Not Separately Priced (NSP) FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1001
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet See Notes A, B, C
DWG# 8563369
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1002
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1003
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Advanced Storage Area Network (ASAN) Cabinet
DWG# - 8563368
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1004
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet
DWG# - 8563367
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1005
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1006
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet
DWG# - 8563366
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1007
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Digital Video Distribution System (DiVDS) Cabinet
DWG# - 8563370
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1008
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Air-Cooled Processing & Storage Subsystem (PS2) Cabinet
DWG# - 8601113-001
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1009
Each
| OPTION |
| Tactical Equivalent -CCS Cabinet |
FFP
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1010
Each
| OPTION |
| Tactical Equivalent-CCS Cabinet -FMS |
FFP
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1011
Each
| OPTION |
| Tactical Equivalent - ASAN Cabinet |
FFP
See Notes A, B, C
DWG# 8563496
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1012
Each
| OPTION |
| Tactical Equivalent - ALIS Cabinet |
FFP
See Notes A, B, C
DWG# 8563495
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1013
Each
| OPTION |
| Tactical Equivalent -ACEGIO1 Cabinet |
FFP
See Notes A, B, C
DWG# 8563493
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1014
Each
| OPTION |
| Tactical Equivalent -ACEGIO2 Cabinet |
FFP
See Notes A, B, C
DWG# 8563494
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1015
Each
| OPTION |
| Tactical Equivalent - DiVDS Cabinet |
FFP
See Notes A, B, C
DWG# 8563498
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1016
Each
| OPTION |
| Tactical Equivalent |
FFP
Air-Cooled PS2 Cabinet See Notes A, B, C
DWG# 8623321-000
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1100
Each
| OPTION |
| INCO, Spares & Repair |
FFP
See Notes B, E FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1200
| 10,000 |
| Hours |
| OPTION |
| Engineering Services |
CPFF
Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1300
Lot
| OPTION |
| ODC & Incidental Materials |
COST
ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000
FOB: Origin (Shipping Point)
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2001
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet
DWG# 8563369
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2002
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2003
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Advanced Storage Area Network (ASAN) Cabinet
DWG# - 8563368
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2004
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet
DWG# - 856367
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2005
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2006
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet
DWG# - 8563366
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2007
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Digital Video Distribution System (DiVDS) Cabinet
DWG# - 8563370
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2008
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Air-Cooled Processing & Storage Subsystem (PS2) Cabinet
DWG# - 8601113-001
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2009
Each
| OPTION |
| Tactical Equivalent - CCS Cabinet |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2010
Each
| OPTION |
| Tactical Equivalent -CCS Cabinet -FMS |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2011
Each
| OPTION |
| Tactical Equivalent - ASAN Cabinet |
FFP
See Notes A, B, C
DWG# 8563496
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2012
Each
| OPTION |
| Tactical Equivalent - ALIS Cabinet |
FFP
See Notes A, B, C
DWG# 8563495
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2013
Each
| OPTION |
| Tactical Equivalent -ACEGIO1 Cabinet |
FFP
See Notes A, B, C
DWG# 8563493
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2014
Each
| OPTION |
| Tactical Equivalent -ACEGIO2 Cabinet |
FFP
See Notes A, B, C
DWG# 8563494
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2015
Each
| OPTION |
| Tactical Equivalent - DiVDS Cabinet |
FFP
See Notes A, B, C
DWG# 8563498
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2016
Each
| OPTION |
| Tactical Equivalent |
FFP
Air-Cooled PS2 Cabinet See Notes A, B, C
DWG# 8623321-000
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2100
Each
| OPTION |
| INCO, Spares & Repair |
FFP
See Notes B, E FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2200
| 10,000 |
| Hours |
| OPTION |
| Engineering Services |
CPFF
Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2300
Lot
| OPTION |
| ODC & Incidental Materials |
COST
ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3001
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet
DWG# 8563369
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3002
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3003
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Advanced Storage Area Network (ASAN) Cabinet
DWG# - 8563368
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3004
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet
DWG# 8563367
