FINAL_NAV_Industry_Day_Brief_(30NOV2017).pdf
PDF 902 KB Posted
- Attached to
- Industry Day National Oceanic and Atmospheric Administration (NOAA) Auxiliary General Purpose
- Solicitation number
- N00024-18-R-2201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_RFP_N00024-18-R-2201_NOAA_AGOR_Variant.pdf | ||
| List.pdf | ||
| FINAL_NAV_Industry_Day_Questions_and_Answers.pdf | ||
| NAV_RFI_20170829.pdf | ||
| NAV_Sources_Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Distribution Statement A: Approved for public release
NOAA AGOR VARIANT
Industry Day 30 November 2017
Cesar Artze
NAVSEA 05D
NAV Ship Design Manager
CAPT Scott Sirois
NOAA OMAO PAD
NAV Acting Chief
Darryl Resio
PEO Ships (PMS325)
NAV Assistant Program Manager
Rana Movahed
Jessica Hathaway
NAVSEA 02
NAV Contracting
2 Distribution Statement A: Approved for public release
Purpose / Ground Rules
Rana Movahed, NAVSEA 02, Procuring Contracting Officer (PCO)
Jessica Hathaway, NAVSEA 02, Principal Contract Specialist
• Purpose
– Provide industry with information in advance of solicitation in order to receive multiple compliant, highly competitive offers
• Intent
– Answer questions in advance of formal RFP release
• Ground Rules
– Submit questions on cards (include slide # on question card as applicable)
– No video/audio recording
3 Distribution Statement A: Approved for public release
Industry Day Agenda
• Roles and Responsibilities of Government Team
– Darryl Resio, PEO Ships (PMS325), Assistant Program Manager (APM)
• History, Mission, CONOPS
– CAPT Scott Sirois, NOAA Office of Marine and Aviation Operations (OMAO) Platform
Acquisition Division (PAD), Acting Chief
• Acquisition Approach and Schedule Overview
– Darryl Resio
• Overview of Solicitation
– Rana Movahed & Jessica Hathaway
• Contract Administration and Construction Oversight (PCO / ACO)
– Rana Movahed & Jessica Hathaway
• Technical Overview
– Cesar Artze, NAVSEA 05D, Ship Design Manager (SDM)
• Test and Trials
– Darryl Resio
• Question Submittal
– Rana Movahed & Jessica Hathaway
4 Distribution Statement A: Approved for public release
Roles and Responsibilities of Gov’t Team
Darryl Resio, PMS325, Assistant Program Manager (APM)
In May 2014, an overarching Interagency Agreement (IAA) was signed establishing an ongoing relationship between NOAA and the Department of the Navy to acquire multiple classes of ships to support NOAA Fleet
Recapitalization.
• PMS325 Support Ships, Boats, and Craft: Acquisition and Program Management
• NAVSEA 02: Contracting
• NAVSEA 05D: Engineering and Technical Oversight
• National Oceanic and Atmospheric Administration (NOAA): Requirements Input, End
User
5 Distribution Statement A: Approved for public release
History, Mission, CONOPS
CAPT Scott Sirois, NOAA OMAO PAD, Acting Chief
• NOAA currently operates a fleet of 16 research/survey vessels
• Expanding mission requirements, increasing age/obsolescence issues are driving the plan
• 8 ships will retire in the next 10 years; creating a significant gap in
NOAA’s at sea capability
6 Distribution Statement A: Approved for public release
Ferdinand R. Hassler
Henry B. Bigelow
Nancy Foster
Ronald H. Brown
Thomas Jefferson
Okeanos Explorer
Oregon II
Gordon Gunter
Pisces
Fairweather
Oscar Dyson
Rainier
Bell M. Shimada
Ruben Lasker
Hi’ialakai
Oscar Elton Sette
Current OMAO
NEWPORT, OR (2)
SAN DIEGO, CA (1)
HONOLULU, HI (2)
KETCHIKAN, AK (1)
KODIAK, AK (1)
NEW CASTLE, NH (1)
NEWPORT, RI (1)
DAVISVILLE, RI (1)
NORFOLK, VA (1)
CHARLESTON, SC (2)
PASCAGOULA, MS (3)
MARINE OPERATIONS HQ
MO - PACIFIC
MO - ATLANTIC
MO - PACIFIC ISLANDS
Fleet: Home Ports
7 Distribution Statement A: Approved for public release
• Urgency for Fleet Recapitalization
Significant Reductions in
Navigation, Observation & Positioning
Protected Resource
Science & Management
Habitat
Conservation & Restoration
2020 2025 2030 2035 2040
O s c a r S e t t e O r e g o n I I
G o r d o n G u n t e r O k e a n o s E x p l o r e r
H i ' i a l a k a i F a i r w e a t h e r
T h o m a s J e f f e r s o n R a i n i e r
N a n c y F o s t e r R o n a l d B r o w n
O s c a r D y s o n H e n r y B i g e l o w
P i s c e s B e l l S h i m a d a
