FBO_Bidder's_Questions_to_ExMCM__20_JUL_2018.XLSX
XLSX spreadsheet 18 KB Posted
- Attached to
- Expeditionary 11m Rigid Inflatable Boats
- Solicitation number
- N00024-18-R-2220
About this file
This document contains questions and answers regarding a draft request for proposal for Expeditionary 11-meter Rigid Inflatable Boats. The Naval Sea Systems Command intends to issue a small business set-aside competitive RFP in the third quarter of fiscal year 2018 seeking proposals for approximately 48 boats over five years. Key details include that the boats will be used to support mine countermeasure and very shallow water operations, with configurations for launch and recovery of unmanned underwater vehicles and combat rubber raiding craft. Molds for the hull, deck and console will be procured as government-furnished equipment for future use. Questions covered topics such as specifications, drawings, schedules and insurance requirements.
Question & Answers to Draft and Final RFP
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 N00024-18-R-2220 Solicitaion Question & Answer July 20, 2018
| # | Question | Response |
| 1 | Is this draft RFP a small business set aside or unrestricted as indicated in the draft RFP? | The intended RFP will be a small business set-aside and will be corrected via a Solicitation modification. |
| 2 | In the opening section 040-1 titled background. You mention that the shallow water version must be able to receive/carry the F-470 or F-580. Over the last three/four years the Navy/Army/Air Force has been transitioning to the P4.7 and P5.8. These are Wing CRRC craft. Wing presently holds the NAVSUP 4.7 contract and the NECC 5.8 Contract as well as the Army 4.7 and 5.8 contract. I would suggest that it might be better to specify both the F and the P crafts. There are still some units that may have legacy F craft…but, they are few and far between as there is no contracting vehicle to replace them once destroyed/damaged. | The description in Section 040-1 is intended to be informative of how the boat will operate. It needs to be able to deploy either (2) CRRC of the 4.7m size or (1) CRRC of the 5.8m size. |
| 3 | Section 169-2. Same as above. a. You mention that the shallow water version must be able to receive/carry the F-470 or F-580. Over the last three/four years the Navy/Army/Air Force has been transitioning to the P4.7 and P5.8. These are Wing CRRC craft. Wing presently hold the NAVSUP 4.7 contract and the NECC 5.8 Contract as well as the Army 4.7 and 5.8 contract. I would suggest that it might be better to specify both the F and the P crafts. There are still some units that may have legacy F craft. | The description in Section 169-2 is intended to be informative of what the boat's transom door is used for. |
| 4 | Section 166-1. We understand and see no issues with the section describing the collar. However, we are unable to locate any description of attachment method of the collar to the hull. It is our belief that most solicitations specify “mechanically attached” and further clarify with bolt rope or flatbar. Based on my review of the documents as written, a builder might be able to supply a glued-on tube. We don’t recommend any application in military use wherein a glued-on tube is beneficial. Moreover, Wing has a further recommendation that “mechanically attached” be further defined to prefer both top and bottom bolt rope attachments but would accept one bolt rope and one flat bar. | The Miscellaneous Drawing depicts the tub attachment. The Specification Section 166-1 has been updated to say the tube shall be mechanically attached per the drawings. |
| 5 | As you might imagine this has just hit the street. I have reviewed the project and am a touch confused. I have no issues with the tests and the requirements for the collar. But, what I can’t find anywhere is the designation as to how the Navy wants the collar attached. Usually, there is a “mechanically attached” call out. Technically, the way this is written it seems as though it would allow for a glued-on tube. Any idea…what am I missing? | The drawings provided with the Expeditionary 11m RIB specification show the required, mechanical, attachment method for the collar. However it is not abundantly clear in the Specification what the intended method of attachment is, or where to find the attachment details. The current RFP is a draft and will be edited to clearly state the required collar attachment method to the hull, and where to find the specific construction details. |
| 6 | SF1449 – BLOCK 10: With the NAICS Code and Size Standard provided, along with the verbiage in the FedBizOps notice and selection of Clause 52.219-6 in the RFP, it is assumed that the selection of Unrestricted in Block 10 of the SF1449 is an error and will be corrected in the Final RFP. Please advise if this assumption is incorrect. | Yes, this will be corrected via a solicitation amendment. |
| 7 | Section B – CLINs: The Draft Section B seems to only contain CLINs for the base year. Will the Final RFP contain CLINS for the optional years, or will instructions be provided as to how these optional year prices are to be provided? | This contract is for a 60 month period of performance with 5, one year ordering periods. Each delivery order will utilize the same CLIN numbers with pricing from Attachment 11. |
| 8 | Clause 52.228-16 Performance and Payment Bonds and H-01 Conditions for Payment – Boat CLINs: In regards to the Payment Bond, should Contractor not require performance payments, and their financial status allow for 98% paid at Acceptance of Boat, with 2% Retention until end of craft warranty period, would this be acceptable to the Government in lieu of the Payment Bond/Irrevocable Letter of Credit. | Yes this would be acceptable. |
| 9 | CLIN 0001 – Expeditionary 11M Rib: Is step ladder pricing desired? If so in what increments? Will the quantity of craft in each of the five (5), one (1) year ordering periods be included in the final RFP? | No, step ladder pricing will not be desired. |
This is an IDIQ and a notional quantity will be noted in Attachment 11.