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3005
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3006
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3007
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Digital Video Distribution (DiVDS) Cabinet
DWG# 8563370
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3008
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Air-Cooled Processing & Storage Subsystem (PS2) Cabinet
DWG# 8601113-001
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3009
Each
| OPTION |
| Tactical Equivalent - CCS Cabinet |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3010
Each
| OPTION |
| Tactical Equivalent -CCS Cabinet -FMS |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3011
Each
| OPTION |
| Tactical Equivalent - ASAN Cabinet |
FFP
See Notes A, B, C
DWG# 8563496
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3012
Each
| OPTION |
| Tactical Equivalent ALIS |
FFP
See Notes A, B, C
DWG# 8563495
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3013
Each
| OPTION |
| Tactical Equivalent -ACEGIO1 Cabinet |
FFP
See Notes A, B, C
DWG# 8563493
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3014
Each
| OPTION |
| Tactical Equivalent -ACEGIO2 Cabinet |
FFP
See Notes A, B, C
DWG# 8563494
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3015
Each
| OPTION |
| Tactical Equivalent - DiVDS Cabinet |
FFP
See Notes A, B, C
DWG# 8563498
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3016
Each
| OPTION |
| Tactical Equivalent |
FFP
Air-Cooled PS2 Cabinet See Notes A, B, C
DWG# 8623321-000
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3100
Each
| OPTION |
| INCO, Spares & Repair |
FFP
See Notes B, E FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3200
| 10,000 |
| Hours |
| OPTION |
| Engineering Services |
CPFF
Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3300
Lot
| OPTION |
| ODC & Incidental Materials |
COST
ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4001
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet
DWG# 8563369
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4002
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Core Computing System (CCS) Cabinet - FMS DWG# - 8563369 [w/o Blades] See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4003
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Advanced Storage Area Network (ASAN) Cabinet
DWG# - 8563368
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4004
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS LAN Interconnect System (ALIS) Cabinet
DWG# - 856367
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4005
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 1 (ACEGIO1) Cabinet
DWG# - 8563365
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4006
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled AEGIS Conversion Equipment Group Input/Output 2 (ACEGIO2) Cabinet
DWG# - 8563366
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4007
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Water-Cooled Digital Video Distribution System (DiVDS) Cabinet
DWG# - 8563370
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4008
Each
| OPTION |
| Network, Processing & Storage Equipment |
FFP
Air-Cooled Processing & Storage Subsystem (PS2) Cabinet
DWG# - 8601113-001
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4009
Each
| OPTION |
| Tactical Equivalent - CCS Cabinet |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4010
Each
| OPTION |
| Tactical Equivalent -CCS Cabinet -FMS |
FFP
See Notes A, B, C
DWG# 8563497
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4011
Each
| OPTION |
| Tactical Equivalent - ASAN Cabinet |
FFP
See Notes A, B, C
DWG# 8563496
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4012
Each
| OPTION |
| Tactical Equivalent - ALIS Cabinet |
FFP
See Notes A, B, C
DWG# 8563495
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4013
Each
| OPTION |
| Tactical Equivalent -ACEGIO1 Cabinet |
FFP
See Notes A, B, C
DWG# 8563493
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4014
Each
| OPTION |
| Tactical Equivalent -ACEGIO2 Cabinet |
FFP
See Notes A, B, C FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4015
Each
| OPTION |
| Tactical Equivalent - DiVDS Cabinet |
FFP
See Notes A, B, C
DWG# 8563498
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4016
Each
| OPTION |
| Tactical Equivalent |
FFP
Air-Cooled PS2 Cabinet See Notes A, B, C
DWG# 8623321-000
FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4100
Each
| OPTION |
| INCO, Spares & Repair |
FFP
See Notes B, E FOB: Origin (Shipping Point)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4200
| 10,000 |
| Hours |
| OPTION |
| Engineering Services |
CPFF
Quantity 10,000 Hours See Notes B, F FOB: Origin (Shipping Point)
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4300
Lot
| OPTION |
| ODC & Incidental Materials |
COST
ODC & Incidental Materials for Engineering Services See Notes B, F Government Estimated $71,000 FOB: Origin (Shipping Point)
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 5000
Each
| OPTION |
| PIO |
FFP
FOB: Origin (Shipping Point)
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
(End of text)
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35; however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
CLAUSES INCORPORATED BY FULL TEXT
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
NOTE A
NOTE A - The minimum quantity that shall be procured under this contract is four (4) units of Water Cooled CCS (CLIN 0001 OR 0002) and two (2) units of any cabinet configurations (CLIN 0003 thru 0008) and one (1) unit of any cabinet configurations (CLIN 0009 thru 0016).
