Launcher_Industry_Day_Presentation_15_December_2016.ppt
PPT presentation 9 MB Posted
- Attached to
- MK 41 VLS Industry Day Federal contract opportunity
- Solicitation number
- N00024-16-R-5372
About this file
Launcher Industry Day Presentation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MK_41_VLS_Self-guided_Module_Understanding_Visit.docx | DOCX document | |
| FY18-22_Canister_Industry_Day_Presentation_as_of_15_December_2016.ppt | PPT presentation | |
| Engineering_Services_Industry_Day_as_of_15_December_2016.pptx | PPTX presentation | |
| SECNAV_5512_1_Non_CAC_Vistors.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA
FY18-FY22
MK 41 Vertical Launch System (VLS) Launcher Acquisition Industry Day 21 July 2016 Presented To: Prospective Offerors
Presented by: Mr. Toan Nguyen
PEO IWS 3L
Presented by: Mr. Stephen Hughes
SEA02531
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Agenda
| Registration: | At Sign-in table | 0900-0915 | ||||
| Welcome/Introductions: | Toan Nguyen | 0915-0930 | ||||
| Disclaimer: | Stephen Hughes | 0930-1000 | ||||
| Ground Rules: | Stephen Hughes | |||||
| Industry Day Objectives: | Stephen Hughes | |||||
| Contract Requirements Overview: Stephen Hughes | ||||||
| Launcher Technical Overview: | Toan Nguyen | 1000-1045 | ||||
| Review Display Hardware | All | 1045-1100 | ||||
| Questions & Answers | All | 1145-1200 | ||||
| Closing | All | 1200-1215 |
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Welcome and Introductions
Toan Nguyen
PEO IWS 3L
Surface Launcher Project Manager
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
DISCLAIMER
The remarks provided today by Government Officials involved in the NAVSEA MK 41 VLS procurement should not be construed as a guarantee of the Government’s course of action in proceeding with the acquisition. The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances. The formal solicitation that may be issued at a later date, is the sole document to be relied upon in determining the Government requirements. All communications regarding this procurement shall routed through Naval Sea Systems Command Contracts Directorate, Stephen Hughes, SEA 02531.
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Ground Rules
| All Attendees Must Sign In |
| Please Silence All Cell Phones |
| No Recording Or Photographs |
| This Is An Information Briefing Only |
| The Government Will Respond In Writing To All Questions Submitted By Posting Them To The Fedbizopps And Navy Electronic Commerce Online Procurement Opportunity Websites |
| Following Today’s Presentation, All Questions Are To Be Submitted Electronically Via Email To The Contracting Officer Mr. Stephen Hughes at stephen.t.hughes@navy.mil |
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Industry Day Objectives
Increase industry understanding of launcher and associated equipment design, Fleet utilization, safety features, and production requirements
Provide industry the opportunity to ask questions and obtain feedback from the Navy
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Contract Requirements Overview
Stephen Hughes Procuring Contracting Officer
SEA 02531
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Contract Overview
| Solicitation No. N00024-16-R-5378 |
| RFP expected to be released: January 2017 |
| Competition Requirements: |
| Full and open competition |
| Subcontracting will be limited |
| Anticipated Award Date: December 2017 |
| Contract Type: Firm Fixed Price |
| Contract Term: One Year, Plus Four (One Year) Options |
| Low Price Technically Acceptable (LPTA) |
| Federal Service Code (FSC) is 1440 Launchers, Guided Missile |
| NAICS CODE: 336 Transportation Equipment Manufacturing/336419 – Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing |
| Current Contract: N00024-15-C-5332, $240,254,544 Awarded |
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
| MK 41 VLS Baseline VII Strike Length Modules, Spares, and Support Equipment for DDG 128 – DDG 137 (10 shipsets/120 modules – BASE requirement) and additional module sets (as OPTIONs) with each shipset consisting of: |
| Ten 8-Cell Standard Modules (Mechanical Structures and Electronics) |
| Two 8-Cell System Modules (Mechanical Structures and Electronics) |
| Two Next Generation-2 (NG-2) Launch Control Units |
| MK 41 VLS Aegis Modernization Electronics and Mechanical Upgrade Kits (up to 45 upgrade kits (see next slide) – as OPTIONs) consisting of: |
