FY20-FY24 SEWIP AN/SLQ-32(V)6 FULL RATE PRODUCTION
Solicitation number
N0002419R5503
Issued by

About this file

Solicitation Amendment 0003

View the file

Other files

File Type Posted
N00024-19-R-5503-0011_7.17.2019.pdf PDF
Bidders_Questions_Amendment_0011.pdf PDF
N00024-19-R-5503-0011_Conformed_7.17.2019.pdf PDF
J-2_GFI_List_(V)6_Production_07022019.pdf PDF
A031_NOR_Signed.pdf PDF
N00024-19-R-5503-0010_7.2.2019.pdf PDF
J-5_CDRL_Glossary_07022019.pdf PDF
A030_Class_II_ECP_Signed.pdf PDF
N00024-19-R-5503-0010_Conformed_7.2.2019.pdf PDF
Bidders_Questions_Amendment_0008.pdf PDF
N00024-19-R-5503-0009_Conformed__6.18.2019.pdf PDF
N00024-19-R-5503-0008_6.18.2019.pdf PDF
N00024-19-R-5503-0009_6.18.2019.pdf PDF
Bidders_Questions_Amendment_0007.pdf PDF
N00024-19-R-5503-0007_6.04.2019.pdf PDF
N00024-19-R-5503-0007_Conformed_6.04.2019.pdf PDF
J-2_GFI_List_(V)6_Production_06042019.pdf PDF
Bidders_Questions_Amendment_0006.pdf PDF
N00024-19-R-5503-0006_6.03.2019.pdf PDF
N00024-19-R-5503-0006_Conformed_6.03.2019.pdf PDF
N00024-19-R-5503-0005_5.31.2019.pdf PDF
Bidders_Questions_Amendment_0005.pdf PDF
N00024-19-R-5503-0005_Conformed_5.31.2019.pdf PDF
N00024-19-R-5503_5.23.19.pdf PDF
N00024-19-R-5503-0004_5.23.19.pdf PDF
J-3_Attachment_GFP_19-R-5503.pdf PDF
J-2_GFI_List_(V)6_Production_05222019.pdf PDF
Bidders_Questions_Amendment_0003.pdf PDF
N00024-19-R-5503_5.9.2019.zip ZIP file
N00024-19-R-5503_5.1.2019.zip ZIP file
N00024-19-R-5503.zip ZIP file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418NR42001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to 1) update the solicitation as referenced in the bidders questions and Government's responses (Enclosure 1) and; 2) Update Attachment J-3

1. CONTRACT ID CODE PAGE OF PAGES

J 1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R5503

X 9B. DATED (SEE ITEM 11)

30-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-May-2019

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002419R5503

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter Structure: MFR PART N/R 78439360G1 See Notes A & B

To:

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter Structure: MFR PART N/R 8439360G1 See Notes A & B

CLIN 0091

MFR PART NR: 78439360G1 and integration with Item 0001See Note C

MFR PART NR: 8439360G1 and integration with Item 0001See Note C

CLIN 0101

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

CLIN 0191

MFR PART NR: 78439360G1 and integration with Item 0101See Note C

MFR PART NR: 8439360G1 and integration with Item 0101See Note C

CLIN 0201

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

CLIN 0291

MFR PART NR: 78439360G1 and integration with Item 0201See Note C

MFR PART NR: 8439360G1 and integration with Item 0201See Note C

CLIN 0301

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter Structure: MFR PART N/R 78439360G1 See Notes A and B

20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter Structure: MFR PART N/R 8439360G1 See Notes A and B

CLIN 0391

MFR PART NR: 78439360G1 and integration with Item 0301See Note C

MFR PART NR: 8439360G1 and integration with Item 0301See Note C

CLIN 0401

MFR PART NR:8493935G3, 77C734560G1 and 7392144-01Less HGHS Components: Quad Processor P/N 20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

20709913-1, Digital Receiver VXS Card P/N 77C735740P1, Clock Generator Card P/N77C735743P1Less Shelter

CLIN 0491

MFR PART NR: 78439360G1 and integration with Item 0401See Note C

MFR PART NR: 8439360G1 and integration with Item 0401See Note C

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

AN/SLQ-32 (V) 6 FY20-24 PRODUCTION

1.0 SCOPE

This SOW defines the effort required for the production and testing of various configurations of Surface Electronic Warfare Improvement Program (SEWIP) AN/SLQ-32(V)6 electronic support antenna and receiver systems/subsystems.

The AN/SLQ-32(V)6 is configured for installation on Arleigh Burke Class DDGs and includes a Block 2 ES subsystem, a Block 1B3 HGHS subsystem and a Liquid Conditioning Unit (LCU).

The AN/SLQ-32A(V)6 is configured for installation on Zumwalt Class DDGs and includes a Block 2 ES subsystem.

The AN/SLQ-32C(V)6 is configured for installation on Small Surface Combatants including Freedom and Independence Class LCSs and U.S. Coast Guard Offshore Patrol Cutters. It includes a Block 2 ES subsystem and a Liquid Conditioning Unit (LCU).

The contractor shall provide all of the personnel, facilities, equipment and fixtures to manufacture, assemble, test and deliver all AN/SLQ-32(V)6 configurations listed in the table below. All items presented for acceptance shall be manufactured, assembled, and tested in accordance with (IAW) the Technical Data Package (TDP) (Attachment J-6) and GFI Incorporated herein (Attachment J-2). Notwithstanding the nomenclature used, the part numbers and drawing numbers provided shall be considered dispositive in the event a conflict is identified.

AN/SLQ-32(V)6 AN/SLQ-32A(V)6 AN/SLQ-32C(V)6

Block 2 ES Subsystem Drawing Number 8493935G3* 8493945G2 77C736819G4 Block 1B3 HGHS Subsystem Drawing Number 77C734560G1 N/A N/A LCU Single Pump Drawing Number 7392144-01 N/A 7392144-01 *Note: System to be delivered with or without Shelter Structure in accordance with Section B.