NOTE B
NOTE B – Option item to which the option clause in Section I applies and which is to be supplied only if, and to the extent, said option is exercised.
NOTE C
NOTE C – The table below establishes stepladder pricing for CLINs 0001 through 0016, 1001 through 1016, 2001 through 2016, 3001 through 3016, 4001 through 4016. If exercised, the Section B amounts shall be established through unilateral modification in accordance with Section I clause 52.217-7 and the stepladder pricing in the below table. Furthermore, the Government has the right to unilaterally increase the quantity ordered under any of these line items after they have been initially exercised as long as it occurs before the latest option exercise date stated under FAR 52.217-7. If this quantity increase occurs within a 60-day period of other quantities ordered under the line item, then pricing for all hardware under that line item procured within this 60-day period shall be adjusted to the unit price from the stepladder pricing appropriate for the total quantity being procured. For quantity increases not occurring within a 60-day period of when other quantities are exercised under the line item the Government will use unit pricing from the stepladder pricing applicable to the quantity of hardware being added and the pricing of previous quantities under said line item shall not change. For funding and administrative purposes, at the time of option exercise and quantity order increases, the Contracting Officer may unilaterally establish separately priced contract line items (CLINs) or subcontract line items (SLINs).
Note C- Table 1 (BASE YEAR) – Step-Ladder Line Items –Unit Price
| CLIN |
| Qty 1 |
| Qty 2-3 |
| Qty 4-6 |
| Qty 7-12 |
| Qty 13-18 |
| Qty 19-24 |
| Qty 25+ |
| 0001 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0002 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0003 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0004 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0005 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0006 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0007 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0008 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0009 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0010 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0011 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0012 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0013 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0014 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0015 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 0016 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
Note C- Table 2 (OPTION YEAR 1) – Step-Ladder Line Items –Unit Price
| CLIN |
| Qty 1 |
| Qty 2-3 |
| Qty 4-6 |
| Qty 7-12 |
| Qty 13-18 |
| Qty 19-24 |
| Qty 25+ |
| 1001 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1002 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1003 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1004 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1005 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1006 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1007 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1008 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1009 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1010 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1011 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1012 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1013 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1014 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1015 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 1016 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
Note C- Table 3 (OPTION YEAR 2) – Step-Ladder Line Items –Unit Price
| CLIN |
| Qty 1 |
| Qty 2-3 |
| Qty 4-6 |
| Qty 7-12 |
| Qty 13-18 |
| Qty 19-24 |
| Qty 25+ |
| 2001 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2002 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2003 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2004 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2005 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2006 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2007 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2008 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2009 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2010 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2011 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2012 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2013 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2014 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2015 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 2016 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
Note C- Table 4 (OPTION YEAR 3) – Step-Ladder Line Items –Unit Price
| CLIN |
| Qty 1 |
| Qty 2-3 |
| Qty 4-6 |
| Qty 7-12 |
| Qty 13-18 |
| Qty 19-24 |
| Qty 25+ |
| 3001 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3002 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3003 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3004 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3005 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3006 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3007 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3008 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3009 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3010 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3011 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3012 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3013 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3014 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3015 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 3016 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
Note C- Table 5 (OPTION YEAR 4) – Step-Ladder Line Items –Unit Price
| CLIN |
| Qty 1 |
| Qty 2-3 |
| Qty 4-6 |
| Qty 7-12 |
| Qty 13-18 |
| Qty 19-24 |
| Qty 25+ |
| 4001 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4002 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4003 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4004 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4005 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4006 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4007 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4008 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4009 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4010 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4011 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4012 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4013 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4014 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4015 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| 4016 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
NOTE D
NOTE D –The Estimated Firm Fixed Price (FFP) amount for CLINs 0017-0026 is provided in the table below. (Offeror to fill in Table below)
| CLIN |
| 0017 |
| 0018 |
| 0019 |
| 0020 |
| 0021 |
| 0022 |
| 0023 |
| 0024 |
| 0025 |
| 0026 |
| Unit Price |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
NOTE E
NOTE E – Stepladder pricing for CLINs 0100, 1100, 2100, 3100 and 4100 is as established in Attachment J-4. The Section B Firm Fixed Price (FFP) amount and the funding provided in each modification shall be unilaterally established based on the stepladder pricing in Attachment J-4. Every sixty (60) days beginning upon contract award, the Government shall review all modifications placed within that timeframe to determine the final unit price. The final unit price shall be based on the total number of parts required for spares/INCO and Network, Processing and Storage Equipment production modifications placed within that 60-day timeframe.
