USS_Higgins_FY18_EDSRA_QA2.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
USS HIGGINS FY18 EDSRA Federal contract opportunity
Solicitation number
N00024-18-R-4400
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Bidder's Q&A 2

View the file

Other files for this federal contract opportunity

Other files attached to USS HIGGINS FY18 EDSRA, newest first.
File Type Posted
USS_Higgins_FY18_EDSRA_QA3.xlsx XLSX spreadsheet
N00024-18-R-4400_A0003.pdf PDF
N00024-18-R-4400_Conformed_RFP_through_A0003.pdf PDF
N00024-18-R-4400_USS_HIGGINS_A0002.pdf PDF
N00024-18-R-4400_USS_HIGGINS_Conformed_through_A0002.pdf PDF
N00024-18-R-4400_Conformed_RFP_through_A0001.pdf PDF
USS_Higgins_FY18_EDSRA_QA1.xlsx XLSX spreadsheet
N00024-18-R-4400_A0001.pdf PDF
CDRLB5(N00024-18-R-4400).pdf PDF
CDRLC1(N00024-18-R-4400).pdf PDF
CDRLB8(N00024-18-R-4400).PDF PDF
A002 Condition Found Report PDF
A007 Quality Assurance Program Plan Fire Prevention - Housekeeping PDF
A005 Purchase Orders PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
A014 Weight Report PDF
N00024-18-R-4400.pdf PDF
CDRLB2(N00024-18-R-4400).pdf PDF
CDRLB1(N00024-18-R-4400).PDF PDF
CDRLB6(N00024-18-R-4400).pdf PDF
S-3_PPI_Form.xlsx XLSX spreadsheet
S-4_PP_Reference_List.docx DOCX document
A009 Technical Report Studies Services Welding PDF
A006 Quality Assurance Program Plan QualitySystem PDF
A012-Key Event Schedule PDF
CDRLB9(N00024-18-R-4400).pdf PDF
A003 Work Specification Report PDF
CDRLB4(N00024-18-R-4400).pdf PDF
A011 Status of Government Furnished Equipment PDF
A008 Quality Assurance Program Plan PCP PDF
CDRLB7(N00024-18-R-4400).pdf PDF
CDRLB3(N00024-18-R-4400).pdf PDF
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
A001 Small Business Subcontract Report PDF
J-5_QASP_Higgins_FY_18_EDSRA.pdf PDF
CDRLC2(N00024-18-R-4400).pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Attachment S-3

Pre-Proposal Information (PPI) Form
DATE OF REQUEST: 20 February 2018SOLICITATION NO: N00024-18-R-4400
TITLE: USS HIGGINS (DDG-76)NAVSEA POC: Lisa Carll, lisa.carll@navy.mil; Sheila Utz, sheila.utz1@navy.mil
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
SSP NO: SSP TPPC-DDG76-

FORWARD ALL REQUESTS TO: Lisa Carll, lisa.carll@navy.mil; Sheila Utz, sheila.utz1@navy.mil

ITEM NO: 437-90-001 CONTRACTOR QUESTION 8: In paragraph 3.2 Contractor is to accomplish inventory, bag, tag and turnover the material received in 5.3 required by the AIT when directed by the supervisor. Supervisor will provide notification 5 days prior to issuance.

Request government to provide complete outline of work scope that the AIT is to perform as per paragraph 3.2.; i.e., is contractor is to turn-over all GFM to the AIT?

QUESTION: Will the AIT perform 100% of the installation of the GFM including components not identified in the GFM list such as the flanged sections of perforated sounding tube, gun barrel rods, fasteners and spacers? Will the AIT accomplish electrical hook ups of electrical runs? Please provide additional guidance.

GOVERNMENT RESPONSE: The only material turned over to the AIT from the MSR is the electrical connector for termination of the TDR heads to the Programmable Logic Control (PLC) and the PLC to the Machinery Control System. AIT will ask for the specific items. AIT will test and calibrate with both AIT and MSR support. MSR is responsible for the installation of all DWG's in their entirety including hook ups of electrical runs, with the exception of ref 2.3. The MSR is responsible for the installation of the GFM provided by the maintenance team, the AIT will only be responsible for testing and calibration.

ERRATA 2 CHANGES BELOW:

3..2 Ensure that cable length is sufficient to connect to the device/equipment/enclosure plus additional cable length equal to the height and width of the device/equipment/enclosure. Pull each cable through deck transits and/or switch board/load center drape over the equipment cabinets.

