Bidder's Q&A 3
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Pre-Proposal Information (PPI) Form | |
| DATE OF REQUEST: 09 February 2018 | SOLICITATION NO: N00024-18-R-4400 |
| TITLE: USS HIGGINS (DDG-76) | NAVSEA POC: Lisa Carll, lisa.carll@navy.mil; Sheila Utz, sheila.utz1@navy.mil |
| The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation. | |
| SSP NO: SSP TPPC-DDG76- |
FORWARD ALL REQUESTS TO: Lisa Carll, lisa.carll@navy.mil; Sheila Utz, sheila.utz1@navy.mil
Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request references, drawings, RLARs, and Errata.
ITEM NO: 551-80-001 CONTRACTOR QUESTION 32: Ref 2.8, 4720-DDG76-FY18, S/A Material Summary, page 285 lists “No Drawings Found for DDG 76 ALT SA 73738D”.
Ref 2.2, Drawing 551-875072 Rev A, lists numerous items as being provided as GFM.
QUESTION: Please provide clarification that no GFM will be provided, or that the items identified as GFM on reference 2.2, will be added via Errata; Ref 2.8, 4720-DDG76-FY18, S/A Material Summary?
| GOVERNMENT RESPONSE: The Government confirms that the items identified as GFM on reference 2.2 were added via ERRATA 2, in reference 4720-DDG-FY18 S/A Material Summary. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 583-11-001 CONTRACTOR QUESTION 33: In paragraph 5.1 (GFM) there are 7 items being manufactured IAW NSWCCD Sketch 7371.
This document is not provided or listed in the reference section paragraph 2 of the basic specification.
Contractor is tasked under NAVSEA Std 009-21 to do a receiving inspection and submit conditions found report.
The contractor will need a copy of NSWCCD sketch 7371 in order to accomplish the requirements of 009-21.
Please provide the above document.
| GOVERNMENT RESPONSE: The Government has made NSWCCD Sketch 7371 available via ERRATA 2. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: Various CONTRACTOR QUESTION 34:
Drawing 165-11-001 (Ref. 2.6) 505-8100-2400-0074 Rev F Typo? 8100-2400-0074 Rev F in CD GFM 167-80-001 (Ref. 2.20) 4720-DDG76-FY18 Not provided: 4720-DDG76-FY18 SA 77228D Drawing 168-11-001 (Ref. 2.5) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
Drawing 168-12-001 (Ref. 2.7) 472-7498089 Rev Q Rev Q not provided. Rev A available in CD.
Drawing 245-11-001 (Ref. 2.4) 115654091 Rev K Rev K not provided. Rev L available in CD.
GFM 438-90-001 (Ref. 2.6) 4720-DDG76-FY18 Not provided: 4720-DDG76-FY18 SA 80612K
Drawing 439-90-002 (Ref. 2.4) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
GFM 463-80-002 (Ref. 2.12) 4720-DDG76-FY18 Not provided: 4720-DDG76-FY18 SA 80916D GFM 464-90-001 (Ref. 2.13) 4720-DDG67-FY18 Not provided: 4720-DDG76-FY18 SA 85032K
Drawing 562-11-001 (Ref. 2.6) 633-6567062 Rev AH Rev AH not provided. Rev AL available in CD.
Drawing 571-31-002 (Ref. 2.4) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
Drawing 582-11-002 (Ref. 2.4) M04780 Rev C Not provided. (ADDED TO FUSION) Drawing 583-11-001 (Ref. 2.9) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
Drawing 625-11-004 (Ref. 2.5) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
Drawing 631-21-006 (Ref. 2.8) 8100-3513-0060 Rev AD Rev AD not provided. Rev AF available in CD.
Drawing 634-11-002 (Ref. 2.2) 634-6221269 Rev L Rev L not provided. Rev M available in CD.
Drawing 644-11-002 (Ref. 2.6) 512-5865873 Rev B Not provided. (ADDED TO FUSION) Drawing 644-11-002 (Ref. 2.8) 8100-3513-0060 Rev AD Rev AD not provided. Rev AF available in CD.
Drawing 651-90-001 (Ref. 2.6) 533-8749205 Rev A Not provided.
Drawing 713-11-001 (Ref. 2.5) 472-7498087 Rev Q Rev Q not provided. Rev L available in CD.
| Drawing 752-11-001 (Ref. 2.2) 752-6220983 Rev N Rev N not provided. Rev P available in CD. | GOVERNMENT RESPONSE: The Government clarifies that the kitted material will be provided GFM. The references have been corrected and are available via ERRATA 2. | |
| TITLE: Missing References | ||
| PARA. NO: |
PAGE NO:
ITEM NO: 520-11-001 CONTRACTOR QUESTION 35:
Question 6:
• Paragraph 3.3 states, “Disconnect, remove, inspect each remote and hydraulic operator for each sea valve listed in 2.2 using 2.6 through 2.8 for guidance as follows:”
Upon review of references 2.6 through 2.8, the Contractor has determined that reference 2.7 directly applies to Teleflex remote valve operators and reference 2.8 directly applies to Rigid Rod remote valve operators, but reference 2.6 has no correlation to any type of remote valve operator.