NOTE F
NOTE F – The quantity of labor hours is the maximum order quantity. Labor hours for each task shall be established through negotiation in each modification via a Government-provided Statement of Work (SOW). Total hour ceilings shall be the only variable negotiated within each modification. The Cost Plus Fixed Fee (CPFF) amount provided in each modification shall be established unilaterally using the composite Rate per Hour proposed in the table below. (Offeror to fill in Table below)
| CLIN |
| 0200 |
| 1200 |
| 2200 |
| 3200 |
| 4200 |
| Est. Cost/Hour |
| $ |
| $ |
| $ |
| $ |
| $ |
| Est. Fixed Fee/Hour* |
| $ |
| $ |
| $ |
| $ |
| $ |
| Total Est. CPFF/Hour |
| $ |
| $ |
| $ |
| $ |
| $ |
*The Offeror shall propose not less than zero (0) and no more than eight (8) percent for fixed fee.
The quantity of hours does not indicate that the Government will necessarily require this amount or any at all.
NOTE G
NOTE G – PERIOD OF PRICING AVAILABILITY
The Government shall issue modifications against the listed CLINs per the periods of performance listed in the table below. Periods established in this table are not to be confused with the delivery schedule, the individual modification periods (12 months), option exercise periods, or the contract’s total period of performance (60 months).
| CLINs/SLINs |
| Pricing Availability |
| 0001-0016, 0100, 0200, 0300 |
| Date of Contract Award to 12 months after Award |
| 0017-0026 |
| Date of Contract Award to 36 months after Award |
| 1001-1016, 1100, 1200, 1300 |
| Date of Option Exercise to 12 months after Option Exercise |
| 2001-2016, 2100, 2200, 2300 |
| Date of Option Exercise to 12 months after Option Exercise |
| 3001-3016, 3100, 3200, 3300 |
| Date of Option Exercise to 12 months after Option Exercise |
| 4001-4016, 4100, 4200, 4300 |
| Date of Option Exercise to 12 months after Option Exercise |
Section C - Descriptions and Specifications
CONTRACT LINE ITEM DESCRIPTION
C-1 DELIVERABLES
The Network, Processing and Storage (NPS) Equipment is comprised of CPS TI-16 Mod 1 and portions of the AAU Equipment Suites, under CLINs 0001-0016 (if exercised 1001-1016, 2001-2016, 3001-3016, 4001-4016) – If procured, the Contractor shall manufacture, assemble, test, and deliver the following Network, Processing and Storage Equipment in accordance with the applicable Technical Data Package (Attachment J-2) and the requirements defined in the statement of work of this contract.
INCO, SPARES, REPAIR CLINs 0100 (if exercised, 1100, 2100, 3100, and 4100) – If procured, the Contractor shall test and deliver INCO/spares and repair parts. The INCO/spare and repair part descriptions and quantities shall be as established in each contract modification.
ENGINEERING SERVICES CLINs 0200 (if exercised, 1200, 2200, 3200, and 4200) - If procured, the Contractor shall provide engineering services (ES), conduct engineering studies, provide engineering analysis and trade-off studies, and/or support engineering changes as directed by the Government. The specific tasks shall be defined in each contract modification.
OTHER DIRECT COSTS (ODCs) CLIN 0300 (if exercised, 1300, 2300, 3300 and 4300) – If procured, the Contractor shall provide any travel or incidental material consumed in the performance of the required Engineering Services. The specific ODC details shall be defined in each contract modification.
FIRST ARTICLE CLINs 0017-0024 – The Contractor shall support and complete first article requirements as defined in the Statement of Work.
PRR CLIN 0025 – The Contractor shall successfully support and complete a Production Readiness Review (PRR) as defined in the Statement of Work.
COUNTRY OF ORIGIN STUDY CLIN 0026 – The Contractor shall determine the components for the country of origin for all major electronic assemblies/subassemblies as defined in the Statement of Work.
