Engineering_Services_Industry_Day_as_of_15_December_2016.pptx
PPTX presentation 8 MB Posted
- Attached to
- MK 41 VLS Industry Day
- Solicitation number
- N00024-16-R-5372
About this file
Engineering Services Industry Day Presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MK_41_VLS_Self-guided_Module_Understanding_Visit.docx | DOCX document | |
| Launcher_Industry_Day_Presentation_15_December_2016.ppt | PPT presentation | |
| FY18-22_Canister_Industry_Day_Presentation_as_of_15_December_2016.ppt | PPT presentation | |
| SECNAV_5512_1_Non_CAC_Vistors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA
FY18-22
MK 41 Vertical Launching System (VLS) Design Agent Engineering Services Industry Day 19 July 2016
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Agenda
| Registration: | At Sign-in table | 0900-0915 | ||
| Welcome/Introductions: | Toan Nguyen | 0915-0930 | ||
| Disclaimer: | Stephen Hughes | 0930-1000 | ||
| Ground Rules: | Stephen Hughes | |||
| Industry Day Objectives: | Stephen Hughes |
Contract Requirements Overview: Stephen Hughes
| Launcher Technical Overview: | Toan Nguyen | 1000-1045 | ||||
| Review Display Hardware | All | 1045-1100 | ||||
| Questions & Answers | All | 1145-1200 | ||||
| Closing | All | 1200-1215 |
Welcome and Introductions
Toan Nguyen
PEO IWS 3L
Surface Launcher Project Manager
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Briefing
DISCLAIMER
The remarks provided today by Government Officials involved in the NAVSEA MK 41 VLS Design Agent Engineering Services procurement should not be construed as a guarantee of the Government's course of action in proceeding with the acquisition. The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances. The formal solicitation, that may be issued at a later date, is the sole document to be relied upon in determining the Government requirements. All communications regarding this procurement shall routed through Naval Sea Systems Command Contracts Directorate, Stephen Hughes, SEA 02531.
Ground Rules
All Attendees Must Sign In Please Silence All Cell Phones No Recording Or Photographs This Is An Information Briefing Only The Government Will Respond In Writing To All Questions Submitted By Posting Them To The FEDBIZOPPS And Navy Electronic Commerce Online Procurement Opportunity Websites Following Today’s Presentation, All Questions Are To Be Submitted Electronically Via Email To The Contracting Officer Mr. Stephen Hughes at stephen.t.hughes@navy.mil
Industry Day Objectives
Increase industry understanding of launcher and associated equipment design, Fleet utilization, safety features, and design agent engineering requirements
Provide industry the opportunity to ask questions and obtain feedback from the Navy
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Contract Requirements Overview
Stephen Hughes Procuring Contracting Officer
SEA 02531
Contract Overview
Solicitation No. N00024-16-R-5372 RFP expected to be released: January 2017 Competition Requirements:
Full and open competition Anticipated Award Date: January 2018 Contract Type: Select Line Items Firm Fixed Price/Remaining Items Cost-Plus Contract Term: One Year, Plus Four (One Year) Options Low Price Technically Acceptable (LPTA) Federal Service Code (FSC) is 1440 Launchers, Guided Missile NAICS CODE: 336 Transportation Equipment Manufacturing/336419 – Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing Current Contracts: N00024-13-C-5325, $93,480,250, Awarded N00024-14-C-5317 $70,722,875, Awarded
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Services Being Procured Provide Engineering Services in support of the MK 41 Vertical Launching System including launcher, launch control unit, computer programs, canister assemblies, production support equipment, and all other associated equipment Provide system, electrical, mechanical, software, field service and other engineering services and expertise as needed in support of:
Engineering, Design and Technical Services Integration Engineering Depot Operations Launcher Installation Aegis Modernization Installation and Test On-Site Support USN and FMS All work to be performed shall be described and authorized in writing by Technical Instructions
MK 41 VLS Launcher Program Overview Toan Nguyen