• Why is the Contractor being directed to utilize reference 2.6, a system diagram, as guidance to remove and inspect remote valve operators? Additionally, there are no references identified in the specification which will provide the Contractor with guidance on Hydraulic remote valve operators, please provide direction?
Question 7:
• Paragraph 3.3.6 states, “Accomplish the requirements to overhaul each hydraulic operator to original manufacturer's specification for each hydraulic operated valve listed in 2.2 (total of 19 each) in accordance with the manufacturing information on labels attached or indicated in the valve manual operator casing. Install new bearings, seal, O-rings and gaskets found not suitable for reuse to each valve operator assembly. Grease and perform shop testing in accordance with applicable original equipment manufacturer specifications.”
The above states that reference 2.2 has 19 each hydraulic operated valves identified, but Contractors review of reference 2.2 – PM-240-0001 Rev ONE, SURF, DDG Sea Valve List, notes that reference 2.2 only lists 66 valves and information pertaining to the location, quantity, and type of remote valve operators is not included.
• Contractor requests detailed information be provided for the location, size, and manufacturer of the 19 each Hydraulic valve operators referenced in paragraph 3.3.6.
(It’s noted that this question has been previously asked and answered (A74) on the USS Howard (DDG 83), FY18, DMP, SSP: TPPC-DDG83-SWRMC18-CN01, Work Item: 520-11-001 “Sea Valve; replace”, paragraph 3.4.8) Question 8:
• Paragraph 3.3.7 states, “Assemble each sea valve hydraulic operator, using new gaskets, seals, packing, o-ring, bearings, bushings, sleeves, coupling and keys, using Table 7-2 of 2.6 for material specifications.”
Upon review of reference 2.6, the Contractor has determined that there is no Table 7-2 in the reference, in fact reference 2.6 has no correlation to any type of remote operator.
• Why is the Contractor being directed to utilize reference 2.6, a system diagram, for the material requirements of Hydraulic valve operators? Additionally, there are no references identified in the specification which will provide the Contractor guidance for Hydraulic valve operators, please provide direction? Question 6: The Government has added the reference to 2.6 from work spec, references to provide the contractors guidance on hyrdaulic remote valve operators can be found via ERRATA 3.
Question 7: Detailed information for the location size and manufacturer of the 19 each hydraulic valve operations reference in paragraph 3.3.6 is provided. Locations are listed in 2.6.
Question 8: The Government has removed the reference to 2.6 from work spec, references to provide contractors guidance on hydraulic valve operators can be found via ERRATA 3.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 520-11-001 CONTRACTOR QUESTION 35 Cont'd:
Question 9:
• Paragraph 3.7 states, “Install new each valve 2-1/2 inch and smaller listed in 2.2 and valves repaired in 3.4, to include valve operators using 2.3 through 2.9 for guidance.”
Upon review of the specification, it’s noted that paragraph 3.7 identifies valves repaired in 3.4, but paragraph 3.4 states, “Remove each valve listed in 2.2 and located in 1.2, using 2.3 through 2.9 for guidance.”
• How is the Contractor to install repaired valves from 3.4, when the valves are not repaired until 3.6?
Question 10:
• Paragraph 3.8 states, “Accomplish an operational test locally on each valve installed in 3.5, for ease of operation, by cycling each valve from full closed to full open to full closed 4 times. Allowable sticking or binding: None.”
Upon review of the specification, it’s noted that paragraph 3.8 directs testing of valves installed in 3.5, but paragraph 3.5 states, “Accomplish the requirements of 009-84 of 2.1.”
• How is the Contractor to test valves installed in 3.5, when the valves are not installed until 3.7?
Question 11:
• Paragraph 3.12 states, “Install new CRES Identification plate for each valve listed in 2.2, in accordance with 2.11 denoting valve number, type, size, service and location.”
Upon review of reference 2.2 – PM-240-0001 Rev ONE, SURF, DDG Sea Valve List, Contractor has determined that reference 2.2 lists 66 valves to be replaced throughout the ship and identifies the valve’s type, size, service, and location, but does not provide the valve number (i.e. SW-V-024).
• Contractor requests that the valve numbers associated with the 66 valves identified in reference 2.2 be provided to allow completion of the requirements of paragraph 3.12 as directed.
GOVERNMENT RESPONSE:
Question 9: The work item has been revised to reorder the repair of the valves prior to asking the contractor to install the repaired valves. The revised work item can be found via ERRATA 3.
Question 10: The work item has been revised to reorder the install the valves prior to testing them. The revised work item can be found via ERRATA 3.
Question 11: The valve numbers associated with the 66 valves identified in reference 2.2 is provided via ERRATA 3.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 464-90-002 CONTRACTOR QUESTION 36: Specification lists reference 2.13 as, “4720-DDG67-FY18, Ship Alteration Material Summary (4720/3)”.