If CLIN 9600 and/or 9601 options are exercised, the contractor shall provide sets of Antenna Support Electronics Assembly (ASEA) Drawing 8493970G4 (1 set consists of qty 2 of drawing 8493970G4) in accordance with Section B.

2.0 APPLICABLE DOCUMENTS

The contractor shall use the following documents in support of the requirements of this contract.

2.1 Military Standards

Document Number Title Effective Date MIL-STD-129R Military Marking for Shipment and Storage 24 MAY 2018 MIL-STD-130N Change 1 Identification Marking of U.S. Military Property 16 NOV 2012 MIL-STD-196F Joint Electronics Type Designation Automated System 30 MAY 2018 MIL-STD-881C Work Breakdown Structures for Defense Material Items 19 JUN 2018

2.2 Military Handbooks

Document Number Title Effective Date MIL-HDBK-61A Configuration Management Guidance 07 FEB 2001 MIL-HDBK-470A Designing and Developing Maintainable Products and Systems 31 MAY 2012 MIL-HDBK-2036 Preparation of Electronic Equipment Specifications 01 NOV 1999 MIL-HDBK-2164A Environmental Stress Screening Process for Electronic Equipment 19 JUN 1996

2.3 Other Government Documents

Document Number Title Effective Date DoDI 8500.01 Cybersecurity 14 MAR 2014 DoD IUID Guide DoD Guide to Uniquely Identifying Items 16 SEP 2015 NAVSEA INST 9400.2 Implementation of Naval Sea Systems Command (NAVSEA) 20 SEP 2016

Afloat Information Assurance and Guidance NAVSO P-6071 Best Practices for Manufacturing Planning MAR 1986

TE000-AB-GTP-020 Government Stress Screening of Hardware 01 JAN 1992

2.4 ASME Standards

Document Number Title Effective Date ASME Y14.24 Types and Applications of Engineering Drawings 01 JAN 2012 ASME Y14.34 Associated Lists 01 JAN 2013 ASME Y14.35 Revision of Engineering Drawings and Associated Documents 29 AUG 2014 ASME Y14.38 Abbreviations and Acronyms for Use on Drawings and 01 JAN 2007

Related Documents ASME Y14.100 Engineering Drawing Practices 14 NOV 2017

2.5 International Organization for Standardization

Document Number Title Effective Date ISO 9001:2015 Quality Management Systems — Requirements SEP 2015 ISO 10007 Quality Management Systems — Guidelines for 01 MAR 2017

Configuration Management – Third Edition

2.6 SAE International

Document Number Title Effective Date SAE EIA-649-B Configuration Management Standard 01 APR 2011 SAE EIA-649-1 Configuration Management Requirements for Defense Contracts 20 NOV 2014

3.0 REQUIREMENTS

The contractor shall manufacture various configurations of the SEWIP AN/SLQ-32(V)6 system IAW the following sections:

3.1 Program Management Support

The Contractor shall assign a qualified Program Manager (PM) who shall have complete responsibility for the planning, execution, control and reporting of all aspects of the program, and for directing in-house and subcontractor efforts. The Contractor shall develop, maintain, and deliver a Contract Work Breakdown Structure IAW CDRL A001. The Contractor shall develop, maintain, and deliver an Integrated Master Schedule (IMS) IAW CDRL A002.

3.2 Information Assurance (IA) Strategy

The Contractor shall implement IA processes IAW DoDI 8500.01, and comply with guidance and technologies described in NAVSEA INST 9400.2. The Contractor shall develop and deliver an Information Support Plan IAW CDRL A003. For the first system produced in each configuration, the contractor shall conduct an IA scan assessment and provide a test report IAW CDRL A004.

3.3 Configuration Management

See C-243-H003, below, for guidance on configuration management. The contractor shall prepare and deliver the Supplier’s Configuration Management Plan prepared IAW CDRL A005.

Participation in the development of Class I and Class II Engineering Change Proposals (ECPs) shall be required.

The Contractor shall support the ECP development during Quarterly Program Reviews (QPR) by reporting and summarizing any issues related to the production of all variants of the AN/SLQ-32 (V)6 system IAW the TDP.

These issues shall be reported as a report, record of meeting minutes IAW CDRL A006.

3.3.1 Request for Variance

In the event that a variance is identified, the Contractor shall prepare and deliver a Request For Variance IAW

CDRL A007.

3.3.2 Diminishing Manufacturing Sources and Material Shortages (DMSMS)

The contractor shall identify obsolete components during procurement of material and document the results IAW

CDRL A008.

3.4 Hardware Production Documentation

The Contractor shall prepare and deliver:

1. Contractor’s Quality Assurance Plan prepared IAW CDRL A009.

2. Handling Procedures for Electrostatic Discharge (ESD) Sensitive Devices prepared IAW CDRL A010

3. Counterfeit Prevention Plan prepared IAW CDRL A011.

3.5 Post Award Conference

The Contractor shall schedule and host a Post Award Conference at the contractor’s facility no later than 60 days after award of the contract. The purpose of this conference is to review the initial production plans. The contractor shall prepare and deliver a Post Award Conference meeting agenda IAW CDRL A012 no later than one week before the date of the post award conference. The contractor shall prepare and deliver meeting minutes IAW CDRL A006 no later than one week after completion of the Post Award Conference.

3.6 Quarterly Program Reviews (QPR)

The Contractor shall schedule and host program reviews on a quarterly basis at the contractor’s facility. The purpose of the QPR is to review the production status. The contractor shall prepare and deliver a QPR meeting agenda IAW CDRL A012 no later than one week before the date of the QPR. The contractor shall prepare and deliver meeting minutes IAW CDRL A006 no later than one week after completion of the QPR.

3.7 Production Readiness Review (PRR)

The Contractor shall schedule and host a PRR within 30 days following Government approval of the Supplier’s Configuration Management Plan required in SOW paragraph 3.3 and the Hardware Production Documentation required in SOW paragraph 3.4.