PEO IWS 3L
Surface Launcher Project Manager
MK 41 VLS is operated and maintained only by trained personnel using authorized procedures
A dead electrical missile interface is always maintained until a missile is intended to be launched with the exception of procedures outline in NAVSEAINST 8394.2F
No simulators of any type will be mixed with live ordnance except during highly controlled special test and evaluation scenarios
No Developmental Test ordnance, programs or Weapons Control Systems will be used with tactical MK 41 VLS ordnance or programs
VLS SAFETY PRECEPTS/CARDINAL RULES
MK 41 VLS Credentials Ballistic Protection Open System Architecture Simultaneous Multiple Missile Launch Multiple Warfare Area Missile Types Any Missile/Any Cell Modular Design And Application High Reliability And Low Maintenance Combat Proven Over 3,900 Missile Firings
MK 41 VLS Overview MK 41 VLS Design Agent Engineering Services Industry Day General Purpose Launching System Multi-Warfare AAW, ASW, Land Attack, BMD Capability Any Missile/Any Cell Rapid Fire Part of Ship Total Weapon System Provides Interface Between Weapon Control System and Missile Modular Design High Reliability/Low Maintenance 99.5% Launch Success Rate Over 3,600 Missile Launches
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Platforms:
ARLEIGH BURKE Class
DDG 51 – 127
TICONDEROGA Class
CG 52 – 73
Twelve Allied Nations Aegis Ashore Sites
Launch Control Units 264” Canisters 8 Cell Module
Spent Fly Through Cover
Spent Aft Closure
Expended Canister Ship Deck Uptake Hatch Cell Hatch
Fly Through Cover Grid
Sill
Plenum Module Structure and Gas Management System
8 Modules 4 Modules
U p t a k e
MK13, 15, or 25 Canister MK14, 21 or 29 Canister
Sill Assy
Adapter
System Overview MK 41 VLS Design Agent Engineering Services Industry Day
12/15/2016
Standard Module (10 Modules per DDG 51 Class Ship):
The Standard Module consists of an upright structure that provides vertical storage space for eight missile canisters. A deck and hatch assembly at the top of the module protects the missile canisters during storage and the hatches open to permit missile launches. The plenum and uptake structure capture and vent missile exhaust gases vertically up through the module to the atmosphere through the uptake hatch. Electronic equipment mounted on the 8-Cell Standard Module monitors the stored missile canisters and the module components and assists in launching the missiles.
System Module (2 Modules per DDG 51 Class Ship):
The System Module similar to the Mechanical and Electronics on the Standard Module with the addition of the 60 Hz and 400 Hz Power Distribution Panels; the Damage Control Junction Box; the System Lighting, Power Receptacle, and Telephone Junction Box; and the System Transformer Platform (see next slide) that serve the entire launcher. The 8-Cell System Module receives and distributes power and control signals from outside the launcher to all the modules and collects control and damage control signals from the modules and sends them outside the launcher.
MK 41 VLS Standard Module/System Module Differences MK 41 MOD 15 VLS Modules
MK 41 VLS Design Agent Engineering Services Industry Day MK 41 VLS Major Module Components
Launch Control Units Mounted on Bulkhead MK 416/MK 430 Status Panels
Located in Computer Room (not attached to modules)
MECHANICAL
CELL HATCH
MECHANICAL
CELL HATCH MOTOR
1 PER CELL
MECHANICAL
UPTAKE
MOTOR 1 PER MODULE
ELECTRONICS
LAUNCH SEQUENCER
MK 5
MECHANICAL
UPTAKE HATCH
MECHANICAL
MODULE CABLES
ELECTRONICS
MOTOR CONTROL PANEL
MK 448
ELECTRONICS
MODULE TRANSFORMER PLATFORM #1/#2
MK 30 and MK 31
ELECTRONICS
PROGRAMMABLE POWER SUPPLY
MK 179
OUTBOARD
ELECTRONICS
MODULE LIGHTING, POWER RECEPTACLE, and TELEPHONE JUNCTION BOX
MECHANICAL
WALKWAYS
ELECTRONICS
SYSTEM LIGHTING, POWER RECEPTACLE, AND TELEPHONE JUNCTION BOX
ELECTRONICS
DAMAGE CONTROL JUNCTION BOX
MK 65 MOD 0
ELECTRONICS
SYSTEM TRANSFORMER
MK 28 MOD 0
ELECTRONICS
60-HZ POWER DISTRIBUTION PANEL
MK 420 MOD 0
ELECTRONICS
400-HZ POWER DISTRIBUTION PANEL
MK 419 MOD 0
HEAT SENSING DEVICE
CANISTER LATCH ASSEMBLY
MECHANICAL
MODULE SPRINKLER HEAD
STANDARD MODULE
SYSTEM MODULE
(Equals Standard Module Plus Components Identified Below)
= ELECTRONICS Component