F e r d i n a n d H a s s l e r R u e b e n L a s k e r
35*
*age of ship at retirement
8 ships
8 Distribution Statement A: Approved for public release
• 2016 Fleet Recapitalization Plan identified 4 new vessel classes
• Emphasis on multi-mission use
SHIP PRIMARY MISSION SECONDARY MISSION
Class A
Oceanographic Monitoring, Research & Modeling
Assessment and Management of
Living Marine Resources (no trawl), Charting and Surveying
Class B
Assessment and Management of
Living Marine Resources, Oceanographic Monitoring, Research
& Modeling
Class C
Assessment and Management of Living Marine Resources
(near-shore, shallow-draft)
Class D
Assessment and Management of Living Marine Resources
(near-shore and deep ocean, longer endurance)
Oceanographic Monitoring, Research
& Modeling
9 Distribution Statement A: Approved for public release
• Class A
– 2016 Fleet Plan recommended initiation of Class A ship build, utilizing recent
USN research vessel acquisitions
– Investigating multiple new ships, multi-mission vessels, integrating new technologies
– NOAA leveraging the USN OCEAN CLASS AGOR documentation
– NOAA anticipates delivery of the lead ship in 2022 with options for additional ships
10 Distribution Statement A: Approved for public release
Acquisition Approach
Overview
Darryl Resio, PMS325, APM
• Firm Fixed Price Contract
• Two-Phase Acquisition Approach
– Phase I Preliminary/Contract Design
6-12 month effort
Full and Open Competition or Small Business Set Aside resulting in multiple awards for the NOAA NAV Program Phase I designs
– Phase II Detail Design and Construction (DD&C)
Option award for Phase II DD&C will be made to one of the participating Phase I
Contractors
Award will include options for construction of the second and third ships
The DD&C option award for the lead ship is currently planned for FY19 and the follow on ships for FY21 (plan/dates subject to revision)
11 Distribution Statement A: Approved for public release
Acquisition Approach
Schedule
FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
NOAA AGOR Variant (NAV)
Contracts
Lead Vessel Schedule
Follow Vessel Schedule Ship 2
Follow Vessel Schedule Ship 3
RFP Issue
Proposal Prep and Source Selection
Competitive Preliminary and Contract Design
Downselection
DD&C Contract Award
Detail Design
SOC
Construction
BT
AT
DEL FCT Final Turnover
Ship 2 Contract Award
SOC
Construction
BT
AT
DEL FCT Final Turnover
Ship 3 Contract Award
SOC
Construction
BT
AT
DEL FCT Final Turnover
AT - Acceptance Trial BT - Builder's Trial DD&C - Detail Design and Construction DEL - Delivery FCT - Final Contract Trial RFP - Request for Proposals SOC - Start of Construction
Note: Schedule is tentative and subject to revision
12 Distribution Statement A: Approved for public release
Overview of Solicitation
• Firm Fixed Price for lead ship with options for two more
• Full and Open Competition or Small Business Set Aside
• Focus Areas
– Contract Type
– Schedule
– Technical
– Past Performance
– Price
• Tips from PCO
13 Distribution Statement A: Approved for public release
Solicitation Timeline
• 06 Jul 17 – Desired Operational Requirements and Characteristics were provided in Sources Sought
• 29 Aug 17 – Follow-on RFI requested information from small-business shipyards regarding capability (schedule & facilities) for constructing the NAV
• 08 Nov 17 – Draft Specifications released
• 30 Nov 17 – Industry Day held at International Work Boat Show
• *Q2 FY18 Formal RFP release
• 45 Day proposal period
• *Q4 FY18 Preliminary/Contract Design Award
*Note: Dates are tentative and subject to revision
14 Distribution Statement A: Approved for public release
Contract Administration and
Construction Oversight (PCO / ACO)
• Contract Oversight
– Procurement Contracting Officer (PCO) / Administrative Contracting Officer
(ACO)
– On-site PMS325 representative and Supervisor of Shipbuilding TBD pending shipbuilder location
15 Distribution Statement A: Approved for public release
Technical Overview
Cesar Artze, NAVSEA 05D, SDM
• NAV Mission – Support NOAA’s shallow coastal, continental shelf, and worldwide ocean survey and data collection requirements.