The Contractor shall use the DoD PRR checklist, attached herein as Attachment J-12 to prepare for the PRR. The PRR shall assess the following: manufacturing process readiness, quality management system, production planning, system requirements compliance, inventory management, and supplier management.

The Contractor shall prepare and deliver a PRR meeting agenda IAW CDRL A012 no later than one week before the date of the PRR. The contractor shall deliver meeting minutes IAW CDRL A006 no later than one week after completion of the PRR.

3.8 Engineering and Test Support

The Contractor shall ensure personnel, procedures, equipment, and facilities used for all required tests conform with the approved test procedure(s), which are provided as GFI

3.8.1 Test Readiness Review (TRR)

For each variation, the contractor shall conduct a test readiness review (TRR) 30 days prior to starting the FAT. The contractor shall deliver an agenda IAW CDRL A012 no later than one week before the date of the TRR. The contractor shall deliver meeting minutes IAW CDRL A006 no later than one week after completion of the TRR.

3.8.2 First Article Qualification Test (FAQT)

For each (V)6 variant, the contractor shall conduct a FAQT on the first manufactured unit for each configuration.

The FAQT shall be completed using the approved test procedure(s), which are provided as GFI. The Contractor shall document results of the FAQT and report IAW CDRL A013. Government approval of the FAQT report, or waiver of FAQT requirements, shall be a prerequisite to acceptance of the first manufactured unit for each configuration.

If modification of the approved test procedure is necessary, the contractor shall submit proposed modifications IAW CDRL A014. The Contractor shall own or have access to equipment and facilities capable of testing IAW the approved test procedure(s). The Contractor shall correct all deficiencies found as a result of FAQT.

3.8.3 Physical Configuration Audit (PCA)

The Contractor shall conduct a Government-witnessed PCA. The PCA shall be held after the first production unit has completed FAQT. The PCA shall be conducted at the Contractor facility. The purpose of the PCA is to verify the as-built configuration matches the technical documentation and to validate supporting processes.

The Contractor shall use the PCA Plan delivered as GFI as a baseline. The contract shall update the PCA Plan only as required for successful PCA completion. If updates are made, the Contractor shall deliver a Physical Configuration Audit (PCA) Plan, IAW CDRL A015, and shall conduct the PCA as defined by the Government accepted plan.

The PCA requires major disassembly of the first unit to a level which will allow for verification of all drawing defined configuration items and an in-depth review of the associated Product Drawings/Models and Associated Lists in comparison with the first unit. Any conflict between the Product Drawings/Models and Associated Lists and the first unit shall be identified, documented. Findings and corrective action shall be delivered IAW CDRL A016.

3.8.4 Environmental Stress Screening (ESS)

ESS shall be conducted on all units prior to any system level functional tests IAW the approved ESS Procedures and Implementation Plan, provided here as GFI. The contractor shall submit proposed updates to the Government-provided test procedure IAW CDRL A017. Results of ESS testing shall be documented IAW CDRL A018

3.8.5 Factory Acceptance Test (FAT)

A FAT shall be conducted on all units before delivery. The Contractor shall perform testing IAW the Test Procedure, Factory Acceptance, provided here as GFI. The contractor shall submit proposed updates to the Government-provided test procedure IAW CDRL A019. The Contractor shall document and deliver the results of the FAT IAW CDRL A020.

3.8.6 Failure Analysis/Corrective Action Report (FACAR) Generation A FACAR shall be generated for each configuration item (as defined by EIA-649-1) that fails during any test event.

FACARs shall be generated IAW CDRL A021.

3.8.7 Trouble Report (TR)

The Contractor shall generate and deliver a TR if software or firmware is suspect in a test event failure.

TRs shall be submitted IAW CDRL A022.

3.8.8 As Built Configuration List (ABCL)

The contractor shall submit an ABCL for each delivered unit IAW CDRL A023.

3.9 Cost Reporting

Cost data reports shall be provided IAW CDRLs A024, A025, and A026.

3.10 Detailed Tasks, Cyber Security (All Items)

The Contractor shall implement the security requirements of the clause under Section I of this contract entitled DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, and National Institute of Standards and Technology (NIST) Special Publication 800-171.

3.10.1 System Security Plan (SSP)

The Contractor shall develop and submit a Technical Report – Study/Services, POAM and Systems Security Plan (SSP) (CDRL A027) that implements the security requirements of DFARS 252.204-7012.

In accordance with DFARS 252.204-7012, the SSP shall implement, at a minimum, all security requirements in NIST 800-171 (Rev. 1) standards 3.1 to 3.14; or ensure that any unimplemented security requirements have been adjudicated by an authorized representative of the DoD CIO to be non-applicable or to have an alternative, but equally effective, security measure in its place. The SSP shall provide proof of such adjudication by DoD CIO.

Further, the SSP shall contain a description of the system boundary, the operational environment, how the specific security requirements are currently implemented, and the relationships with or connections to other systems. The

POAM shall detail how and when the Contractor will meet all security requirements of 800-171 that are not fully implemented except for the requirements noted in the specific bullets below, which must be fully implemented in the SSP. The Contractor shall permit the Government to validate information in the SSP every three years, on an ad hoc basis with no notice to the Contractor, other than to coordinate any necessary security requests, but not more than five business days, or upon replacement or rotation of the Government program manager.

The SSP shall:

• Fully implement Multi-factor authentication, including authentication and authorization of users in a manner that is auditable

• Implement FIPS 140-2 validation encryption at a minimum of Level 2

• Employ the principle of least privilege or “need to know”

• Require the Contractor to review, in a manner that can be audited, user privileges at least annually

• Require monitoring and controlling remote access sessions and includes mechanisms to audit the session and methods

3.10.2 SSP and POAM Review

The Contractor shall allow the Government to evaluate the SSP and POAM upon request, including on the Contractor’s site, on an ad hoc basis. The Government will provide sufficient notification, but not more than five business days, to the Contractor to allow for the processing of visit requests to the site, if necessary. The Contractor shall support this evaluation IAW NIST 800-171A.