= MECHANICAL Component
ELECTRONICS
CO MONITOR
Dimensions and Weights Dimensions: Inches (mm)
| Dock Length | 125 (3,175) |
| Dock Width | 82 (2,083) |
| Height | 303 (7,695) |
| Module | 32,300 (14,651) |
| Adapters | 4,900 (2,223) |
| Sill (s) | --- |
| Loaded Canister (s) | 46,700 (21,183) |
w/ ESSM
Deck and Hatch Assembly
Cell Hatch Module Structure (segment) Uptake Structure (segment) Plenum Assembly and Plenum Drain Assembly Deluge Valve Assembly Module Structure (with Deluge Valves)
Module Structure
Motor Control Panel Programmable Power Supply
400 Hz PDP
60 Hz PDP
Module Lighting Junction Box Module Transformer Platform
Module Electronic Assemblies
Launch Sequencer
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Launch Control Unit
MK 235 MOD 6/7
Configurations/Capabilities
LAUNCH
CONTROL
UNIT
HARDWARE/
SOFTWARE
LAUNCH
SEQUENCER
MISSILE
CAPABILITY
MK 41 VLS
BASELINE
IIIA/VII
III/IIIA/IIIB
UYK-44
OL267
Software:
LCCP 0581
CG 52-58
CG 59-73*
DDG 51-78*
V
UYK-44EP ALP
Software:
LCCP 0756
ALPS 0800
DDG 79-90
VII
DDG 91-112
MK 235 Mod 0
UYQ-70
Software:
LCCP 0815
ALPS 0811
MECS 1F+
IIIA
III/IIIA/B
VII
DDG 113-127
MK 235 Mod 7 UYQ-70 with VGI Integrated (NG2 w/VGI)
Software:
LCCP 0815
ALPS 0811
VGIS 0850
SHIPS
VIIC1
Software
MECS 1F+
VII C1
Software
MECS 2-
VII C2
MK 235 Mod 3
UYQ-70
Software:
LCCP 0815
ALPS 0811
MECS 1G+
V
IIIB/VII
IIIB
VIIC2
DDG 51-78*
MK 235 Mod 6 UYQ-70 with VGI Integrated (NG2 w/VGI) Software:
LCCP 0815
ALPS 0811
VGIS 0850
BMD/SM3 Capable>
BL IIIA
BL IIIB
SM-2 BLK IIIA, IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
VLA,
ESSM (Two BL VII Modules Only)
SM-2 BLK IIIA, IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
VLA
ESSM
SM-2 BLK IIIA, IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
VLA
ESSM
SM-2 BLK IIIA,IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
SM-3 BLK IA/IB/IIA
VLA
ESSM
SM-2 BLK IIIA,IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
SM-3 BLK IA/IB
VLA
SM-2 BLK IIIA,IIIB
SM-2 BLK IV/SM-6
THWK BLK III/IV
SM-3 BLK IA/IB
VLA
ESSM (Two BL VII Modules Only) BMD Capable
MK 41 VLS Design Agent Engineering Services Industry Day Software
MECS
Software
MECS 1G+
Vertical Strongback Hand Lift Truck Adapter Plenum Cell Cover
Sill Assembly Canister Adapter Horizontal Strongback Canister Adapter Lift Beam MK 41 VLS Design Agent Engineering Services Industry Day Ancillary Equipment
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Serves as Shipping and Storage Container (with PHS&T) and Launch Rail/Tube Provides:
Mechanical, Electrical, Digital, Optical Interfaces Environmental Protection Hazards Detection Shock Isolation Missile Identification Deluge MK 41 VLS Design Agent Engineering Services Industry Day Typical Canister Assembly
Presently Built by UDLP LMNE&SS-Baltimore originally designed and built first canisters (MK 13, MK 14 & MK 15)
AAW
ASW
SM-2 BLK IV
MK 21Mod 0 Canister
SM-2 BLK III/IIIA/IIIB
MK 13 Mod 0 Canister
ESSM BLK I/II
MK 25 Mod 0/1 Canister
VLA RUM-139A
MK 15 Mod 0/1
All Up Round Variants DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
TACTICAL
TOMAHAWK
MK 14 MOD 2
Canister
BMD
SM-3 BLK 1A/1B/IIA
MK 21 MOD 2
Strike/SUW
SM-6 BLK I/IA
MK 21 MOD 3/4
Over the Horizon
SM-3 BLK IIB
MK 29 Mod 0 Canister
DISTRIBUTION STATEMENT F: FOR OFFICIAL USE ONLY Further Distribution Only As Authorized By PEO IWS 3L (July 2016) MK 41 VLS Design Agent Engineering Services Industry Day All Up Round Variants (cont’d)
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day System Block Diagram
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
12/15/2016
MK 683 Interface Test Set MK 96 Interface Test Set Missile Round Cable Test Set VLS Operational Test Set Multi Standard Missile Echo Unit Dog Down Canister Switch Test Set Deck and Hatch Test Tool
SMEU
Umbilical Fault Simulator
Quadpack Missile Echo Unit B/L VII Hatch Timing Test Tool
MK 41 VLS Design Agent
Special Test Equipment
Misc. Test Equipment
Canister Insulation Resistance Test Unit Universal Breakout Box Safe And Arm Drive Motor Tester
MK 690 Canister Acceptance Test Set
MK 21 Canister ATE
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
NSWC; NAVAL SURFACE WARFARE CENTER
LSEQ ATE
MK 41 VLS Design Agent
Automatic Test Equipment
CCA ATE
MCP ATE
Module ATE
