FY18-22_Canister_Industry_Day_Presentation_as_of_15_December_2016.ppt
PPT presentation 7 MB Posted
- Attached to
- MK 41 VLS Industry Day
- Solicitation number
- N00024-16-R-5372
About this file
Canister Industry Day Presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MK_41_VLS_Self-guided_Module_Understanding_Visit.docx | DOCX document | |
| Launcher_Industry_Day_Presentation_15_December_2016.ppt | PPT presentation | |
| Engineering_Services_Industry_Day_as_of_15_December_2016.pptx | PPTX presentation | |
| SECNAV_5512_1_Non_CAC_Vistors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA
FY18-22
MK 41 Vertical Launch System (VLS) Canister Acquisition Industry Day 20 July 2016 Presented To: Prospective Offerors
Presented by: Mr. Toan Nguyen
PEO IWS 3L
Presented by: Mr. Stephen Hughes
SEA02531
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
Agenda
| Registration: | At Sign-in table | 0900-0915 | |||||
| Welcome/Introductions: | Toan Nguyen | 0915-0930 | |||||
| Disclaimer: | Stephen Hughes | 0930-1000 | |||||
| Ground Rules: | Stephen Hughes | ||||||
| Industry Day Objectives: | Stephen Hughes | ||||||
| Contract Requirements Overview: | Stephen Hughes | ||||||
| Canister Technical Overview: | Toan Nguyen | 1000-1045 | |||||
| Review Display Hardware | All | 1045-1145 | |||||
| Questions & Answers | All | 1145-1200 | |||||
| Closing | All | 1200-1215 |
Welcome and Introductions
Toan Nguyen
PEO IWS 3L
Surface Launcher Project Manager
DISCLAIMER
The remarks provided today by Government Officials involved in the NAVSEA VLS Canister procurement should not be construed as a guarantee of the Government’s course of action in proceeding with the acquisition. The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances. The formal solicitation that may be issued at a later date, is the only document to be relied upon in determining the Government requirements. All communications regarding this procurement shall routed through Naval Sea Systems Command Contracts Directorate, Stephen Hughes, SEA 02531.
Ground Rules
| All Attendees Must Sign In |
| Please Silence All Cell Phones |
| No Recording Or Photographs |
| This Is An Information Briefing Only |
| The Government Will Respond In Writing To All Questions Submitted By Posting Them To The FEDBIZOPPS And Navy Electronic Commerce Online Procurement Opportunity Websites |
| Following Today’s Presentation, All Questions Are To Be Submitted Electronically Via Email To The Contracting Officer Mr. Stephen Hughes at stephen.t.hughes@navy.mil |
Industry Day Objectives
Increase industry understanding of canister and associated equipment design, Fleet utilization, safety features, and production requirements
Provide industry the opportunity to ask questions and obtain feedback from the Navy
Contract Requirements Overview
Stephen Hughes Procuring Contracting Officer
SEA 02531
Contract Overview
| Solicitation No. N00024-16-R-5380 |
| RFP expected to be released: March 2017 |
| Competition Requirements: |
| Full and open competition (competitive) |
| Anticipated Award Date: December 2017 |
| Contract Type: Firm Fixed Price |
| Contract Term: One Year, Plus Four (One Year) Options |
| Low Price Technically Acceptable (LPTA) |