3.10.3 Subcontractors

The Contractor shall provide the plan to track flow down of covered defense information and to assess DFARS clause 252.204-7012 compliance for these suppliers/subcontractors in the SSP (CDRL A027).

3.10.4 Encryption of Data at Rest

Covered Defense Information (CDI) and Covered Contractor Information Systems (CCIS) are defined within clause 252.204-7012. Information at rest is defined as the state of information when it is not in process or in transit and is located on storage devices as specific components of systems. On all CCISs, the Contractor shall encrypt CDI at rest IAW NIST 800-171.

3.10.5 Incident Reporting

The Contractor shall report cyber incidents, as defined in DFARS 252.204-7012, to the Damage Assessment Management Office (DAMO) via the DIB-Net website within 72 hours, per DFARS 252.204-7012. In addition to the reporting requirements above, the Contractor shall deliver all information related to cyber incidents, defined in DFARS 252.204-7012, in a Technical Report – Study/Services, Cyber Incident Report, IAW CDRL A028. The Contractor shall segregate DON CUI from Contractor-owned information, when feasible. Segregation may be implemented through logical isolation, physical isolation, a hybrid approach, or other technological processes to achieve required delivery of compromised data in cyber incidents.

3.10.6 Coordination with NCIS

The Contractor consents to installation by the Naval Criminal Investigative Service (NCIS) of network sensors, owned and maintained by NCIS, on the Contractor's CCIS or other information technology assets when intelligence indicates a vulnerability or a potential vulnerability for the duration of the contract performance period. If NCIS determines that the Contractor’s own sensor capability is adequate, the Contractor consents to cooperation with NCIS on cybersecurity, to include sharing information from its sensor capability and networks.

Both routinely and in response to emergent developments, NCIS engages in outreach efforts to the defense contracting community to coordinate cybersecurity efforts. The Contractor shall regularly monitor and engage with such efforts to ensure that contractor is aware of the most up-to-date cybersecurity information and strategies. As part of these efforts, the Contractor shall consider implementing all recommendations from NCIS for additional hardening (e.g., more stringent configuration settings) of DON critical programs and technologies.

4.0 GOVERNMENT FURNISHED INFORMATION (GFI) AND PROPERTY (GFP)

Government Furnished Information (GFI) and Property (GFP)

The Contractor shall be provided with GFI and GFP for use in the performance of this contract. The GFI inventory list is attached here as Attachment J-2, and the GFP inventory list is attached here as Attachment J-3. The

Contractor shall inspect GFI and GFP within 10 working days of receipt. GFI and GFP deficiencies shall be promptly reported IAW CDRL A029.

5.0 PROVISIONED ITEM ORDERS (CLINs 9800, 9801)

See C-217-H001 PROVISIONED ITEMS ORDERS--BASIC (NAVSEA) (OCT 2018). For CLIN 9801, PIO orders will be placed using the parts listed in Attachment J-14. The Government will specify the subset of required parts from Attachment J-14 and at what quantities in each order. The price of each part shall not exceed the maximum part price specified in Attachment J-14. Prices may be downward adjusted as part of a negotiated order between the Contractor and Government.

6.0 DATA (CLIN 9900)

The data to be furnished hereunder shall be prepared IAW CDRL, DD Form 1423.

6.1 Integrated Digital Data Environment (IDDE)

The Contractor shall use the Government-furnished IDDE to transmit unclassified CDRLs and documents. All Contractor source data published in the IDDE shall be in native format unless otherwise specified. The Government IDDE requires PKI/CAC credentials for access, and the contractor shall be responsible for obtaining/maintaining necessary access credentials. Access to the Government IDDE may be obtained from the Contracting Officer’s Representative.

7.0 SECURITY REQUIREMENTS

Contract performance requires the generation, handling, and safeguarding of classified data. The Contractor shall have facilities appropriate for classified document storage and control as identified in Attachment J-1 – Security Classification Specification, DD Form 254. The Contractor shall have personnel cleared for SECRET information required to maintain knowledge of the current, Non-SCI intelligence information (e.g. threat data). Access up to SECRET is required for contract performance. Information/data generated, handled or utilized in performance of this contract shall not be disclosed to any third party (e.g. foreign governments, other corporate entities, etc.) without prior written approval from the Contracting Officer’s Representative.

Facility Security Clearance Required: The contractor is required to maintain a SECRET facility security clearance

Level of Safeguarding for Classified Information/Material Required at Contractor Facility: The contractor is required to maintain a level of safeguarding for classified information/material at the SECRET level

COMSEC: The Contractor requires COMSEC to accommodate the use of secure communications such as Secure Terminal Equipment (STE). The contractor will be required to have access to COMSEC for the STE phone.

Non-SCI: The contractor will require access to non-SCI. This contract contains technology with the purpose of countering threats of potential adversaries.

Controlled Unclassified Information (CUI)(Formerly for Official Use Only Information): The contractor will be required to have access to CUI.

Other: Contractor will require access to a Secure Terminal Equipment (STE) classified phone, not included as GFP.

Receive, Store, and Generate Classified Information: The contractor will assist in modernizing systems that are classified. Techniques to modernize this equipment, testing of this equipment and overall system performance could be classified and the subject to email and written reports. In this capacity, the contractor will generate and be in receipt of classified material. The contractor requires access to classified source data up to and including the SECRET level. Classified material generated in support of this contract shall be classified in accordance with the source material of the Navy Security Classification Guidance. Automated Information Systems (AIS) must be certified and accredited by the Cognizant Security Agency (CSA) prior to processing classified information from

NAVSEA.

Fabricate, modify, or store classified hardware: The contract will fabricate and modify classified component in support of this contract and then store this hardware until completion of all requirements. All classified data and hardware will be protected IAW DoD 5220.22-M, National Industrial Security Program Operating Manual

(NISPOM).

DTIC: In order to use the current contract specifications and applicable documentation, the contractor is required to use the Defense Technical Information Center (DTIC). DD Form 1540 “Registration for Scientific and Technical Information Services” must be completed for registration with DTIC. The contractor may also submit DD Form 2345 “Militarily Critical Technical Data Agreement” (after registration with DTIC) to the Defense Logistics Services Center for access to unclassified, militarily critical technical data from other DoD sources.

Require COMSEC Account: Contractor requires a COMSEC account to accommodate the use of secure communications. The contractor will be required to have access to COMSEC for Government Furnished Equipment (GFE). Contractor will return ALL GFE or Government purchased COMSEC equipment at the closure of the contract.

Operations Security Requirements: Due to the sensitive nature of this contract, the contractor shall develop and submit for approval an Operations Security (OPSEC) Plan. The contractor is required to protect critical information associated with this contract to prevent unauthorized disclosure and will observe OPSEC requirements.

Be authorized to use the Defense Courier Service (DCS): The contractor will require use of the Defiance Courier Service for the transfer of classified material. Only certain classified information qualifies for shipment by DCS.

Prior approval of the KO is required before a prime contractor can authorize a subcontractor to use the services of

DCS.

Receive, Store, or Generate Controlled Unclassified Information (CUI): The contractor will be required to have access to CUI with developers and integrators.

SECTION F - DELIVERIES OR PERFORMANCE

DELIVERY INFORMATION

Submission of a proposal in response to this solicitation is considered a commitment by the offeror to deliver in accordance with the following delivery schedule (exercise of all available options and stepladder quantities at award assumed here; however, the Government shall in no way be obligated to exercise any option or stepladder quantity).

DELIVERY NOTE 1: CLIN 0001, and Option CLINs 0031, 0061, 0091, 0101, 0161, 0191, 0201, 0261, 0291, 0301, 0361, 0391, 0401, 0461 and 0491 if exercised, shall be delivered at a rate of two (2) units per month beginning fifteen (15) months after the option is exercised, as illustrated in the below table.

To the extent that options are exercised resulting in concurrent deliveries, the contractor shall be required to deliver no more than one (2) AN/SLQ-32(V)6 Systems per month. The Government will provide further instructions clarifying the delivery schedule via contract modification.

CLIN Quantity Required Delivery Date Ship to Address UIC 0001 1 15 Months After Contract To Be Determined (TBD) TBD 0001 1 15 Months After Contract TBD TBD 0001 1 16 Months After Contract TBD TBD

0001 1 16 Months After Contract TBD TBD 0001 1 17 Months After Contract TBD TBD 0001 1 17 Months After Contract TBD TBD 0001 1 18 Months After Contract TBD TBD 0001 1 18 Months After Contract TBD TBD 0001 1 19 Months After Contract TBD TBD 0001 1 19 Months After Contract TBD TBD 0001 1 20 Months After Contract TBD TBD 0001 1 20 Months After Contract TBD TBD 0001 1 21 Months After Contract TBD TBD 0001 1 21 Months After Contract TBD TBD 0001 1 22 Months After Contract TBD TBD 0001 1 22 Months After Contract TBD TBD 0001 1 23 Months After Contract TBD TBD 0001 1 23 Months After Contract TBD TBD 0001 1 24 Months After Contract TBD TBD 0001 1 24 Months After Contract TBD TBD 0001 1 25 Months After Contract TBD TBD 0001 1 25 Months After Contract TBD TBD 0031 1 15 Months After Option Exercise TBD TBD 0061 1 15 Months After Option Exercise TBD TBD 0061 1 15 Months After Option Exercise TBD TBD 0061 1 16 Months After Option Exercise TBD TBD 0061 1 16 Months After Option Exercise TBD TBD 0061 1 17 Months After Option Exercise TBD TBD 0091 1 15 Months After Option Exercise TBD TBD 0091 1 15 Months After Option Exercise TBD TBD 0091 1 16 Months After Option Exercise TBD TBD 0091 1 16 Months After Option Exercise TBD TBD 0091 1 17 Months After Option Exercise TBD TBD 0091 1 17 Months After Option Exercise TBD TBD 0091 1 18 Months After Option Exercise TBD TBD 0091 1 18 Months After Option Exercise TBD TBD 0091 1 19 Months After Option Exercise TBD TBD 0091 1 19 Months After Option Exercise TBD TBD 0091 1 20 Months After Option Exercise TBD TBD 0091 1 20 Months After Option Exercise TBD TBD 0091 1 21 Months After Option Exercise TBD TBD 0091 1 21 Months After Option Exercise TBD TBD 0091 1 22 Months After Option Exercise TBD TBD 0091 1 22 Months After Option Exercise TBD TBD 0091 1 23 Months After Option Exercise TBD TBD 0091 1 23 Months After Option Exercise TBD TBD 0091 1 24 Months After Option Exercise TBD TBD

0091 1 24 Months After Option Exercise TBD TBD 0091 1 25 Months After Option Exercise TBD TBD 0091 1 25 Months After Option Exercise TBD TBD 0101 1 15 Months After Option Exercise TBD TBD 0101 1 15 Months After Option Exercise TBD TBD 0101 1 16 Months After Option Exercise TBD TBD 0101 1 16 Months After Option Exercise TBD TBD 0101 1 17 Months After Option Exercise TBD TBD 0101 1 17 Months After Option Exercise TBD TBD 0101 1 18 Months After Option Exercise TBD TBD 0101 1 18 Months After Option Exercise TBD TBD 0101 1 19 Months After Option Exercise TBD TBD 0101 1 19 Months After Option Exercise TBD TBD 0101 1 20 Months After Option Exercise TBD TBD 0101 1 20 Months After Option Exercise TBD TBD 0101 1 21 Months After Option Exercise TBD TBD 0101 1 21 Months After Option Exercise TBD TBD 0101 1 22 Months After Option Exercise TBD TBD 0101 1 22 Months After Option Exercise TBD TBD 0101 1 23 Months After Option Exercise TBD TBD 0101 1 23 Months After Option Exercise TBD TBD 0101 1 24 Months After Option Exercise TBD TBD 0101 1 24 Months After Option Exercise TBD TBD 0101 1 25 Months After Option Exercise TBD TBD 0161 1 15 Months After Option Exercise TBD TBD 0161 1 15 Months After Option Exercise TBD TBD 0161 1 16 Months After Option Exercise TBD TBD 0161 1 16 Months After Option Exercise TBD TBD 0161 1 17 Months After Option Exercise TBD TBD 0161 1 17 Months After Option Exercise TBD TBD 0191 1 15 Months After Option Exercise TBD TBD 0191 1 15 Months After Option Exercise TBD TBD 0191 1 16 Months After Option Exercise TBD TBD 0191 1 16 Months After Option Exercise TBD TBD 0191 1 17 Months After Option Exercise TBD TBD 0191 1 17 Months After Option Exercise TBD TBD 0191 1 18 Months After Option Exercise TBD TBD 0191 1 18 Months After Option Exercise TBD TBD 0191 1 19 Months After Option Exercise TBD TBD 0191 1 19 Months After Option Exercise TBD TBD 0191 1 20 Months After Option Exercise TBD TBD 0191 1 20 Months After Option Exercise TBD TBD 0191 1 21 Months After Option Exercise TBD TBD 0191 1 21 Months After Option Exercise TBD TBD

0191 1 22 Months After Option Exercise TBD TBD 0191 1 22 Months After Option Exercise TBD TBD 0191 1 23 Months After Option Exercise TBD TBD 0191 1 23 Months After Option Exercise TBD TBD 0191 1 24 Months After Option Exercise TBD TBD 0191 1 24 Months After Option Exercise TBD TBD 0191 1 25 Months After Option Exercise TBD TBD 0201 1 15 Months After Option Exercise TBD TBD 0201 1 15 Months After Option Exercise TBD TBD 0201 1 16 Months After Option Exercise TBD TBD 0201 1 16 Months After Option Exercise TBD TBD 0201 1 17 Months After Option Exercise TBD TBD 0201 1 17 Months After Option Exercise TBD TBD 0201 1 18 Months After Option Exercise TBD TBD 0201 1 18 Months After Option Exercise TBD TBD 0201 1 19 Months After Option Exercise TBD TBD 0201 1 19 Months After Option Exercise TBD TBD 0201 1 20 Months After Option Exercise TBD TBD 0261 1 15 Months After Option Exercise TBD TBD 0261 1 15 Months After Option Exercise TBD TBD 0261 1 16 Months After Option Exercise TBD TBD 0261 1 16 Months After Option Exercise TBD TBD 0291 1 15 Months After Option Exercise TBD TBD 0291 1 15 Months After Option Exercise TBD TBD 0291 1 16 Months After Option Exercise TBD TBD 0291 1 16 Months After Option Exercise TBD TBD 0291 1 17 Months After Option Exercise TBD TBD 0291 1 17 Months After Option Exercise TBD TBD 0291 1 18 Months After Option Exercise TBD TBD 0291 1 18 Months After Option Exercise TBD TBD 0291 1 19 Months After Option Exercise TBD TBD 0291 1 19 Months After Option Exercise TBD TBD 0291 1 20 Months After Option Exercise TBD TBD 0301 1 15 Months After Option Exercise TBD TBD 0301 1 15 Months After Option Exercise TBD TBD 0301 1 16 Months After Option Exercise TBD TBD 0301 1 16 Months After Option Exercise TBD TBD 0301 1 17 Months After Option Exercise TBD TBD 0301 1 17 Months After Option Exercise TBD TBD 0301 1 18 Months After Option Exercise TBD TBD 0301 1 18 Months After Option Exercise TBD TBD 0301 1 19 Months After Option Exercise TBD TBD 0301 1 19 Months After Option Exercise TBD TBD 0301 1 20 Months After Option Exercise TBD TBD

0301 1 20 Months After Option Exercise TBD TBD 0301 1 21 Months After Option Exercise TBD TBD 0301 1 21 Months After Option Exercise TBD TBD 0301 1 22 Months After Option Exercise TBD TBD 0301 1 22 Months After Option Exercise TBD TBD 0301 1 23 Months After Option Exercise TBD TBD 0361 1 15 Months After Option Exercise TBD TBD 0361 1 15 Months After Option Exercise TBD TBD 0361 1 16 Months After Option Exercise TBD TBD 0361 1 16 Months After Option Exercise TBD TBD 0391 1 15 Months After Option Exercise TBD TBD 0391 1 15 Months After Option Exercise TBD TBD 0391 1 16 Months After Option Exercise TBD TBD 0391 1 16 Months After Option Exercise TBD TBD 0391 1 17 Months After Option Exercise TBD TBD 0391 1 17 Months After Option Exercise TBD TBD 0391 1 18 Months After Option Exercise TBD TBD 0391 1 18 Months After Option Exercise TBD TBD 0391 1 19 Months After Option Exercise TBD TBD 0391 1 19 Months After Option Exercise TBD TBD 0391 1 20 Months After Option Exercise TBD TBD 0391 1 20 Months After Option Exercise TBD TBD 0391 1 21 Months After Option Exercise TBD TBD 0391 1 21 Months After Option Exercise TBD TBD 0391 1 22 Months After Option Exercise TBD TBD 0391 1 22 Months After Option Exercise TBD TBD 0391 1 23 Months After Option Exercise TBD TBD 0401 1 15 Months After Option Exercise TBD TBD 0401 1 15 Months After Option Exercise TBD TBD 0401 1 16 Months After Option Exercise TBD TBD 0461 1 15 Months After Option Exercise TBD TBD 0461 1 15 Months After Option Exercise TBD TBD 0461 1 16 Months After Option Exercise TBD TBD 0491 1 15 Months After Option Exercise TBD TBD 0491 1 15 Months After Option Exercise TBD TBD 0491 1 16 Months After Option Exercise TBD TBD 9600 2 15 Months After Option Exercise TBD TBD 9600 2 15 Months After Option Exercise TBD TBD 9600 2 16 Months After Option Exercise TBD TBD 9600 2 16 Months After Option Exercise TBD TBD 9600 2 17 Months After Option Exercise TBD TBD 9601 2 15 Months After Option Exercise TBD TBD 9601 2 15 Months After Option Exercise TBD TBD 9601 2 16 Months After Option Exercise TBD TBD

9601 2 16 Months After Option Exercise TBD TBD 9601 2 17 Months After Option Exercise TBD TBD 9700 1 15 Months After Option Exercise TBD TBD 9701 1 15 Months After Option Exercise TBD TBD 9702 1 15 Months After Option Exercise TBD TBD 9800 1 15 Months After Option Exercise TBD TBD 9801 1 15 Months After Option Exercise TBD TBD

9900 1 30 MAR 2026 TBD TBD

DELIVERY NOTE 2: All data to be furnished under CLIN 9900 of this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.219-7004 Small Business Subcontracting Plan (Test Program) APR 2018

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

(NAVSEA VARIATION I) (SEP 2009)

The Government may require the delivery of the numbered line item(s)/subline item(s), identified in the Schedule as an option item(s), in the quantity and at the price(s) stated in the Schedule. If more than one option exists, the Government has the right to unilaterally exercise any such option, in whole or in part up to the total quantity specified in the option item, whether or not it has exercised other options. Option(s) shall be exercised, if at all, by written or telegraphic notice(s) signed by the Contracting Officer and sent within the time(s) specified below:

ITEM(s) LATEST OPTION EXERCISE DATE

0031 30 SEP 2020

0061 30 SEP 2020

0091 30 SEP 2020

0101 30 SEP 2021

0161 30 SEP 2021

0191 30 SEP 2021

0201 30 SEP 2022

0261 30 SEP 2022

0291 30 SEP 2022

0301 30 SEP 2023

0361 30 SEP 2023

0391 30 SEP 2023

0401 30 SEP 2024

0461 30 SEP 2024

0491 30 SEP 2024

9600 30 SEP 2023

9601 30 SEP 2024

9700 30 SEP 2020

9701 30 SEP 2020

9702 30 SEP 2020

30 SEP 2024

30 SEP 2024

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

SECTION L 1.0

General

1.1 The Contracting Officer is the sole point of contact for this solicitation; however, the designated Contract Specialist may communicate with industry on the Contracting Officer’s behalf.

The Contracting Officer for this solicitation is:

Ms. Holly Danner, SEA 02552

(202) 781-2364 holly.danner@navy.mil

The designated Contract Specialist is:

Ms. Danielle Hinton, SEA 02552H

(202) 781-1400 danielle.hinton@navy.mil

1.2 The Government intends to evaluate proposals and award one contract for full rate production of SEWIP AN/SLQ-32(V)6 systems. The estimated award date is 3rd quarter 2020.

1.3 No classified data shall be included within proposals. Appropriate security classification markings shall be included, and handling instructions followed, for all submitted data. Strict compliance with applicable law;

mailto:kate.robb@navy.mil mailto:danielle.hinton@navy.mil regulation; and DoD directives, instructions, and manuals is required.

1.4 “Pricing information,” is defined as facts, statistics, or data describing the consideration an offeror will receive in exchange for furnishing the supplies and services described in this solicitation. Pricing information may only be included within Volume I: Price Proposal. Inclusion of pricing information within any other Volume will likely result in rejection of the offeror’s proposal, as well as the offeror being determined ineligible for award. If doubt exists as to what constitutes pricing information, offeror’s are strongly encouraged to submit a question in accordance with paragraph 2.8 of this section.

1.5 Offerors shall refer to FAR 52.215-1, Instructions to Offerors -- Competitive Acquisition. The information below is provided to supplement and implement FAR 52.215-1. Please note that pursuant to FAR 52.215-1, the Government intends to award a contract on the basis of a proposal submission without conducting discussions with offerors, but reserves the right to conduct discussions in accordance with FAR 15.306 if determined by the Contracting Officer to be necessary.

1.6 Each offeror shall submit only one proposal. No alternate proposals will be accepted, and submission of multiple proposals will result in disqualification of the submitting offeror. The offeror’s proposal submission should contain the offeror’s best terms from a price and technical standpoint.

EXCEPTION: If an offeror believes they may be eligible for waiver of a First Article Qualification Testing (FAQT) requirement based on acceptance of a prior product, they may submit two Volume I pricing volumes for consideration. See M-209-H002, below for details on when submission of an “OFFER A” and “OFFER B” would be appropriate. If an offeror elects to submit two Volume I pricing volumes for consideration, the Letter of Transmittal shall clearly indicate whether the Volume is an “OFFER A” (no waiver of First Article Qualification Testing (FAQT)) or an “OFFER B” (waiver of First Article Qualification Testing (FAQT)).

1.7 The Government may contact any or all or a limited number of Offerors with questions concerning their proposals as permitted under FAR part 15.

1.8 Offerors are reminded past performance information is proprietary source selection information. The Government will only discuss past performance information directly with the prospective prime or sub-contractor that is being reviewed. If there is a problem with a proposed subcontractor’s past performance the prime may be notified of a problem, but no details will be discussed without the subcontractor’s permission.

1.9 At the end of discussions, if they occur, the Government will request Final Proposal Revisions (FPRs) from all Offerors still within the competitive range.

1.10 Each offeror must submit all information required by this solicitation. The offeror’s proposal shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section J). Failure to comply with the terms and conditions of the solicitation and/or failure to provide all of the requested information may result in the offeror’s proposal being rejected, and may result in the offeror being determined ineligible for award.

1.11 The solicitation will be announced through the Government wide point of entry (GPE) at: https://www.fbo.gov/.

1.12 The Government may post additional information to the GPE relating to this solicitation (e.g. a solicitation amendment responding to submitted offeror questions). It is the offeror’s responsibility to check the GPE for any such information.

1.13 All questions shall be submitted to the Contracting Officer and Contract Specialist in accordance with paragraph 2.8 of this section.

1.14 The Government may schedule a pre-award site survey at facilities identified in any or all or a limited number of offeror proposals following the proposal submission date.

http://www.fbo.gov/

1.15 Each offeror is required to complete Attachment J-S1, Contractor Award Information, in its entirety and provide it along with their proposal submission. Attachment J-S1 will not count against the proposal page count limitations.