MK 41 VLS Missile/Weapon Control System Integration
SEASPARROW
SAAB TECH FCS
THALES MWCS
MELCO FCS
SM-2 BLOCK II/III/IIIa/IIIb
WCS MK 8 AEGIS
WDS MK 14 (Canada) WDS MK14 (Korea)
THALES APAR (TFC MSS-41)
SM-2 BLOCK IV
WCS MK 8 AEGIS
VLASROC
ASWCS MK 116,
MODS 6,7,8
HITACHI ASWCS (J) OYQ-103
ESSM/QUAD PACK
WCS MK 8 AEGIS
SAAB TECH FCS
THALES APAR (TFC MSS-41)
FFG MK92
Engineering Services Description* MK 41 VLS Design Agent Engineering Services Industry Day
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Launcher Installation Support Aegis Modernization (AMOD) Installation and Test Support Depot Operations Services MK 41 VLS Design Agent Engineering Services Industry Day Firm Fixed Price (FFP) Tasks
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Launcher Installation Support Provide Three FTEs annually at each DDG new construction shipyard (Bath, ME and Pascagoula, MS) consisting of:
One On-Site, Full-Time Certified MK 41 VLS Test Director Two On-Site, Full Time Certified MK 41 VLS System Maintenance Technicians MK 41 VLS Standing Instruction 86-2C Defines Certification Requirements and Process Support Shipbuilder and Aegis Test Team to Install, Checkout, Test, and Deliver Launching Systems
MK 41 VLS Design Agent Engineering Services Industry Day FFP Task Overviews
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day FFP Task Overviews AMOD Installation and Test Support Provide On-Site, Certified MK 41 VLS Test Director, at least One (1) Certified MK 41 VLS System Maintenance Technician and Other Qualified Personnel @ AMOD Availability Sites (East and West Coast) to support the following notional schedule:
Support MK 41 VLS In-Service Engineering Agent Team Leader to Install VLS SCIP/ORDALTs and Perform Launcher Grooming (Preventive Maintenance and Inspections) Ablative Installations Must Be Performed By Subject Matter Experts with Ablative Installation Experience
FFP Task Overviews Depot Operation Services Provide four FTEs to operate and maintain the MK 41 VLS Depot Provide Storage and Repair Area Estimated Space Requirement: 35,000 sq ft-Storage, 9,000 sq-ft-Repair Responsible for Security, Access and Facility Management Provide Space and Support For One (1) Collocated Navy Technical Representative
Store and Manage Government Property (GP) Parts Inventory Approximately 27,000 Line Items, Approximately 1.2M Parts Spare Parts, Repair Parts, Ordalt Kits, Launcher Installation Parts, Special Test Equipment, Etc.
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day FFP Task Overviews Depot Operations Services (cont’d) Provide One Full-Time Equivalent Integrated Logistics Support Subject Matter Expert
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Tasks Engineering, Design and Technical Services Integration Engineering and Technical Services Emergent On-Site Support Emergent Support for Launcher Installation, AMOD Installation and Test and Depot Operations Incidental Material For All Tasks Travel For All Tasks
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews Engineering, Design and Technical Services Computer Program Support Design and Test Upgrades Investigate and Resolve Software and Firmware Trouble Reports Hardware Design and Qualification Product Improvement, Obsolescence Resolution Failure Investigations Land Based Test Site Support Launch Control System Support System Engineering Gas Management System and Other Technical Support Production Support (Canister and Launcher) ATE, Production Environmental Test and Obsolescence Management Production Assistance
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews Integration Engineering and Technical Services Integrate MK 41 VLS into new ship class or integrate new missile or new missile variant into MK 41 VLS Includes Weapon Control System-to-VLS and VLS-to-Missile Integration Integration may require Launch Control Computer Program, Launch Control Unit, Module Electronics, Module Structure, Canister Assembly, Test Equipment, Ancillary Equipment and/or Production Support Equipment Design Modification or New Design Perform All Necessary Engineering and Manufacturing Development Phase Tasks
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews Integration Engineering and Technical Services (Cont.)