This statement is providing within the reference, page 461, “NO DRAWINGS FOUND FOR DDG 76 ALT SA 85032 00 Troy Goodnow (757) 492-8313”.
However, the specification also lists in paragraph 5.3, ‘1KT, Kitted Material for ShipAlt 85032K”
Please provide an updated/Complete 4720 Ship Alteration Material Summary (4720/3)
| GOVERNMENT RESPONSE: The Government has updated this reference and it was added via ERRATA 2, as reference 4720-DDG-FY18 S/A Material Summary. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 438-90-001 CONTRACTOR QUESTION 37:
Para 3.8. states "Reference 2.6. is a list of kitted material for this work item", but when you go to the Ship Alt Material Summary (4720/3) it states "No dwg for DDG 76 ALT SA 80612". Please provide a list of the kitted material.
| GOVERNMENT RESPONSE: The Government has updated this reference and it was added via ERRATA 2, as reference 4720-DDG-FY18 S/A Material Summary. | |
| TITLE: SHIPALT DDG51-80612K, BACKFIT ICAS INSTALL; ACCOMPLISH | |
| PARA. NO: 3.8. | |
| PAGE NO: 2 of 3 |
ITEM NO: 512-11-001 CONTRACTOR QUESTION 38:
For estimating and material purposes, please provide more information (e.g. assembly number, Reference drawing) to accomplish the requirements of Paragraph 3.6
| GOVERNMENT RESPONSE: The Government provided the additional information regarding the accomplishments of paragraph 3.6: the assembly is based on the results of 3.2.1.1. All the necessary drawings are listed an provided via NMD. The rvised work specification can be found via ERRATA 2. | |
| TITLE: VENTILATION DUCT CLEANING | |
| PARA. NO: 3.6 | |
| PAGE NO: 6 |
ITEM NO: 439-90-003 CONTRACTOR QUESTION 39: Reference 2.9 provides 4720 for material sourcing, paragraph 3.5 identifies 2.9 and paragraph 5.3 identifies kitted material.
The 4720 provided does not include any kitted material and in fact has three drawings identified that are not called out in the specification.
Reference 2.3 indicates that all the “Cable Assemblies” A0001 thru A0325, items 109 and M0106 are GFM. It also indicates items 101-106 and 115 are provided by HSC.
Reference 2.8 identifies material changes and the source is listed as GFM and HSC. None of this is indicated on the 4720 at this time.
References 2.5, 2.6 and 2.7 are provided but are not applicable to DDG-76 and none of the drawing identified are included on this specification.
Unless the correct and applicable references are provided, Contractor can only assume items sourced as GFM and HSC on the reference drawings will be provided and that references 2.5, 2.6 and 2.7 are for information only.
GOVERNMENT RESPONSE: The Government confirms material is GFM and the references are listed for information only. This reference was made available via ERRATA 2.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 150-11-011 CONTRACTOR QUESTION 40: Para 3.1.1, States remove existing and install new 2 SF of plate listed in 1.3.1 and located in 1.2.1.1.
Para 1.3.1 Identifies the plate as steel, 0.156”thick, ASTM-A607 GR 50.
The ASTM-A607 is for steel sheet or strip, 0.156” is sheet versus plate
ASTM-A607 Has been withdrawn per DLA document services (see below) The Department of Defense has determined it no longer has an interest in ASTM-A607, "Steel, Sheet and Strip, High-Strength, Low-Alloy, Columbium or Vanadium, or Both, Hot-Rolled and Cold-Rolled", and is hereby withdrawing its adoption of this document as of 01 May 2009.
Unless otherwise directed contractor will estimate 3/16” plate 0.188” ASTM-A572 ASTM-A572/A572M, "High-Strength Low-Alloy Columbium-Vanadium Structural Steel", was adopted on 03-MAY-93 for use by the Department of Defense
Please concur or advise GOVERNMENT RESPONSE: A revised work specification corrected with the correct metal plate type is availabl via ERRATA 3. Additionally, the Government clarifies the work specification should read: 1.3.1. Quantity (2 SF), Plate, Steel, .188 Inch Thick, ASTM-A572.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 439-90-001, 439-90-002, 439-90-003 CONTRACTOR QUESTION 41: The subject work items have several cable assemblies listed along with the materials to make up the assemblies on the drawing references.
WI 439-90-001; S/A 71615 DIDGITAL VIDEO SURVEILLANCE SYSTEM (DVSS) Ref. 2.2 Materials WI 439-90-002; S/A 77333K, AWS CKT 3TV COTS UPGRADE Ref. 2.3 Materials WI 439-90-003; S/A 83940K, AWS VIDEO DISTRIBUTION SYSTEM UPGRAD Ref. 2.3 Materials
QUESTION: Will the GFM cable assemblies come pre-assembled?
| GOVERNMENT RESPONSE: For bidding purposes, the offeror should assume that the cables will not come pre-assembled. A final determination will be made at A-30. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 571-31-003 CONTRACTOR QUESTION 43: Paragraph 3.1 States: Remove existing, fabricate, fit and install new equipment listed in 1.3 in accordance with 2.2 through 2.6.