| 10 | Section M Factor 3: Price: The total evaluated price appears to only include the first ordering period. Please advise if this is correct or includes all five (5) ordering periods and will be clarified in the final RFP. | This contract is for a 60 month period of performance with 5, one year ordering periods. Each delivery order will utilize the same CLIN numbers with pricing from Attachment 11. | |
| 11 | Section M Factor 1: Production Approach and Facilities: How many boat deliveries per ordering period should be assumed in the Section F notional delivery dates? | 10 per year, 8 in the last year. | |
| 12 | Section B CLIN 0008 Spec 100-3 Mold Requirements. Hull, deck and console production molds are to be provided and become GFP. Small parts molds are not mentioned, but are required also. Does the Government not wish for these small parts molds to be provided and become GFP? | Small part molds are not required, only the hull, deck, and console molds are required. | |
| 13 | Section B CLIN 0008, Spec 100-3 Mold Requirements, Clause 5252.228-9105 Insurance Property Loss or Damage Liability to Third Persons Contractor will purchase and deliver the Hull, Deck and Console Molds, which will become GFP upon acceptance at Contractor Facility. Prior to acceptance of these molds, they will be covered under Contractor’s Builder Risk Insurance. Can you confirm that post acceptance, these molds fall under the subject Insurance clause and insurance will be covered by the Government. | Once the government has accepted these molds a revised attachment 16 will be completed and the items will follow all terms and conditions of the Government Property clauses. | |
| 14 | HQC-2-0005 Access to Vessels by Non-US Citizens (NAVSEA) Sept 2016 | ||
| If US Persons (as defined by the State Dept, i.e. Permanent Residents or Resident Aliens) are employed at Contractor’s facility and have worked on previous Government contracts prior where an ACP has not been required, is the ACP required during the RFP response? | Yes - the extent of the plan will be discussed during the post award conference. | ||
| 15 | Section J, Attachment 2 Contract Drawings. Can you advise, upon contract award, the format in which drawings will be provided? Is a 3D model available? | Contract drawings will be provided upon award in 2017 AutoCAD Format (Alternate Years can be made available)/ A 3D solidworks model can be made available as guidance but not contractual (The contractor would accept any risks if an error in the model conflict with a contractual requirement or other adverse building practices.). Drawings are Distribution D, subcontractors/vendors will need to sign the same (Non-Disclosure Agreement) and submit to the government to view and drawings. | |
| 16 | Will a Design Weight Estimate be provided? | The governments design weight estimate will not be provided because it will be used as an independent comparison to the contractors' AWE. | |
| 17 | Performance Bond is supposed to cover the whole period of the contract including the warranty period. What is considered as the warranty period for this purpose? Government may not put the delivered boat into service until several years after the boat is delivered. | The Contractor shall provide a Contractor’s Warranty for the boat and all installed equipment, for minimum of one year, starting from the date the boat enters service with the Navy's end-user. Notification of official in-service date will be provided to the Contractor by the U.S. Navy Boat Inventory Manager. Note to Contractors: Boats procured for the Navy may sit in stock (outdoors in uncovered storage) for up to twelve (12) months prior to issue to the Navy end-user | |
| 18 | (For insurance purpose) Can you send us a copy of the following or provide a download URL as we cannot find it via web search: "Standard Forms of Marine Builders Risk (Navy Form Syndicate) and War Damage Insurance Policies referred to in Vessel Contracts to the Bureau of Ships," dated 23 November 1942. | WILL LOAD ANSWER IN A LATER AMENDMENT | |
| 19 | (For insurance purpose) Can you provide the max dollar value of GFE at any given time? | The max value of the molds cannot be determined prior to award as this will be based on the winning bid. Contractor can use $75 per Davit. | |
| 20 | Government is going to purchase Hull, Deck, and Console Molds under CLIN0008. What about other molds for small pieces such as Hatches, Keel Guard etc. | Small part molds are not required, only the hull, deck, and console molds are required. | |
| 21 | In Attachment 4, it suggests that HC0920300 (Cabin Heater Plumbing), RG0963200 (Marine Gear), XS0971600 (Exhaust Outlet) are supplied by the customer. Can you confirm that such materials will be part of the GFE? | These items are not GFE. These items shall be supplied by the boat Contractor (customer to the engine distributer in this case). | |
| 22 | What type of drawing files will be provided to the winning contractor? Full vessel 3D model, AutoCAD / dxf drawings? | Contract drawings will be provided upon award in 2017 AutoCAD Format (Alternate Years can be made available)/ A 3D solidworks model can be made available as guidance but not contractual (The contractor would accept any risks if an error in the model conflict with a contractual requirement or other adverse building practices.). Drawings are Distribution D, subcontractors/vendors will need to sign the same (Non-Disclosure Agreement) and submit to the government to view and drawings. | |
| 23 | Regarding Detail 38-B, CONTROL CONSOLE ARRANGEMENT AND DETAILS. Page 4 of 4. Can we please get an extrusion call out (dimensions / thickness) on the Communications Rack? | Construction details for the communications rack are left for the Contractor to complete. The rack shall meet the overall dimensions per the drawings and accommodate the radio dimensions as stated on the drawings. | |
| 24 | Notional schedule for boat #6 is 430 days. Is that correct? Same questions for boat 7-10. Days After Receipt of Order (DARO) 1 TBD 330 |
2 TBD 360
3 TBD 390
4 TBD 420
5 TBD 450
6 TBD 430
7 TBD 460
8 TBD 490
9 TBD 520
10 TBD 550
| Attachment corrected with updated notional schedule | |
| 25 | Is the assumption that Attachment 15 documents are not required to be included on the Volume II Price electronic submissions correct? Is a separate CD of these documents required within the sealed envelope? |
| Due to the sensitivity of information contained on Attachment 15, it should be submitted in CD format on a separate CD win a sealed envelope NOT with Volume II Pricing. | |
| 26 | Draft RFP Released 8 June 2018 |
Will the Government be releasing Questions and Answers provided during the Draft RFP stage?
| Yes | |
| 27 | Section B |
Completion of Section B is not listed in Section L requirements.
• Please advise if Section B is required to be completed
• If Section B is required, please advise which pricing should be incorporated (i.e. base year or an average of all five years).
| Per Section A of the solicitation, the Government will use Attachment 11 pricing to complete Section B of the awarded contract and subsequent delivery orders. | |
| 28 | Section B CLIN 0008 Spec 100-3 Mold Requirements |
Hull, deck and console production molds are to be provided and become GFP. Small parts molds are not mentioned, but are required also. Does the Government wish for these small parts molds to be provided and become GFP?
| Small part molds are not required, only the hull, deck, and console molds are required. | ||
| 29 | Section B CLIN 0008, Spec 100-3 Mold Requirements, Clause 5252.228-9105 Insurance Property Loss or Damage Liability to Third Persons Contractor will purchase and deliver the Hull, Deck and Console Molds, which will become GFP upon acceptance at Contractor Facility. Prior to acceptance of these molds, they will be covered under Contractor’s Builder Risk Insurance. Can you confirm that post acceptance, these molds fall under the subject Insurance clause and insurance will be covered by the Government. | Once the government has accepted these molds a revised Attachment 16 will be completed and the items will follow all terms and conitions of the Government Property clauses. |
| 30 |
Section J, Attachment 2 Contract Drawings Can you advise, upon contract award, the format in which drawings will be provided? Is a 3D model available?
Will the drawings released with the RFP package be protected with Distribution Statement D as the drawings with the RFI that was released previously? If so, will permission be required during RFP stage for release of drawings or parts of drawings to vendors for quotation?
| Contract drawings will be provided upon award in 2017 AutoCAD Format (Alternate Years can be made available). A 3D Solidworks model can be made available as guidance but not contractual. Drawings are Distribution D, subcontractors/vendors will need to sign the same (Non-Disclosure Agreement) and submit to the government to view and drawings. | |
| 31 | Section 085 TDP |
Paragraph 2 “Detailed design and engineering work and related drawings shall precede construction so that problems can be discovered and resolved prior to construction. Detailed accurate drawings that define the boat shall be developed and used as a construction, quality assurance, and configuration control tool by the Contractor and the Government.
How many meetings, contractor and government together, does the government anticipate for finalization of detailed design? Will the meetings be held at the contractor’s facility?
| The Statement Of Work section C-3 defines the required Contractor and Government meetings. | |
| 32 | Section 075 Fasteners |
Paragraph 5 ”Where fasteners are used in cored and fiberglass structure the fastener threads shall be dipped in catalyzed resin at the time of installation.”
Is this only for highly loaded items such as engine mounts and lift fittings, or would this include all fasteners that touch fiberglass? Example mounting bilge pump brackets, Seat Track Mounting, Pipe/Hose hangers, Handrails, Blower mounts, etc.,
| This requirement is for sealing the core to protect against water intrusion | ||
| 33 | Is a bid bond required with the submittal of the proposal or only if after review of financials it is deemed necessary by the government? | No bond is required with the submittal. Should the Government require bonds they will issue an amendment to the solicitation. |
| 34 | With regards to the question and answer period would the government be willing to extend this period by 4-5 business days to accommodate the time of the MACC. We would like to request extending the question period to July 26/27. | The Q&A date closed July 19. Contractors may continue to submit questions up to July 25 but there is no guarantee that the government will answer these questions prior to the solicitation closing date of August 9th which will not be extended. |
| 35 | Specification Section 042-3 Contract Drawings references Government created drawings for Transport Arrangement and Details, and Stern Gate Launch & Recovery Device Arrangement and Details that are available upon request | Yes the draft drawings are available upon request. |