3.2.1 Data cable connector fabrication and installation shall be accomplished by the AIT.

3.2 .2.Contractor is to accomplish inventory, bag, tag and turnover the material received in 5.3 for data cable connector fabrication and installation required by the AIT when directed by the supervisor. Supervisor will provide notification 5 days prior to issuance.

3.2.3 Submit one copy, in hard or approved transferable media, of a report listing final installed cable lengths to the SUPERVISOR.

TITLE:
PARA. NO:
PAGE NO:
ITEM NO: VariousCONTRACTOR QUESTION 9:
Work Items 857-11-007 and 897-11-003 appear to be work items written for a MSMO contract that specify requirements not applicable to a firm fixed price contract. Recommend deleting these work items. Please adviseGOVERNMENT RESPONSE: These work spec requirements will be deleted from the work package in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2
TITLE:
PARA. NO:

PAGE NO:

ITEM NO: 624-12-001 CONTRACTOR QUESTION 10: After a review of the Specification paragraph 3.1.2, and Reference 2.2 Drawing 621-7558366 Rev C, (Sheet 4 Install Section View 4-7A, & Elevation View 4-5A), Contractor noted some differences in the Material listed in Paragraph 3.1.2, and the Materials required In the Install Section View 4-7A, & Elevation View 4-5A.

Paragraph 3.1.2 lists Piece 114, Qty 7ft.

Drawing reads Piece 114, Qty 4 ea, Paragraph 3.1.2 lists Piece 115 6ea, Drawing reads Piece115 Need 1ea., Paragraph 3.1.2 lists Piece 116 7ft, Drawing reads Piece 116 Need 1 ea., Paragraph 3.1.2 lists Piece 118, Qty 7ft.

Drawing reads Piece 118 Need 2 ea, Paragraph 3.1.2 lists Piece 119, Qty 7 ea.

Drawing reads Piece 119 Need 1ea, Paragraph 3.1.2 lists Piece 122, Qty 814 ea., Piece 172 Qty 167 ea, & Piece 175 Qty 120 ea.

Drawing lists Quantity of Rivets, Piece 122, 172, & 176, needed to accomplish all the Requirements of Reference 2.2 Drawing 621-7558366 Rev C.

Unless otherwise directed Contractor Intends to Include in the Proposal the Price for the extra Pieces Required for Piece 114, (3 each), & 118, (1 each), and the correct Quantities of other Piece Numbers required to accomplish the Work Item.

Please Accept Information and Concur, or Clarify Otherwise.

GOVERNMENT RESPONSE: The Government concurs that the offeror is required to price the extra pieces for piece 114 and 118. The updated material requirements are clarified via ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 992-11-018 CONTRACTOR QUESTION 11:

Install the announcing system listed in 1.3 and location in 1.2. For estimating purposes please provide quantity of speakers to be installed .

GOVERNMENT REPSONSE: The Government clarifies that 15 speakers will need to be installed. This work item specification will be updated and provided via ERRATA 3.
TITLE: Temporary General announcing system, circuit 1MC ; install
PARA. NO:
PAGE NO:

ITEM NO: CONTRACTOR QUESTION 66: Bidder has submitted 32 total PPI’s to-date, to which Bidder has not received responses to these submitted questions. These unanswered questions include missing references and required technical/work scope guidance/clarifications. This timeline, along with missing references and unanswered Bidder's Questions has a negative impact on the responsiveness of the required subcontractor/material vendor community who, along with the MSRs, are strained by the overall San Diego waterfront proposal workload.

In order to afford sufficient time to prepare/submit accurate proposals and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, bidder requests the following;

1. Navy customer responses to all submitted Bidder's Questions as soon as possible, and

2. The proposal due date be extended from 02 April 2018 at 10:00 am, local time, San Diego, CA. to 23 April 2018 at 10:00 am, local time, San Diego, CA. A 14-day proposal due date extension.

GOVERNMENT RESPONSE: The Government will issue a proposal due date extension through 14:00 local time, April 13th, 2018.
TITLE: Proposal Due Date Extension Request
PARA. NO:
PAGE NO:

ITEM NO: 992-11-009 CONTRACTOR QUESTION 13:

Please confirm if paragraph 3.4 applies while the ship is in its home port of San Diego.

GOVERNMENT RESPONSE: Paragraph 3.4 is deleted via ERRATA 2 and will not apply. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE: Support Service For Ships Force Security
PARA. NO: 3.4
PAGE NO: 1

ITEM NO: 992-11-015 CONTRACTOR QUESTION 14:

The Fuel depot in San Diego does not allow contractor provided tugs to enter or tow there barges.

Please Advise:GOVERNMENT RESPONSE: The Government has deleted the requirement via ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE: Fuel Assistance and Tow Boat Service for Ful Barge
PARA. NO: 3.2
PAGE NO: 1

ITEM NO: Multiple CONTRACTOR QUESTION 15:

Contractor has reviewed the shafting items 243-11-004, 243-11-002, 243-11-003, 243-12-004 these items are very similar in scope of work were they duplicated by mistake. Please Advise: GOVERNMENT RESPONSE: There is no work item 243-11-002 in the work specification package. The Government has included 243-12-004 for inspection of Port, and 243-11-003 for inspection for STBD. Additionally work items 243-11-004 and 243-12-002 are included as option items to be invoked prior to the beginning of the availability for replacing port and STBD shafting.

TITLE: Propulsion Shafting
PARA. NO:
PAGE NO:

ITEM NO: 251-33-002 CONTRACTOR QUESTION 16:

Is the Government will provide this FOD screen as GFM to be installed in paragraph 3.5?GOVERNMENT RESPONSE: FOD Screen is not listed as GFM; this will be provided as CFM. Clarified in work item in ERFRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
FOD SCREEN ; REPLACE
PARA. NO:
PAGE NO:
ITEM NO: 259-11-004CONTRACTOR QUESTION 17:
Paragraph 3.5 states,"Vee-out and weld 124 linear inches of cracks on each exhaust collector listed in 1.3 for a total of 124 linear inches". Which one is correct, 124 linear inches each ( times 4 collectors equal to 496 linear inches, or a total of 124 linear inches for all 4 duct collectors? Please advice.GOVERNMENT RESPONSE: The Government did not include work item 259-11-004 in the work package. If original question was reference work item 259-10-004, please see the response to Contractor Question 23 below.
TITLE: GTRB EXH. DUCT COLLECTOR
PARA. NO: 3.5
PAGE NO:

ITEM NO: 505-11-006 CONTRACTOR QUESTION 18:

The description of the hose assemblies in paragraph 1.3 are to vague. Please provide more info to accurately bid the hose assemblies.GOVERNMENT RESPONSE: The contractor should estimate 800 fex hoses for bidding purposes. Clarification to work specification is provided in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE: Flex Hose Assemblies Replace
PARA. NO: 1.3.1-1.3.36
PAGE NO: 1-2

ITEM NO: 259-12-004 CONTRACTOR QUESTION 19:

Paragraphs 3.2 and 3.6 have the same requirements. Please clarify.GOVERNMENT RESPONSE: 3.2 is before work is complete and 3.6 is for after work completion. The Government intends to keep both paragraphs, no change required.
TITLE: GTRB DUCT EXTENSION JOINT
PARA. NO: 3.2 AND 3.6
PAGE NO: 1-2

ITEM NO: 993-11-001 CONTRACTOR QUESTION 20:

Contrator request that the location of the storage space can be located with in 25 miles from the ship.GOVERNMENT RESPONSE: The storage space can be as far as contractor likes as long it is easily accessible for maintenance material. ERRATA 2 will take out distance specific. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE: Ships Force Warehouse Storage
PARA. NO: 3.1-3.1.8
PAGE NO: 1

ITEM NO: 243-11-004 CONTRACTOR QUESTION 21: The basic spec. reads:

(V)(G) Magnetic Particle Testing

3.10.3 Accomplish a dye penetrant test of each new shaft IAW paragraph 243-1.1.7.2 of 2.4… (S9086-HM-STM-010/ CH-243)

Paragraph 243-1.1.7.2 does not clearly define MT or PT. Contractor requests clarification on what type of NDT is being requested, MT or PT?

GOVERNMENT RESPONSE: The Government is requiring the accomplishment of a dye Penetration Test (PT). Clarification to work specification is provided in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 243-12-002 CONTRACTOR QUESTION 22: The basic spec. reads:

(V)(G) Magnetic Particle Testing

3.10.3 Accomplish a dye penetrant test of each new shaft IAW paragraph 243-1.1.7.2 of 2.4… (S9086-HM-STM-010/ CH-243)

Paragraph 243-1.1.7.2 does not clearly define MT or PT. Contractor requests clarification on what type of NDT is being requested, MT or PT?

GOVERNMENT RESPONSE: The Government is requiring the accomplishment of a dye Penetration Test (PT). Clarification to work specification is provided in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 259-10-004 CONTRACTOR QUESTION 23: The basic spec. reads:

3.5 Vee-out and weld 124 linear inches of cracks on each exhaust collector listed in 1.3 for a total of 124 linear inches….

There are (4) each dust collectors as per paragraph 1.3 and the way paragraph 3.5 reads is to do 124” x 4 (ea. dust collectors) = 496” linear inches of weld to PT for a total of 124 inches; which does not make sense.