| Two Launch Sequencers and Cables (for B/L VII upgrades only) |
| Two Motor Control Panels (for B/L VII upgrades only) |
| Four Programmable Power Supplies (for B/L VII upgrades only) |
| Four Module Transformer Platforms (for B/L VII upgrades only) |
| Two Next Generation-2 (NG-2) Launch Control Units (B/L V or VII upgrade kits) |
| Fiber Optic Cables for Twelve Modules (DDGs – B/L V or VII) or Sixteen Modules (CGs - B/L VII) |
| Ablative Blocks for Twelve Modules (DDGs – B/L V or VII) or Sixteen Modules (CGs - B/L VII) |
Major Equipment Being Procured DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Notional Launcher Production Requirements
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
| FY18 | FY19 | FY20 | FY21 | FY22 | |
| MK 41 VLS Launchers | |||||
| (DDG 51 Class) | * BASE: 10 Shipsets |
120 Modules
| * | * |
| MK 41 VLS |
Launchers (FMS or USN) OPTION: 1 – 4 Shipset 12 – 48 Modules (exercised any year 18-22)
| CG Mod | OPTION: 1 – 3 Kits | OPTION: 1 – 3 Kits | OPTION: 1 – 3 Kits | OPTION: 1 – 3 Kits | OPTION: 1 – 3 Kits |
| DDG Mod | OPTION: 1 – 6 Kits | ||||
| OPTION: 1 – 6 Kits | OPTION: 1 – 6 Kits | OPTION: 1 – 6 Kits | OPTION: 1 – 6 Kits |
| Production Readiness Review (Preliminary & Final) |
| Production In Process Review (Quarterly) |
| First Article Inspections |
| First Article Tests |
| Shock and Vibrations Tests |
| Physical Configuration Audits |
| Fit Check Tool Fabrication |
| Module Level Launcher Acceptance Tests |
Notional Contract Non-Recurring Requirements DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Launcher Program Overview Toan Nguyen
PEO IWS 3L
Surface Launcher Project Manager
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS is operated and maintained only by trained personnel using authorized procedures
A dead electrical missile interface is always maintained until a missile is intended to be launched with the exception of procedures outline in NAVSEAINST 8394.2F
No simulators of any type will be mixed with live ordnance except during highly controlled special test and evaluation scenarios
No Developmental Test ordnance, programs or Weapons Control Systems will be used with tactical MK 41 VLS ordnance or programs
VLS SAFETY PRECEPTS/CARDINAL RULES
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Credentials
| Ballistic Protection |
| Open System Architecture |
| Simultaneous Multiple Missile Launch |
| Multiple Warfare Area Missile Types |
| Any Missile/Any Cell |
| Modular Design And Application |
| High Reliability And Low Maintenance |
| Combat Proven |
| Over 3,900 Missile Firings |
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Platforms:
ARLEIGH BURKE Class
DDG 51 – 127
TICONDEROGA Class
CG 52 – 73
Twelve Allied Nations Aegis Ashore Sites Launch Control Units 264”
Canisters 8 Cell Module Spent Fly Through Cover
Spent Aft Closure Expended Canister Ship Deck Uptake Hatch Cell Hatch Fly Through Cover Grid Sill Plenum
Module Structure and Gas Management System 8 Modules 4 Modules
| U |
| p |
| t |
| a |
| k |
| e |
MK13, 15, or 25 Canister MK14, 21 or 29 Canister Sill Assy Canister Adapter
System Overview MK 41 VLS Design Agent Engineering Services Industry Day
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
| Standard Module (10 Modules per DDG 51 Class Ship): |
| The Standard Module consists of an upright structure that provides vertical storage space for eight missile canisters. A deck and hatch assembly at the top of the module protects the missile canisters during storage and the hatches open to permit missile launches. The plenum and uptake structure capture and vent missile exhaust gases vertically up through the module to the atmosphere through the uptake hatch. Electronic equipment mounted on the 8-Cell Standard Module monitors the stored missile canisters and the module components and assists in launching the missiles. |
| System Module (2 Modules per DDG 51 Class Ship): |
| The System Module similar to the Mechanical and Electronics on the Standard Module with the addition of the 60 Hz and 400 Hz Power Distribution Panels; the Damage Control Junction Box; the System Lighting, Power Receptacle, and Telephone Junction Box; and the System Transformer Platform (see next slide) that serve the entire launcher. The 8-Cell System Module receives and distributes power and control signals from outside the launcher to all the modules and collects control and damage control signals from the modules and sends them outside the launcher. |