Paragraph 1.3.1.3 Quantity (One EA) Back Support Panel Contractor requests clarification on Paragraph 1.3.1.3 Quantity (One EA) Back Support Panel.
What reference, part number, material type or detail is the Back Support Panel is to be fabricated from?
| GOVERNMENT RESPONSE: The Government has deleted 1.3.1.3 as it is not needed for this work specification. Please find the updaetd work specification via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 251-30-001 CONTRACTOR QUESTION 44: Paragraph 1.3.1.1 List: Quantity (8 EA), Latch Assembly, Closed - Weldment, Mfr.: Peerless, Part No. D510-40500-1 Paragraph 1.3.2.1 List: Quantity (8 EA), Latch Assembly, Closed - Weldment, Mfr.: Peerless, Part No. D510-40500-1 Paragraph 3.3 States: Remove existing, fit, and install new the parts provided in 5.1 via the SUPERVISOR, using 2.2 through 2.4 for guidance.
Paragraph 5.1 List 10 each Latch Assembly, Closed Weldment NOTE: Paragraph 1.3.1.1 and 1.3.2.1 are not invoked as a requirement in paragraph 3 QUESTION: Contactor requests clarification as to how many Latch Assemblies are to be replaced? 16 each or 10 each?
| GOVERNMENT RESPONSE: The Government confirms that it is (10 each) latch assemblies to be replaced. Please find the updated work specification via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 551-51-001 CONTRACTOR QUESTION 45: PARAGRAPH 5.1 OF THE BASIC SPECIFICATIONS STATES THAT THE KIT WILL BE PROVIDED AS GFM. THE OEM “RIX INDUSTRIES” STATED THAT THEY DO NOT SELL THIS KIT AS A STAND ALONE ITEM AND THAT THIS KIT IS PROVIDED IN CONJUNCTION WITH THEIR SERVICE.
PLEASE ADVISE.
| GOVERNMENT RESPONSE: The Governmnt clarifies that this material will be CFM. Please find the updated work specification via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 464-90-001 CONTRACTOR QUESTION 46: Reference 2.6A 505-8749160 material list source column shows GFM for all materials listed.
Specification lists reference 2.13 as, “4720-DDG67-FY18, Ship Alteration Material Summary (4720/3)” The following statement is within the reference provided, page 461 of the document reads, “NO DRAWINGS FOUND FOR DDG 76 ALT SA 85032 00 Troy Goodnow (757) 492-8313”
However, the specification also lists in paragraph 5.3, "1KT, Kitted Material for ShipAlt 85032K”
Please provide an updated/Complete 4720 Ship Alteration Material Summary (4720/3)
Unless otherwise directed contractor will consider material on Reference 2.6A as GFM and will estimate item accordingly.
| GOVERNMENT RESPONSE: The Government confirms this material is GFM and has updated this reference via ERRATA 2, as reference 4720-DDG-FY18 S/A Material Summary. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 259-10-004 CONTRACTOR QUESTION 47: Paragraph 1.3.1.2 States: Quantity (12 EA), replace perforated sheathing panel securing tabs
Paragraph 1.3.2.1 States: Quantity (16 EA), replace perforated sheathing panel securing tabs
The above paragraphs are not invoked as a requirement in paragraph 3
Is it the customer's intent to replace 28 each (total) securing tabs?
GOVERNMENT RESPONSE: Yes, it is the Government's intent to replace 28 each securing tabs. The follownig changes have been made via ERRATA 3:
3.2 Accomplish the requirements to install and remove staging form the second platform up to the first 90 degree turn for the equipment listed 1.3 and located in 1.2. 3.6.3 Replace 28 each perforated sheathing panel securing tabs listed in 1.3.1.2 and 1.3.2.1 and located in 1.2.
(E3)
3.6.3.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column F, Lines One through 10.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 534-11-002 CONTRACTOR QUESTION 48:
Paragrph 3.2 states to install new fittings listed in 1.3 but, there are no fittings listed in 1.3. For pricing purposes please provide the Following information; Total quantity of fittings? Spacificly what type of fitting (if its a 90 deg elbow or 45 deg elbow, are there flanges, Tees, Bosses)?, size?, what material it's made of? What psi?)
Because the specification is vague, contractor request a start and end of the piping to replaced. This would allow the contractor to identify level of effort as well as identifing CAT1 standard items (009-23).
Contractor also questions if the intention of the specification. Is the intent to inspect up to 100 feet of piping and submit report for repairs identified?
| Please direct | GOVERNMENT RESPONSE: The Government clarifies that all parts are listed in Reference 2.2 & 2.3. in the revised work specification provided via ERRATA 3. Additionally, the Government confirms that the intent of the work specification is to accomplish the requirements of a pressure test of the entire oily waste transfer system using 2.3 for guidance. The offeror is required to submit a report if any deficiencies are discovered upon pressure test completion. The reference to 100 feet of piping has been deleted from the work specification. | |
| TITLE: Oily Waste Transfer Piping Replace | ||
| PARA. NO: 3.2 | ||
| PAGE NO: 1 |
ITEM NO: 624-12-001 CONTRACTOR QUESTION 49: Para. 3.9 references kitted material, Reference 2.20.
Upon review of Ref 2.20 for the list of kitted material it states, “NO DRAWINGS FOUND FOR DDG 76 ALT SA 77228 00”
Does this mean none of the PCMS material or doors listed in 1.3.1 – 1.3.23 are being provided as GFM?
Does the customer want the Contractor to bid for manufacturing 25 EA CRES Doors?
Please advise.
| GOVERNMENT RESPONSE: The Government provided the wrong work specification. The correct work specification is 167-80-001. To clarify, the customer wants the contractor to bid for 12 doors all together. The doors will be provided as GFM. Please see the revised work specification via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 512-11-004 CONTRACTOR QUESTION 50:
| Paragraph states, " To fabrricate and install new vent trunk assembly listed in 1.3.1, located in 1.2, in accordance with 2.2 through 2.5 and from the report submitted in 3.1.1." Paragraph 3.1.1 is ,"Chip and grind surfaces flush in way of removals". There is no report submitted on this paragraph. Please verify. | GOVERNMENT RESPONSE: The Government has revised this work specification to correct 3.1.1 to 3.3.1. Please see the revised work specification via ERRATA 3. | |
| TITLE: Supply Vent Trunk Assy ; replace | ||
| PARA. NO: 3.3 and 3.1.1 | ||
| PAGE NO: 1 |
ITEM NO: 526-80-002 CONTRACTOR QUESTION 51:
| Contractors has received lowest quote at this time for reference 2.2 Deck Drains F0001 and Internals F0002, lead time is 12 weeks ARO. | GOVERNMENT RESPONSE: The Government confirms that 12 weeks ARO is enough time to accomplish the work within the availability duration. | |
| TITLE: ShipAlt DDG51-64270D, 02 Level Aft Weather Deck Drain | ||
| PARA. NO: : 3.1& Reference 2.2 | ||
| PAGE NO: 1 of 2 |
ITEM NO: RFP Attachment J4 CONTRACTOR QUESTION 52:
| Attachment J-4, Tab 2 contains formula errors in cells D3, D6 and D7 and all subsequent listed CLINs. Please correct and re-issue. | GOVERNMENT RESPONSE: The Government has corrected these errors and revised Attachment J-4 to reflect these changes via Amendment 0001. | |
| TITLE: Pricing Workbook | ||
| PARA. NO: | ||
| PAGE NO: |
ITEM NO: 633-21-002 CONTRACTOR QUESTION 53:
| Accomplish a pre-docking inspection and test of the equipment listed in 1.3. Para 3.1.1 accomplish this inspection 6 months prior to the start of the avail. This scope of work is outside the current milestone provided; please advise | GOVERNMENT RESPONSE: The Government clarifies that the contractor should bid with the intent to accomplish inspection prior to docking. The work specification has been modified and is updated via ERRATA 3. | |
| TITLE: Impressed Current Cathodic Protection (ICCP) System; inspect | ||
| PARA. NO: 3.1.1 | ||
| PAGE NO: 1 |
ITEM NO: 612-21-001 CONTRACTOR QUESTION 54:
| Paragraph 3.2.1 tell you to ID and retain existing nets 3.6 directs to install each new safety net, filler net provide direction via errata wether nets are to be replace with new | GOVERNMENT RESPONSE: The Government clarifies that safety nets will be replaced with new if there are issues with originals which will be determined after inspection. Original safety net will be used as a model to fabricate a new net if needed and those nets will be replaced. The Government clarifies that this is an option item for out of port only. | |
| TITLE: Safety Net and Frame; replace (OPTION ITEM) | ||
| PARA. NO: 3.2.1 & 3.6 | ||
| PAGE NO: 2 of 3 |
ITEM NO: 593-90-001 CONTRACTOR QUESTION 55:
Para 3.2. states " Accomplish an op-test of the H2S Detector Sys in accordance w/ Test note T2 of Ref 2.2. (Dwg# 593-8475789 Rev B). Please provide listed reference test procedure 593113001 Rev A; VCHT H2S Detection Sys Op-Test in support of (V)(G) Op-Test.
GOVERNMENT RESPONSE: The Government will provide reference test procedure 593113001 Rev A with ERRATA 4.
| TITLE: SA DDG51-73622 VCHT H2S DETECTOR INSTALLATION; ACCOMPLISH |
| PARA. NO: 3.2. |
| PAGE NO: 2 OF 2 |
ITEM NO: 528-11-002 CONTRACTOR QUESTION 56: Paragraph 3.1 states, “Remove, template from existing and install new flexible shaft remote operating gear for the valve listed in 1.3.1 and 1.3.2 and located in 1.2.1 through 1.2.3, using 2.2 through 2.5 for guidance. Replace from but not including each deck box down to but not including the quick disconnect at each valve.”