Contractor requests clarification on length of cracking repair being accomplished.

GOVERNMENT RESPONSE: The Government clarifies the following: Vee-out and weld 144 linear inches of cracks on each exhaust collector listed in 1.3 for a total 576 linear inches, in accordance with paragraphs 7-255 and 7-256 of 2.4. Pipe being repaired is 576 linear inches total (144 each collector). Additional clarification provided in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 259-13-001 CONTRACTOR QUESTION 24: The basic spec. reads:

3.4.2 Accomplish the requirements of 009-12 of 2.1 to include Table 2, Column F, Lines 1-10.

3.5 Accomplish the requirements of 009-12 of 2.1, including Table 1, Column F, Lines 1-10.

Contractor found that the same parts which are being inspected have two different welding tables being called out, and Contractor believes there was a typo in paragraph 3.4.2 for Table 2 vice table 1.

Contractor requests clarification if paragraph 3.4.2 is correct or if there was a typo made?

GOVERNMENT RESPONSE: The Government has removed paragraph 3.4.2, clarification is provided in ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 505-11-001 CONTRACTOR QUESTION 25: Contractor found that paragraph 1.2 states “throughout the ship.”

In order to achieve a completive/ accurate bid, contractor requires how many different locations the SAB fittings will be replaced throughout the ship.

Historically, an SAB union fitting inspect item is accomplished prior to a replacement item.

Contractor requests the silicon aluminum bronze inspection report be accomplished prior to current availability, or for an accurate account of fitting being replaced, or identification of spaces, for an accurate and completive bid for the number of NDT dye penetrate inspections required for P1 class piping.

GOVERNMENT RESPONSE: The requested report is attached to the work item specification provided. On the report all locations are listed, the report can be located by scrolling to the end of the work item.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 113-11-001 CONTRACTOR QUESTION 26:

Paragraph 3.10 states; "Remove existing, fit and install new each zinc anode identified in 1.3.11 in each bilge drain well listed in 1.3.1 through 1.3.9 and located in 1.2, in accordance with 2.5, using 2.7 and 2.8 for guidance".

Contractor Question: Zinc anodes are identified on paragraph 1.3.12 not in 1.3.11, unless otherwise directed contractor will use paragraph 1.3.12 for the identification & material pricing of zinc anodes.

Pleeas concur.GOVERNMENT RESPONSE: The Government concurs that the contractor should use 1.3.12 for identification and material pricing of zinc anodes. Paragraph 1.3.11 was deleted via ERRATA 2. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request ERRATA 2.
TITLE: Machinery Space Bilge Drain Well; repair
PARA. NO: 3.10
PAGE NO: 5

ITEM NO: RFP Attachment J4 CONTRACTOR QUESTION 27:

Attachment J-4, tab 1 is missing formulas in protected cells J274 through J426 and N274 through N426 and O274 through O426. Please correct and re-issue.

GOVERNMENT RESPONSE: The formula's have been corrected and Attachment J-4 is reissued as Attachment J-4 A0001. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request the revised Attachment J-4 A0001.
TITLE: Pricing Workbook
PARA. NO:
PAGE NO:

ITEM NO: RFP Attachment J4 CONTRACTOR QUESTION 28:

On Attachment J-4, Tab 1, please clarify the intent of blank cells at the top table in Cells D, E,I, K, L and M rows 4 through 13.GOVERNMENT RESPONSE: The attachment has been modified to remove some of the blank cells. There is no contractor action required by the offeror for any of the remaining cells in the top table. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request the revised Attachment J-4 A0001.
TITLE: Pricing Workbook
PARA. NO:
PAGE NO:

ITEM NO: RFP Attachment J4 CONTRACTOR QUESTION 29:

Attachment J-4, Tab 2 contains formula errors in cells D3, D6 and D7 and all subsequent listed CLINs. Please correct and re-issue.GOVERNMENT RESPONSE: The formula's have been corrected and Attachment J-4 is reissued as Attachment J-4 A0001. Please contact Lisa Carll, lisa.carll@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request the revised Attachment J-4 A0001.
TITLE: Pricing Workbook
PARA. NO:
PAGE NO:

ITEM NO: Section B - LOE to Completion Hours and Material Values; Attach J-4 Pricing Workbook Discrepancy CONTRACTOR QUESTION 30: The RFP (Section B, Note A) depicts the LOE to Completion Manhours and Materials values as follows;

Manhours: 119,199 Materials: $6,750,736

However, the Attachment J-4 Pricing Workbook, “Labor&Material Growth Rates” Tab depicts the following LOE to Completion Manhours and Materials Values;

Manhours: 227,247 Materials: $6,572,165

As such, there is a discrepancy between Section B LOE to Completion Hours and Materials Values and the J-4 Pricing Workbook Growth Rates Hours and Materials Values.