DATA/CDRLs CLIN 0400 - The data to be furnished hereunder shall be prepared in accordance with the requirements of this contract and the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A, B and C. The item is Not Separately Priced (NSP).
PROVISIONED ITEMS ORDERS CLIN 5000 - Provisioned Items Orders will be placed in accordance with the Section C clause PROVISIONED ITEMS ORDERS. The supplies or services shall be identified in each Order.
SECTION C-2 STATEMENT OF WORK
THE FOLLOWING STATEMENT OF WORK (SOW) IS APPLICABLE TO ALL LINE ITEMS UNLESS OTHERWISE SPECIFIED
This SOW will refer to CPS and portions of the AAU equipment suite throughout this document indicating this alignment of functions and requirements, which is reflected in the title of this future contract “Network, Processing, and Storage Equipment”. This Statement of Work (SOW) defines the efforts required for the manufacture, assembly, and test of the Network, Processing and Storage Equipment. The Contractor’s facilities shall be cleared at the secret level in accordance with the attached DD 254 (Attachment # J-1).
1.0 SCOPE
This Statement of Work (SOW) defines the efforts required for the manufacture, assembly, and test of the Network, Processing and Storage Equipment, spares, and associated technical services, including logistics product development. The Network, Processing and Storage Equipment is comprised of the Common Processing System (CPS) Technology Insertion (TI) 16 Mod 1 and portions of the Aegis Weapon System (AWS) Aegis Modernization (AMOD) Upgrade (AAU) equipment suite. The Network, Processing and Storage Equipment is designed to support the Program Executive Office for Integrated Warfare Systems’ (PEO IWS) implementation of an Open Architecture (OA) for Navy combat systems. The equipment maximizes flexibility and modularity by incorporating commercial hardware and software compliant with Open Architecture Computing Environment (OACE) technologies and standards, when available. The equipment provides the computer processing and memory, data storage and extraction, and Input/Output (I/O) interfaces to support host software applications of Navy combat systems.
1.1 BACKGROUND
The Network Processing Storage equipment supports the hardware resource requirements for multiple Combat and Weapon Systems. Technical requirements have been driven by AEGIS new ship construction (SCN), AEGIS Modernization (AMOD), AEGIS Ashore (AA), Ship Self Defense System (SSDS), Aircraft Carrier – Tactical Support Center (CV-TSC), Surface Electronic Warfare Improvement Program (SEWIP), Guns Weapon System (GWS), Foreign Military Sales (FMS), Fast Frigate (FFG), U.S. Coast Guard (USCG), MQ-25 Unmanned Carrier Aviation (UCA) UCA Mission Control System (UMCS), Amphibious Ships, and Littoral Combat Ship (LCS).
The CPS TI-16 Mod 1 portion of the contract consists of two different Enclosure Assemblies (MCE and EMCORP) and three variants – a Core Computing System (CCS) Cabinet, an Advanced Storage Area Network (ASAN) Cabinet, and a Processing and Storage Subsystem (PS2) air-cooled Cabinet. The CCS provides core computing resources for Navy Combat System application programs. The ASAN Cabinet provides storage for load files, program data storage, video files, data extraction files, database management, and other mass storage and archive requirements for the Combat System. The PS2 cabinet combines processing and storage into a single cabinet with reduced processing and storage capacities.
CPS TI-16 Mod 1 provides solutions to address diminishing manufacturing supply and obsolescence issues with TI 16 Mod 0. Additionally, the CPS TI 16 Mod 1 procurement incorporates AAU components. TI 16 Mod 1 mitigates DMS impacts to the TI 12 AAU configuration, drives the AWS design toward the use of “common building blocks” thereby reducing the count of line repairable units (LRUs), incorporates IA requirements and system protection features into the initial design, and upgrades AWS processors and displays to allow the implementation of ACB 16 improvements.