| Federal Service Code (FSC) is 1440 Launchers, Guided Missile |
| NAICS CODE: 336 Transportation Equipment Manufacturing/336419 – Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing |
| Current Production Contract: N00024-13-C-5314, $178,678,940 Awarded |
Major Equipment Being Procured
| Canister Assembly w/Packaging, Handling, Storage, and Transportation (PHS&T) Equipment |
| 8 Variants |
| Renewed Canister Assembly w/PHS&T Equipment |
| 4 Variants |
| Reconfigurable Coding Plug Assemblies |
| 2 Variants |
| Explosive Bolts |
| 3 Variants |
| Impulse Cartridge Assemblies |
| Spares |
Typical Canister Equipment MK 7 Explosive Bolt MK 25 Canister with PHS&T Equipment Reconfigurable Coding Plug Assy MK 236 Impulse Cartridge Assy (Initiator)
Notional Canister New Production Requirements*
* Note: Canisters include Packaging, Handling, Storage, and Transportation (PHS&T) equipment
| FY18 | FY19 | FY20 | FY21 | FY22 | |
| MK 13 MOD 0 | 1-9 | 1-9 | 1-9 | 1-9 | 1-9 |
| 10-39 | 10-39 | 10-39 | 10-39 | 10-39 | |
| 40,89 | 40,89 | 40,89 | 40,89 | 40,89 | |
| 90-149 | 90-149 | 90-149 | 90-149 | 90-149 |
| MK 14 MOD 2 | 1-9 | 1-9 | 1-9 | 1-9 | 1-9 |
| 10-39 | 10-39 | 10-39 | 10-39 | 10-39 | |
| 40,89 | 40,89 | 40,89 | 40,89 | 40,89 | |
| 90-149 | 90-149 | 90-149 | 90-149 | 90-149 |
| MK 21 MOD 2 | 1-9 | 1-9 | 1-9 | 1-9 | 1-9 |
| 10-39 | 10-39 | 10-39 | 10-39 | 10-39 | |
| 40,89 | 40,89 | 40,89 | 40,89 | 40,89 | |
| 90-149 | 90-149 | 90-149 | 90-149 | 90-149 |
| MK 21 MOD 3 | 1-9 | 1-9 | 1-9 | 1-9 | 1-9 |
| 10-39 | 10-39 | 10-39 | 10-39 | 10-39 | |
| 40,89 | 40,89 | 40,89 | 40,89 | 40,89 | |
| 90-149 | 90-149 | 90-149 | 90-149 | 90-149 |
| MK 21 MOD 4 | 1-9 | 1-9 | 1-9 | 1-9 | 1-9 |
| 10-39 | 10-39 | 10-39 | 10-39 | 10-39 | |
| 40,89 | 40,89 | 40,89 | 40,89 | 40,89 | |
| 90-149 | 90-149 | 90-149 | 90-149 | 90-149 |
| MK 25 MOD 0 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-20 | 16-20 | 16-20 | 16-20 | 16-20 |
| MK 25 MOD 1 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-15 | 6-15 | 6-15 | 6-15 | 6-15 | |
| 16-25 | 16-25 | 16-25 | 16-25 | 16-25 | |
| 26-50 | 26-50 | 26-50 | 26-50 | 26-50 |
| MK 29 MOD 0 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-30 | 16-30 | 16-30 | 16-30 | 16-30 |
Notional Canister Refurb/Renew Production Requirements*
* Note: Canisters include Packaging, Handling, Storage, and Transportation (PHS&T) equipment
| FY18 | FY19 | FY20 | FY21 | FY22 | |
| MK 14 MOD 1 to 2 | 1-29 | 1-29 | 1-29 | 1-29 | 1-29 |
| 30-59 | 30-59 | 30-59 | 30-59 | 30-59 | |
| 60-89 | 60-89 | 60-89 | 60-89 | 60-89 | |
| 90-129 | 90-129 | 90-129 | 90-129 | 90-129 |
| Renew MK 13 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-20 | 16-20 | 16-20 | 16-20 | 16-20 |
| Renew MK 21-2 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-20 | 16-20 | 16-20 | 16-20 | 16-20 |
| Renew MK 21-3 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-20 | 16-20 | 16-20 | 16-20 | 16-20 |
| Renew MK 25 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-10 | 6-10 | 6-10 | 6-10 | 6-10 | |
| 11-15 | 11-15 | 11-15 | 11-15 | 11-15 | |
| 16-20 | 16-20 | 16-20 | 16-20 | 16-20 |
Associated Canister Equipment Production Requirements
| FY18 | FY19 | FY20 | FY21 | FY22 | |