MK 41 VLS Standard Module/System Module Differences MK 41 MOD 15 VLS Modules DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day MK 41 VLS Major Module Components
MECHANICAL
CELL HATCH
MECHANICAL
CELL HATCH MOTOR
1 PER CELL
MECHANICAL
UPTAKE
MOTOR 1 PER MODULE
ELECTRONICS
LAUNCH SEQUENCER
MK 5
MECHANICAL
UPTAKE HATCH
MECHANICAL
MODULE CABLES
ELECTRONICS
MOTOR CONTROL PANEL
MK 448
ELECTRONICS
MODULE TRANSFORMER PLATFORM #1/#2
MK 30 and MK 31
ELECTRONICS
PROGRAMMABLE POWER SUPPLY
MK 179
MECHANICAL
OUTBOARD
ELECTRONICS
MODULE LIGHTING, POWER RECEPTACLE, and TELEPHONE JUNCTION BOX
MECHANICAL
WALKWAYS
ELECTRONICS
SYSTEM LIGHTING, POWER RECEPTACLE, AND TELEPHONE JUNCTION BOX
ELECTRONICS
DAMAGE CONTROL JUNCTION BOX
MK 65 MOD 0
ELECTRONICS
SYSTEM TRANSFORMER
MK 28 MOD 0
ELECTRONICS
60-HZ POWER DISTRIBUTION PANEL
MK 420 MOD 0
ELECTRONICS
400-HZ POWER DISTRIBUTION PANEL
MK 419 MOD 0
HEAT SENSING DEVICE
CANISTER LATCH ASSEMBLY
MECHANICAL
MODULE SPRINKLER HEAD
STANDARD MODULE
SYSTEM MODULE
(Equals Standard Module Plus Components Identified Below)
= ELECTRONICS Component
= MECHANICAL Component
ELECTRONICS
CO MONITOR
Dimensions and Weights Dimensions: Inches (mm)
| Dock Length | 125 (3,175) |
| Dock Width | 82 (2,083) |
| Height | 303 (7,695) |
| Module | 32,300 (14,651) |
| Adapters | 4,900 (2,223) |
| Sill (s) | --- |
| Loaded Canister (s) | 46,700 (21,183) |
w/ ESSM
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Launch Control Units Mounted on Bulkhead MK 416/MK 430 Status Panels Located in Computer Room (not attached to modules)
MK 41 MOD 15 VLS
Major Mechanical Components
Deck & Hatch Assembly Cell Hatch Module Structure (segment) Uptake Structure (segment) Plenum Assembly & Plenum Drain Assembly Deluge Valve Assembly Module Structure (with Deluge Valves) DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 MOD 15 VLS Baseline VII Major Electronics Components LCU (MK 235 Mod 7)
MCP/AIP
(MK 448 Mod 1) Programmable Power Supply #1 and #2 (MK 179 Mod 0) 400 Hz PDP (MK 419 Mod 0) 60 Hz PDP (MK 420 Mod 0) Module Lighting Junction Box Module Transformer Platform #1 (MK 31 Mod 0) DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
| 901 Shock Test |
| Launch Vibration Test |
| Plenum/Uptake Internal Pressure Test |
| Plenum/Uptake Ablative Bonding Test |
| Cell/Uptake Hatch Cycle Test |
| Topside Watertight Integrity Test |
| RF Shielding Effectiveness Test |
Launcher (Sample Requirements) DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Fleet
Germany
FFG BRANDENBURG
4 Ships Norway
FFG NANSEN
5 Ships United States
DDG ARLEIGH BURKE
77 Ships
CG TICONDEROGA
22 Ships
FFG SACHSEN
3 Ships Japan
DDG KONGO/ATAGO/+NEW
8 Ships
DD MURASAME
9 Ships Turkiye
FFG SALIHREIS
2 Ships
DDH HYUGU
2 Ships
DD TAKANAMI
5 Ships
FFG BARBAROS
2 Ships
DD AKIZUKI/+NEW
6 Ships
FFG HUITFELDT
3 Ships Denmark G-Class Frigates 4 Ships
DDG HOBART
5 Ships
FFG NARESUAN
2 Ships Thailand DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
DDG IROQUOIS
3 Ships Canada Spain
FFG ALVARO DE BAZAN
5 Ships
Netherlands
DDG DEZEVEN PROVINCIEN
4 Ships
Australia
FF ANZAC
8 Ships
FFG ADELAIDE
4 Ships
New Zealand
FF ANZAC
2 Ships
Korea DDH CHUNGMUGONG YI SUNSHIN/6 Ships
DDG SEJONG THE
GREAT/6 Ships
MK 41 VLS Missile/Weapon Control System Integration
| SEASPARROW |
| SAAB TECH FCS |
| THALES MWCS |
| MELCO FCS |
| SM-2 BLOCK II/III/IIIa/IIIb |
| WCS MK 8 AEGIS |
| WDS MK 14 (Canada) |
| WDS MK14 (Korea) |
| THALES APAR (TFC MSS-41) |
| SM-2 BLOCK IV |
| WCS MK 8 AEGIS |
| VLASROC |
| ASWCS MK 116, |
MODS 6,7,8
HITACHI ASWCS (J) OYQ-103
| ESSM/QUAD PACK |
| WCS MK 8 AEGIS |
| SAAB TECH FCS |
| THALES APAR (TFC MSS-41) |
| FFG MK92 |
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Summary Premier Launching System for the USN and Twelve International Navies
- More Than 12,000 Cells Worldwide
- Qualified and Certified Performance Provides the Highest Performance, Firepower and Flexibility
- Any Missile/ Any Cell
- Highest Density Missiles per Footprint Capability
- AAW Self/ Area Defense, BMD, Land Attack or ASW US Procurement of MK 41 VLS and Associated Hardware Expected Through at Least FY22
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
UNKNOWN-0
UNKNOWN-1
UNKNOWN-2
UNKNOWN-3
UNKNOWN-4
File details come from the government source that posted it. Updated .