The portions of the AAU contract will produce four variants of populated cabinets – an AEGIS LAN Interconnect System (ALIS) cabinet, an AEGIS Conversion Equipment Group Input/Output (ACEGIO) #1 Cabinet, and ACEGIO #2 Cabinet, and a Digital Video Display System (DiVDS) Cabinet. The ALIS cabinet provides the mechanism for Combat System and external systems to communicate with the AEGIS Weapons System, the core connectivity between cabinets that host AEGIS Weapons System Elements, and the capabilities for cabinet management, network switching, intrusion detection, firewall services, gateway services, a detonation chamber, and cross domain solutions. The ACEGIO cabinets provide legacy equipment interface support, network time protocol dissemination electro-mechanical integration, and installation of legacy VME / interface cards. The DiVDS provides shipboard operators with access to analog video data from multiple sources to include consoles, camera locations, tactical applications and video walls.
2.0 APPLICABLE DOCUMENTS.
The following documents form part of the SOW to the extent specified herein. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW shall be considered the superseding requirement. These documents are updated frequently, Offerors should refer to the latest approved version of these documents.
2.1 Government Documents
| Title |
| Date |
Program Executive Office, Integrated Warfare Systems (PEO IWS) – Deputy Commander, Naval Sea Systems Command Research and System Engineering Warfare Systems Engineering and Human Systems Integration Directorate (NAVSEA 05H) Technical Review Manual (TRM) v2.0 18 Dec 2009
| PEO IWS AEGIS Weapon System Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan |
| June 2005 |
| PEO IWS Program Plan PEO IWS Instruction 4130.1B PEO IWS Enterprise Configuration Control Process, |
| 02 May 2017 |
| PEOIWSINST 5000.8 Risk Management |
| 13 January 2014 |
Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Contracts Handbook 09 December 2009
| Public Law (P.L.) 102 – 484, Section 4219 (h) |
| 23 September 1996 |
| Federal Acquisition Regulation (FAR) |
| 15 June, 2018 |
| Naval Operations Instruction 2450.2 Electromagnetic Compatibility Program Within the Department of the Navy |
| 08 January 1990 |
Configuration Management Plan (CMP) for Program Executive Office, Integrated Warfare Systems
(PEO IWS) 1.0
17 January 2014
Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Instruction 9078.22, Naval Ships Critical Safety Items (CSI) Program Technical Requirements 15 May 2008
| Naval Operations Instruction 3432.1 , Operations Security |
| 04 August 2011 |
Naval Sea Systems Command Warfare Systems Engineering Directorate (NAVSEA) Clinger-Cohen Act (CCA) Compliance Guide April 2008
| Department of the Navy DON Policy on Digital Product/Technical Data Memorandum |
| 23 October 2004 |
| SECNAV Instruction 5000.2E Department of the Navy Implementation and Operation of the Defense Acquisition System and Joint Capabilities Integration and Development System |
| 01 September 2011 |
2.2 Joint Chiefs of Staff, Department of Defense, and DoD Services Documents
| Title |
| Date |
Defense Acquisition Guidebook 4.3.3.4.7, Production Readiness Review (PRR) https://dag.dau.mil 06 August 2013
| DoD 5220.22M Defense Security Service (DSS) National Industrial Security Program Operating manual (NISPOM) |
| 28 February 2006 |
| Department of Defense Instruction (DoDI) 5000.1 The Defense Acquisition System |
| 12 May 2003 |
| Department of Defense Instruction (DoDI) 5000.2 Operation of the Defense Acquisition System |
| 25 November 2013 |
| Department of Defense Instruction (DoDI) 5000.4-M-1 Cost and Software Data Reporting (CSDR) Manual |
| 04 November 2011 |
| Defense Federal Acquisition Regulations (DFARS) 252.211-7000 |
| October 2010 |
| Department of Defense Standard DoD-STD-1679A |
| 22 October 1983 |
| DCPR-1 Configuration Management Process |
| 06 February 2003 |
| Department of Defense Instruction (DoDI) 8500.1 |
| 14 March 2014 |
| Department of Defense Instruction (DoDI) 5200.39 Critical Program Information (CPI) Protection within the Department of Defense |
| 16 July 2008 |
| Department of Defense Instruction (DoDI) 4140.67 Department of Defense Counterfeit Prevention Policy |
| 26 April 2013 |
| Department of Defense Instruction (DoDI) 4160.21-M Defense Materiel Disposition Manual |
| August 1997 |
| Department of Defense Instruction (DoDI) 4160.28 Department of Defense Demilitarization (DEMIL) Program |