Typical analyses to be performed may include Module 3D Multi-phase Gas Dynamics, Near Miss Shock, Vibration, Thermal, Missile Blast Effects, 6 DoF Missile Flyout, Ablative Erosion, Error Budget, Transportation Shock and Vibration Typical tests to be performed may include Environmental Qualification (temperature, humidity, shock, vibration, EMI etc.), Restrained Firing, Flight (land based or shipboard), Canister Packaging, Handling, Storage and Transportation, Launch Control System, Formal Qualification, Safety
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews Emergent On-Site Support Provide Qualified On-Site Personnel Support Aegis Ashore Site in Host Nations Provide Launcher Installation Support Install SCIP/ORDALTs Support Canister Handling Sites (USN and FMS)
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Emergent Launcher Installation Support Provide Emergent/Surge On-Site, Full-Time Certified MK 41 VLS Test Director and MK 41 VLS System Maintenance Technician Support @ DDG Construction Shipyards (Bath, ME and Pascagoula, MS) as required MK 41 VLS Standing Instruction 86-2C Defines Certification Requirements and Process Support Shipbuilder and Aegis Test Team to Install, Checkout, and Test, Launching Systems as required (See Notional Schedule) MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews
| Shipyard/FY | FY18 | FY19 | FY20 | FY21 | FY22 |
| Bath | DDG 116 (End Apr) |
DDG 118
DDG 120 (Start Sep) DDG 118
DDG 120
DDG 122 (Start Sep) DDG 118 (End Oct) DDG 120 (End Apr) DDG 122 DDG 122 (End Oct)
DDG 124
DDG 126 (Start Feb) DDG 124 (End Oct)
DDG 126
DDG 128*
| Pascagoula | DDG 117 | |
| DDG 119 | DDG 119 | |
| DDG 121 | DDG 119 (End Oct) |
DDG 121
DDG 123 (Start Sep) DDG 121 (End Oct)
DDG 123
DDG 125 DDG 123 (End Oct)
DDG 125
DDG 127*
* Estimated
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews AMOD Installation and Test Emergent Support Support Additional AMOD Availabilities or Perform Additional SCIP/ORDALT Installations or Launcher Grooming
MK 41 VLS Design Agent Engineering Services Industry Day Cost Plus Task Overviews Depot Operations Emergent Support Perform Failure Assessments, Repair And Acceptance Testing of Depot Level Repairable Parts Operate, Maintain and Calibrate GP Test Equipment Develop New Repair Capabilities Receive, Repair, Upgrade, Store and Ship Canister Assemblies and Associated Equipment Provide Engineering Support Resolve Technical Issue, Support Failure Investigations, Review Fleet Deficiency Report, CASREPs, etc., Provide Repair Recommendations, etc.
Incidental Material Procurement Maintain Stocking Objectives Procure incidental material in support of depot function (As Authorized)
MK 41 VLS Summary Premier Launching System for the USN and Twelve International Navies
- More Than 12,000 Cells Worldwide
- Qualified and Certified Performance
Provides the Highest Performance, Firepower and Flexibility
- Any Missile/ Any Cell
- Highest Density Missiles per Footprint Capability
- AAW Self/ Area Defense, BMD, Land Attack or ASW US Procurement of MK 41 VLS and Associated Hardware Expected Through at Least FY22
FOR OFFICIAL USE ONLY
image4.jpeg image1.wmf image5.png image6.jpeg image2.jpeg image3.jpeg image7.jpeg image8.png image15.wmf image9.wmf image10.jpeg image11.wmf image12.wmf image13.wmf image14.wmf image16.png image17.jpeg image18.png image19.png image20.png image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.png image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.png image35.jpeg image36.png image42.png image43.png image37.png
DisarmCustomerMessage.txt This file contained exploitable content that has been removed by Symantec Disarm technology. You can now use it as you normally would. Contact your system administrator if more information is needed.
image38.wmf image39.png image40.jpeg image41.png image44.png image45.png image46.png image47.png image48.png image49.png image50.png image51.jpeg image52.wmf image53.wmf image54.wmf image55.wmf image56.wmf oleObject9.bin image57.wmf image58.wmf image59.png image60.png image69.jpeg image70.jpeg image71.jpeg image61.jpeg image62.png image63.jpeg image64.jpeg image65.jpeg image66.jpeg image67.jpeg image68.jpeg image72.jpeg image73.jpeg image74.jpeg image75.jpeg image76.jpeg image77.jpeg image78.png image79.png image80.jpeg image81.wmf image82.wmf image83.wmf image84.wmf image85.wmf image86.wmf image87.wmf image88.emf image89.jpeg
File details come from the government source that posted it. Updated .