1.16 All notional dates included within this solicitation (e.g. 12 months after contract award) shall be unilaterally changed by the Government to actual calendar dates (e.g. 5 Jan 21) at contract award.

1.17 For purposes of this proposal, offerors are being notified of obsolete components and parts which will be provided as either GFM or GFE as follows (This information is also contained in the GFP list, attachment J-3):

(a) Government Furnished Material (GFM)

Offerors shall not include the cost of acquiring the following obsolete components in their proposed price on the base year. The Government will provide the following obsolete components as GFM, required for production of specific Block 2 TDP parts for the base year units ONLY (see attachment J-3). The Government is actively developing solutions to these obsolescence issues which may result in ECPs to be negotiated after contract award.

Obsolete components of Block 2 Parts for base year Items 0001, 0031, 0061:

Component P/N Component Description TDP Part Number

Part Description

Component Mfg

BCM5345KPBG

BGA LTB BCM5345 24PORT

GBIT SWT 77A126691P1 Ethernet

Switch Abaco

BCM5345KPBG

BGA LTB BCM5345 24PORT

GBIT SWT 77A126691P2 Ethernet

Switch Abaco

NFA31CC102R1E4D

EMI FILTER CAP TYPE 1000PF

25V 4ELE 1206

77A126694P1 Single Board Computer

Abaco

CN80617005745ACS

LBXX

BGA INTEL CORE I7-610E

2.53GHZ 35W BGA12

K4B1G0846G-BCH9

BGA DDR3 SDRAM 1GB

128MX8 FBGA

BD82QM57 SLGZQ

BGA PCH QM57 CHIPSET

FCBGA1071 27 X 25MM

TSI148-133CLY BGA IC PCIX-VME320 BRIDGE

DS3905U-020+ Triple NV Resistor/Switch PI3VDP101LSZDEX EOL HDMI Level Shifter

88SA8052A1-

TBC2C000 SATA TO PATA CONTROLLER

SIR866DP-T1-GE3 NFET 20V 40A .003OHM SO-8

77A126688P1 VXS

Switch Abaco VSC3144XHR-32

BGA CROSSPOINT SWITCH

3.5GBPS 144X144 BG

88E1111-B2-

BAB1I000

BGA 88E1111 GIG ENET PHY

SCL

M-IC0002207-001

OP-IC,LC4128B-5TN128I,TQFP,-

40C/+105C

77A126689P1 Quad Processor Abaco

C-IC0001743-C01 LF-IC,TSI148,BGA,0C/+70C

C-IC0001789-I01

LF-IC,S29GL01GP-

13FFIV10,FBGA,-40C/+85C

B-IC0002176-I01

LF-IC,ISPGAL22V10AV-

75,QFN,-40C/+85C

C-IC0002414-005

LF-IC,DDR2

SDRAM,64MX16,BGA,DDR2-

C-IC0002231-001

LF-IC,VSC7384,BGA,-

40C/+100C

C-IC0002170-I01

LF-IC,ICS853006,TSSOP,-

40C/+85C

C-TRN000093-001

LF-TRN,SI7866ADP,PowerPAK

SO-8,-55/+150C

C-IC0001789-I01

LF-IC,S29GL01GP-

13FFIV10,FBGA,-40C/+85C

77A126687P1 SRIO

Switch Abaco

C-IC0003256-001

LF-IC,MPC8548EVTAQGB,FC-

PBGA,0C/+105C

B-IC0002110-I01 LF-IC,TSI578,BGA,0C/+70C

B-IC0002200-001

LF-IC,DDR2

SDRAM,32MX16,FBGA,0C/+85C

C-CON001027-006 LF-CON,PLG,VPX,VITA 41

C-CON001006-080

LF-CON,53729-804,PLG,80-

WAY,0.5MM,LP

C-TRN000093-001

LF-TRN,SI7866ADP,PowerPAK

SO-8,-55/+150C

C-IC0002170-I01

LF-IC,ICS853006,TSSOP,-

40C/+85C

TSI148-133IL

2eSST VME Protocol to PCI-X Bridge Device 77A126690P1 Hybrid

Processor Nallatech

(b) Government Furnished Material (GFM)

Offerors shall not include the cost of acquiring the following obsolete parts in their proposed option year pricing. The Government will provide the following obsolete parts as GFM for Items 0101 ,0161, 0201, 0261, 0301, 0361, 0401, 0461 ONLY (see attachment J-3). The Government is actively developing solutions to these obsolescence issues which may result in ECPs to be negotiated after contract award.

Obsolete Block 2 Parts for option year Items 0101 ,0161, 0201, 0261, 0301, 0361, 0401, 0461:

Part Number Part Description Manufacturer 77A126691P1 Ethernet Switch Abaco 77A126691P2 Ethernet Switch Abaco 77A226694P1 Single Board Computer Abaco 77A126688P1 VXS Switch Abaco 77A126689P1 Quad Processor Abaco 77A126687P1 SRIO Switch Abaco 77A126690P1 Hybrid Processor Nallatech

(c) Government Furnished Equipment (GFE)

Offerors shall not include the cost of acquiring the following obsolete parts in their proposed base year and option year pricing. The Government will provide the obsolete HGHS parts listed below as GFE for testing purposes (see attachment J-3). These parts shall be inserted into the (V)6 systems for FAT testing.

These parts shall then be removed and the (V)6 shall be delivered without these three obsolete parts. The Government is actively developing solutions to these obsolescence issues which may result in ECPs to be negotiated after contract award

HGHS obsolete Parts for base and option year Items : 0001, 0101, 0201, 0301, 0401

Part Description Part Number System Manufacturer Quad Processor 20709913-1 HGHS Abaco

Digital Receiver VXS Card

77C735740P1 HGHS AMS

Clock Generator 77C735743P1 HGHS Curtis-Wright

1.18 Each offeror is required to complete Attachment J-14, PIO Spares, and provide…