| 07 April 2011 |
| Defense Federal Acquisition Regulations (DFARS) 252.245-7003 Contractor Property Management System Administration |
| April 2012 |
2.3 Military Standards (MIL-STD)
| Title |
| Date |
MIL-STD-129P DoD Standard Practice, Military marking for Shipment and Storage, 19 September 2007
MIL-STD 130N Department of Defense Standard Practice Identification Marking of U.S. Military Property 15 June 2007
| MIL-STD-882E System Safety |
| 11 May 2012 |
| MIL-STD-1378E Requirements for Employing Standard Electronic Modules |
| 21 April 1989 |
| MIL-STD-461F Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment |
| 10 December 2007 |
| MIL-STD 973 Configuration Management |
| 17 April 1992 |
| MIL-STD-3034A, Department of Defense Standard Practice: Reliability Centered Maintenance (RCM) Process |
| 29 April 2014 |
2.4 Other Military Documents
| Title |
| Date |
| MIL-D-23140D Drawings, Installation Control, for Shipboard Electronic Equipment |
| 30 April 1992 |
| MIL-DTL-31000C Technical Data Packages, Detail Specification |
| 09 July 2004 |
MIL-PRF-29612B Training Data Products
31 August 2001
| ASTM F 1166 Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities |
| 01 October 2013 |
2.5 Handbooks
| Title |
| Date |
| MIL-HDBK-881A Work Breakdown Structures For Defense Materiel Items |
| 02 January 1998 |
| MIL-HDBK-237D Electromagnetic Environmental Effects and Spectrum Supportability Guidance for the Acquisition Process |
| 20 May 2005 |
| MIL-HDBK-61B Configuration Management Guidance |
| 10 September 2002 |
2.6 Non-Government Documents/ Commercial Standards
| Title |
| Date |
| ANSI/ASQC Q9001-2008 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing |
| 15 November 2008 |
| ANSI/EIA-649B, “Configuration Management Standard” |
| 01 April 2011 |
2.7 Non-Government Documents
| Title | |
| Date |
| ASME Y14.24-2012, Types and Applications of Engineering Drawings |
| 2012 |
American Society for Testing of Materials (ASTM)
ASTM F1337-10
Standard Practice For Human Engineering Program Requirements For Ships And Marine Systems, Equipment, And Facilities
| IEEE/EIA 12207.0-2008 Software Life Cycle Processes |
| 31 January 2008 |
| IEEE/EIA 12207.1-1997 Software Life Cycle Processes – Life Cycle Data |
| 21 December 1998 |
| IEEE/EIA 12207.2-1997 Software Life Cycle Processes – Implementation Considerations |
| 1998 |
International Organization for Standards (ISO) ISO 9001:2015, Quality Management Systems – Requirements 30 November 2008
International Organization for Standards (ISO) ISO 10007:2003 Quality Management Guidelines for Configuration Management 01 June 2003
| Institute of Electrical and Electronics Engineers (IEEE)/EIA-649-1998 National Consensus Standard for Configuration Management |
| 10 July 1998 |
3.0 REQUIREMENTS.
3.1 GENERAL. The Contractor shall furnish all cleared labor and materials, other than the items provided by the Government as GFE/GFP as identified in Section H, necessary for the manufacture, assembly, and test of the Network, Processing and Storage Equipment, spares, and associated technical services, including logistics product development. Program information, deliveries, and data shall be handled in accordance with the Contract Security Specification, (DD Form 254, Attachment J-1).
3.2 Program Management and Control (Applicable to All CLINs). The Contractor shall provide program management oversight to ensure all work conducted within this contract is planned and executed in a manner that will achieve all quality, schedule, and cost objectives.
3.2.1 Program Management Office. The Contractor shall establish a Program Management Office that is responsible for the management and control of Program Management Plan (CDRL A001) elements in order to support the successful on-time delivery of the contract requirements. The Program Management Plan shall incorporate detailed production planning, milestones, and metrics capable of supporting the execution of all tasks required by the Contract and this SOW.
Deliverable Data Item (See DD-1423):
CDRL A001: “Program Management Plan”
3.2.2 Program Manager. The Contractor shall designate a Program Manager who will ensure all work conducted within this contract is planned and executed in a manner that will achieve all management, technical, logistics, budget, and schedule objectives.
3.2.3 Subcontractor Management (Applicable to all CLINs).The Contractor is responsible for executing the requirements of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .