FINAL_NAV_Industry_Day_Questions_and_Answers.pdf

PDF 77 KB Posted

Attached to
Industry Day National Oceanic and Atmospheric Administration (NOAA) Auxiliary General Purpose
Solicitation number
N00024-18-R-2201
Issued by

View the file

Other files

File Type Posted
DRAFT_RFP_N00024-18-R-2201_NOAA_AGOR_Variant.pdf PDF
List.pdf PDF
FINAL_NAV_Industry_Day_Brief_(30NOV2017).pdf PDF
NAV_RFI_20170829.pdf PDF
NAV_Sources_Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Number Slide # Question Answer 1 10 Does a SY have to prime Phase 1 Yes.

2 10 When will SBSA be determined Prior to RFP release.

3 10 How many awards Multiple awards in Phase I. Only 1 for Phase II.

Is the Navy only looking for a mod of AGOR or is there an openess for a new design

We are looking for any design that can meet our requirements.

How will continuing resolutions affect the funding and schedule for NAV CR will not affect the award of this program.

6 29 Will the Government distribute copies of today's presentation to registered vendors?

Yes. It will be uploaded to FedBizOpps.

(https://www.fbo.gov/spg/DON/NAVSEA/NAVSEAHQ/N00 024‐18‐R‐2201/listing.html)

Will the client accept use of CFD for flow visualizationpurposes instead of model testing in Phase #1.

This would significantly reduce time and cost. No.

8 6 Does the design that is presented to win Phase I be a proven design?

No. There is no requirement to use an existing design that is in service.

9 6 Does the design have to be exclusive to one ship yard

Phase II will be awarded to one shipyard. That shipyard may partner with other shipyards subject to their build strategy.

10 Is the bidders design to be a parent craft in operation today?

No. There is no requirement to use an existing design that is in service.

File details come from the government source that posted it.