In addition, there appears to be errors in the J-4 Pricing Workbook formulas (“Labor&Material Growth Rates” Tab); i.e., The Proposed Labor & Material Burden Rate Growth Price Cells for each CLIN appear to be adding erroneous other Cells and Data.

Please advise which LOE to Completion Hours and Materials Values are correct, and please issue an RFP Amendment that updates either Section B or Attachment J-4 accordingly.

GOVERNMENT RESPONSE: The Government clarifies that the growth values are 227,247 Manhours and $6,750,736 Material Dollars. Both Section B Note A and J-4 now reflect these amounts. Additionally, J-4 has been updated and revised to correctly calculate the growth values.
TITLE:
PARA. NO:
PAGE NO:

ITEM NO: CONTRACTOR QUESTION 31: USS HIGGINS (DDG-76) FY18 EDSRA RFP issued 1/31/2018 has a due date of 4/02/2018. This current due date allows contractors roughly 51 planning days to prepare/provide a robust proposal. This timeline, along with missing references, is having a negative effect on the responsiveness of the subcontractor/material vendor community who, along with the MSRs, are strained by the overall San Diego waterfront proposal workload.

Below is a list of missing references.

120-11-003: 2.8 636-6221060PL Rev AA, Damping Schedule (Possibly should be 6221260PL_AA)

259-12-012: 2.5 21950ES01NA4W-2L, SWRCM CODE 242 LEVEL 2 STRUCTURAL REPORT

259-13-001: 2.2 S9234-AD-MMO-060 Rev 14, LM2500 Propulsion Gas Turbine Module (REV 13 provided on Disk) 437-90-001 ; 2.2 437-8750530 Rev A, ShipAlt DDG-51-77829 Install Tank Sensors (Radar/TDR) Electrical Mods & ML

2.3 437-8750530 Rev A, ShipAlt DDG-51-77829 Install Tank Sensors (Radar/TDR) Electrical Wire Connection List (REF LISTED TWICE ON SPEC… is this a typo or was it supposed to be a different reference?)

438-90-002: 2.8 RLAR 71726/DDG76/1170500, Cable Termination Change at SPS-73 SAOP 438-90-004: 2.29 RLAR 71604/DDG72/1171097 , Add FDN to Repair Station Console

2.30 RLAR 71604/DDG76/1170375 , Revise Fiddleboard Arr & info to suit HWFT Control Panel Instl in CCS & DCC

2.31 RLAR 71604/DDG76/1170754 , Revise Catalog Number to Chair in CSMC Item Number 398 450-90-001: 2.11 S9AA0-AB-GOS-030-GSO Rev 5, General Specifications for Overhaul of Surface Ships (REV 1 provided on Disk); 2.12 51221-3-078 Rev A15, HVAC/AWS 5.3.9 To BMD 4.0.1 Volumetric Balancing Test 464-90-001: 2.9 43611-3-014 Rev D, Secure Communications Space Door Position Alarm System Ckt 10DL Functional Test (REV A provided on Disk) 472-90-001: 2.11 RLAR 80156/DD79/1167235 Rev A, ECW Valves Under CIC SLQ-32 Console 512-90-003: 2.2 512-8757362 Rev A, Textile Duct for CIC CNSLD HVAC DWG & ML, 2.3 505-8757361 Rev A, Textile Duct for CIC CNSLD Pipe DWG & ML, 2.4 300-8757360 Rev A, Textile Duct for CIC CNSLD Elec DWG & ML

2.6 LAR 91785/DDG76/1169931, Change Chilled Water Flow fittings for Cooling Coils A13 & B13 From 33 to 34 GPM 523-80-001; 583-11-001; 625-11-004; 713-11-001: 2.10 472-7498087 Rev Q, Baseline Configuration 1-2 Installation Details Special Coating Materials (REV L provided on Disk)

In order to afford all contractors ample time to prepare/submit accurate proposals and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 02 April 2018 at 10:00 am, local time, San Diego, CA. to 23 April 2018 at 10:00 am, local time, San Diego, CA; A 14-day proposal due date extension.

GOVERNMENT RESPONSE: The Government will issue a proposal due date extension through 14:00 local time, April 13th, 2018.
TITLE: Proposal Due Date Extension Request
PARA. NO:
PAGE NO:

image1.jpg