• Due to lack of information provided within the drawings and tech manuals to correctly identify what is currently installed in the systems, contractor and vendor recommends to perform a visual inspection to determine actual material and operating conditions. Pending visual inspection, any further material determined to be required shall be subject to an equitable adjustment.
| GOVERNMENT RESPONSE: The Government concurs with the request and has added a visual inspection to the work specification via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 857-11-002 CONTRACTOR QUESTION 57: Paragraph 1.3.1.1 calls out to replace part number L44M.
Contractor has been notified this item is obsolete with no replacement recommended.
Please review and advise.
| GOVERNMENT RESPONSE: The Government has revised the work specification to provide the correct part number, the revised work specification is provided via ERRATA 3. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 168-12-001 CONTRACTOR QUESTION 58: Paragraph 3.3 tasks preservation of the Cargo Door in accordance with NAVSEA Standard Item 009-32, including Table 2, Line 39, Columns A, B and G. Subject Table 2, Line 39, Columns A, B, and G require powder coating applied by “fluidized bed method only”.
Due to lack of local vendor capability, the Contractor recommends powder coating be accomplished using “Electrostatic Powder Coating (TGIC) conforming to MIL-PRF-23236, Type VIII, Class 7, Grade D” method in lieu of “fluidized bed method.”
Please concur with Contractor recommendation.
| GOVERNMENT RESPONSE: The Government concurs with the contractor reccommendation for the powder coating be accomplished using "Electrostatic Powder Coating (TGIC) conforming to MIL-PRF-23236, Type VIII, Class 7, Grade D” method in lieu of “fluidized bed method." | |
| TITLE: Pallet Truck Stowage / Battery Door; preserve | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 520-11-001 CONTRACTOR QUESTION 59: Paragraph 3.3.6 states, accomplish the requirements to overhaul each hydraulic operator to original manufacturer’s specification for each hydraulic operated valve listed in 2.2 (total of 19 each) in accordance with the manufacturing information on labels attached or indicated in the valve manual operator casing. Install new bearings, seal, O-rings and gaskets found not suitable for reuse to each valve operator assembly. Grease and perform shop testing in accordance with applicable original equipment manufacturer specifications.
• Due to lack of information provided within the drawings and tech manuals to correctly identify what is currently installed in the systems, contractor and vendor recommends to perform a visual inspection to determine actual material and operating conditions. Pending visual inspection, any further material determined to be required shall be subject to an equitable adjustment.
| GOVERNMENT RESPONSE: Visual inspection or direction by superviosr prior to work start is okay. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: Multiple items CONTRACTOR QUESTION 60:
| Contractor feels that the following items do not apply if the ship is to remain in its home port of San Diego. 857-11-006 Temporary Galley and Messing Facility, 857-11-005 Temporary Duty Section Berthing, 857-11-004 Temporary Off-Ship Berthing, 992-11-001 Messing and Berthing Barge Tow Service | GOVERNMENT RESPONSE: Work items 857-11-004 and 857-11-006 have been removed from the work package as their values are already incorporated in the interport differential. Work Item 857-11-005 should only be proposed by out of port offeror. This is reflected in errata 4. | |
| TITLE: | ||
| PARA. NO: | ||
| PAGE NO: |
ITEM NO: Section I , Liquidated Damages CONTRACTOR QUESTION 61: RFP Amendment 0001 was Issued 08 March 2018. On 08 March 2018, the Navy also provided the “N00024-18-R-4400_Conformed_RFP_through_A0001.pdf” document. Bidder’s review of the Conformed RFP indicates that the RFP Section I, “52.211-11 LIQUIDATED DAMAGES” provisions contained in the original RFP have been removed.
Question: Please provide guidance regarding the RFP Section I, “52.211-11 LIQUIDATED DAMAGES” provisions contained in the RFP?
| GOVERNMENT RESPONSE: The values for "52.211-11 Liquidated Damages have been reinstated via Amendment 0002. | |
| TITLE: 52.211-11 LIQUIDATED DAMAGES | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 120-11-003 CONTRACTOR QUESTION 62:
Paragraph 3.1 states to "remove existing & install new a total of 400 SQ FT of defective plate", CONTRACTOR QUESTION; since exact locations are not being provided & unless otherwise directed removal & reinstallation of inteferences in way of repairs will not be included on estimate & they will be subject to an equitable adjustment. Please concur.