PRIMARY TASKS SECONDARY TASKS
• Marine geology and geophysics
• Ocean engineering and marine acoustics
• Bathymetry, gravimetry, and magnetometry
• Physical, chemical, and biological oceanography
• Multi-discipline environmental investigations
• Sampling/data collection of surface, midwater, and seafloor parameters
• Launch, towing, and recovering of scientific packages
• Handling, monitoring, and servicing
ROVs and AUVs
• Supporting diving operations
• Deploying and recovering AAVs and balloons
• Deploying and recovering free-floating instruments
• Shipboard data processing and sample analyses
• Precise navigation, station keeping, and track-line maneuvering to support deep-sea and coastal operations
16 Distribution Statement A: Approved for public release
• Designed & classed to commercial marine design standards
• Regulatory Body Requirements
– ABS Rules for Steel Vessels Under 90 meters (295 feet) in Length
– ABS Notations: A1, Circle E, AMS, ACCU, NIBS, IHM, DPS-1, CRC, Ice
Class D0, and UWILD
– 46 CFR Subchapter U
– MARPOL Annex I, V & VI
– SOVC for Annex IV
– SOLAS
• Commercial Industry Standards
– IEEE, SNAME, ASME, ANSI, ASTM, SSPC, CDC, etc.
17 Distribution Statement A: Approved for public release
• Key Ship Design Requirements & Features
– Complement of 48 persons:
20 crew
24 science personnel
Surge capacity for 4 additional personnel
– Sustained Speed: 12 knots at 85% MCR
– Range: 10,000 nm
– Endurance: 40 days
– Maximum Navigational Draft: 17 ft
– Dynamic Positioning System
– Full Operability up to Sea State (SS) 4 (Bretschneider)
– Similar to USN OCEAN CLASS AGOR Design Requirements
18 Distribution Statement A: Approved for public release
• Scientific Mission Requirements & Features
– Capable of towing scientific packages:
10,000 pounds of towing load at 6 knots
25,000 pounds of towing load at 4 knots
– Modern & Highly Flexible Scientific Mission Spaces:
Main & Wet Labs
Elex Technician Shop/Computer Lab
Environmentally Controlled Room
Staging Bay
– Aft Working Deck Area – minimum 1,800 ft2 clear area
– Stbd Side Working Deck – minimum 80 ft (L) x 10 ft (W) clear area
– Fwd Scientific Weather Deck – minimum 80 ft2 clear area
– Marine Mammal Observation Station
19 Distribution Statement A: Approved for public release
• Scientific Mission Requirements & Features (cont’d)
– Scientific Van Sites:
Carry up to 5 vans aft (2 sheltered van locations near Main Lab & 3 van locations on Aft Working Deck)
Carry up to 2 vans forward
All vans per ISO Standard 668, Designation 1CC
– Main Crane – 10,000 lbs up to 12 ft over the starboard side in SS4
– Stern Frame – 25,000 lbs in SS4
– CTD Handling Gear – 11,100 lbs in SS4
– J-Frame – 4,500 lbs in SS4
– Hydrographic Winches (2)
– Tow/Trawl Traction Winch System
20 Distribution Statement A: Approved for public release
• Scientific Mission Requirements & Features (cont’d)
– 1 x Workboat - 25 ft RHIB
– Capability of launching/retrieving 16.4 ft manned workboats using Main
Crane
– Nitrox Dive Air System & Dive Locker
– Uncontaminated Seawater System
– Scientific Computer System Network
21 Distribution Statement A: Approved for public release
• Scientific Mission Sensors
Equipment Frequency (kHZ)
Singlebeam Echosounder System (SBES) 18
Multibeam Echosounder System (MESS) 70 – 120
Multibeam Survey System – Deep Water (MBSS-DW) 12
Multibeam Survey System – Mid Water (MBSS-MW) 40-100
Sub Bottom Profiler (SBP) 2.2 – 7
Acoustic Navigation and Tracking System (ANTS) 21 – 31
Singlebeam Survey System (SBSS) 12
Acoustic Doppler Current Profiler (ADCP)
22 Distribution Statement A: Approved for public release
• Underwater Radiated Noise Limit
23 Distribution Statement A: Approved for public release
• Integration of Scientific Mission Spaces Key to Ship Functionality
– Working Deck must consider:
Towing Operations
Crane and Over the Side Handling Operations
