STATEMENT OF WORK

The Contractor shall perform the following efforts:

PART 1 – GENERAL GUIDANCE

The execution of the contract requirements for individual LCS ships will begin upon the completion of Crew Move Aboard, unless directed otherwise by the Government.

Work delineated in this Statement of Work shall only be executed by Technical Instruction (TI).

Always consider Life Cycle Costs/Total Ownership Costs (TOC) and incorporate life cycle cost reduction opportunities when performing tasks.

For all material purchased, ensure all material purchased against a ship's repair item or work candidate is traceable to the Job Control Number (JCN) and the Job Sequencing Number (JSN) and Ship Change Document Number (SCDs).

Maintain close interaction with and continuous involvement in each LCS ship’s materiel condition and operational schedule throughout each ship’s lifecycle.

Ensure availability planning for maintenance of identified critical systems follows Controlled Work Packages (CWPs)/Process Control Procedures (PCPs). Critical systems maintenance shall be required to utilize NAVSEAINST 5400.108A dated 16 Aug 2011 titled, “Policy for Quality Management of Work on Non-Nuclear Surface Ship Critical Systems.”

Ensure all design development and engineering efforts align with Naval Vessel Rules (NVR) as defined in Section J, Attachment 25.

Ensure all design development and engineering efforts align with Aluminum Welding Requirements for LCS w Cover Ltr Dec 2015 as defined in Section J, Attachment 24.

Planning Yard is the Engineering Authority.

Item 0001 – Program Management - Advanced and Execution Planning and Completion for LCS Class Ships (and, if options are exercised, Items 0101, 0201, 0301, and 0401)

Effort 1: Contracts and Financial Management

The Contractor shall provide the management effort to ensure effective cost, schedule, and technical performance of this CLIN and all funded CLINs and efforts, including:

Task Management

Accounting Classification Reference Number (ACRN) Accounting Management/75% Notification Letters Invoice Management Material Estimating, Rough Order of Magnitude (ROM), and Negotiation Status (A032/OT-17-XXXXX) Financial Reporting Monthly Financial Reports – Ship/SCD/ACRN/SLIN level- worked is tasked based on Ship and SCD and the funding is executed based on SLIN/ACRN (A021/DI-FNCL-80912)

Labor Rate Performance Report (A027/DI-FNCL-81865) Obligation Plan with Contract Work Breakdown Structure (CWBS) (A028/DI-MGMT-81651 & DI-MGMT-81334D) Funding Depletion Status Report and Execution Plan (A029/DI-MISC-80508B) Forecasting of Future Work – Obligation Plans Technical Manual Cost Report (C004/DI-TMSS-81811) Other Direct Cost (ODC) Report (A026/DI-FNCL-81866) Cost and Schedule Performance Metrics including Reliability, Availability, Maintainability & Cost (RAM-C)

Continuous Process Improvement (i.e., Six Sigma, Lean Initiatives, etc.)

Availability Planning and Post Availability Effectiveness Metrics

B. The Contractor shall provide a fiscal year funding phasing plan 90 days prior to the start of each US Government fiscal year (1 October) and 30 days after award of each option. The plan shall identify by month and quarter the expected funding requirements to execute the scope of this contract. (A025/ DI-MGMT-81468)

Effort 2: Personnel, Production and Administration Management

The Contractor shall provide technical representation in planning conferences, program reviews, and design reviews, which may include Government Progress Reviews, Design Reviews, Availability Readiness Reviews, Planning Yard Reviews, Availability Progress Reviews, and Planned Maintenance Planning meetings.

With Program agreement with quantity and labor mix, the Contractor shall provide onsite representation at all Contiguous United States (CONUS) and Outside of Contiguous United States (OCONUS) waterfront support sites.

Liaison between the Planning Yard and assigned ships and their chains of command, including the Type Commander and other cognizant activities, as appropriate, to accomplish this Effort.
Provide timely resolution of interface, engineering, and design, material, integrated logistics, and configuration management problems in planning for alterations and other Planning Yard technical support.

Coordinate visits of and liaison with non-permanent Planning Yard design, engineering, material, integrated logistics (ILS), configuration management, and assistance teams to assigned ships during availabilities or special projects.

Have a Planning Yard representative member on the Program Manager’s Representative (PMR) waterfront team. Provide the PMR visit coordination and status information, and general Planning Yard support. Work similarly with other representatives of Warfare Centers and other Systems Command representatives to coordinate Planning Yard technical services when required. Specifically, the Planning Yard representative will:

Coordinate scope of Planning Yard work and schedules with the PMR.

Report conflicting schedules and guidance and work out solutions with the PMR.

Provide regular Planning Yard status updates to the PMR.

Report emergent problems and provide remedial action to support the PMR.

Coordinate all Planning Yard ship checks and visits with the PMR. This may include checking-in at the PMR Office when arriving in that homeport. The PMR will provide notifications, clearances, schedules and obtaining support services.

Coordinate with the Port Engineers on the planning and execution of all ship alterations.

For those meetings for which the Contractor is the designated host, the Contractor shall:

Provide adequate meeting space.

Prepare agenda (A001/DI-ADMN-81249B), meeting minutes, and action item lists.