| GOVERNMENT RESPONSE: The work specification requires that the contractor replace up to 400 SQ FT that is defective after inspection of plating. Any additional work will be considered growth. | |
| TITLE: Machinery Space Bilge; repair & preserve (OPTION ITEM) | |
| PARA. NO: 3.1 | |
| PAGE NO: 1 |
ITEM NO:450-90-001 CONTRACTOR QUESTION 63:
| KTR requesting clarification if GFM will be provided for this Ship Alt. Para 5.3 references GFM kit called out in reference 2.26, which does not exist. Please clarify. | GOVERNMENT RESPONSE: The Government confirms that this kit is provided as GFM. Reference is corrected to read 2.16. via ERRATA 1. | |
| TITLE: Ship Alt DDG-51 79322, BMD 4.1 Install; accomplish (OPTION ITEM) | ||
| PARA. NO: 5.3 | ||
| PAGE NO: 8 and 9 |
ITEM NO: 561-11-001 CONTRACTOR QUESTION 64:
Paragraph 3.6 States "Disconnect and remove the equipment listed in 1.3.1, using 2.2 through 2.4 for guidance." Reference 2.3 paragraph 4-2.1 a. Place ram assembly on test fixture as shown in Figure 4-9.For bidding purposes is the intent for the contractor to procure the test fixture or is the this going to be GFE. Please provide or advice.
| GOVERNMENT RESPONSE: The Government clarifies that the only CFM required is listed in 3.9.1 and the GFM provided is listed in 5.1 | |
| TITLE: Steering Gear Hydraulic Ram; repair | |
| PARA. NO: 3.6 | |
| PAGE NO: 1 |
ITEM NO: 631-21-007 CONTRACTOR QUESTION 65: Contractor has been unable to locate the correct division of McDonnell Douglas Corp that manufactures or has information concerning the following items in paragraph 3.5.
Reference 2.7, 5269222 E, Frame Assy, Canister.
4ea Clamp, Frame, pn 5169230-002 4ea Clamp, Frame, pn 5169230-003 4ea Clamp, Frame, pn 5169230-004 4ea Clamp, Frame, pn 5169230-005
Please provide current manufacturer or please provide as GFM.
| GOVERNMENT RESPONSE: The Governent clarifies that using McDonnel Douglas is not required, the contractor may procure the material from any qualified distributor. | |
| TITLE: | |
| PARA. NO: | |
| PAGE NO: |
ITEM NO: 612-21-001 CONTRACTOR QUESTION 66:
Paragraph 3.6.6 fabricate and install new guy wire assembly shown in det. 5A-5G of sheet 5A IAW ref 2.4. Ref 2.4 doesn’t have sheet 5A or det. 5A-5G
| provide correct reference or advise | GOVERNMENT RESPONSE: The Government has corrected the reference and added 2.2 to paragraph 3.6.6. The work specification has been modified and can be found via ERRATA 3. | |
| TITLE: Safety Net and Frame; replace (OPTION ITEM) | ||
| PARA. NO: 3.6.6 | ||
| PAGE NO: 2 of 3 | ||
| PAGE NO: |
| ITEM NO: Various, Missing References | CONTRACTOR QUESTION 67: In addition to the missing references listed and submitted in previous PPI’s, please provide the following which are also missing: WI 168-11-001, reference 2.5; WI 439-90-002, reference 2.4; WI 464-90-002, reference 2.9 | GOVERNMENT RESPONSE: The Government clarifies that the listed references are all available by request with the exception to 464-90-002 as that work specification is not in the work pacakge. The Government is able to provide reference 2.9 from work item 464-90-001. |
| TITLE: | ||
| PARA. NO: | ||
| PAGE NO: |
ITEM NO: 466-11-001 CONTRACTOR QUESTION 68: Para 1.3.1 refers to Find No. 104, 105, 146, and 147 of 2.5. These find numbers do not exist in the reference. Should the work item be referring to Find No. 02104, 02105, 02146, and 02147?
Also, the only time the work item refers to para 1.3 is in para 3.2.2 for 009-32 on the items listed in 1.3.
Contractor believes the specification is referring to painting 4 watertight penetrations on REF 2.5.
Para 3.2 only states we are removing and installing one new Watertight Penetration (Item 02104, referenced in both 2.5 and 2.8).
• Are there more penetrations we should be aware of, or is 1.3 incorrect? Please provide feedback.
• If the specification intent is to remove watertight penetrations and weld in the new ones, shouldn’t 009-12 tables and lines be identified in the work item?
Contractor believes the work item is referring to the removal of the transit blocks, upon removal of waveguide section. However, the work item is written as though we are required to remove the entire transit.
Please review and advise.
GOVERNMENT RESPONSE: The Government has corrected the Find No. to 02104, 02105, 02146, and 02147. Paragraph 1.3 was incorrect and is corrected via ERRATA 3. There are no additional penetrations reuqired, just the ones listed in 1.3 The Government provides the following information:
Pre-fabricated waveguides and brackets, no need to weld. The contractor is to transit leading to CO's cabin.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 520-11-001 CONTRACTOR QUESTION 69:
Question 1:
• Reference 2.7 states, “S6435-QJ-MMI-010 Rev 5, Remote Mechanical Valve Actuator.”