Aft ISO Van Locations & Access
Work Boat Launch/Retrieval
Ease of Access to Staging Bay, Main Lab & Wet Lab
Dive Operations & Access to Dive Locker
Routine Personnel & Equipment Traffic
– Highly Flexible Lab Configurations with Interior/Exterior Access
– Fwd ISO Van Locations & Access
– Marine Mammal Observation Station Visibility & Safety
24 Distribution Statement A: Approved for public release
• Technical Risks & Mitigation Plans
Risk Mitigation Plan
Bubble sweepdown may cause interference with sonar operation
Phase I CFD analysis at 8 kts, 10 kts and sustained speed with +/- 4 degree pitch variation
Phase I bubble sweepdown flow visualization model tests
Phase I & II Scientific Electronic
Systems (SES) Single System Vendor
(SSV) to analyze hull forms to determine optimum sensor locations, and assess hull appendage flow noise to prevent degradation in the performance of sensors
25 Distribution Statement A: Approved for public release
• Technical Risks & Mitigation Plans (cont’d)
Adverse acoustic performance impacts scientific mission
Noise Control Consultant to be used during Phase I & II
Phase I & II Sonar Self-Noise Analysis to be conducted
Phase I & II Underwater Radiated
Noise Analysis to be conducted
Acoustic Trials, SES Sea Acceptance
Trials, and Deep Sea Acceptance
Trials to be performed in Phase II
26 Distribution Statement A: Approved for public release
• Technical Risks & Mitigation Plans (cont’d)
Propeller cavitation noise impacts scientific mission
Phase I model testing includes propeller cavitation performance testing
Noise Control Consultant to be used during Phase I & II
Phase I & II SES SSV to assess machinery noise to prevent degradation in the performance of sensors
Phase I & II Underwater Radiated
Noise Analysis to be conducted
Acoustic Trials, SES Sea Acceptance
Trials, and Deep Sea Acceptance
Trials to be performed in Phase II
27 Distribution Statement A: Approved for public release
Test and Trials
• The Shipbuilder will be required to accomplish pre-delivery tests and trials to demonstrate compliance with specified performance requirements and the requirements of Regulatory Bodies prior to ship delivery. These include:
1. Vendors Sea Trials including
a. Propulsion System grooming
b. Scientific Electronic Systems grooming
c. Dynamic Positioning System grooming
2. Builder’s Trials (BT) including
a. Builder’s Dock Trials (BDT)
b. Builder's Sea Trials (BST)
c. Dynamic Positioning Sea Trials (DPST)
3. Acoustic Trials
4. Scientific Electronic Systems (SES) Sea Acceptance Trials (SAT)/Deep Sea
Acceptance Trials (DSAT)
5. Acceptance Trials (AT)
28 Distribution Statement A: Approved for public release
Test and Trials
• The Shipbuilder will be required to select and obtain the services of a SES
Single Systems Vendor (SSV) and Propulsion SSV.
– The SES SSV will be responsible for the overall engineering, design, procurement, integration, regulatory body approval and testing of the Scientific Mission Systems
– The Propulsion SSV will be responsible for the overall engineering, design, procurement, integration, including prime mover vendor equipment integration, regulatory body approval and testing of main propulsion machinery and electrical plants
• The SES SAT and DSAT will be performed by the Shipbuilder/SES SSV to verify all SES systems and equipment as installed are fully functional at sea and serve as a successful demonstration of the SES.
• Post Delivery Test and Trials include:
– Mission Trials conducted by NOAA
– Final Contract Trials conducted by the Program Office
29 Distribution Statement A: Approved for public release
Question Submittal &
Closing Remarks
Questions
Please submit your index cards. Slide # should be included on question card as applicable.
30 Distribution Statement A: Approved for public release
END
File details come from the government source that posted it.