Provide post-meeting follow up of Contractor-responsible action items. (A002/DI-ADMN-81308A) Contractor shall submit, semi-annually, a Self-Evaluation Report no later than 15 days after the first semi-annual incentive evaluation period. (A022/DI-MISC-80652)

Item 0002 –Planned Maintenance Management - Advanced and Execution Planning and Completion for LCS Class Ships (and, if options are exercised, Items 0102, 0202, 0302, and 0402)

Effort 1: General Scope of Work

The Contractor will support Government management and update of the Planned Maintenance System (PMS) deck and track maintenance accomplishment.

The Contractor shall furnish all material, facilities, personnel, quality control, and management control required to perform the effort covered by this CLIN.

In all instances involving mass transfer of technical data and drawings from the Contractor to another activity, the Contractor shall evaluate current media and processes and recommend methods for transferring the data digitally vice by paper or other hard copy. Changes accepted by the Program Office will be reflected in modified contract data requirements.

Provide Miscellaneous Documentation Support (MDS) for design tasks, documentation correction, and requests for shipboard technical reference, documentation package, and copy distribution. MDS may include documentation not previously provided by the initial software distribution. MDS services also include minor updates of Ship Selected Records that are not coincident with a scheduled availability, to support Alteration Installation Team (AIT) installation, Continuous Maintenance Availabilities (CMAVs), Planned Maintenance Availabilities (PMAVs), unscheduled maintenance availabilities and docking periods.

The Contractor shall develop and maintain an Integrated Master Schedule (IMS). The IMS shall outline the major activities, milestones and procedures for all work to be accomplished. This IMS shall be compatible with other program management software and exportable and editable via Microsoft Office products to ensure the Government and maintenance activities can share and have insight into the schedule via the PY database.

Update the Integrated Data Environment (IDE) and Planning Yard Hull Management System (HMS), tasked in Items 0005 and 0006, as appropriate.

Effort 2: Program Operations

The Contractor shall outline, in advance of an availability, the major activities and procedures for maintenance work to be accomplished. The contractor shall develop and provide: maintenance activity schedules, status lists, approved participants, and estimated completion dates for all work to be accomplished, and issue them to activities designated by the Contracting Officer’s Representative (COR).

The Contractor shall direct communications with other contractor and government activities to ensure efficient and timely completion of maintenance package development and accomplishment via the electronic-Liaison Action Request (eLAR) process. RLAR/eLAR have a 72 hour routine response time and a 24-hour response time in case of emergencies

Monitor maintenance completion status (including recommendations for deferral or canceling completed maintenance requirements).

Provide on-site support, as required, at the builders’ yards in Marionette, WI and Mobile, AL intermittently to provide early Planned Maintenance Availability (PMAV) planning prior to ships’ transiting to their homeport.

The Contractor shall be required to manage, and control access to, the Enterprise Asset Management (EAM) database MAXIMO.

Effort 3: Validation Assurance Review For Planned Maintenance System tasks within scheduled Availabilities:

The Contractor shall document planned, deferred, cancelled, started, in-process, and completion of all tasks accomplished during the maintenance availability, identification (by name) of the maintenance person who performed the check, and the hours required to accomplish the task to include make ready and restoration steps and provide as in process and post availability metrics.

Verify that the actual maintenance task complied with the Planned Maintenance requirement.

Effort 4: Maintain the Planned Maintenance System Deck and associated Index Pages

Maintain and update the PMS deck Maintenance Index Pages (MIPs) and associated Maintenance Requirement Cards (MRCs) Library for both LCS variants. Updates shall be based on Force Revisions/Advance Change Notices (ACNs) issued by the cognizant Navy technical authority.

Maintain, update, reproduce, and coordinate the distribution of such documentation required for accomplishing availability planning functions and execution by the Sustainment Execution Contractor.

When a discrepancy or error is noted in an MRC or a maintenance action is required to be altered due to equipment modification or modernization, identify the discrepancy to the Government and prepare a Technical Feed Back Report (TFBR) for submission to the Government for review and consideration.

Establish procedures for efficient and expeditious transfer to the Government of all documentation in the PMS repository upon notification by the SPM.

Effort 5: Update the Class Maintenance Plan (CMP)

Generate CMP and LCSP change requests based upon review and analysis of feedback information received from the Port Engineers and analysis of Maintenance Figure of Merit (MFOM) and 3M data.

Effort 6: Provide Engineering and Technical Support

Provide resolution, tracking and status of open Current Ship’s Maintenance Project (CSMP) deficiencies.

Perform special cost and engineering studies.

Develop estimates to support special studies and emergent requirements.

Support Lessons Learned and Hot Wash meetings by providing suitable Program Management, technical and logistical representatives at the meetings.

Effort 7: Pre-Availability Scoping Sessions

Support Government scoping sessions for the installing activity, after contract award. Scoping sessions will encompass all maintenance activities to ensure that the executing and planning activities are coordinated on and understand the work scope, size, complexity, cost, and task integration of the work; the impact of that work on other planned tasks; and its effects on timely completion of the availability. The types of outside and technical assistance available, required or desired will also be resolved during scoping meetings.

Effort 8: Reliability Engineering/Condition Based Maintenance Plus

The Contractor shall support the Reliability Engineering/Condition Based Maintenance Plus (RE/CBM+) Program, in conjunction with the Navy’s Program Office, government stakeholders, and installing activities to support and execute a strategic maintenance and material management approach. The Contractor will provide data and feedback at the discretion of the Program Office to support RE/CBM+ efforts. This support shall include but is not limited to:

Track PY efforts that are related to RE/CBM+.

Submit RE/CBM+ data and feedback reports via the IDE (tasked in Items 0005 and 0006).

Participate in RE/CBM+ meetings and working groups.

Effort 9: Support Material Requisitions

Verify that material specified by the Maintenance Requirement Cards (MRCs) is available to the executing activity in the port designated to accomplish the maintenance.

Perform the following material requirement functions in addition to those of NSTS 9090-600.

Verify that sufficient quantities of all specified standard stock materials (i.e., assigned a National Stock Number (NSN)) are available in the stock system to support the maintenance activity. If an item does not support Ship Change installation, notify the SPM and provide a proposed solution.

For all non-standard (non-NSN or "not carried") items, which are not procured by the Planning Yard, verify that the items are procurable. If an item is not procurable, or if the material procurement lead time will not support the availability, provide proposed solutions; all efforts shall be made to avoid sole-sourcing of any material to the extent possible.

Item 0003 –Corrective and Continuous Maintenance Planning - Advanced and Execution Planning and Completion for LCS 1 Variants (and, if options are exercised, Items 0103, 0203, 0303, and 0403

The Contractor shall furnish all material, facilities, personnel, quality control, and management control required to perform the effort covered by this CLIN.

The contractor shall use ShipConstructor shipbuilding CAD/CAM software for LCS 3D design, manufacturing, maintenance, repair, and refit modeling. The version used shall be compatible with all versions since ShipConstructor 2008. If generated or received ship drawings are not compatible with ShipConstructor 2008, the contractor shall update them as required.

In all instances involving mass transfer of technical data and drawings from the Contractor to another activity, the Contractor shall evaluate current media and processes and recommend methods for transferring the data digitally vice by paper or other hard copy.

Provide Miscellaneous Documentation Support (MDS) for design tasks, documentation correction, and requests for shipboard technical reference, documentation package, and copy distribution. MDS may include documentation not previously provided by the initial software distribution. MDS services also include minor updates of Ship Selected Records that are not coincident with a scheduled availability, to support Alteration Installation Team (AIT) installation, Continuous Maintenance Availabilities (CMAVs), Planned Maintenance Availabilities (PMAVs), CNO Availabilities, unscheduled maintenance availabilities and docking periods.

The Contractor shall develop and maintain an Integrated Master Schedule (IMS). The IMS shall outline the major activities, milestones and procedures for all work to be accomplished. This IMS shall be compatible with other program management software and exportable and editable via Microsoft Office products to ensure the Government and maintenance activities can share and have insight into the schedule via the PY database.

The contractor and its subcontractors shall use DoD Supply systems as the first source(s) to identify and procure material. The prime contractor and subcontractors shall prepare and submit transactions to the DoD Supply System via DLATS/DAAS in standard MILSTRIP/MILSTRAP format using Routing Identifier “NRP”. The preferred method of submission of material requisitions to the DoD Supply systems is via NAVSUP’s One Touch Support (OTS). The prime contractor and sub-contractors shall determine if material supports the requisite timeframe(s) to successfully execute the performance of work, as defined in this contract, to meet cost and schedule goals.

The contractor and sub-contractors shall record all usage demand data including material procured outside the DoD supply system, during the period of performance of this contract. Submissions of the MILSTRAP DHA and BHJ documents for material procured outside the DoD supply system shall be submitted monthly by maintenance availability and shall be in accordance with Section J, Attachment 23 “MILSTRAP DHA/BHJ Desk Guide for Demand Only Transaction Reporting dtd 12 May 2016”.

MILSTRAP DHA and BHJ demand submission data count information shall be provided quarterly by the prime contractor for all prime and sub-contractor data submissions. (A030/OT-16-20203)

The Contractor shall track all work completion for incorporation into each ship's maintenance and alteration history, from which recommendations for future alterations and availability work shall be made by the Contractor. Existing modernization alterations may be found in the LCS Hull Modernization Plan (LHMP). Alteration approval and execution schedules may be found in the LCS Authorized Hull Modernization Plan (LAHMP) and LCS Execution Hull Modernization Plan (LEHMP). As alterations are approved, authorized and executed, the contractor shall update the appropriate plan. NAVSEAINST SL720-AA-MAN-010/020- Fleet Modernization Management and Operations Manual specifies the processes to ensure a disciplined process to deliver operational and technical modifications to the LCS ships.

Update Regional Maintenance Automated Information System (RMAIS) and Military Engineering Drawing Allowance Locator System (MEDALS) for changes resulting from alterations and other changes during maintenance and modernization availabilities.

Update the Integrated Data Environment (IDE) and Planning Yard Hull Management System (HMS), tasked in Item 0005, as appropriate.

The metric system of measurement (Système International d’Unitès (SI)) shall be used for new design efforts and documentation, except where necessary to interface with existing inch-pound equipment or systems. Where existing technical documentation for inch-pound equipment or systems does not require modification for any reason other than conversion to the metric system, conversion of the documentation to the metric system need not be accomplished. Any deviation from the use of SI shall be documented within a Metric Policy, Analysis, and Report.

In advance of an availability, the Contractor shall outline the major activities and procedures for all maintenance work to be accomplished. The contractor shall develop and provide: maintenance activity schedules, status lists, approved participants, and estimated completion dates for all work to be accomplished, and issue them to activities designated.

The Contractor shall direct communications with other contractor and government activities to ensure efficient and timely completion of maintenance package development and accomplishment via the eLAR process.

Develop and update maintenance completion status (including recommendations for deferral or canceling completed maintenance requirements).

Provide on-site support, as required, at the builders’ yards in Marionette, WI and Mobile, AL intermittently to provide early Continuous Maintenance Availability (CMAV) planning prior to ships’ transiting to their homeport.
The Contractor shall be required to manage, and control access to, the Enterprise Asset Management (EAM) database MAXIMO.

For Maintenance tasks within scheduled Availabilities:

The PY shall document planned, deferred, cancelled, started, in-process, and completion of all tasks accomplished during the maintenance availability on a weekly basis, identification by name the maintenance person who performed the check, and the hours required to accomplish the task to include make ready and restoration steps and provide as in process and post availability metrics.

Verify and update, if required, that the actual maintenance task complied with the Planned Maintenance requirement.

The Contractor shall have the ability, in a surge capacity, to develop 4E Work Specs or work items in accordance with COMFLTFORCOMINST 4790.3 VII-4-E-2 30 JUL 2010/FY-12 titled Naval Sea Systems Command Joint Fleet Maintenance Manual (JFMM) Volume VII, Chapter 4, Contract Specification Development, Appendix 4-E Procedures for the Preparation and Use of Work Items for Ship Repair.

Effort 4: Provide On-site Support During Maintenance Accomplishment

Provide liaison services to the Regional Maintenance Center, Naval Supervising Activity (NSA), and Executing Activity during all availabilities in which maintenance is being accomplished. Monitor Ship Change installations, including AITs, to ensure that design integrity is not compromised. Advise the NSA representative of adverse conditions noted.

Support the PMR by providing status information on maintenance accomplishment at the completion of each PMAV, CMAV, CNO Availability or unscheduled maintenance availability.

As required, attend availability meetings and conferences, including but not limited to:

Work Package Integration Conference

Arrival Conference Lessons Learned Meetings Work Package Execution Review (WPER) Daily Production Meetings

Effort 5: Support Material Requisitions

The contractor shall perform Item Unique Identification (IUID) tasking to include, but not limited to: IUID tagging, IUID file upload to Configuration Data Managers' Database Open Architecture (CDMD-OA), and NAVY IUID registry.

Perform the following material requirement functions in addition to those of NSTS 9090-600.

Verify that sufficient quantities of all specified standard stock materials (i.e., assigned a National Stock Number (NSN)) are available in the stock system to support the maintenance activity. If an item does not support Ship Change installation, notify the SPM and provide a proposed solution.

For all non-standard (non-NSN or "not carried") items, which are not procured by the Planning Yard, verify that the items are procurable. If an item is not procurable, or if the material procurement lead time will not support the availability, provide proposed solutions; all efforts shall be made to avoid sole-sourcing of any material to the extent possible.

Effort 6: Perform Material Kitting Planning Functions (A015/DI-MGMT-80227)

Coordinate with appropriate parties, including government agencies and the installing activities, to plan for the assembly of material and special tools into kits to installing activities, if provisions for general maintenance are not available in the designated port. The specific functions to be performed for planning the kits include:

Use an automated inventory management system that can effectively control kit material for more than one ship and be responsive to short-term schedule demands.

Develop an overall Plan of Action and Milestones (POA&M) that coordinates key events/activities of all participants and ensures timely delivery of kits to meet schedules for each availability.

Evaluate and propose to the Government bulk purchase items to support delivery schedule and cost savings.

Receive material and provide storage for all material to be kitted and any kits awaiting shipment.

Assemble, package, and identify kitted material to a particular ship. Ensure that all kitted material is in appropriate containers for shipment to the maintenance contractor or NSA in accordance with MIL-STD-2073-1E(1).

Prepare kits for shipment to the installing activity in accordance with MIL-STD-2073-1E(1). Upon arrival of the kit(s) at the installing activity and as requested, with the NSA representative and Technical Activity, unpack and inventory kit(s) to ensure all items are received and in installable condition.

Establish a material release control program to ensure that no kit will be released without specific direction from the SPM.

Collect and analyze complete and accurate actual material usage data on all material provided by the Planning Yard to the maintenance activity to accomplish work items. Include materials that had to be ordered after start of the availability. Include the information in future planning for the same repair/ Ship Change items in other ships.

Upon completion of the maintenance, review the unused material for possible use in the future kit(s).

Analyze total amount of unused materials. Unused materials should not exceed 5 percent (quantity) of the material ordered in support of any maintenance availability. Provide feedback analysis to improve planning for future maintenance.

Act as the receiving, stowage, coordinating, and shipping point for repair kits.

Provide Level of Effort (LOE) type support to the material provisioning/kitting process to ensure the most cost/schedule effective means of assembling and shipping material required for a given availability. LOE activities include but are not limited to warehouse supervision, material handling and transportation, kit packaging, and crate construction, and quality assurance.

Effort 7: Monitor Material Status

Monitor the procurement and shipping status of material provided by the Planning Yard until turned over to the NSA, RMC, or designated government recipient.

Contact material sponsor(s) and other sources to obtain updated material availability status.

Include material status (A032/OT-17-XXXXX) and potential work-arounds in applicable Availability Analyses to include but not limited to material required to comply with Bid Specifications, MRCs, and MIPs. Where substitute material has been authorized include documentation allowing substitution and, if applicable, a certificate of identicality.

Effort 8: Provide ILS Management Support

Coordinate the management and identification of Planned Maintenance System (PMS) Data, "push" material, formal training and any other pertinent ILS elements.

For OCONUS availabilities, identify, assemble and package as necessary for transoceanic shipment, logistic support requirements for each maintenance availability. Packaging requirements include consideration for proper customs clearance.

Produce reports to support the Program Office’s Availability Planning Baseline Meetings, and other meetings to monitor completion for availabilities as tasked by the SPM.

Effort 9: Provide Technical Liaison Services

Provide liaison services between the Ship Production Manager and other Navy activities.

Provide technical and administrative support to track the review and approval of appropriate technical documentation. (i.e., receipt, coordination, distribution, routing and suspense of technical documentation and correspondence).

Review Completion Reports for status of maintenance packages, growth and emergent work, and lessons learned. Analyze data and recommend changes to Class Maintenance Plan (CMP), Ship Change estimates, Material Ordering Guide (MOGs), and associated availability planning. During Fleet Support and Planning Yard Review meetings, be prepared to present lessons learned and to discuss growth and emergent work experienced during availabilities, and any other relevant information as stated in the meeting agenda.

Effort 10: Develop and Analyze Availability Work Packages (A016/DI-MISC-80711A)

For each scheduled availability (PMAV, CMAV, CNO Availability), analyze the planned availability work package and report to the Government:

Size, in mandays, for maintenance, including known CMP and Current Ship’s Maintenance Project (CSMP) maintenance work, whether scheduled to be installed by the availability executing contractor or other organization, public or private.
Comparison with standard notional size and duration, with explanation of significant differences.

Minimum time required for the known work package, including testing and trials. Recommendations for shift work, prefabrication, or other reasonable means of meeting the availability schedule or minimizing time requirements. Recommend change in availability length, either shorter or longer, if supported by the analysis.

Time phased work schedules; analysis of critical path, including testing and trial requirements.
Outside activities (In-Service Engineering Agents, Alteration Installation Teams, etc.) that will be doing work during the availability, type and magnitude of work, and the time frame, duration and schedule when they will be present.

Day-to-day manpower loading graphs, by major trade, and total loading, with assessment of ability of potential executing shipyards to provide the required work force.

Status of supporting documentation as of the issue date of the analysis.

Planning yard or other technical assistance available to the installing activity.

Required concurrent work items.

Effort 11: Update the Class Maintenance Plan (CMP)

Continuously monitor the Class Maintenance Plan (CMP) ensuring LCS Class unique maintenance requirements are identified based on on-going reliability and maintainability engineering effort and other engineering feedback. The contractor shall account for the Life Cycle Sustainment Plan (LCSP) and the sustainment key performance metrics.

Support the NAVSEA CMP Functional Design Team, as required, to define CMP functional interface with other databases, i.e. Configuration Data Manager Database-Open Architecture (CDMD-OA), Maintenance Resource Manager System (MRMS) etc.

Generate CMP and LCSP change requests based upon review and analysis of feedback information received from the Port Engineers and analysis of Maintenance Figure of Merit (MFOM) and 3M data.

Effort 12: Provide Engineering, Technical and Logistic Support

The contractor shall perform the following efforts:

Provide resolution, tracking and status of open Current Ship’s Maintenance Project (CSMP) deficiencies.
Perform special cost and engineering studies.

Develop estimates to support special studies and emergent requirements.

Maintain Failure Reporting, Analysis, Collection and Corrective Action System (FRACAS), MIL-STD-2155, DCACA, MIL-STD-78, of system an equipment problems in each ship and ship class.

Recommend technical priority for un-prioritized Ship Changes.

Recommend changes in priorities of previously prioritized Ship Changes.

Identify interrelated, conjunctive, or prerequisite alterations, and ensure they are coordinated and scheduled accordingly.

Identify across-the-Class alterations.

The Contractor shall support Lessons Learned and Hot Wash meetings by providing suitable Program Management, technical and logistical representatives at the meetings.

The latest revision of reference documents in effect at the time of execution of the contract or any of its options shall govern when cited in an effort, unless the effort specifically states otherwise.

Effort 13: Pre-Availability Scoping Sessions

The contractor shall support Government scoping sessions for the installing activity, after contract award. Scoping sessions will encompass all maintenance activities to ensure that the executing and planning activities are coordinated on and understand the work scope, size, complexity, cost, and task integration of the work; the impact of that work on other planned tasks; and its effects on timely completion of the availability. The types of outside and technical assistance available, required or desired will also be resolved during scoping meetings.

Effort 14: Reliability Engineering/Condition Based Maintenance Plus

The Contractor shall support the Reliability Engineering/Condition Based Maintenance Plus (RE/CBM+) Program, in conjunction with the Navy’s Program Office, government stakeholders, and installing activities to support and execute a strategic maintenance and material management approach. The Contractor will provide data and feedback at the discretion of the Program Office to support RE/CBM+ efforts. This support shall include but is not limited to:

Track PY efforts that are related to RE/CBM+.

Submit RE/CBM+ data and feedback reports via the IDE (tasked in Item 0004).

Participate in RE/CBM+ meetings and working groups.

Effort 15: Crew Training

Develop training aids and provide crew training, based on maintenance actions performed or modified during maintenance and modernization availabilities.

Item 0004 – Corrective and Continuous Maintenance Planning - Advanced and Execution Planning and Completion for LCS 2 Variants (and, if options are exercised, Items 0104, 0204, 0304, and 0404)

The Contractor shall furnish all material, facilities, personnel, quality control, and management control required to perform the effort covered by this CLIN.

The contractor shall use ShipConstructor shipbuilding CAD/CAM software for LCS 3D design, manufacturing, maintenance, repair, and refit modeling. The version used shall be compatible with all versions since ShipConstructor 2008. If generated or received ship drawings are not compatible with ShipConstructor 2008, the contractor shall update them as required.

In all instances involving mass transfer of technical data and drawings from the Contractor to another activity, the Contractor shall evaluate current media and processes and recommend methods for transferring the data digitally vice by paper or other hard copy.

Provide Miscellaneous Documentation Support (MDS) for design tasks, documentation correction, and requests for shipboard technical reference, documentation package, and copy distribution. MDS may include documentation not previously provided by the initial software distribution. MDS services also include minor updates of Ship Selected Records that are not coincident with a scheduled availability, to support Alteration Installation Team (AIT) installation, Continuous Maintenance Availabilities (CMAVs), Planned Maintenance Availabilities (PMAVs), CNO Availabilities, unscheduled maintenance availabilities and docking periods.

The Contractor shall develop and maintain an Integrated Master Schedule (IMS). The IMS shall outline the major activities, milestones and procedures for all work to be accomplished. This IMS shall be compatible with other program management software and exportable and editable via Microsoft Office products to ensure the Government and maintenance activities can share and have insight into the schedule via the PY database.

The contractor and its subcontractors shall use DoD Supply systems as the first source(s) to identify and procure material. The prime contractor and subcontractors shall prepare and submit transactions to the DoD Supply System via DLATS/DAAS in standard MILSTRIP/MILSTRAP format using Routing Identifier “NRP”. The preferred method of submission of material requisitions to the DoD Supply systems is via NAVSUP’s One Touch Support (OTS). The prime contractor and sub-contractors shall determine if material supports the requisite timeframe(s) to successfully execute the performance of work, as defined in this contract, to meet cost and schedule goals.

The contractor and sub-contractors shall record all usage demand data including material procured outside the DoD supply system, during the period of performance of this contract. Submissions of the MILSTRAP DHA and BHJ documents for material procured outside the DoD supply system shall be submitted monthly by maintenance availability and shall be in accordance with Section J, Attachment 23 “MILSTRAP DHA/BHJ Desk Guide for Demand Only Transaction Reporting dtd 12 May 2016”.

MILSTRAP DHA and BHJ demand submission data count information shall be provided quarterly by the prime contractor for all prime and sub-contractor data submissions. (A030/OT-16-20203)

The Contractor shall track all work completion for incorporation into each ship's maintenance and alteration history, from which recommendations for future alterations and availability work shall be made by the Contractor. Existing modernization alterations may be found in the LCS Hull Modernization Plan (LHMP). Alteration approval and execution schedules may be found in the LCS Authorized Hull Modernization Plan (LAHMP) and LCS Execution Hull Modernization Plan (LEHMP). As alterations are approved, authorized and executed, the contractor shall update the appropriate plan. NAVSEAINST SL720-AA-MAN-010/020- Fleet Modernization Management and Operations Manual specifies the processes to ensure a disciplined process to deliver operational and technical modifications to the LCS ships.

Update Regional Maintenance Automated Information System (RMAIS) and Military Engineering Drawing Allowance Locator System (MEDALS) for changes resulting from alterations and other changes during maintenance and modernization availabilities.

Update the Integrated Data Environment (IDE) and Planning Yard Hull Management System (HMS), tasked in Item 0005, as appropriate.

The metric system of measurement (Système International d’Unitès (SI)) shall be used for new design efforts and documentation, except where necessary to interface with existing inch-pound equipment or systems. Where existing technical documentation for inch-pound equipment or systems does not require modification for any reason other than conversion to the metric system, conversion of the documentation to the metric system need not be accomplished. Any deviation from the use of SI shall be documented within a Metric Policy, Analysis, and Report.

In advance of an availability, the Contractor shall outline the major activities and procedures for all maintenance work to be accomplished. The contractor shall develop and provide: maintenance activity schedules, status lists, approved participants, and estimated completion dates for all work to be accomplished, and issue them to activities designated in the TI.

The Contractor shall direct communications with other contractor and government activities to ensure efficient and timely completion of maintenance package development and accomplishment via the eLAR process.

Develop and update maintenance completion status (including recommendations for deferral or canceling completed maintenance requirements).

Provide on-site support, as required, at the builders’ yards in Marionette, WI and Mobile, AL intermittently to provide early Continuous Maintenance Availability (CMAV) planning prior to ships’ transiting to their homeport.

For Maintenance tasks within scheduled Availabilities:

Document planned, deferred, cancelled, started, in-process, and completion of all tasks accomplished during the maintenance availability on a weekly basis, identification by name the maintenance person who performed the check, and the hours required to accomplish the task to include make ready and restoration steps and provide as in process and post availability metrics.

Verify and update, if required, that the actual maintenance task complied with the Planned Maintenance requirement.

In a surge capacity, be able to develop 4E Work Specs or work items in accordance with COMFLTFORCOMINST 4790.3 VII-4-E-2 30 JUL 2010/FY-12 titled Naval Sea Systems Command Joint Fleet Maintenance Manual (JFMM) Volume VII, Chapter 4, Contract Specification Development, Appendix 4-E Procedures for the Preparation and Use of Work Items for Ship Repair.

Effort 4: Provide On-site Support During Maintenance Accomplishment

Provide liaison services to the Regional Maintenance Center, Naval Supervising Activity (NSA), and Executing Activity during all availabilities in which maintenance is being accomplished. Monitor Ship Change installations, including AITs, to ensure that design integrity is not compromised. Advise the NSA representative of adverse conditions noted.

Support the PMR by providing status information on maintenance accomplishment at the completion of each PMAV, CMAV, CNO Availability or unscheduled maintenance availability.

As required, attend availability meetings and conferences, including but not limited to:

Work Package Integration Conference
Arrival Conference

Lessons Learned Meetings Work Package Execution Review (WPER) Daily Production Meetings

Effort 5: Support Material Requisitions

The contractor shall perform Item Unique Identification (IUID) tasking to include, but not limited to: IUID tagging, IUID file upload to Configuration Data Managers' Database Open Architecture (CDMD-OA), and NAVY IUID registry.

Perform the following material requirement functions in addition to those of NSTS 9090-600.

Verify that sufficient quantities of all specified standard stock materials (i.e., assigned a National Stock Number (NSN)) are available in the stock system to support the maintenance activity. If an item does not support Ship Change installation, notify the SPM and provide a proposed solution.

For all non-standard (non-NSN or "not carried") items, which are not procured by the Planning Yard, verify that the items are procurable. If an item is not procurable, or if the material procurement lead time will not support the availability, provide proposed solutions; all efforts shall be made to avoid sole-sourcing of any material to the extent possible.

Effort 6: Perform Material Kitting Planning Functions (A015/DI-MGMT-80227)

Coordinate with appropriate parties, including government agencies and the installing activities, to plan for the assembly of material and special tools into kits to installing activities, if provisions for general maintenance are not available in the designated port. The specific functions to be performed for planning the kits include:

Use an automated inventory management system that can effectively control kit material for more than one ship and be responsive to short-term schedule demands.

Develop an overall Plan of Action and Milestones (POA&M) that coordinates key events/activities of all participants and ensures timely delivery of kits to meet schedules for each availability.

Evaluate and propose to the Government bulk purchase items to support delivery schedule and cost savings.

Receive material and provide storage for all material to be kitted and any kits awaiting shipment.

Assemble, package, and identify kitted material to a particular ship. Ensure that all kitted material is in appropriate containers for shipment to the maintenance contractor or NSA in accordance with MIL-STD-2073-1E(1).

Prepare kits for shipment to the installing activity in accordance with MIL-STD-2073-1E(1). Upon arrival of the kit(s) at the installing activity and as requested, with the NSA representative and Technical Activity, unpack and inventory kit(s) to ensure all items are received and in installable condition.

Establish a material release control program to ensure that no kit will be released without specific direction from the SPM.

Collect and analyze complete and accurate actual material usage data on all material provided by the Planning Yard to the maintenance activity to accomplish work items. Include materials that had to be ordered after start of the availability. Include the information in future planning for the same repair/ Ship Change items in other ships.

Upon completion of the maintenance, review the unused material for possible use in the future kit(s).

Analyze total amount of unused materials. Unused materials should not exceed 5 percent (quantity) of the material ordered in support of any maintenance availability. Provide feedback analysis to improve planning for future maintenance.

Act as the receiving, stowage, coordinating, and shipping point for repair kits.

Provide Level of Effort (LOE) type support to the material provisioning/kitting process to ensure the most cost/schedule effective means of assembling and shipping material required for a given availability. LOE activities include but are not limited to warehouse supervision, material handling and transportation, kit packaging, and crate construction, and quality assurance.

Effort 7: Monitor Material Status

Monitor the procurement and shipping status of material provided by the Planning Yard until turned over to the NSA, RMC, or designated government recipient.

Contact material sponsor(s) and other sources to obtain updated material availability status.

Include material status (A032/OT-17-XXXXX) and potential work-arounds in applicable Availability Analyses to include but not limited to material required to comply with Bid Specifications, MRCs, and MIPs. Where substitute material has been authorized include documentation allowing substitution and, if applicable, a certificate of identicality.

Effort 8: Provide ILS Management Support

Coordinate the management and identification of Planned Maintenance System (PMS) Data, "push" material, formal training and any other pertinent ILS elements.

For OCONUS availabilities, identify, assemble and package as necessary for transoceanic shipment, logistic support requirements for each maintenance availability. Packaging requirements include consideration for proper customs clearance.

Produce reports to support the Program Office’s Availability Planning Baseline Meetings, and other meetings to monitor completion for availabilities as tasked by the SPM.

Effort 9: Provide Technical Liaison Services

Provide liaison services between the Ship Production Manager and other Navy activities.

Provide technical and administrative support to track the review and approval of appropriate technical documentation. (i.e., receipt, coordination, distribution, routing and suspense of technical documentation and correspondence).

Review Completion Reports for status of maintenance packages, growth and emergent work, and lessons learned. Analyze data and recommend changes to Class Maintenance Plan (CMP), Ship Change estimates, Material Ordering Guide (MOGs), and associated availability planning. During Fleet Support and Planning Yard Review meetings, be prepared to present lessons learned and to discuss growth and emergent work experienced during availabilities, and any other relevant information as stated in the meeting agenda.

Effort 10: Develop and Analyze Availability Work Packages (A016/DI-MISC-80711A)

For each scheduled availability (PMAV, CMAV, CNO Availability), the contractor shall analyze the planned availability work package and report to the Government:

Size, in mandays, for maintenance, including known CMP and Current Ship’s Maintenance Project (CSMP) maintenance work, whether scheduled to be installed by the availability executing contractor or other organization, public or private.
Comparison with standard notional size and duration, with explanation of significant differences.

Minimum time required for the known work package, including testing and trials. Recommendations for shift work, prefabrication, or other reasonable means of meeting the availability schedule or minimizing time requirements. Recommend change in availability length, either shorter or longer, if supported by the analysis.

Time phased work schedules; analysis of critical path, including testing and trial requirements.
Outside activities (In Service Engineering Activitys, Alteration Installation Teams, etc.) that will be doing work during the availability, type and magnitude of work, and the time frame, duration and schedule when they will be present.

Day-to-day manpower loading graphs, by major trade, and total loading, with assessment of ability of potential executing shipyards to provide the required work force.

Status of supporting documentation as of the issue date of the analysis.

Planning yard or other technical assistance available to the installing activity.

Required concurrent work items.

Effort 11: Update the Class Maintenance Plan (CMP) Continuously monitor the Class Maintenance Plan (CMP) ensuring LCS Class unique maintenance requirements are identified based on on-going reliability and maintainability engineering effort and other engineering feedback. The contractor shall account for the Life Cycle Sustainment Plan (LCSP) and the sustainment key performance metrics.

Support the NAVSEA CMP Functional Design Team, as required, to define CMP functional interface with other databases, i.e. Configuration Data Manager Database-Open Architecture (CDMD-OA), Maintenance Resource Manager System (MRMS) etc.

Generate CMP and LCSP change requests based upon review and analysis of feedback information received from the Port Engineers and analysis of Maintenance Figure of Merit (MFOM) and 3M data.

Effort 12: Provide Engineering, Technical and Logistic Support

The contractor shall perform the following efforts:

Provide resolution, tracking and status of open Current Ship’s Maintenance Project (CSMP) deficiencies.
Perform special cost and engineering studies.

Develop estimates to support special studies and emergent requirements.

Maintain Failure Reporting, Analysis, Collection and Corrective Action System (FRACAS), MIL-STD-2155, DCACA, MIL-STD-78, of system an equipment problems in each ship and ship class.

Recommend technical priority for un-prioritized Ship Changes.

Recommend changes in priorities of previously prioritized Ship Changes.

Identify interrelated, conjunctive, or prerequisite alterations, and ensure they are coordinated and scheduled accordingly.

Identify across-the-Class alterations.

The Contractor shall support Lessons Learned and Hot Wash meetings by providing suitable Program Management, technical and logistical representatives at the meetings.

The latest revision of reference documents in effect at the time of execution of the contract or any of its options shall govern when cited in an effort, unless the effort specifically states otherwise.

Effort 13: Pre-Availability Scoping Sessions

The contractor shall support Government scoping sessions for the installing activity, after contract award. Scoping sessions will encompass all maintenance activities to ensure that the executing and planning activities are coordinated on and understand the work scope, size, complexity, cost, and task integration of the work; the impact of that work on other planned tasks; and its effects on timely completion of the availability.

This is the start of the file's text. The full file is on GovTribe.

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.