Upon review of reference 2.7 – S6435-QJ-MMI-010 Rev 5, the Contractor has identified that the technical manual title is actually “Dual Linear Remote Mechanical Valve Actuator” and the information contained within provides for the description, selection, installation, operation, and maintenance of Teleflex remote valve operators only and has nothing to do with either Rigid Rod or Hydraulic type remote valve operators.
• In regards to paragraph 2.7, shouldn’t reference material be properly and completely identified to prevent miscommunication?
Question 2:
• Until PPI 004 is answered, is the Contractor to assume that the referenced 2.2.2 in paragraph 3.1.1 is a typo for reference 2.2 – PM-240-0001 Rev ONE, SURF, DDG Sea Valve List?
Question 3:
• Paragraph 3.1.1 states, “Provide the services of a Teleflex technical representative to assist in the inspection and repair of each Teleflex system associated with valves identified in 2.2.2 and Attachment A.”
Contractor has reviewed all identified references and notes that reference 2.2 includes a detailed listing of Sea Valves, but does not include details for the quantity, size, and location of any Teleflex remote valve operators. Additionally, this information cannot be found on any of the other listed references. This includes reference 2.7 – S6435-QJ-MMI-010 Rev 5, Remote Mechanical Valve Actuator.
• Contractor requests that the detailed information for any Sea Valve Teleflex remote valve operator installations affected by this Work Item be provided.
(It’s noted that this question has been previously asked and answered (A233 and A297) on the USS Paul Hamilton (DDG 60), FY16, EDSRA, SSP: TPPC-DDG60-SSSD16-CN01, Work Item: 520-11-001 “Sea Valve; repair and replace”, paragraph 3.1.1) Question 4:
• Paragraph 3.2 states, “Accomplish a pre-repair operational test, both locally and remotely, of each valve and valve operator listed in 2.2, prior to removal to determine the actual operating condition of each valve and its remote operator, from local and remote locations, by fully opening and closing its respective valve through four complete cycles.”
Upon review of reference 2.2 – PM-240-0001 Rev ONE, SURF, DDG Sea Valve List, Contractor has determined that reference 2.2 only lists 66 valves and any information pertaining to the location, quantity, and type of remote valve operators is not included.
• Contractor requests detailed information be provided for the location and quantity of any Teleflex, Rigid Rod, and Hydraulic remote valve operators as referenced in paragraph 3.2.
Question 5:
• Paragraph 3.2.1 states, “Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR. Report shall include any repair recommendations and material requirements necessary to accomplish this work item.”
Upon review of the work item it’s noted that paragraph 3.2.1 requests a repair recommendation for the requirements of paragraph 3.1 which states to, “Accomplish the requirements of 009-90 of 2.1.”
• Contractor requests guidance on how to meet the requirements of paragraph 3.2.1 on a “Technical Representative; provide” directive?
GOVERNMENT RESPONSE: Question 1: Reference material has been properly and completely identified to prevent miscommunication, updated work item can be found in ERRATA 2.
Question 2: 3.2 Accomplish a pre-repair operational test, both locally and remotely, of each valve and valve operator listed in 2.2.2 and 2.13 prior to removal to determine the actual operating condition of each valve and its remote operator, from local and remote locations, by fully opening and closing its respective valve through four complete cycles. The Government clarifies that Reference 2.2 is the DDG Sea Valve List, "2.2.2" appears to be a typo and is corrected with ERRATA 3.
Question 3: 3.1.1 Provide the services of a Teleflex technical representative to assist in the inspection and repair of each Teleflex system associated with valves identified in 2.2. There is not OEM required so the offerors can choose who they want use for the technical representative for teleflex.
Question 4: The teleflex, ridig rod, and hydraulic remote valve operators as referenced in paragraph 3.2 are located in reference 1.2, the quantity is referenced in 2.2. This information is located in the reference 2.2
Question 5: Paragraph 3.2.1 has been corrected in Erratta 3, it is now paragraph "3.2" vice "3.1".
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 982-31-001 CONTRACTOR QUESTION 70:
The specification is caling out two diferent sea trails. Please verify which one is correct.
| GOVERNMENT RESPONSE: The correct sea trial is the 5 Day Sea Trial. This has been added via ERRATA 5. | |
| TITLE: Dock, Sea Trail, Fast cruise | |
| PARA. NO: 3.4,3.6.1 | |
| PAGE NO: 1-4 |
| ITEM NO: 562-11-002,562-11-003 | CONTRACTOR QUESTION 71: | ||
| Contractor has contacted Timken for 009-90 services Anthony Iannamorelli 330-704-3122 [anthony.iannamorelli@timken.com] he has stated they will no longer provide onsite service engineering support. Please advise or remove 009-90 requirement. | GOVERNMENT RESPONSE: The Government clarifies that there is no directed OEM and no requirement to use Timkin as a subcontractor. The Government intends to leave 009-90 in for these work items. | ||
| TITLE: Ruder Stock Bearing | |||
| PARA. NO: 3.2-3.2.1 | |||
| PAGE NO: 2 |