| Coding plugs for MK 13/14/21/29 | 230-287 | 230-287 | 230-287 | 230-287 | 230-287 |
| 290-347 | 290-347 | 290-347 | 290-347 | 290-347 | |
| 350-407 | 350-407 | 350-407 | 350-407 | 350-407 | |
| 410-467 | 410-467 | 410-467 | 410-467 | 410-467 |
| Coding plugs for MK 25 MOD 0/1 | 1-5 | 1-5 | 1-5 | 1-5 | 1-5 |
| 6-15 | 6-15 | 6-15 | 6-15 | 6-15 | |
| 16-25 | 16-25 | 16-25 | 16-25 | 16-25 | |
| 26-50 | 26-50 | 26-50 | 26-50 | 26-50 |
| MK 7 Bolts for 21/2/3/4 and MK 29 | 115-143 | 115-143 | 115-143 | 115-143 | 115-143 |
| 145-173 | 145-173 | 145-173 | 145-173 | 145-173 | |
| 175-203 | 175-203 | 175-203 | 175-203 | 175-203 | |
| 205-233 | 205-233 | 205-233 | 205-233 | 205-233 |
| MK 236 Bolts for 21/2/3/4 and MK 29 | 115-143 | 115-143 | 115-143 | 115-143 | 115-143 |
| 145-173 | 145-173 | 145-173 | 145-173 | 145-173 | |
| 175-203 | 175-203 | 175-203 | 175-203 | 175-203 | |
| 205-233 | 205-233 | 205-233 | 205-233 | 205-233 |
| MK 8 Bolts for MK 25 MOD 0/1 | 4-20 | 4-20 | 4-20 | 4-20 | 4-20 |
| 24-60 | 24-60 | 24-60 | 24-60 | 24-60 | |
| 64-100 | 64-100 | 64-100 | 64-100 | 64-100 | |
| 104-200 | 104-200 | 104-200 | 104-200 | 104-200 |
| MK 10 Explosive Bolts | 1-49 | 1-49 | 1-49 | 1-49 | 1-49 |
| 50-99 | 50-99 | 50-99 | 50-99 | 50-99 | |
| 100-149 | 100-149 | 100-149 | 100-149 | 100-149 | |
| 150-199 | 150-199 | 150-199 | 150-199 | 150-199 |
Notional Contract Non-Recurring Requirements
| Production Readiness Review (Preliminary & Final) |
| First Article Inspections |
| First Article Tests |
| Aft Closure, Forward Closure & Canister Shell Pressure Tests |
| PHS&T Shock and Vibrations Tests |
| Physical Configuration Audits |
| Fit Check Tool Fabrication |
| GFP Canister Electrical Acceptance Test Equipment Installation |
MK 41 VLS Program Overview Toan Nguyen Program Executive Office, PEO IWS 3L
MK 41 VLS is operated and maintained only by trained personnel using authorized procedures in the USN supplied technical manuals
A dead electrical missile interface is always maintained until a missile is intended to be launched with the exception of procedures outlined in NAVSEAINST 8394.2F
No simulators of any type will be used with live ordnance except during highly controlled special test and evaluation scenarios
No Developmental Test ordnance, programs or Weapons Control Systems will be used with tactical MK 41 VLS ordnance or programs
VLS SAFETY PRECEPTS/CARDINAL RULES
MK 41 VLS Credentials
| Ballistic Protection |
| Open System Architecture |
| Simultaneous Multiple Missile Launch |
| Multiple Warfare Area Missile Types |
| Any Missile/Any Cell |
| Modular Design And Application |
| High Reliability And Low Maintenance |
| Combat Proven |
| Over 3,900 Missile Firings |
MK 41 VLS Fleet Over 12,000 Cells Installed Or Under Contract DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
DDG IROQUOIS
3 Ships Canada Spain
FFG ALVARO DE BAZAN
5 Ships
Norway
FFG NANSEN
5 Ships Netherlands
DDG DEZEVEN PROVINCIEN
4 Ships
Australia
FF ANZAC
8 Ships
FFG ADELAIDE
4 Ships
New Zealand
FF ANZAC
2 Ships
Korea DDH CHUNGMUGONG YI SUNSHIN/6 Ships
DDG SEJONG THE
GREAT/6 Ships
Germany
FFG BRANDENBURG
4 Ships United States
DDG ARLEIGH BURKE
77 Ships
CG TICONDEROGA
22 Ships
FFG SACHSEN
3 Ships Japan
DDG KONGO/ATAGO/+NEW
8 Ships
DD MURASAME
9 Ships Turkiye
FFG SALIHREIS
2 Ships
DDH HYUGU
2 Ships
DD TAKANAMI
5 Ships
FFG BARBAROS
2 Ships
DD AKIZUKI/+NEW
6 Ships
FFG HUITFELDT
3 Ships Denmark G-Class Frigates 4 Ships
DDG HOBART
5 Ships
FFG NARESUAN
2 Ships Thailand
Platforms:
ARLEIGH BURKE Class
DDG 51 – 127
TICONDEROGA Class
CG 52 – 73
Twelve Allied Nations Aegis Ashore Sites Launch Control Units 264”
Canisters 8 Cell Module Spent Fly Through Cover
Spent Aft Closure Expended Canister Ship Deck Uptake Hatch Cell Hatch Fly Through Cover Grid Sill Plenum
Module Structure and Gas Management System 8 Modules 4 Modules
| U |
| p |
| t |
| a |
| k |
| e |
MK13, 15, or 25 Canister MK14, 21 or 29 Canister Sill Assy Canister Adapter
System Overview MK 41 VLS Design Agent Engineering Services Industry Day
MK 41 VLS AUR Capability
AAW
ASW
SM-2 BLK IV
MK 21Mod 0 Canister
SM-2 BLK III/IIIA/IIIB
MK 13 Mod 0 Canister
ESSM BLK I/II
MK 25 Mod 0/1 Canister
VLA RUM-139A
MK 15 Mod 0/1 Canister
MK 41 VLS AUR Capability (cont’d)
TACTICAL
TOMAHAWK
MK 14 MOD 2
Canister
BMD
SM-3 BLK 1A/1B/IIA
MK 21 MOD 2
Canister
SM-6 BLK I/IA
MK 21 MOD 3/4
Canister Over the Horizon
SM-3 BLK IIB
MK 29 Mod 0 Canister Strike/SUW
| SM-2 (MK 13 MOD 0 Canister) |
| Designed for extended range anti-air warfare |
| Provides protection for ships against attacking missiles and aircraft |
| TOMAHAWK (MK 14 MOD 2 Canister) |
| All-weather, long range, subsonic cruise missile used for land attack warfare |
| SM-3 (MK 21 MOD 2 Canister) |
| Designed primarily as an anti-ballistic missile, the SM-3 has also been employed in an anti-satellite capacity at the lower end of Low Earth orbit |
| SM-6 (MK 21 MOD 3/4 Canister) |
| Designed for extended range anti-air warfare |
| Provides capability against fixed and rotary wing aircraft unmanned aerial vehicles, and anti-ship cruise missiles in flight, both over sea and land |
VLS Canister/Missile Descriptions
| ESSM (MK 25 MOD 0/1 Canister) |
| Designed as a medium range surface to air missile |
| Provides protection for ships from attacking missiles and aircraft |
| SM-3 (MK 29 MOD 0 Composite Canister) |
| Designed primarily as an anti-ballistic missile, the SM-3 has also been employed in an anti-satellite capacity at the lower end of Low Earth orbit |
VLS Canister/Missile Descriptions (cont’d)
Gas Management System MK 41 VLS Module Structure & Gas Management System
| Near Miss Shock |
| Ship Vibration |
| Safe Egress in Sea State |
| Service Life |
| Temperature/Humidity |
| PHS&T Loading |
Encanistered Missile (Sample Requirements)
Pierside Onload Demonstration
MK 41 VLS Summary Premier Launching System for the USN and Twelve International Navies
- More Than 12,000 Cells Worldwide
- Qualified and Certified Performance Provides the Highest Performance, Firepower and Flexibility
- Any Missile/ Any Cell
- Highest Density Missiles per Footprint Capability
- AAW Self/ Area Defense, BMD, Land Attack or ASW US Procurement of VLS and Associated Canisters Expected Through at Least FY22
DISTRIBUTION STATEMENT A : Approved for public release. Distribution is unlimited.
UNKNOWN-0
UNKNOWN-1
UNKNOWN-2
UNKNOWN-3
UNKNOWN-4
UNKNOWN-5
UNKNOWN-6
UNKNOWN-7
UNKNOWN-8
UNKNOWN-9
File details come from the government source that posted it. Updated .